This solicitation package outlines the requirements for the Dexter Adult Fish Facility Upgrades project. The scope of work involves major renovations and additions to the existing fish facility to meet National Marine Fisheries Service criteria. Key work includes mobilization, excavation, construction of new structures for fish sorting and handling, mechanical and electrical systems, and controls upgrades. The period of performance is March 2023 through November 2026. The estimated value is between $25-100 million. The solicitation is unrestricted and full and open with a 10% price evaluation preference for HUBZone small businesses. The primary NAICS code is 237990 for other heavy civil engineering construction with a $39.5 million small business size standard. The solicitation was issued by the U.S. Army Corps of Engineers Portland District.
View the file
Other files
Show 40 more
Latest 50 of 71 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9127N23R0005
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Mobilization and Demobilization
FFP
Mobilize and demobilize all plant, equipment, fuel, supplies, materials, and personnel to and from the job site. This Contract Line Item Number (CLIN) applies to the Prime Contractor and all subcontractor mobilization and demobilization.
FOB: Destination
PSC CD: Z1KA
NET AMT
0002 1 Job Care and Diversion of Water
FFP
Provide all labor, equipment, materials, parts, and incidentals for cofferdam, dewatering for cofferdam, channel and land excavations, and pumps and piping.
0003 1 Job Interim Water Supply
FFP
Provide all labor, equipment, materials, parts, and incidentals for construction, operation, and removal of the gravity fed water supply required to temporarily supply water to the fish facility during construction.
Common Excavation
FFP
For informational purposes only.
See sub-CLINs 0004AA and 0004AB.
0004AA 14,000 Cubic
Yard
First 14,000 Cubic Yards
FFP
Provide all labor, plant, equipment, materials, and incidentals required for common excavation and shall include all excavating, loading, hauling, and disposing of the materials at the designated disposal site shown on the drawings.
0004AB 1,000 Cubic
Over 14,000 Cubic Yards
Provide all labor, plant, equipment, materials, and incidentals required for common excavation and shall include all excavating, loading, hauling, and disposing of the materials at the designated disposal site shown on the drawings.
Rock Excavation
FFP
For informational purposes only.
See sub-CLINs 0005AA and 0005AB.
0005AA 1,000 Cubic
First 1,000 Cubic Yards
Provide all labor, plant, equipment, materials, and incidentals required for common excavation and shall include all excavating, loading, hauling, and disposing of the materials at the designated disposal site shown on the drawings.
0005AB 1,000 Cubic
Over 1,000 Cubic Yards
Provide all labor, plant, equipment, materials, and incidentals required for common excavation and shall include all excavating, loading, hauling, and disposing of the materials at the designated disposal site shown on the drawings.
0006 1 Job Civil
FFP
Provide all labor, equipment, materials, parts, and incidentals for civil construction.
0007 1 Job Fishway Water Supply Conduit Trashrack
FFP
Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Fishway Water Supply Conduit Trashrack. The intent of this CLIN is to include all work described on the SJ series of the structural drawings.
0008 1 Job AWS Diffusion Chamber
FFP
Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the AWS Diffusion Chamber. The intent of this CLIN is to include all structural work not related to the fish ladder as described in the SK series of the structural drawings.
0009 1 Job Fish Ladder
FFP
Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Fish Ladder. The intent of this CLIN is to include all work associated with the fish ladder from the fish ladder entrance to station 3+72.39 and the alterations to the existing fish ladder as described in the SK series of the structural drawings. This includes the fish ladder walls and weirs, fish ladder flow vane, fish exclusion screen and frame, bulkhead, existing fish ladder fish screens and concrete wall plugs, and walkways, railings, and stairs associated with the fish ladder.
0010 1 Job Pre-Sort Pool Structural
FFP
Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Pre-Sort Pool. The intent of this CLIN is to include all work described on the SL series of the structural drawings.
0011 1 Job Post-Sort Pools
FFP
Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Post-Sort Pools. The intent of this CLIN is to include all work described on the SN series of the structural drawings.
0012 1 Job Hopper Crane Frame
FFP
Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Hopper Crane Frame Structure and design and installation of the hopper cranes. The intent of this CLIN is to include all work described on the SO series of the structural drawings.
0013 1 Job Fish Ladder Crossing
FFP
Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Fish Ladder Crossing. The intent of this CLIN is to include all work described on the ST series of the structural drawings.
0014 1 Job Discharge Outlet Structure
FFP
Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the discharge outlet. The intent of this CLIN is to include all work described on the SQ series of the structural drawings excluding the return to river outfall structure.
0015 1 Job Discharge Return to River Structure
FFP
Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Discharge Return to River Outfall Structure. The intent of this CLIN is to include all work described on the SQ series of the structural drawings excluding the discharge outlet structure.
0016 1 Job Juvenile Pools Return Water System
FFP
Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Juvenile Pools Return Water System. The intent of this CLIN is to include all work described on the SR series of the structural drawings.
0017 1 Job Fish Ladder Entrance Shade Structure
FFP
Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Fish Ladder Entrance Shade Structure. The intent of this CLIN is to include all work described on the AK series of the architectural drawings.
0018 1 Job Pre-Sort Pool Shade Structure
FFP
Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Pre-Sort Pool Shade Structure. The intent of this CLIN is to include all work described on the AL series of the architectural drawings.
0019 1 Job Sorting Structure
FFP
Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Sorting Structure. The intent of this CLIN is to include all work described in the SM series of the structural drawings and the AM series of the architectural drawings.
0020 1 Job Maintenance and Office Building
FFP
Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Maintenance and Office Building. The intent of this CLIN is to include all work described on the AY series of the architectural drawings and the MY series of the mechanical drawings.
0021 1 Job Mechanical and Electrical Building
FFP
Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Mechanical and Electrical Building. The intent of this CLIN is to include all work described on the AZ series of the architectural drawings and the MZ series of the mechanical drawings.
0022 1 Job Pre-Sort Finger Weir and False Weir
FFP
Provide all labor, equipment, materials, parts, and incidentals for construction of the Pre-Sort Finger Weir and False Weir. The intent of this CLIN is to include all work associated with the pre-sort finger weir and false weir as described in the ML series of the mechanical drawings.
0023 1 Job AWS and Fish Ladder Gates
FFP
Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the AWS and fish ladder gates, including the fish ladder entrance slide gate, diffuser chamber slide gates, and the lift gate constructed in the existing fish ladder.
0024 1 Job Sorting Area Equipment
FFP
Provide all labor, equipment, materials, parts, and incidentals for construction of the Sorting Area Equipment and Fish Flume to include the sorting table, anesthetic tank, recovery tank, fish flume, and switchgates. The intent of this CLIN is to include all work described on the MM series of the mechanical drawings and the switchgear and fish flume as described in the ML series.
0025 1 Job Post-Sort Pool Mechanical
FFP
Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Post-Sort Pool Mechanical and associated items. The intent of this CLIN is to include all work described on the MN, MO, and MQ series of the mechanical drawings.
0026 1 Job Crowders
FFP
Provide all of the crowders to include the pre-sort crowder, post-sort crowders, and rails. The intent of this CLIN is to include all work associated with the crowders as described in the ML series of the mechanical drawings.
0027 1 Job Facility Water Supply Piping
FFP
Provide all labor, equipment, materials, parts, and incidentals for construction of the Facility Water Supply Piping. The intent of this CLIN is to include all work described on the MP series of the mechanical drawings, the piping and valves shown on the MK series of the mechanical drawings, and all work described on the SP series of the structural drawings.
0028 1 Job Compressed Air System
FFP
Provide all labor, equipment, materials, parts, and incidentals for construction of the Compressed Air System to includes the air compressor, piping, fittings, and controls. The intent of this CLIN is to include all work described on the MS series of the mechanical drawings.
0029 1 Job Electrical and Controls
FFP
Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Electrical and Controls to include incidental asbestos. The intent of this CLIN is to include all work described on the electrical drawings.
0030 1 Job OPTION Remove Prestressed Concrete Beams
FFP
Provide all labor, equipment, materials, parts, and incidentals for demolition and removal of the Prestressed Concrete Beams detailed in Appendix A15.
0031 1 Job OPTION Temp Utilities for Existing Residence
FFP
Temporary Utilities for the Existing Residence (Option) Provide all labor, equipment, materials, parts, and incidentals to provide temporary utilities to the existing residence.