Dexter_Pre-Bid and Follow On Site Visit_Attendance List.pdf

PDF 95 KB Posted

Attached to
Dexter Adult Fish Facility Upgrades
Solicitation number
W9127N23R0005
Issued by

About this file

This document includes an attendance list from a pre-bid site visit and follow-on site visit for the Dexter Adult Fish Facility Upgrades project, as well as details of the related federal contract opportunity. The Dexter Adult Fish Facility Upgrades project will improve, replace, and add features to meet requirements set forth in the National Marine Fisheries Service's 2008 Biological Opinion. The estimated value of construction is between $25-100 million. The period of performance is from March 2023 to November 2026. The North American Industry Classification System code for this work is 237990 for other heavy and civil engineering construction, with a small business size standard of $39.5 million. The solicitation is unrestricted and full and open, with a 10% price evaluation preference for HUBZone small businesses. The contracting agency is the Department of the Army Corps of Engineers Engineering District Portland.

View the file

Other files

File Type Posted
Dexter Fish Facility W9127N23R0005 Amend 0005.pdf PDF
ProjectNet Inquiries and Responses - Dexter Fish Facilities.pdf PDF
Section 00 10 00 CLINS Structure AMDT 0004.pdf PDF
Drawings SR701_SR101_AMDT 0004.pdf PDF
Drawings MK502_M-600_M-002_MQ501_AMDT 0004.pdf PDF
DB Wage Rate OR20230057 01.06.2023_AMDT 0004.pdf PDF
Dexter Fish Facility W9127N23R0005 Amend 0004.pdf PDF
Spec 26 42 13.00 25_AMDT 0004.pdf PDF
Specs Attachment 1 - Submittal Register_AMDT 0004.pdf PDF
Drawings SK523_SK516-2_SK516_SK516-1_SK516-3_AMDT 0004.pdf PDF
Spec 33 61 13.19 25_AMDT 0004.pdf PDF
Spec 01 22 00.00 25_AMDT 0004.pdf PDF
Drawings CS103_CU105_CU201_CU102_CU103_AMDT 0004.pdf PDF
Clean Sol Package Drawings ELECTRICAL_AMDT 0003 Part4.pdf PDF
Clean Sol Package Drawings MECHANICAL_AMDT 0003.pdf PDF
Dexter W9127N23R0005 Clean Solicitation Package.pdf PDF
Clean Sol Package Drawings ELECTRICAL_AMDT 0003 Part1.pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 5 (SP).pdf PDF
Clean Sol Package Drawings ELECTRICAL_AMDT 0003 Part2.pdf PDF
Clean Sol Package Drawings GENERAL_AMDT 0003.pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 3 (SL-SN).pdf PDF
Clean Sol Package Drawings ELECTRICAL_AMDT 0003 Part3.pdf PDF
Clean Sol Package Drawings LANDSCAPE_AMDT 0003.pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 4 (SO-ST).pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 1 (S-SJ) - Part2.pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 2 (SK).pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 1 (S-SJ) - Part1.pdf PDF
Dexter Fish Facility W9127N23R0005 Amend 0003.pdf PDF
Clean Sol Package Drawings CIVIL_AMDT 0003.pdf PDF
STRUCTURES_AMDT 0002.pdf PDF
CU502_19DEC22_AMDT 0002.pdf PDF
M-600_AMDT 0002.pdf PDF
MK502_AMDT 0002.pdf PDF
E-603_EL602_EN602_M-601_ML524_AMDT 0002.pdf PDF
MZ101_23DEC22_AMDT 0002.pdf PDF
MW101-MW501-MW502_AMDT 0002.pdf PDF
MY103_AMDT0002.pdf PDF
STRUCTURES_AMDT 0002.pdf PDF
CD501_19DEC22_AMDT 0002.pdf PDF
Dexter Amendment 0002 Spec Changes Package.pdf PDF
W9127N23R0005 Amendment 0002 12.29.22.pdf PDF
Dexter Road Photo Tour.pdf PDF
Dexter Fish Facility Photo Tour.pdf PDF
DXF1.101_ES101-A2 (Electrical_Update_Amend0002).pdf PDF
Attach 8 - Dexter GBR Update Amend0002.pdf PDF
DXF1.101_DEXTER FF UPGRADE_STRUCTURAL UPDATE AMEND 0002.pdf PDF
Attachment 10 - DSL Removal Fill Permit.pdf PDF
W9127N23R0005-Amendment 0001 12.5.2022.pdf PDF
Specs 01 22 00.00 25 M&P Amend 0001.pdf PDF
Site Visit Attendance Sheet - Dexter.pdf PDF
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dexter Adult Fish Facility Follow-On Site Visit Attendance List

January 04, 2023

Last Name First Name Company Name 1 Anderson Phillip Powerconcrete Cutting & Demolition 2 Babcock Steve EC Company 3 Davis Benjamin Malcolm Drilling Co., Inc 4 DeWitt Chase DeWitt Construction Inc 5 Franklin Jarred Mountain View Tree Service 6 Gibson Lloyd Olsson Industrial Electric 7 Hamacher John Northbank Civil & Marine 8 Hiller Max Condon-Johnson & Associates 9 Jones Ed Dutch Worx LLC 10 Keller Gregory Garco Construction 11 Kuenzi Gibson Siegmund Excavation & Construction 12 Lynch Sean NetCompliance Environmental Service 13 Maughan Eric NetCompliance Environmental 14 McNeilly Miranda Slayden Constructors, Inc 15 Moen Chad Malcolm Drilling Co., Inc 16 Nelson Brandon Transco Industries 17 Olsson Ben Olsson Industrial Electric 18 Philips David Slayden Constructors, Inc 19 Smith Chris FM Sheet Metal 20 Wick Erik Garco Construction 21 Ross Todd Legacy Cont.

22 Moore Will Axe Contracting 23 Dow Ryan FM Sheet Metal 24 Hoyes Craig FMSM 25 Booner John FMSM 26 Dawes Ed FM SHMTL

Dexter Adult Fish Facility Pre-Bid Site Visit Attendance List

November 17, 2022

Last Name First Name Company Name 1 Barnes Matthew Orion 2 Birrell Ian Advanced American Construction 3 Bodenlos Kainan Northbank Civil & Marine 4 Brockmoller Lee McMillen Jacobs 5 Howatt Marc HDR 6 Howell Austin Legacy Contracting, Inc 7 King Rich Thalle Construction 8 Mahnke Dan McMillen Jacobs 9 McElligott Richard (Dick) James W Fowler Co 10 Meskill Shay Thriller Manufacturing 11 Pharis Andrew Slayden Construction 12 Philips David Slayden Construction 13 Pollard Kenny Slayden Construction 14 Schwartz Walter Nova Group 15 Spratt Rich JR Merit 16 Taylor Jeremy Michels Construction 17 Wall Jeff Slayden Construction 18 Worrlein Paul HDR

File details come from the government source that posted it. Updated .