This amendment modifies a solicitation for the Dexter Adult Fish Facility Upgrades project. The modification updates drawings, specifications, wage determinations, and contract line item descriptions and extended descriptions to incorporate responses to bidder inquiries. The Dexter Fish Facility Upgrades Project will improve, replace, and add major features to the facility to meet criteria approved by the National Marine Fisheries Service and requirements in the 2008 Biological Opinion of the Corps' Willamette Valley Project. The period of performance is from March 2023 to November 2026. The estimated magnitude of construction is between $25 million to $100 million. The solicitation is unrestricted and full and open with application of the HUBZone 10% price preference as required. The NAICS code is 237990 for other heavy and civil engineering construction with a $39.5 million small business size standard.

View the file

Other files

File Type Posted
Dexter Fish Facility W9127N23R0005 Amend 0005.pdf PDF
Dexter_Pre-Bid and Follow On Site Visit_Attendance List.pdf PDF
ProjectNet Inquiries and Responses - Dexter Fish Facilities.pdf PDF
Section 00 10 00 CLINS Structure AMDT 0004.pdf PDF
Drawings SR701_SR101_AMDT 0004.pdf PDF
Drawings MK502_M-600_M-002_MQ501_AMDT 0004.pdf PDF
DB Wage Rate OR20230057 01.06.2023_AMDT 0004.pdf PDF
Spec 26 42 13.00 25_AMDT 0004.pdf PDF
Specs Attachment 1 - Submittal Register_AMDT 0004.pdf PDF
Drawings SK523_SK516-2_SK516_SK516-1_SK516-3_AMDT 0004.pdf PDF
Spec 33 61 13.19 25_AMDT 0004.pdf PDF
Spec 01 22 00.00 25_AMDT 0004.pdf PDF
Drawings CS103_CU105_CU201_CU102_CU103_AMDT 0004.pdf PDF
Clean Sol Package Drawings ELECTRICAL_AMDT 0003 Part4.pdf PDF
Clean Sol Package Drawings MECHANICAL_AMDT 0003.pdf PDF
Dexter W9127N23R0005 Clean Solicitation Package.pdf PDF
Clean Sol Package Drawings ELECTRICAL_AMDT 0003 Part1.pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 5 (SP).pdf PDF
Clean Sol Package Drawings ELECTRICAL_AMDT 0003 Part2.pdf PDF
Clean Sol Package Drawings GENERAL_AMDT 0003.pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 3 (SL-SN).pdf PDF
Clean Sol Package Drawings ELECTRICAL_AMDT 0003 Part3.pdf PDF
Clean Sol Package Drawings LANDSCAPE_AMDT 0003.pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 4 (SO-ST).pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 1 (S-SJ) - Part2.pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 2 (SK).pdf PDF
Clean Sol Package Drawings STRUCTURAL_AMDT 0003 Set 1 (S-SJ) - Part1.pdf PDF
Dexter Fish Facility W9127N23R0005 Amend 0003.pdf PDF
Clean Sol Package Drawings CIVIL_AMDT 0003.pdf PDF
STRUCTURES_AMDT 0002.pdf PDF
CU502_19DEC22_AMDT 0002.pdf PDF
M-600_AMDT 0002.pdf PDF
MK502_AMDT 0002.pdf PDF
E-603_EL602_EN602_M-601_ML524_AMDT 0002.pdf PDF
MZ101_23DEC22_AMDT 0002.pdf PDF
MW101-MW501-MW502_AMDT 0002.pdf PDF
MY103_AMDT0002.pdf PDF
STRUCTURES_AMDT 0002.pdf PDF
CD501_19DEC22_AMDT 0002.pdf PDF
Dexter Amendment 0002 Spec Changes Package.pdf PDF
W9127N23R0005 Amendment 0002 12.29.22.pdf PDF
Dexter Road Photo Tour.pdf PDF
Dexter Fish Facility Photo Tour.pdf PDF
DXF1.101_ES101-A2 (Electrical_Update_Amend0002).pdf PDF
Attach 8 - Dexter GBR Update Amend0002.pdf PDF
DXF1.101_DEXTER FF UPGRADE_STRUCTURAL UPDATE AMEND 0002.pdf PDF
Attachment 10 - DSL Removal Fill Permit.pdf PDF
W9127N23R0005-Amendment 0001 12.5.2022.pdf PDF
Specs 01 22 00.00 25 M&P Amend 0001.pdf PDF
Site Visit Attendance Sheet - Dexter.pdf PDF
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Jan-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N23R0005

X 9B. DATED (SEE ITEM 11)

23-Nov-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this Amendment is to update CLIN Descriptions and extended descriptions, Draw ings, Specifications, DB Wage Rates, and the Submittal Register Attachment in response to Bidder Inquiries. See Summary of Changes for details.

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Jan-2023

CODE

USACE, PORTLAND DISTRICT

333 SW 1ST AVE

PORTLAND OR 97204

W9127N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127N23R0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been modified:

SUMMARY OF CHANGES

The following Drawings, Specifications, and Attachments have been updated and added to SAM.gov as Attachments, all ending with AMDT 0004.

Structural Drawings SK516-1, SK516-2, SK516-3, SK516, SK523 and SR101 updated. The “Fish Screen 2” and associated debris platform will be shifted to directly in front of the AWS inlet.

Drawing MQ501 updated to include additional information regarding the return to river pipe route, and to provide centerline pipe control points.

Measurement and Payment Specification 01 22 00.00 25 updated.

Drawing SK523 updated guide rail height on Section B.

Drawing M-002 General Notes updated to clearly delineate types of pipe for install in terms of exposed service and buried service, and to clarify material requirements.

Specification Section 33 61 13.19 25 updated to reference the material requirements of stainless steel pipes.

Drawing M-600 updated “TBD” to “MK501.”

Specification Section 26 42 13.00 25 Galvanic (Sacrificial) Anode Cathodic Protection (Gacp) System updated.

The storm drain line and associated manholes on Drawing CU105 have been adjusted and a profile added to Drawing CU201 Drawing CU102 and CU103 updated the connection to the drain channel.

Drawing SK516-2 updated in response to Bidder Inquiry 10055020.

Updated Attachment 1 Submittal Register to reflect changes to Specifications 26 42 13.00 25.

Updated DB Wage Rates to reflect changes posted on 06 Jan 2023.

Changes to CLIN Descriptions and extended descriptions are shown below. An updated CLIN Structure incorporating these changes has been added to the Attachments in SAM.gov as Section 00 10 00 CLINS Structure

AMDT 0004.

SECTION 00 10 00 - SOLICITATION

CLIN 0009

The CLIN extended description has changed from:

Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Fish Ladder.

The intent of this CLIN is to include all work associated with the fish ladder from the fish ladder entrance to station 3+72.39 as described in the SK series of the structural drawings. This includes the fish ladder walls and weirs, fish ladder flow vane, occlusion screen and frame, fish screen, and bulkhead.

To:

Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Fish Ladder.

The intent of this CLIN is to include all work associated with the fish ladder from the fish ladder entrance to station 3+72.39 and the alterations to the existing fish ladder as described in the SK series of the structural drawings. This includes the fish ladder walls and weirs, fish ladder flow vane, fish exclusion screen and frame, bulkhead, existing fish ladder fish screens and concrete wall plugs, and walkways, railings, and stairs associated with the fish ladder.

CLIN 0012

The CLIN extended description has changed from:

Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Hopper Crane Frame Structure and design and installation of the hopper crane. The intent of this CLIN is to include all work described on the SO series of the structural drawings.

Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Hopper Crane Frame Structure and design and installation of the hopper cranes. The intent of this CLIN is to include all work described on the SO series of the structural drawings.

CLIN 0013

Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Maintenance Building. The intent of this CLIN is to include all work described on the ST series of the structural drawings.

Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Fish Ladder Crossing. The intent of this CLIN is to include all work described on the ST series of the structural drawings.

CLIN 0023

The CLIN description has changed from Fish Exclusion Screen to AWS and Fish Ladder Gates.

The CLIN extended description has changed from:

Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the Fish Exclusion Screen. The intent of this CLIN is to include all work described on the MK series of the mechanical drawings.

Provide all labor, equipment, materials, parts, and incidentals for demolition and construction of the AWS and fish ladder gates, including the fish ladder entrance slide gate, diffuser chamber slide gates, and the lift gate constructed in the existing fish ladder.

CLIN 0027

Provide all labor, equipment, materials, parts, and incidentals for construction of the Facility Water Supply Piping.

The intent of this CLIN is to include all work described on the MP series of the mechanical drawings and the SP series of the structural drawings.

Provide all labor, equipment, materials, parts, and incidentals for construction of the Facility Water Supply Piping.

The intent of this CLIN is to include all work described on the MP series of the mechanical drawings, the piping and valves shown on the MK series of the mechanical drawings, and all work described on the SP series of the structural drawings.

CLIN 0028

Provide alllabor, equipment, materials, parts, and incidentals for constructionof the Compressed Air System to includes the air compressor, piping, fittings, and controls. The intent of this CLIN is to include all work described on the MS series of the mechanical drawings.

Provide all labor, equipment, materials, parts, and incidentals for construction of the Compressed Air System to includes the air compressor, piping, fittings, and controls. The intent of this CLIN is to include all work described on the MS series of the mechanical drawings.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .