W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_1B_of_5_Sampling_Summary.pdf

PDF 2 MB Posted

Attached to
JBSA FSH ARNORTH Bldg 615 Renovation Project for Army Band
Solicitation number
W9126G-19-B-3286
Issued by

About this file

B3_Solicitation_DIV 2_Attachment A Hazmat Survey Section 1B of 5_Sampling Summary_JBSA FSH ARNORTH BLDG 615 Renovation Project for Army Band

View the file

Other files

File Type Posted
C1_Rev_2_SF_1409_Abstract_of_Offers-Page2of3_PRINT1.pdf PDF
C1_Rev_SF_1409_Abstract_of_Offers-Page_3of3.pdf PDF
C1_Rev_2_SF_1409_Abstract_of_Offers-Page1of3_Signed_29Sep_19.pdf PDF
am_0007.pdf PDF
am_0006.pdf PDF
am_0005_12_Sep_19.pdf PDF
Revise_Site_Visit_Form_11_Sep_19.pdf PDF
B3_Amendment_03_30_Aug_19.pdf PDF
Amendment_02_Change_of_Solicitation_closing_date_and_Bidder_Key_28_Aug_19.pdf PDF
B3_Unescorted_Access_Request_Form_pg_1-4-26_Aug_19-5.pdf PDF
JBSA_FSH_ARNORTH_Building_615-Amend_01.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-165__of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-136_-144__of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_1-7_of_191.pdf PDF
W9126G19B3286_DIV_02_Specifications_Appendix_A_Abatement_Guidelines_Part_2_of_2.pdf PDF
B3_W9126G19B3286_DIV_27_28_31_and_32_Specifications_23_Aug_19.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_20-22_of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-166_-170__of_191.pdf PDF
B3_W9126G19B3286_DIV_08_to_DIV_10_Specifications_23_Aug_19.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_1A_of_5_Sampling_Methodology.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_1C.2_of_5_All_Other_areas__Lead_Based_Paint_Findings.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-113_-_115__of_191.pdf PDF
B3_W9126G19B3286_DIV_03_to_DIV_06_Specifications_23_Aug_19.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-127_-130__of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-123_-126__of_191.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_3_of_5.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-162__of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-160_-161__of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_-61-67_of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_-46-50_of_191.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_4_of_5_page_13_to_21_of_21.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_-51-55_of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_23-27_of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-186__of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-179_-183__of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_-75-77_of_191.pdf PDF
B3_W9126G19B3286_DIV_02_Specifications_Appendix_A_Abatement_Guidelines_ACM_Map.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_28-30_of_191.pdf PDF
B3_W9126G19B3286_DIV_26_Specifications_23_Aug_19.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_1C.3_of_5_Lead_Based_Paint_Findings.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_4_of_5_page_17_to_21_of_21.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_1E_of_5_Conclusions_and_recommendations.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_-78-81_of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-187__of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_36_-40_of_191.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_4_of_5_page_10-_11_of_21.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_31-35_of_191.pdf PDF
B3_W9126G19B3286_DIV_01_Specifications_23_Aug_19.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-184__of_191.pdf PDF
B3_W9126G19B3286_DIV_02_Specifications_Asbestos_Abatement_23_Aug_19.pdf PDF
Show 40 more

Latest 50 of 92 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HOMOGENEOUS MATERIAL SAMPLING AREA SUMMARY

SURFACING MATERIALS

There were no suspect surfacing materials identified in the building during this asbestos survey.

THERMAL SYSTEM INSULATING MATERIALS

HA-05

HA-06

Pipe Straight Run Insulation with White Mastic

This homogeneous sampling area includes pipe straight run insulation with white mastic on hot and cold water pipes located throughout the building on the 1st and 2nd floors and in mechanical rooms. A total of seven samples of this material were collected during this survey, and all of the samples tested negative for asbestos.

NOTE: It is possible, due to the age of the building, that older types of pipe insulation could still be present in areas behind plaster walls or in pipe chases, which were inaccessible at the time of this inspection without conducting wall demolition and destructive sampling. If, during renovation activities, additional pipe insulation is discovered in any such areas, it should be assumed to be asbestos-containing (ACM) until it can be tested and proven otherwise.

Pipe Fitting Insulation with White Mastic

This homogeneous sampling area includes pipe fitting insulation with white mastic on pipes located throughout the building on the 1st and 2nd floors and in mechanical rooms. A total of nine samples of this material were collected during this survey, and all of the samples tested negative for asbestos.

NOTE: It is possible, due to the age of the building, that older types of pipe insulation could still be present in areas behind plaster walls, which were inaccessible at the time of this inspection without conducting wall demolition and destructive sampling. If, during renovation activities, additional pipe insulation is located in any of these areas, it should be assumed to be asbestos-containing (ACM) until it can be tested and proven otherwise.

MICRO AIR OF TEXAS, INC. Fort Sam Houston; San Antonio, TX - Building 615 9

HA-11

HA-16

HA-17

HA-21

HA-23

HA-24

HVAC Duct Sealant, Gray

This material was found on the first floor in the restrooms (1014, 1016) and in the West Wing North Mechanical Room (1004) . Three samples of this material were collected and analyzed, and the material tested negative for asbestos.

Pipe Insulation, Straight Run with White Mastic (Water Heater)

This material was found on the first floor in the West Wing North Mechanical Room (1004). One sample of this material was collected and analyzed, and it tested negative for asbestos.

Pipe Fitting Insulation with White Mastic (Water Heater)

This material was found on the first floor in the West Wing North Mechanical Room (1004 ). One sample of this material was collected and analyzed, and it tested negative for asbestos.

Interior Duct Insulation, Fiber Glass with Black Paper

This material was found on the first floor in the Boiler Room. Three samples of this material were collected and analyzed, and it tested negative for asbestos.

Pipe Fitting Insulation with White Mastic on Hot Water Supply & Return (Newer Insulation)

This homogeneous sampling area includes pipe fitting insulation with white mastic on pipes located in the Boiler Room (1013). A total of three samples of this material were collected during this survey, and all of the samples tested negative for asbestos.

Pipe Insulation, Straight Run with White Mastic on Hot Water Supply & Return (Newer Insulation)

This homogeneous sampling area includes pipe straight run insulation with white mastic on pipes located in the Boiler Room (1013). A total of three samples of this material were collected during this survey, and all of the samples tested negative for asbestos.

MICRO AIR OF TEXAS, INC. Fort Sam Houston; San Antonio, TX - Building 615 10

HA-35 HVAC Duct Insulation with White Mastic

This homogeneous sampling area includes HVAC duct insulation with fiberglass and white mastic sealant. The material was found throughout the 2nd floor but may be present in inaccessible areas of the 1st floor. A total of three samples of this material were collected during this survey, and all of the samples tested negative for asbestos.

MISCELLANEOUS MATERIALS

HA-01

HA-02

HA-03

HA-04

HA-07

12" x 12" Yellow-Beige Floor Tile with Adhesive

This material was found throughout the building on the 1st and 2nd floors.

Seven samples of this material were collected and analyzed, and the material tested negative for asbestos.

Beige Cove Base Adhesive

This homogeneous area was found throughout the 1st floor. Five samples of this material were collected and analyzed, and the material tested negative for asbestos.

Ceiling Tile, White 2' x 4', Type I

This homogeneous area was found on the 1st floor in the restroom hallway.

Three samples of this material were collected and analyzed, and this material was found not to be asbestos-containing.

Sheetrock, Joint Compound, and Texture

This homogeneous area is located throughout the building on the 1st and 2nd floors. Eleven samples of this material were collected and analyzed, and this material was found not to be asbestos-containing.

Shiplap Cement Material

This material is located under the plaster ceilings throughout the building and was visible on the 1st floor in the restroom hallway above the ceiling, as well as in Rm. 2011. Four samples of this material were collected and analyzed, and it was found to be negative for asbestos.

MICRO AIR OF TEXAS, INC. Fort Sam Houston; San Antonio, TX - Building 615 11

HA-08

HA-09

HA-10

HA-12

HA-13

Plaster and Scratch Coat Material

This homogeneous area was found throughout the building on the 1st and 2nd floors. Six samples of this material were collected and analyzed, and it was found to be negative for asbestos.

Lay-In Ceiling Insulation, Yellow with Paper Backing

This homogeneous area was found above the ceiling on the first floor in the restrooms and in Rm. 2011. Three samples of this material were collected and analyzed, and this material was found not to be asbestos-containing.

Ceiling Tile, White 2' x 2', Type II

This material was found on the 1st floor in the restrooms (1014, 1016). Three samples were collected and analyzed, and this material was found not to be asbestos-containing.

HVAC Vibration Dampeners

This homogeneous area was found on the 1st floor in Rm. 1017, Mechanical Room (1008), and in the West Wing Large Room (1003). Four samples of this material were collected and analyzed, and this material was found not to be asbestos-containing.

12" x 12" Floor Tile, Beige with Adhesive

This homogeneous area was found on the 1st floor in the Rm. 2017 Storage Cage. Three samples of this material were collected and analyzed, and this material was found not to be asbestos-containing.

HA-14 N/A

HA-15

This Homogeneous Area sampling number was previously assigned to a material that was later included with another Homogeneous Area. Therefore, this number is not used in this survey report.

Felt Backing Above Tin Ceiling Squares

This material was found in the 1st Floor West Wing Large Room (1003) above the tin ceiling squares. Three samples of the material were collected and analyzed, and the material was found not to be asbestos-containing.

MICRO AIR OF TEXAS, INC. Fort Sam Houston; San Antonio, TX - Building 615 12

HA-18

HA-19

HA-20

HA-22

HA-25

HA-26

Stair Tread Adhesive, Brown

This homogeneous area was found on the west entrance door stairs located in the 1st Floor West Wing Large Room (1003) and in the West Wing North Mechanical Room (1004). Two samples of this material were collected and analyzed, and this material was found not to be asbestos-containing.

12" x 12" Beige Floor Tile with Black Mastic

This homogeneous area was found on the 1st Floor in the West Wing Comm.

1 Room (1002). Three samples of this material were collected and analyzed, and the material was determined not to be asbestos-containing.

2' x 4' Ceiling Tile, Cream Color, Type Ill

This homogeneous area was found in the West Wing Large Room (1003) on the South side, and on the 2nd Floor near the staircase (2010). Four samples of this material were collected and analyzed, and it was determined not to be asbestos-containing.

Vibration Dampener, Newer Material

This homogeneous area was found in the Boiler Room (1013) on the west side AHU. One sample of this material was collected and analyzed, and the material tested negative for asbestos.

Exterior Wall Penetration Insulation Sealant

This material was found on the exterior of the building on the east side of the East Wing. One sample of this material was collected, and it was found to be negative for asbestos.

Exterior Door Frame Caulking Material

This material was found on the exterior side of entry doors in all parts of the building. Four samples of this material were collected and analyzed, three of which were found to be asbestos-containing. This material is considered to be Category II non-friable ACM. There is a total of approximately 330 linear feet of this material.

MICRO AIR OF TEXAS, INC. Fort Sam Houston; San Antonio, TX - Building 615 13

HA-27

HA-28

HA-29

HA-30

HA-31

HA-32

Exterior Caulking Material on Former Windows (Boarded Up)

This homogeneous area was found on the exterior side of former windows that now are boarded up. Three samples of this material were collected and analyzed, and this material was found not to be asbestos-containing.

Exterior Caulking Material on Window Frames

This homogeneous area was found on the exterior window frames at the brick interface around the building. Three samples of this material were collected and analyzed, and the material was determined not to be asbestos containing.

Exterior Window Glazing Material, 1st Floor Windows

This homogeneous area was found on the 1st Floor exterior side of the windows. Three samples of this material were collected and analyzed, and the material tested negative for asbestos.

Exterior Window Glazing Material, 2nd Floor Windows

This homogeneous area was found on the 2nd Floor exterior side of the windows. Three samples of this material were collected and analyzed, and the material tested negative for asbestos.

Exterior Gray Sealant Material

This material was found on the exterior of the building at the brick wall and sidewalk interface, ground level. Three samples of the material were collected and analyzed, and the material tested negative for asbestos.

Exterior Black Sealant I Waterproofing Material

This material was found on the exterior of the building at the brick wall and dirt interface, ground level. Three samples of this material were collected and analyzed, and the material tested negative for asbestos.

MICRO AIR OF TEXAS, INC. Fort Sam Houston; San Antonio, TX - Building 615 14

HA-33

HA-34

HA-36

HA-37

12" x 12" Floor Tile, Gray Mottled with Black Mastic Adhesive

This homogeneous area was found on the 1st floor in the storage room located underneath the staircase. One sample of this material was collected and analyzed, and the material tested positive for asbestos in the black mastic adhesive layer. The vinyl floor tiles are inseparable from the mastic layer; therefore, both layers must be treated as asbestos-containing. This material is considered to be Category I non-friable ACM in good condition. There is approximately 65 square feet of this material.

Rubber Ramp Adhesive

This material was found on the 1st floor in the Entry Corridor (1015). One sample of the adhesive was collected and analyzed, and the material tested negative for asbestos.

2' x 2' Ceiling Tile, White, Type IV

This material was found on the 2nd Floor in Rooms 2011, 2000, and 2004.

Three samples of this material were collected and analyzed, and the material tested negative for asbestos.

Slate Roof Shingle

This material was found on the roof of the building. One sample of this material was collected and analyzed, and the material tested negative for asbestos.

MICRO AIR OF TEXAS, INC. Fort Sam Houston; San Antonio, TX - Building 615 15