Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Solicitation for JBSA FSH ARNORTH B615 Renovation at San Antonio, Texas is amended as follows.
See SF30 Continuation Sheet(s)
NOTE: Proposal Receipt date is 24 Sept 2019; at 10:00 AM,CT as previously stated.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
W9126G19B3286
X 9B. DATED (SEE ITEM 11)
24-Aug-2019
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13 Sept-2019
CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A19
P.O. BOX 17300
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
W9126GB19B3286
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
CHANGES TO THE SPECIFICATIONS
1. Replacement Sections.- Replace Specification Section 00 11 00 with the attached new section of the same name and number, with the notation “W9126G19B3286, AMENDMENT 0006”.
End of Summary of Changes
Section: 00 11 00 W9126G19B3286
CLIN ESTIMATED Unit No. Quantity Unit Price Amount
BASE ITEM 1: ALL WORK
REQUIRED FOR THE
RENOVATION OF BUILDING 615
INCLUSIVE OF WORK INSIDE THE
5 FOOT BUILDING LINE AND
EXCLUSIVE OF ALL OTHER WORK
LISTED SEPARATELY
1 JOB $ *** $ ________________
BASE ITEM 2: ALL WORK
REQUIRED FOR THE SITE
DEVELOPMENT SPECIFICALLY
INDICATED ON DRAWING SHEET
CS‐104 AS BASE BID AND
UTILITIES OUTSIDE THE 5 FOOT
BUILDING LINE, EXCLUSIVE OF
ALL OTHER WORK LISTED
SEPARATELY
1 JOB $ *** $ ________________
BASE ITEM 3: RELOCATION AND
INSTALLATION OF GOVERNMENT
FURNISHED/CONTRACTOR
INSTALLED (GF/CI) SOUND
BOOTHS IDENTIFIED IN THE
CONTRACT DOCUMENTS
1 JOB $ *** $ ________________
BASE ITEM 4: ALL WORK FOR
THE ABATEMENT OF ALL
HAZARDOUS MATERIAL(S) FOR
BUILDING 615 AS IDENTIFIED IN
THE CONTRACT DOCUMENTS
1 JOB $ *** $ ________________
<AM_0006>
BASE ITEM 5: ALL WORK FOR
UTILITY COORDINATION WITH
SAN ANTONIO CITY PUBLIC
SERVICES (CPS)
1 JOB $ *** 25,000.00$
<AM_0006\>
San Anontio, TX
CONTRACT LINE ITEM SCHEDULE
Renovation of B615 ARNorth, JBSA FSH
FY 19
TOTAL BASE OFFER
--------------------------------------------------------------- BASE PROPOSAL ----------------------------------------------
Description
CLIN ESTIMATED Unit No. Quantity Unit Price Amount
San Anontio, TX
CONTRACT LINE ITEM SCHEDULE
Renovation of B615 ARNorth, JBSA FSH
FY 19
Description
OPTIONAL BID ITEM 1:
PROCUREMENT
INSTALLATION OF FF&E
PACKAGE, INCLUSIVE OF
CONTRACTOR
FURNISHED/CONTRACTOR
INSTALLED (CF/CI) ELEMENTS
IDENTIFIED IN THE CONTRACT
DOCUMENTS
1 JOB $ *** $ ________________
OPTIONAL BID ITEM 2: ALL
WORK REQUIRED
FOR THE CONSTRUCTION OF THE
ELEVATOR ADDITION AND
ASSOCIATED ELEMENTS,
EXCLUSIVE OF ALL OTHER WORK
LISTED SEPERATELY
1 JOB $ *** $ ________________
OPTIONAL BID ITEM 3:
ADDITIONAL WORK REQUIRED
TO UPGRADE BASE BID STAIR E1
TO CONSTRUCT THE EAST ENTRY
PORTICO/STAIR ADDITION NO. E1
(BID OPTION) AT SAME
LOCATION, EXCLUSIVE OF ALL
OTHER WORK LISTED
SEPARATELY
1 JOB $ *** $ ________________
--------------------------------------------------------------- OPTIONS ----------------------------------------------
CLIN ESTIMATED Unit No. Quantity Unit Price Amount
San Anontio, TX
CONTRACT LINE ITEM SCHEDULE
Renovation of B615 ARNorth, JBSA FSH
FY 19
Description
OPTIONAL BID ITEM 4:
ALL WORK REQUIREDFOR THE
RECONSTRUCTION OF
PORCH/STAIR NO. S1, W2, AND W3
AND ASSOCIATED ELEMENTS
EXCLUSIVE OF ALL OTHER WORK
LISTED SEPARATELY
1 JOB $ *** $ ________________
OPTIONAL BID ITEM 5:
ALL WORK REQUIREDFOR THE
RECONSTRUCTION OF
PORCH/STAIR NO. N1 AND
ASSOCIATED ELEMENTS
EXCLUSIVE OF ALL OTHER
WORK LISTED SEPARATELY
1 JOB $ *** $ ________________
OPTIONAL BID ITEM 6:
SITE DEVELOPMENT AND
LANDSCAPE OUTSIDE THE 5
FOOT BUILDING LINE AND
EXCLUSIVE OF ALL OTHER WORK
LISTED SEPARATELY
1 JOB $ *** $ ________________
TOTAL ALL OPTIONS
TOTAL OFFER (BASE + OPTIONS)
Renovation of B615 ARNorth, JBSA FSH
FY 19
San Anontio, TX
CONTRACT LINE ITEM SCHEDULE NOTES
NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
NOTE NO. 2. Offerors must insert a price on all numbered items of the CLIN Schedule. Failure to do so may result in the offer being unacceptable
NOTE NO. 3. All the extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
NOTE NO. 4. Include all costs for coordination and accommodation of Government-Furnished, Government- Installed Equipment. In the Contract Line Items for construction of the associated facilities.
<AM 0006>
NOTE NO. 5. Include all costs for coordination of the utilities provided by the City of San Antonio City Public Services (CPS). The amount listed for CLIN 0005 is an estimated amount for bidding purposes; the amount will be adjusted upward or downwards by modification based on the actual invoice amount from CPS.
<AM 0006\>
NOTE NO. 6. 52.217-5 EVALUATION OF OPTIONS (JUL 1990)
(a) Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(b) The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
NOTE NO. 7. Responders are advised that this requirement may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process based on decisions related to DOD changes in force structure and disposition of the Armed Forces.
NOTE NO. 8. Any proposal that is materially unbalanced as to prices for the Base Schedule may be rejected. An unbalanced proposal is one that is based on prices significantly less than the cost for some work and prices that are significantly overstated for other work and can also exist where only overpricing or underpricing exists.
END OF CLIN SCHEDULE
| Changes to the Specifications |
| 00 11 00-mtl rfp_w-Options AM 0006 13 SEPT AUG 2019.pdf |
| Sheet1 |
File details come from the government source that posted it.