B615_Final_Design_Plans_Aug_12_2019_Sheet_-123_-126__of_191.pdf

PDF 986 KB Posted

Attached to
JBSA FSH ARNORTH Bldg 615 Renovation Project for Army Band
Solicitation number
W9126G-19-B-3286
Issued by

About this file

B615 Final Design Plans Sheet 123 - 126 of 191

View the file

Other files

File Type Posted
C1_Rev_2_SF_1409_Abstract_of_Offers-Page2of3_PRINT1.pdf PDF
C1_Rev_SF_1409_Abstract_of_Offers-Page_3of3.pdf PDF
C1_Rev_2_SF_1409_Abstract_of_Offers-Page1of3_Signed_29Sep_19.pdf PDF
am_0007.pdf PDF
am_0006.pdf PDF
am_0005_12_Sep_19.pdf PDF
Revise_Site_Visit_Form_11_Sep_19.pdf PDF
B3_Amendment_03_30_Aug_19.pdf PDF
Amendment_02_Change_of_Solicitation_closing_date_and_Bidder_Key_28_Aug_19.pdf PDF
B3_Unescorted_Access_Request_Form_pg_1-4-26_Aug_19-5.pdf PDF
JBSA_FSH_ARNORTH_Building_615-Amend_01.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-165__of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-136_-144__of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_1-7_of_191.pdf PDF
W9126G19B3286_DIV_02_Specifications_Appendix_A_Abatement_Guidelines_Part_2_of_2.pdf PDF
B3_W9126G19B3286_DIV_27_28_31_and_32_Specifications_23_Aug_19.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_20-22_of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-166_-170__of_191.pdf PDF
B3_W9126G19B3286_DIV_08_to_DIV_10_Specifications_23_Aug_19.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_1A_of_5_Sampling_Methodology.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_1C.2_of_5_All_Other_areas__Lead_Based_Paint_Findings.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-113_-_115__of_191.pdf PDF
B3_W9126G19B3286_DIV_03_to_DIV_06_Specifications_23_Aug_19.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-127_-130__of_191.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_3_of_5.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-162__of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-160_-161__of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_-61-67_of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_-46-50_of_191.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_4_of_5_page_13_to_21_of_21.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_-51-55_of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_23-27_of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-186__of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-179_-183__of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_-75-77_of_191.pdf PDF
B3_W9126G19B3286_DIV_02_Specifications_Appendix_A_Abatement_Guidelines_ACM_Map.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_28-30_of_191.pdf PDF
B3_W9126G19B3286_DIV_26_Specifications_23_Aug_19.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_1C.3_of_5_Lead_Based_Paint_Findings.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_4_of_5_page_17_to_21_of_21.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_1E_of_5_Conclusions_and_recommendations.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_-78-81_of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-187__of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_36_-40_of_191.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_4_of_5_page_10-_11_of_21.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_31-35_of_191.pdf PDF
B3_W9126G19B3286_DIV_01_Specifications_23_Aug_19.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-184__of_191.pdf PDF
B3_W9126G19B3286_DIV_02_Specifications_Asbestos_Abatement_23_Aug_19.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_16-19_of_191.pdf PDF
Show 40 more

Latest 50 of 92 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"X" INDICATES ZONE)

(LOCAL CONTROL

SP

DOUBLE LINE

DUCTWORK SYMBOLS

PIPING SYMBOLS

TRIPLE DUTY VALVE

BUTTERFLY VALVE

PRESSURE

REDUCING VALVE

2-WAY CONTROL VALVE

3-WAY CONTROL VALVE

CHECK VALVE

OS&Y VALVE

PIPE FLANGE

STRAINER W/

BLOWDOWN VALVE

GATE VALVE

BALL VALVE

GLOBE VALVE

TEE OUTLET DOWN

DIRECTION OF FLOW

DIRECTION OF SLOPE

UNION

HORSEPOWER

VALVE IN RISE

TEE OUTLET UP

VALVE IN CENTER

DROP

VALVE IN DROP

ELBOW DOWN

ELBOW UP

HTG

HP

HEATING

PRESSURE GAUGE

PUMP

THERMOMETER

FLEXIBLE CONNECTION

AIR DEVICES, PUMPS, ETC.)

EXISTING EQUIPMENT (FANS,

DIFFUSER/GRILLE/REGISTER LABEL:

"A" - TYPE/DESIGNATION

"200" - AIRFLOW (CFM)

THERMOSTAT

H

T

TT

TO BE RELOCATED.

WITH GAUGE COCK

PRESSURE GAUGE

PRESSURE SWITCH

T&P RELIEF VALVE

AUTOMATIC AIR VENT

MANUAL AIR VENT

WATER GAUGE

FLOW SWITCH

CAP ON END LINE

PIPE GUIDE

EXPANSION JOINT

PIPE ANCHOR

FS

PS

X

WB

WG

WET BULB

D U

C T

W O

R K

EXISTING

TO REMAIN

P

IP

IN

G

NEW

NEW

EXISTING

TO REMAIN

SINGLE LINE

PLAN SYMBOLOGY

DUCTWORK SIZE TRANSITION.

ENERGY MONITORING AND CONTROL SYSTEM

ABBREVIATIONS

(ALL SYMBOLS SHOWN ARE NOT NECESSARILY USED ON THE DRAWINGS)

CC COOLING COIL

EFFICIENCYEFF

HEATING COIL

GALLONS PER MINUTE

FEET PER MINUTEFPM

HC

HVAC

HZHZ

GPM

FT

HERTZ

FEET, FOOT

FLEX

F

EMCS

EXH

EL

FLEXIBLE

FAHRENHEIT

ELEVATION

EXHAUST

DIRECT DIGITAL CONTROL

DIRECT EXPANSION

ELECTRIC/ELECTRICAL

ENTERING AIR TEMPERATURE

CUBIC FEET PER MINUTE

CONNECTION

CONDENSATE DRAIN

DWGS

EAT

ELEC

DDC

DEG

DX

DRAWINGS

DEGREE

CONN

DIA

DB

dB

CFM

CD

DIAMETER

DRY BULB

DECIBELS

HVAC SYMBOLS

BUILDING AUTOMATION SYSTEM

BRITISH THERMAL UNIT PER HOUR

BRAKE HORSEPOWER

AIR CONDITIONING

ARCHITECTURE/ARCHITECTURAL

APPROXIMATELY

ABOVE FINISHED FLOOR

BAS

BTUH

BHP

ASHRAE

A/C

ARCH

AFF

APPROX

NOISE CRITERIANC

SMACNA

SUPPLY AIR

VOLUME DAMPER

VARIABLE AIR VOLUME

UNLESS NOTED OTHERWISE

THERMOSTAT

SQUARE FEET

TEMPERATURE

STATIC PRESSURE

WATER COLUMN

VARIABLE FREQUENCY DRIVE

TYP TYPICAL

VFD

VD

WC

WTR

VAV

UNO

WATER

SA

T-STAT

TEMP

SP

SQ FT

NORMALLY OPEN

NORMALLY CLOSED

POUNDS PER SQUARE INCH

RETURN AIR

OUTSIDE AIR

NOT TO SCALE

REVOLUTIONS PER MINUTE

RE

RA

RPM

PSI

PLBG

P/PH

REFER/REFERENCE

PLUMBING

PHASE

NO

N.C.

N.O.

OA

NTS

NOM

NUMBER

NOMINAL

FLARED SPIN-IN TAP WITH DAMPER

RADIUS DUCTWORK ELBOW

ROUND OR RECTANGULAR

SPIN-IN TAP WITH DAMPER

RADIUS DUCTWORK ELBOW

ROUND OR RECTANGULAR

FLEXIBLE DUCT

RETURN/TRANSFER AIR DUCT

SUPPLY OR OUTSIDE AIR DUCT

RELIEF OR EXHAUST AIR DUCT

NATIONAL FIRE PROTECTION ASSOC.

MECHANICAL

LEAVING WATER TEMPERATURE

THOUSANDS BTU's PER HOUR

MINIMUM CIRCUIT AMPACITY

LEAVING AIR TEMPERATURE

LWT

NFPA

MIN

MBH

MECH

MAX

MCA

MINIMUM

MAXIMUM

IN

KW

LAT

INCHES

KILOWATT

ROUND DUCTWORK

RETURN/TRANSFER AIR GRILLE

EXHAUST GRILLE

SUPPLY AIR PLENUM SLOT DIFFUSER

FCC FAN COIL CASSETTES

DRAWING NOTE REFERENCE

DIAMETER/PHASE

DUCT SMOKE DETECTOR

P

S

C

MISCELLANEOUS

R

X

PIPING TYPES

EQUIPMENT DESIGNATIONS

CD CONDENSATE DRAIN (COLD)

CHR CHILLED WTR RETURN

CHS CHILLED WTR SUPPLY

DTR DUAL TEMP RETURN

DTS DUAL TEMP SUPPLY

DE = CIRCULAR EQUIVALENT OF RECTANGULAR DUCT

GENERAL NOTES

IN-LINE 90 DEGREE RISE

SD - SMOKE DAMPER

FSD - COMBINATION

FIRE/SMOKE DAMPER

RELIEF OR EXHAUST

AIR DUCT DOWN

MANUAL VOLUME

(BALANCE) DAMPER

90° ELBOW WITH

TURNING VANES

RELIEF OR EXHAUST

AIR DUCT UP

RETURN AIR DUCT DOWN

INCLINED DROP IN DUCT

INCLINED RISE IN DUCT

FD - FIRE DAMPER

MOTORIZED DAMPER

OR DROP IN DUCT

IN INCHES

SUPPLY OR OUTSIDE

AIR DUCT UP

SUPPLY OR OUTSIDE

AIR DUCT DOWN

FLEXIBLE DUCT

CONNECTION

RETURN AIR DUCT UP

TO EQUIPMENT

A 200

CENTIGRADEC

WT WATTS

ENTERING WATER TEMPERATUREEWT

12/12

12"

FD

M

DN

UP

B = LENGTH OF OTHER SIDE OF DUCT IN INCHES

A = LENGTH OF ONE SIDE OF DUCT IN INCHES

BALANCING VALVE

WITH DIFFERENTIAL

PRESSURE TAPS

HEATING, VENTILATION AND AIR CONDITIONING

SHEET METAL AND AIR CONDITIONING

CONTRACTORS NATIONAL ASSOC.

DUCT MOUNTED STATIC

PRESSURE SENSOR

HUMIDITY SENSOR

TEMPERATURE SENSOR

CO2 SENSOR

PRESSURE SENSOR

SENSOR WITH NON-LOCKING

PROTECTIVE GUARD

POINT OF NEW

CONNECTION BETWEEN

NEW AND EXISTING WORK

ROUND DUCT BRANCH TAKE-OFF FROM

RECTANGULAR OR FLAT OVAL MAIN WITH

CONICAL TAP. PROVIDE BALANCE DAMPER

FOR LOW PRESSURE DUCTWORK ONLY

RECTANGULAR DUCTWORK BRANCH TAKE-OFF

W/DAMPER AND 45 DEGREE BRANCH INLET

AMERICAN SOCIETY OF HEATING,

REFRIGERATION, AND

AIR CONDITIONING ENGINEERS

RECTANGULAR DUCTWORK. SIZE INDICATED IN

INCHES, FIRST NUMBER IS SIDE SHOWN

SUPPLY AIR DIFFUSER - ARROWS INDICATE

PATTERN. NO ARROWS SHOWN EQUALS

4-WAY.

DE =

1.30 (AB)

(A + B)

0.625

0.250

EF EXHAUST FAN

1. THIS PROJECT IS DESIGNED BASED ON THE FOLLOWING CODES: INTERNATIONAL MECHANICAL CODE 2018, INTERNATIONAL ENERGY CONSERVATION CODE 2015, ASHRAE 62.1, ASHRAE 90.1-2016, ASHRAE 15, UFC 1-200-01, UFC

3-410-01, AND UFC 1-200-02.

2. ALL INFORMATION REQUIRED FOR DESIGN MAY NOT BE COVERED IN THE DRAWINGS. REFER TO DIVISION 23 TECHNICAL

SPECIFICATIONS AND OTHER RELATED SECTIONS FOR ADDITIONAL INFORMATION.

3. ALL DUCT SIZES SHOWN ON THE DRAWINGS ARE NET INSIDE CLEAR DIMENSIONS.

4. UTILIZE LONG RADIUS ELBOWS WHERE SPACE PERMITS UNLESS OTHERWISE NOTED. ALL RECTANGULAR ELBOWS SHALL

CONTAIN TURNING VANES.

5. COORDINATE WITH OTHER UTILITIES TO AVOID INTERFERENCES WHEN INSTALLING DUCTWORK, PIPING AND

EQUIPMENT.

6. FURNISH AND INSTALL ALL EQUIPMENT AS PER MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS. PROVIDE

MODIFICATIONS AND ACCESSORIES AS REQUIRED AND RECOMMENDED BY THE MANUFACTURER TO ASSURE PROPER

OPERATION OF THE EQUIPMENT.

7. VERIFY DIMENSIONS, LOCATIONS, ELEVATIONS AND CONFIGURATION OF ALL ITEMS ASSOCIATED WITH THE

INSTALLATION OF DUCTWORK AND EQUIPMENT.

8. EQUIPMENT, DUCTWORK AND PIPING SHALL NOT BE SUPPORTED OR SECURED TO OTHER EQUIPMENT, DUCTWORK, PIPING OR OTHER UTILITIES.

9. PAINT ALL EQUIPMENT VISIBLE THRU AIR DEVICES MATT BLACK.

10. PROVIDE MANUAL VOLUME DAMPERS IN ALL DUCTWORK AT ALL DUCT SPLITS, BRANCH RUNOUTS AND DUCT COLLARS

FOR REGISTERS. ALL MANUAL DAMPERS MAY NOT BE SHOWN ON DRAWINGS.

11. ALL DUCTWORK SHALL BE CONSTRUCTED, SEALED AND INSTALLED IN CONFORMANCE TO SMACNA DUCT

CONSTRUCTION STANDARDS.

12. TO RESOLVE FIELD PROBLEMS IN ROUTING DUCTWORK THE CONTRACTOR SHALL USE THE SAME CIRCULAR EQUIVALENT

DIAMETER TO TRANSFORM DUCT SIZE FROM THAT SPECIFIED ON THE DRAWINGS.

13. PROVIDE FIRE RESISTANT FLEXIBLE CONNECTION WHENEVER DUCTWORK IS CONNECTED TO MOTORIZED EQUIPMENT.

14. DUCT MATERIAL SHALL BE ZINC-COATED STEEL WITH METAL AND GALVANIZING THICKNESS AS PER SMACNA

CONSTRUCTION STANDARDS.

15. PROVIDE OSHA-REQUIRED CLEARANCES AROUND ALL HVAC EQUIPMENT AND COMPONENTS FOR PERSONNEL ACCESS

AND MAINTENANCE.

16. ALL PIPE HANGERS AND SUPPORTS SHALL COMPLY WITH MANUFACTURER'S STANDARDIZATION SOCIETY (MSS)

STANDARDS. VERTICAL PIPES MUST BE SUPPORTED AT EACH FLOOR WITH PIPE CLAMPS.

17. INSULATE BACKS AND PLENUMS OF SUPPLY AIR DEVICES WITH MINIMUM 1" MINERAL FIBER.

18. ALL AIR MOVING EQUIPMENT CONTAINING PARTICULATE FILTERS SHALL NOT BE OPERATED WITHOUT PARTICULATE

FILTERS IN PLACE.

19. ADD DIELECTRIC CONNECTIONS BETWEEN PIPES OF DIFFERENT METALS.

20. MAINTAIN A VERTICAL SLOPE OF 1/8" PER FOOT IN THE DIRECTION OF FLOW FOR ALL HORIZONTAL CONDENSATE

PIPING.

21. INSTALL ALL PIPING PARALLEL TO BUILDING LINES UNLESS STATED OTHERWISE IN DRAWINGS.

22. ALL ABOVE CEILING EQUIPMENT, DUCTWORK AND PIPING AND ASSOCIATED DEVICES (VALVES, DAMPERS, ETC.) SHALL

BE SUPPORTED FROM DECK AND SHALL BE ACCESSIBLE BY A 5' TALL PERSON STANDING ON A LADDER.

23. PROVIDE MERV 8 FILTERS DURING CONSTRUCTION. REPLACE WITH NEW FILTERS AT SUBSTANTIAL COMPLETION. NEW

FILTERS SHALL BE AS PER SCHEDULE.

24. ALL PIPING PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE SEALED WITH FIRE CAULKING ON BOTH SIDES OF THE

PIPE.

25. ALL EMERGENCY SHUTDOWN BUTTONS THROUGHOUT THE BUILD SHALL BE PROVIDED WITH A CLEAR, NON-LOCKABLE, PLASTIC COVER. INSTALL AT 48" AFF. CONTRACTOR TO FIELD VERIFY TO AVOID CONFLICTS WITH EXISTING AND

PROPOSED FURNITURE, FIXTURES, AND EQUIPMENT.

26. REFER TO TECHNICAL SPECIFICATION 23 07 00 FOR INSULATION TYPE AND THICKNESS FOR MECHANICAL SYSTEMS.

27. ROUTE INSULATED PIPING TIGHT AGAINST CEILING STRUCTURE AND WRAP PIPING BELOW BEAMS. CONCEAL PIPING

ABOVE SUSPENDED CEILINGS TO EXTENT POSSIBLE. DO NOT ROUTE PIPING ABOVE ELECTRICAL OR

TELECOMMUNICATION ROOMS UNLESS IT IS SLEEVED. COORDINATE PIPING LAYOUT WITH OTHER TRADES SUCH AS

DUCTWORK. LIGHTING, ELECTRICAL, FIRE PROTECTION AND BUILDING CONTROLS. PROVIDE SHOP DRAWINGS TO

CLEARLY SHOW PIPING ROUTING AND COORDINATION WITH OTHER ELEMENTS. IN CASE OF CONFLICT, COORDINATE

REROUTING OF UTILITIES WITH ENGINEER AND ARCHITECT.

28. PROVIDE LINE SIZE MANUAL ISOLATION VALVES AT ALL MAJOR PIPING TAKE OFFS. REFER TO PIPING SCHEMATIC FOR

VALVE LOCATION AND SIZES. INSTALL ISOLATION VALVES IN ACCESSIBLE LOCATIONS. PROVIDE ADEQUATELY SIZED

ACCESS DOORS WHERE REQUIRED.

29. PROVIDE DRAIN AND VENT CONNECTIONS AT LOWEST AND HIGHEST POINTS OF CHILLED WATER PIPING SEGMENTS.

30. FOR AIR HANDLING UNITS OVER 2000 CFM, PROVIDE SMOKE DETECTORS IN THE SUPPLY AIR DUCT UPSTREAM OF ANY

BRANCH CONNECTIONS AND IN THE RETURN AIR DUCT UPSTREAM OF FILTERS AND OUTSIDE AIR CONNECTION. DUCT

SMOKE DETECTORS SHALL SHUT DOWN UNIT UPON ACTIVATION AND SIGNAL ALARM TO FIRE ALARM PANEL.

CONTRACTOR TO COORDINATE WITH OWNER’S REPRESENTATIVE FOR FIRE ALARM SYSTEM INFORMATION. FOR

DUCTLESS SYSTEMS SUPPLYING OVER 2000 CFM, THE UNIT SHALL SHUT DOWN UPON ACTIVATION OF THE ROOM

SMOKE DETECTOR. SMOKE DETECTORS SHALL BE FURNISHED AND WIRED BY THE FIRE ALARM CONTRACTOR. THE

MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR MOUNTING THE SMOKE DETECTOR IN DUCTWORK IN

ACCORDANCE WITH THE MANUFACTURE’S PRINTED INSTRUCTIONS. COMPLY WITH NFPA 72.

TO BE DEMOLISHED

TO BE DEMOLISHED

E HVAC EMERGENCY SHUTDOWN SWITCH

B BOILER

BCP BOILER CIRCULATION PUMP

CHP CHILLED WATER PUMP

HWP HOT WATER PUMP

CH CHILLER

ET EXPANSION TANK

BT BUFFER TANK

CI CHEMICAL INJECTOR

AHU MINI-SPLIT AIR HANDLING UNIT

CU MINI-SPLIT AIR COOLED

CONDENSING UNIT

AS AIR SEPARATOR

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

R REFRIGERANT

DUAL TECHNOLOGY SENSORDS

SOUND TRANSMISSION CLASSSTC

DH DEHUMIDIFIER

HM HUMIDIFIER

FCU FAN COIL UNIT

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

M-001

L E

G E

N D

A

B B

R E

V

IA

T

IO

N S

A

N D

G E

N E

R A

L N

O T

E S

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G

J O

IN

T

B A

S E

S A

N A

N T

O N

IO

F

O R

T S

A M

H O

U S

T O

N T

X

K E

N A

L L

F N

I S

A V

O Y

D R

IV

E

S

U

IT

E

H O

U S

T O

N T

E X

A S

P H

O N

E (8

-8

A J S

A J S

V R

N

A U

G U

S T

K F

B

L D

G H

V A

C

FINAL SUBMITTAL

M -0

R E

E

NI

GNELANOI

SS

E F

O R

S

TATE O

SAXETF

P

RYAN EDWARDS

131050

NECI

L

SED

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

W

G

B

08/09/2019

DN

EE

E7.2 E7.8

E

D

C

W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18

WA

WB

WC

WD

EA

EB

EC

ED

E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12

G

G

4"HWR

OFFICE 6

OFFICE 5

OFFICE 4

MECH

OFFICE 3

OFFICE 2

OFFICE 1

OPEN/CONFERERENCE

STORAGE 1

STORAGE 2

COMM 1

SPRINKLER

LAUNDRY

3" DTR

3" DTS

4" CHR

4" CHS

BOILER

1012 MECHANICAL

W. TOIL

CORRIDOR

M. TOIL

STORAGE

OFFICE AREA

STORAGE

OFFICE 3

AHU-2

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

MD-101

H V

A C

D

E M

O L

IT

IO

N

P L A

N

F

IR

S T

F L O

O R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G

J O

IN

T

B A

S E

S A

N A

N T

O N

IO

F

O R

T S

A M

H O

U S

T O

N T

X

K E

N A

L L

F N

I S

A V

O Y

D R

IV

E

S

U

IT

E

H O

U S

T O

N T

E X

A S

P H

O N

E (8

-8

A J S

A J S

V R

N

A U

G U

S T

K F

B

L D

G H

V A

C

FINAL SUBMITTAL

M D

-1

1/8" = 1'-0"1

HVAC - DEMOLITION PLAN - FIRST FLOOR

1. REFER TO M-001 FOR LEGEND, ABBREVIATIONS, AND

GENERAL NOTES.

2. DEMOLISH ALL EQUIPMENT, DUCT WORK, PIPING,

AND SUPPORTS TO THE EXTENT SHOWN.

3. REPAIR EXISTING CONCRETE PAD FOR REUSE.

0' 8' 16'

GRAPHIC SCALE 1/8" = 1'-0"

4'

NORTH

NOTES BY SYMBOL " "

1. DEMOLISH AIR HANDLING UNIT, ASSOCIATED SUPPORTS,

PIPING, DUCTWORK, DIFFUSERS, AND CONTROL WIRING.

2. DEMOLISH EXHAUST FAN AND ASSOCIATED DUCTWORK,

SUPPORTS, AND CONTROL WIRING; REPAIR RESULTING ROOF

OPENING FOR REUSE. RE: ARCHITECTURAL DRAWING.

3. DEMOLISH BOILER, EXISTING PUMPS, EXPANSION TANK, AIR

SEPARATOR, AND ASSOCIATED EQUIPMENT, PIPING,

CONTROLS, OTHER ACCESSORIES IN THEIR ENTIRETY. REPAIR

EXISTING CONCRETE PAD FOR REUSE.

4. DEMOLISH WINDOW LOUVER; INFILL RESULTING OPENING.

RE: AD101.

5. DEMOLISH CHILLER, EXISTING PUMP, EXPANSION TANK, AIR

SEPARATOR, ASSOCIATED EQUIPMENT, PIPING, CONTROLS,

AND OTHER ACCESSORIES IN THEIR ENTIRETY. REPAIR

EXISTING CONCRETE PAD FOR REUSE. RETURN CHILLER

EQUIPMENT TO OWNER.

6. DEMOLISH UNDERGROUND PIPING.

7. DEMOLISH WALL MOUNTED LOUVER; PATCH RESULTING WALL

OPENING. RE: ARCHITECTURAL DRAWING.

8. DEMOLISH UNDERGROUND PIPING TO THIS LOCATION WHERE

THE LINES WERE CAPPED DURING PREVIOUS RENOVATION.

9. DEMOLISH EXISTING CHILLED WATER PIPING, REPAIR

RESULTING WALL PENETRATION FOR REUSE.

10. DEMOLISH EXISTING CHILLED WATER PIPING, PATCH

RESULTING WALL PENETRATION.

11. EXISTING VENT FOR WATER HEATER TO REMAIN.

GENERAL NOTES:

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

R E

E

NI

GNELANOI

SS

E F

O R

S

TATE O

SAXETF

P

RYAN EDWARDS

131050

NECI

L

SED

W

G

B

EE

EF

E7.2 E7.8

E

D

C

W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18

WA

WB

WC

WD

EA

EB

EC

ED

E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12

ROCK

REHERSAL

LIBRARY

COMM

OFFICE AREA

LARGE

REHERSAL

STORAGE

CORRIDOR

MECHANICAL

CLASSROOM

ELEC.

CORRIDOR

CORRIDOR

CORRIDOR

OFFICE

OFFICE

OFFICE

OFFICE

M. TOIL

MECHANICAL

W. TOIL

AHU-3

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

MD-102

H V

A C

D E

M O

L

IT

IO

N

P L A

N

S E

C O

N D

F L O

O R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G

J O

IN

T

B A

S E

S A

N A

N T

O N

IO

F

O R

T S

A M

H O

U S

T O

N T

X

K E

N A

L L

F N

I S

A V

O Y

D R

IV

E

S

U

IT

E

H O

U S

T O

N T

E X

A S

P H

O N

E (8

-8

D e s ig n e r

A u th o r

C h e c k e r

A U

G U

S T

K F

B

L D

G H

V A

C

FINAL SUBMITTAL

M D

-1

1/8" = 1'-0"1

HVAC - DEMOLITION PLAN - SECOND FLOOR

R E

E

NI

GNELANOI

SS

E F

O R

S

TATE O

SAXETF

P

RYAN EDWARDS

131050

NECI

L

SED

NORTH

0' 8' 16'

GRAPHIC SCALE 1/8" = 1'-0"

4'

1. REFER TO M-001 FOR LEGEND, ABBREVIATIONS, AND GENERAL

NOTES.

2. DEMOLISH ALL EQUIPMENT, DUCT WORK, PIPING, AND

SUPPORTS TO THE EXTENT SHOWN.

3. REPAIR EXISTING CONCRETE PAD FOR REUSE.

NOTES BY SYMBOL " "

1. DEMOLISH MULTI-ZONE AIR HANDLING UNIT, ASSOCIATED

SUPPORTS, PIPING, DUCTWORK, DIFFUSERS, AND CONTROL

WIRING.

2. DEMOLISH EXHAUST FAN, ASSOCIATED DUCTWORK, SUPPORTS,

AND CONTORL WIRING; REPAIR RESULTING ROOF OPENING FOR

REUSE. RE: ARCHITECTURAL DRAWING.

3. REMOVE EXISTING CONTROL PANEL AND ASSOCIATED CONTROL

WIRING. RETURN THE PANEL TO OWNER.

4. DEMOLISH WINDOW LOUVER; INFILL RESULTING OPENING. RE:

AD101.

GENERAL NOTES:

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

W

G

B

EE

EF

E7.2 E7.8

E

D

C

W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18

WA

WB

WC

WD

EA

EB

EC

ED

E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12

IND.

PRACTICE

ROOMS

COMM.

SUPPLY

OFFICE

MEN LOCKER

MEN SHOWER

MENS

CORR.

C108

INSTRUMENT

STORAGE

SPRINKLER

MECH / ELECT

INSTRUMENT

MAINTENANCE

116 STG

CORR.

C107

CORR.

C106

GROUP

REHEARSAL 1

STORAGE

STORAGE

CORR.

C110

CORR.

C105

MECHANICAL /

ELECTRICAL

GROUP

REHEARSAL 4

OPEN OFFICE

MACHINE

ELEV.

E1CORR.

C104

CORR.

C101

RECEPT.

CORR.

C102

WOMEN

WOMEN

LOCKER

STORAGE

SHOWERS

MECHANICAL

ELECTRICAL

JAN

C 125 C 125

C 140

E 225

C 150 C 140

B 140

EF-2

DOAS-1

FCU

1-4

FCU

1-3

FCC

1-2

FCC

1-1

CU-2

AHU-2-1

CU-1

AHU-1-1

FCU

1-7

FCU

1-8

FCU

1-9

A 20

A 50

G 20

G 20

A 50

A 30

B 75

B 65

A 25

A 55

B 80

E 225

E 120

E 175

E 175

E -

E - E -

H -

E 70

E -

G 100

E -

E 150E 180

F 70

E 200

B 60

B 85

C 185

C 180

C 150

E -

B 100

E -

D 270

E -

F -

F -

E -E -E -E -E -E - B 80

C 140

DH-1

B 70

C 185

C 185

E -

D 250D 250 C 150

C 150

6/4

8/6 4/4

8/6 10/8

8/6 4/4

10/6

12/8

6/4

10/6

/1

18/8

12/8

18/10

18/14

6/6

18/14 18/14 16/10

16/10

8/6

8/6

16/10

10/6

12/10

8/8

12/1010/10

8/6

10/8 10/8

14/8

10/6

12/10

8/6

14/12 10/8

14/12

14/8

10/6

8/6

16/8

12/8 10/6

10/6

/8

12/8 10/6

10/8

10/6

10/8

8/8

8/48/4

10/8

/1

6/6

6/6

12/612/612/6

12/6 8/6

8/6

12/6

6/6

8/6

E -

E -

E

E E

E

E

E

E

H

S

B-1

8/4

C 100C 100

G 60 C 160

E - E -E -

C 120 G 60 12/8

FCU

1-5

D 260

E -

E -E -

12/616/10

16/10

16/10

18/14

12/8

D 260D 280

18 18

E 150

(TYP.)

6/8

CORR.

C103

22 2222

8/6

10/6

GROUP

REHEARSAL 2

GROUP

REHEARSAL 3

8/6

FCU

1-6

18/14

10/8

12/818/14

8/8

10/6

10/8

14/8

10/6

8/8 12/8

8/6

/8

16/10

10/6

18/8

A 20

16/8

16/10

12/10

/2

/1

14/16

/6

2 2

18/10

HM-1

H

8/4

6/6

12/8

10/10

12/12

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

MH-101

H V

A C

F L O

O R

P L A

N

F

IR

S T

F L O

O R

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G

J O

IN

T

B A

S E

S A

N A

N T

O N

IO

F

O R

T S

A M

H O

U S

T O

N T

X

K E

N A

L L

F N

I S

A V

O Y

D R

IV

E

S

U

IT

E

H O

U S

T O

N T

E X

A S

P H

O N

E (8

-8

D e s ig n e r

A u th o r

C h e c k e r

A U

G U

S T

K F

B

L D

G H

V A

C

FINAL SUBMITTAL

M H

-1

1/8" = 1'-0"1

HVAC - EQUIPMENT/DUCTWORK PLAN - FIRST FLOOR

R E

E

NI

GNELANOI

SS

E F

O R

S

TATE O

SAXETF

P

RYAN EDWARDS

131050

NECI

L

SED

1. REFER TO M-001 FOR LEGEND, ABBREVIATIONS, AND GENERAL NOTES.

2. REFER TO DIVISION 23 FOR TECHNICAL SPECIFICATIONS.

3. REFER TO ELECTRICAL DRAWINGS FOR POWER ROUTING/CONNECTION

TO MECHANICAL EQUIPMENT.

4. PROVIDE 120V THERMOSTATICALLY CONTROLLED HEAT TRACE ON ALL

EXTERIOR PIPING BENEATH INSULATION. INSTALL PER MANUFACTURER

RECOMMENDATIONS.

5. ROUTE DUCT TO AVOID CONFLICTS WITH STRUCTURAL MEMBERS,

ELECTRICAL EQUIPMENT, LIGHTS, AND OTHER UTILITIES.

6. REFER TO M-103 & M-104 FOR CONDENSATE DRAIN AND PIPING

LAYOUT.

7. INSTALL THERMOSTATS AT 48" AFF.

8. USE EXISTING AIR INTAKE HOOD AND EXHAUST VENT ON ROOF. REFER

TO D1/A-520 FOR DETAILS ON CONNECTION OF DUCT AND

HOOD/VENT.

NOTES BY SYMBOL " "

12. DOAS-1 SUPPLY INLET, CONNECT TO SUPPLY DUCT; ROUTE DUCT FROM EXISTING AIR INTAKE

HOOD ON ROOF DOWN TO THE UNIT.

13. BOILER VENT OUTLET CONNECT TO 3" DIA EXHAUST DUCT. ROUTE DUCT UP THROUGH ROOF, TERMINATE WITH EXISTING VENT CAP ABOVE ROOF. REFER TO MH-102 FOR MORE INFORMATION

ON DUCT ROUTING.

14. PROVIDE BOILER, PUMPS, ACCESSORIES, AND ASSOCIATED PIPING; USE EXISTING CONCRETE PAD.

PROVIDE VIBRATION ISOLATION FOR THE UNIT; RE: M-602.

15. PROVIDE COOLING ONLY MINI SPLIT SYSTEM; SECURE OUTDOOR UNIT ON NEW CONCRETE PAD, MOUNT BOTTOM OF INDOOR UNIT AT 8 FT AFF. PROVIDE FULL-SIZE CONDENSATE DRAIN FOR

INDOOR UNIT. RE: M-103 FOR CONDENSATE DRAIN PIPING ROUTING. RE: 4/M503 FOR DETAIL. RE:

M-601 FOR EQUIPMENT SCHEDULE.

16. PROVIDE EMERGENCY SHUTDOWN SWITCH WITH NON-LOCKING CLEAR PLASTIC COVER TO SHUT

DOWN ALL EQUIPMENT CONNECTED TO BAS; INSTALL AT 48" AFF.

17. HUMIDIFIER; RH% SETPOINT: 47% (ADJ.). RE: M-602 FOR SCHEDULE. RE: PP-103 FOR POTABLE

WATER ROUTING. RE: M-103 FOR CONDENSATE DRAIN.

18. DUCTLESS CASSETTE FCU.

19. DUCTED FAN COIL UNIT.

20. 32"X28" EXHAUST LOUVER; FREE AREA: 3.2 SQ FT. DUCT TO IN-LINE EXHAUST FAN EF-2. REFER TO

SPECIFICATION SECTION 08 90 00 LOUVERS AND VENTS FOR DETAILS.

21. COMBUSTION AIR DUCT FOR BOILER, TAP FROM DOAS-1 SUPPLY DUCT.

22. DUCT PENETRATION THROUGH STC-55 RATED WALL. APPLY STC-55 RATED DOUBLE-WALL DUCT

SILENCER TO DUCT MIN. 6FT FROM BOTH SIDES OF THE WALL. RE: M-505.

23. PROVIDE COOLING ONLY MINI SPLIT SYSTEM; SECURE OUTDOOR UNIT ON NEW CONCRETE PAD, MOUNT BOTTOM OF INDOOR UNIT AT 8 FT AFF. PROVIDE FULL-SIZE CONDENSATE DRAIN FROM

INDOOR UNIT, EXTEND THROUGH WALL DROP DOWN AND TERMINATE AT APPROVED

TERMINATION POINT. RE: 4/M503 FOR DETAIL. RE: M-601 FOR EQUIPMENT SCHEDULE.

24. PROVIDE CHILLED WATER PUMPS, EXPANSION TANK, AND CHEMICAL INJECTOR; INSTALLED ON

NEW CONCRETE PAD. RE: M-103 FOR MORE INFORMATION ON CONNECTION AND PIPING

ROUTING.

25. PROVIDE BOILER WATER PUMPS, EXPANSIN TANK, AND CHEMICAL INJECTOR; INSTALLED ON NEW

CONCRETE PAD. RE: M-103 FOR MORE INFORMATION ON CONNECTION AND PIPING ROUTING.

26. EXISTING VENT FOR WATER HEATER TO REMAIN.

GENERAL NOTES:

NORTH

0' 8' 16'

GRAPHIC SCALE 1/8" = 1'-0"

4'

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

NOTES BY SYMBOL " " CONT.

1. PROVIDE DOAS UNIT AND INSTALL ON EXISTING CONCRETE PAD.

2. 24"x12" DOOR LOUVER FOR PRESSURE BALANCE; REFER TO

SPECIFICATION SECTION 08 90 00 LOUVERS AND VENTS FOR DETAILS.

3. ROUTE DUCTWORK UNDER THE BEAM.

4. EXHAUST DUCT UP TO SECOND FLOOR, AND CONNECT TO INLINE

EXHAUST FAN, EF-1.

5. OUTSIDE AIR SUPPLY/RETURN DUCT; ROUTE DOWN AND CONNECT TO

DOAS-1 INSTALLED IN ROOM 108. RETURN AIR SHALL BE DIRECTED TO

DOAS MIXING BOX FOR ENERGY RECOVERY.

6. OUTSIDE AIR SUPPLY/RETURN DUCT; ROUTE UP AND CONNECT TO

DOAS-2 INSTALLED IN ROOM 219. RETURN AIR SHALL BE DIRECTED TO

DOAS MIXING BOX FOR ENERGY RECOVERY.

7. EXISTING BEAM.

8. DEHUMIDIFIER; RH% SETPOINT: 50% (ADJ.). REFER TO M-602 FOR

SCHEDULE. RE: M-103 FOR CONDENSATE DRAIN.

9. CONTROL PANELS; RE: ELECTRICAL.

10. ACCEPTABLE LOCATION FOR DDC SUB-PANEL. CONTROL CONTRACTOR

SHALL VERIFY QUANTITIES AND LOCATIONS OF ALL CONTROLLERS

PRIOR TO BID AND COORDINATE POWER REQUIREMENTS WITH

ELECTRICAL CONTRACTOR.

11. DOAS-1 EXHAUST OUTLET, CONNECT TO EXHAUST DUCT; ROUTE DUCT

UP THROUGH ROOF, TERMINATE WITH EXISTING VENT CAP ABOVE

ROOF. RE: MD-102 FOR MORE INFORMATION ON DUCT ROUTING.

W

G

B

General Sheets
Cover Sheet
Mechanical Sheets
M-001
MD-101
MD-102
MH-101

File details come from the government source that posted it.