"X" INDICATES ZONE)
(LOCAL CONTROL
SP
DOUBLE LINE
DUCTWORK SYMBOLS
PIPING SYMBOLS
TRIPLE DUTY VALVE
BUTTERFLY VALVE
PRESSURE
REDUCING VALVE
2-WAY CONTROL VALVE
3-WAY CONTROL VALVE
CHECK VALVE
OS&Y VALVE
PIPE FLANGE
STRAINER W/
BLOWDOWN VALVE
GATE VALVE
BALL VALVE
GLOBE VALVE
TEE OUTLET DOWN
DIRECTION OF FLOW
DIRECTION OF SLOPE
UNION
HORSEPOWER
VALVE IN RISE
TEE OUTLET UP
VALVE IN CENTER
DROP
VALVE IN DROP
ELBOW DOWN
ELBOW UP
HTG
HP
HEATING
PRESSURE GAUGE
PUMP
THERMOMETER
FLEXIBLE CONNECTION
AIR DEVICES, PUMPS, ETC.)
EXISTING EQUIPMENT (FANS,
DIFFUSER/GRILLE/REGISTER LABEL:
"A" - TYPE/DESIGNATION
"200" - AIRFLOW (CFM)
THERMOSTAT
H
T
TT
TO BE RELOCATED.
WITH GAUGE COCK
PRESSURE GAUGE
PRESSURE SWITCH
T&P RELIEF VALVE
AUTOMATIC AIR VENT
MANUAL AIR VENT
WATER GAUGE
FLOW SWITCH
CAP ON END LINE
PIPE GUIDE
EXPANSION JOINT
PIPE ANCHOR
FS
PS
X
WB
WG
WET BULB
D U
C T
W O
R K
EXISTING
TO REMAIN
P
IP
IN
G
NEW
NEW
EXISTING
TO REMAIN
SINGLE LINE
PLAN SYMBOLOGY
DUCTWORK SIZE TRANSITION.
ENERGY MONITORING AND CONTROL SYSTEM
ABBREVIATIONS
(ALL SYMBOLS SHOWN ARE NOT NECESSARILY USED ON THE DRAWINGS)
CC COOLING COIL
EFFICIENCYEFF
HEATING COIL
GALLONS PER MINUTE
FEET PER MINUTEFPM
HC
HVAC
HZHZ
GPM
FT
HERTZ
FEET, FOOT
FLEX
F
EMCS
EXH
EL
FLEXIBLE
FAHRENHEIT
ELEVATION
EXHAUST
DIRECT DIGITAL CONTROL
DIRECT EXPANSION
ELECTRIC/ELECTRICAL
ENTERING AIR TEMPERATURE
CUBIC FEET PER MINUTE
CONNECTION
CONDENSATE DRAIN
DWGS
EAT
ELEC
DDC
DEG
DX
DRAWINGS
DEGREE
CONN
DIA
DB
dB
CFM
CD
DIAMETER
DRY BULB
DECIBELS
HVAC SYMBOLS
BUILDING AUTOMATION SYSTEM
BRITISH THERMAL UNIT PER HOUR
BRAKE HORSEPOWER
AIR CONDITIONING
ARCHITECTURE/ARCHITECTURAL
APPROXIMATELY
ABOVE FINISHED FLOOR
BAS
BTUH
BHP
ASHRAE
A/C
ARCH
AFF
APPROX
NOISE CRITERIANC
SMACNA
SUPPLY AIR
VOLUME DAMPER
VARIABLE AIR VOLUME
UNLESS NOTED OTHERWISE
THERMOSTAT
SQUARE FEET
TEMPERATURE
STATIC PRESSURE
WATER COLUMN
VARIABLE FREQUENCY DRIVE
TYP TYPICAL
VFD
VD
WC
WTR
VAV
UNO
WATER
SA
T-STAT
TEMP
SP
SQ FT
NORMALLY OPEN
NORMALLY CLOSED
POUNDS PER SQUARE INCH
RETURN AIR
OUTSIDE AIR
NOT TO SCALE
REVOLUTIONS PER MINUTE
RE
RA
RPM
PSI
PLBG
P/PH
REFER/REFERENCE
PLUMBING
PHASE
NO
N.C.
N.O.
OA
NTS
NOM
NUMBER
NOMINAL
FLARED SPIN-IN TAP WITH DAMPER
RADIUS DUCTWORK ELBOW
ROUND OR RECTANGULAR
SPIN-IN TAP WITH DAMPER
RADIUS DUCTWORK ELBOW
ROUND OR RECTANGULAR
FLEXIBLE DUCT
RETURN/TRANSFER AIR DUCT
SUPPLY OR OUTSIDE AIR DUCT
RELIEF OR EXHAUST AIR DUCT
NATIONAL FIRE PROTECTION ASSOC.
MECHANICAL
LEAVING WATER TEMPERATURE
THOUSANDS BTU's PER HOUR
MINIMUM CIRCUIT AMPACITY
LEAVING AIR TEMPERATURE
LWT
NFPA
MIN
MBH
MECH
MAX
MCA
MINIMUM
MAXIMUM
IN
KW
LAT
INCHES
KILOWATT
ROUND DUCTWORK
RETURN/TRANSFER AIR GRILLE
EXHAUST GRILLE
SUPPLY AIR PLENUM SLOT DIFFUSER
FCC FAN COIL CASSETTES
DRAWING NOTE REFERENCE
DIAMETER/PHASE
DUCT SMOKE DETECTOR
P
S
C
MISCELLANEOUS
R
X
PIPING TYPES
EQUIPMENT DESIGNATIONS
CD CONDENSATE DRAIN (COLD)
CHR CHILLED WTR RETURN
CHS CHILLED WTR SUPPLY
DTR DUAL TEMP RETURN
DTS DUAL TEMP SUPPLY
DE = CIRCULAR EQUIVALENT OF RECTANGULAR DUCT
GENERAL NOTES
IN-LINE 90 DEGREE RISE
SD - SMOKE DAMPER
FSD - COMBINATION
FIRE/SMOKE DAMPER
RELIEF OR EXHAUST
AIR DUCT DOWN
MANUAL VOLUME
(BALANCE) DAMPER
90° ELBOW WITH
TURNING VANES
RELIEF OR EXHAUST
AIR DUCT UP
RETURN AIR DUCT DOWN
INCLINED DROP IN DUCT
INCLINED RISE IN DUCT
FD - FIRE DAMPER
MOTORIZED DAMPER
OR DROP IN DUCT
IN INCHES
SUPPLY OR OUTSIDE
AIR DUCT UP
SUPPLY OR OUTSIDE
AIR DUCT DOWN
FLEXIBLE DUCT
CONNECTION
RETURN AIR DUCT UP
TO EQUIPMENT
A 200
CENTIGRADEC
WT WATTS
ENTERING WATER TEMPERATUREEWT
12/12
12"
FD
M
DN
UP
B = LENGTH OF OTHER SIDE OF DUCT IN INCHES
A = LENGTH OF ONE SIDE OF DUCT IN INCHES
BALANCING VALVE
WITH DIFFERENTIAL
PRESSURE TAPS
HEATING, VENTILATION AND AIR CONDITIONING
SHEET METAL AND AIR CONDITIONING
CONTRACTORS NATIONAL ASSOC.
DUCT MOUNTED STATIC
PRESSURE SENSOR
HUMIDITY SENSOR
TEMPERATURE SENSOR
CO2 SENSOR
PRESSURE SENSOR
SENSOR WITH NON-LOCKING
PROTECTIVE GUARD
POINT OF NEW
CONNECTION BETWEEN
NEW AND EXISTING WORK
ROUND DUCT BRANCH TAKE-OFF FROM
RECTANGULAR OR FLAT OVAL MAIN WITH
CONICAL TAP. PROVIDE BALANCE DAMPER
FOR LOW PRESSURE DUCTWORK ONLY
RECTANGULAR DUCTWORK BRANCH TAKE-OFF
W/DAMPER AND 45 DEGREE BRANCH INLET
AMERICAN SOCIETY OF HEATING,
REFRIGERATION, AND
AIR CONDITIONING ENGINEERS
RECTANGULAR DUCTWORK. SIZE INDICATED IN
INCHES, FIRST NUMBER IS SIDE SHOWN
SUPPLY AIR DIFFUSER - ARROWS INDICATE
PATTERN. NO ARROWS SHOWN EQUALS
4-WAY.
DE =
1.30 (AB)
(A + B)
0.625
0.250
EF EXHAUST FAN
1. THIS PROJECT IS DESIGNED BASED ON THE FOLLOWING CODES: INTERNATIONAL MECHANICAL CODE 2018, INTERNATIONAL ENERGY CONSERVATION CODE 2015, ASHRAE 62.1, ASHRAE 90.1-2016, ASHRAE 15, UFC 1-200-01, UFC
3-410-01, AND UFC 1-200-02.
2. ALL INFORMATION REQUIRED FOR DESIGN MAY NOT BE COVERED IN THE DRAWINGS. REFER TO DIVISION 23 TECHNICAL
SPECIFICATIONS AND OTHER RELATED SECTIONS FOR ADDITIONAL INFORMATION.
3. ALL DUCT SIZES SHOWN ON THE DRAWINGS ARE NET INSIDE CLEAR DIMENSIONS.
4. UTILIZE LONG RADIUS ELBOWS WHERE SPACE PERMITS UNLESS OTHERWISE NOTED. ALL RECTANGULAR ELBOWS SHALL
CONTAIN TURNING VANES.
5. COORDINATE WITH OTHER UTILITIES TO AVOID INTERFERENCES WHEN INSTALLING DUCTWORK, PIPING AND
EQUIPMENT.
6. FURNISH AND INSTALL ALL EQUIPMENT AS PER MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS. PROVIDE
MODIFICATIONS AND ACCESSORIES AS REQUIRED AND RECOMMENDED BY THE MANUFACTURER TO ASSURE PROPER
OPERATION OF THE EQUIPMENT.
7. VERIFY DIMENSIONS, LOCATIONS, ELEVATIONS AND CONFIGURATION OF ALL ITEMS ASSOCIATED WITH THE
INSTALLATION OF DUCTWORK AND EQUIPMENT.
8. EQUIPMENT, DUCTWORK AND PIPING SHALL NOT BE SUPPORTED OR SECURED TO OTHER EQUIPMENT, DUCTWORK, PIPING OR OTHER UTILITIES.
9. PAINT ALL EQUIPMENT VISIBLE THRU AIR DEVICES MATT BLACK.
10. PROVIDE MANUAL VOLUME DAMPERS IN ALL DUCTWORK AT ALL DUCT SPLITS, BRANCH RUNOUTS AND DUCT COLLARS
FOR REGISTERS. ALL MANUAL DAMPERS MAY NOT BE SHOWN ON DRAWINGS.
11. ALL DUCTWORK SHALL BE CONSTRUCTED, SEALED AND INSTALLED IN CONFORMANCE TO SMACNA DUCT
CONSTRUCTION STANDARDS.
12. TO RESOLVE FIELD PROBLEMS IN ROUTING DUCTWORK THE CONTRACTOR SHALL USE THE SAME CIRCULAR EQUIVALENT
DIAMETER TO TRANSFORM DUCT SIZE FROM THAT SPECIFIED ON THE DRAWINGS.
13. PROVIDE FIRE RESISTANT FLEXIBLE CONNECTION WHENEVER DUCTWORK IS CONNECTED TO MOTORIZED EQUIPMENT.
14. DUCT MATERIAL SHALL BE ZINC-COATED STEEL WITH METAL AND GALVANIZING THICKNESS AS PER SMACNA
CONSTRUCTION STANDARDS.
15. PROVIDE OSHA-REQUIRED CLEARANCES AROUND ALL HVAC EQUIPMENT AND COMPONENTS FOR PERSONNEL ACCESS
AND MAINTENANCE.
16. ALL PIPE HANGERS AND SUPPORTS SHALL COMPLY WITH MANUFACTURER'S STANDARDIZATION SOCIETY (MSS)
STANDARDS. VERTICAL PIPES MUST BE SUPPORTED AT EACH FLOOR WITH PIPE CLAMPS.
17. INSULATE BACKS AND PLENUMS OF SUPPLY AIR DEVICES WITH MINIMUM 1" MINERAL FIBER.
18. ALL AIR MOVING EQUIPMENT CONTAINING PARTICULATE FILTERS SHALL NOT BE OPERATED WITHOUT PARTICULATE
FILTERS IN PLACE.
19. ADD DIELECTRIC CONNECTIONS BETWEEN PIPES OF DIFFERENT METALS.
20. MAINTAIN A VERTICAL SLOPE OF 1/8" PER FOOT IN THE DIRECTION OF FLOW FOR ALL HORIZONTAL CONDENSATE
PIPING.
21. INSTALL ALL PIPING PARALLEL TO BUILDING LINES UNLESS STATED OTHERWISE IN DRAWINGS.
22. ALL ABOVE CEILING EQUIPMENT, DUCTWORK AND PIPING AND ASSOCIATED DEVICES (VALVES, DAMPERS, ETC.) SHALL
BE SUPPORTED FROM DECK AND SHALL BE ACCESSIBLE BY A 5' TALL PERSON STANDING ON A LADDER.
23. PROVIDE MERV 8 FILTERS DURING CONSTRUCTION. REPLACE WITH NEW FILTERS AT SUBSTANTIAL COMPLETION. NEW
FILTERS SHALL BE AS PER SCHEDULE.
24. ALL PIPING PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE SEALED WITH FIRE CAULKING ON BOTH SIDES OF THE
PIPE.
25. ALL EMERGENCY SHUTDOWN BUTTONS THROUGHOUT THE BUILD SHALL BE PROVIDED WITH A CLEAR, NON-LOCKABLE, PLASTIC COVER. INSTALL AT 48" AFF. CONTRACTOR TO FIELD VERIFY TO AVOID CONFLICTS WITH EXISTING AND
PROPOSED FURNITURE, FIXTURES, AND EQUIPMENT.
26. REFER TO TECHNICAL SPECIFICATION 23 07 00 FOR INSULATION TYPE AND THICKNESS FOR MECHANICAL SYSTEMS.
27. ROUTE INSULATED PIPING TIGHT AGAINST CEILING STRUCTURE AND WRAP PIPING BELOW BEAMS. CONCEAL PIPING
ABOVE SUSPENDED CEILINGS TO EXTENT POSSIBLE. DO NOT ROUTE PIPING ABOVE ELECTRICAL OR
TELECOMMUNICATION ROOMS UNLESS IT IS SLEEVED. COORDINATE PIPING LAYOUT WITH OTHER TRADES SUCH AS
DUCTWORK. LIGHTING, ELECTRICAL, FIRE PROTECTION AND BUILDING CONTROLS. PROVIDE SHOP DRAWINGS TO
CLEARLY SHOW PIPING ROUTING AND COORDINATION WITH OTHER ELEMENTS. IN CASE OF CONFLICT, COORDINATE
REROUTING OF UTILITIES WITH ENGINEER AND ARCHITECT.
28. PROVIDE LINE SIZE MANUAL ISOLATION VALVES AT ALL MAJOR PIPING TAKE OFFS. REFER TO PIPING SCHEMATIC FOR
VALVE LOCATION AND SIZES. INSTALL ISOLATION VALVES IN ACCESSIBLE LOCATIONS. PROVIDE ADEQUATELY SIZED
ACCESS DOORS WHERE REQUIRED.
29. PROVIDE DRAIN AND VENT CONNECTIONS AT LOWEST AND HIGHEST POINTS OF CHILLED WATER PIPING SEGMENTS.
30. FOR AIR HANDLING UNITS OVER 2000 CFM, PROVIDE SMOKE DETECTORS IN THE SUPPLY AIR DUCT UPSTREAM OF ANY
BRANCH CONNECTIONS AND IN THE RETURN AIR DUCT UPSTREAM OF FILTERS AND OUTSIDE AIR CONNECTION. DUCT
SMOKE DETECTORS SHALL SHUT DOWN UNIT UPON ACTIVATION AND SIGNAL ALARM TO FIRE ALARM PANEL.
CONTRACTOR TO COORDINATE WITH OWNER’S REPRESENTATIVE FOR FIRE ALARM SYSTEM INFORMATION. FOR
DUCTLESS SYSTEMS SUPPLYING OVER 2000 CFM, THE UNIT SHALL SHUT DOWN UPON ACTIVATION OF THE ROOM
SMOKE DETECTOR. SMOKE DETECTORS SHALL BE FURNISHED AND WIRED BY THE FIRE ALARM CONTRACTOR. THE
MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR MOUNTING THE SMOKE DETECTOR IN DUCTWORK IN
ACCORDANCE WITH THE MANUFACTURE’S PRINTED INSTRUCTIONS. COMPLY WITH NFPA 72.
TO BE DEMOLISHED
TO BE DEMOLISHED
E HVAC EMERGENCY SHUTDOWN SWITCH
B BOILER
BCP BOILER CIRCULATION PUMP
CHP CHILLED WATER PUMP
HWP HOT WATER PUMP
CH CHILLER
ET EXPANSION TANK
BT BUFFER TANK
CI CHEMICAL INJECTOR
AHU MINI-SPLIT AIR HANDLING UNIT
CU MINI-SPLIT AIR COOLED
CONDENSING UNIT
AS AIR SEPARATOR
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
R REFRIGERANT
DUAL TECHNOLOGY SENSORDS
SOUND TRANSMISSION CLASSSTC
DH DEHUMIDIFIER
HM HUMIDIFIER
FCU FAN COIL UNIT
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
M-001
L E
G E
N D
A
B B
R E
V
IA
T
IO
N S
A
N D
G E
N E
R A
L N
O T
E S
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G
J O
IN
T
B A
S E
S A
N A
N T
O N
IO
F
O R
T S
A M
H O
U S
T O
N T
X
K E
N A
L L
F N
I S
A V
O Y
D R
IV
E
S
U
IT
E
H O
U S
T O
N T
E X
A S
P H
O N
E (8
-8
A J S
A J S
V R
N
A U
G U
S T
K F
B
L D
G H
V A
C
FINAL SUBMITTAL
M -0
R E
E
NI
GNELANOI
SS
E F
O R
S
TATE O
SAXETF
P
RYAN EDWARDS
131050
NECI
L
SED
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
W
G
B
08/09/2019
DN
EE
E7.2 E7.8
E
D
C
W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18
WA
WB
WC
WD
EA
EB
EC
ED
E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12
G
G
4"HWR
OFFICE 6
OFFICE 5
OFFICE 4
MECH
OFFICE 3
OFFICE 2
OFFICE 1
OPEN/CONFERERENCE
STORAGE 1
STORAGE 2
COMM 1
SPRINKLER
LAUNDRY
3" DTR
3" DTS
4" CHR
4" CHS
BOILER
1012 MECHANICAL
W. TOIL
CORRIDOR
M. TOIL
STORAGE
OFFICE AREA
STORAGE
OFFICE 3
AHU-2
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
MD-101
H V
A C
D
E M
O L
IT
IO
N
P L A
N
F
IR
S T
F L O
O R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G
J O
IN
T
B A
S E
S A
N A
N T
O N
IO
F
O R
T S
A M
H O
U S
T O
N T
X
K E
N A
L L
F N
I S
A V
O Y
D R
IV
E
S
U
IT
E
H O
U S
T O
N T
E X
A S
P H
O N
E (8
-8
A J S
A J S
V R
N
A U
G U
S T
K F
B
L D
G H
V A
C
FINAL SUBMITTAL
M D
-1
1/8" = 1'-0"1
HVAC - DEMOLITION PLAN - FIRST FLOOR
1. REFER TO M-001 FOR LEGEND, ABBREVIATIONS, AND
GENERAL NOTES.
2. DEMOLISH ALL EQUIPMENT, DUCT WORK, PIPING,
AND SUPPORTS TO THE EXTENT SHOWN.
3. REPAIR EXISTING CONCRETE PAD FOR REUSE.
0' 8' 16'
GRAPHIC SCALE 1/8" = 1'-0"
4'
NORTH
NOTES BY SYMBOL " "
1. DEMOLISH AIR HANDLING UNIT, ASSOCIATED SUPPORTS,
PIPING, DUCTWORK, DIFFUSERS, AND CONTROL WIRING.
2. DEMOLISH EXHAUST FAN AND ASSOCIATED DUCTWORK,
SUPPORTS, AND CONTROL WIRING; REPAIR RESULTING ROOF
OPENING FOR REUSE. RE: ARCHITECTURAL DRAWING.
3. DEMOLISH BOILER, EXISTING PUMPS, EXPANSION TANK, AIR
SEPARATOR, AND ASSOCIATED EQUIPMENT, PIPING,
CONTROLS, OTHER ACCESSORIES IN THEIR ENTIRETY. REPAIR
EXISTING CONCRETE PAD FOR REUSE.
4. DEMOLISH WINDOW LOUVER; INFILL RESULTING OPENING.
RE: AD101.
5. DEMOLISH CHILLER, EXISTING PUMP, EXPANSION TANK, AIR
SEPARATOR, ASSOCIATED EQUIPMENT, PIPING, CONTROLS,
AND OTHER ACCESSORIES IN THEIR ENTIRETY. REPAIR
EXISTING CONCRETE PAD FOR REUSE. RETURN CHILLER
EQUIPMENT TO OWNER.
6. DEMOLISH UNDERGROUND PIPING.
7. DEMOLISH WALL MOUNTED LOUVER; PATCH RESULTING WALL
OPENING. RE: ARCHITECTURAL DRAWING.
8. DEMOLISH UNDERGROUND PIPING TO THIS LOCATION WHERE
THE LINES WERE CAPPED DURING PREVIOUS RENOVATION.
9. DEMOLISH EXISTING CHILLED WATER PIPING, REPAIR
RESULTING WALL PENETRATION FOR REUSE.
10. DEMOLISH EXISTING CHILLED WATER PIPING, PATCH
RESULTING WALL PENETRATION.
11. EXISTING VENT FOR WATER HEATER TO REMAIN.
GENERAL NOTES:
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
R E
E
NI
GNELANOI
SS
E F
O R
S
TATE O
SAXETF
P
RYAN EDWARDS
131050
NECI
L
SED
W
G
B
EE
EF
E7.2 E7.8
E
D
C
W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18
WA
WB
WC
WD
EA
EB
EC
ED
E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12
ROCK
REHERSAL
LIBRARY
COMM
OFFICE AREA
LARGE
REHERSAL
STORAGE
CORRIDOR
MECHANICAL
CLASSROOM
ELEC.
CORRIDOR
CORRIDOR
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
M. TOIL
MECHANICAL
W. TOIL
AHU-3
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
MD-102
H V
A C
D E
M O
L
IT
IO
N
P L A
N
S E
C O
N D
F L O
O R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G
J O
IN
T
B A
S E
S A
N A
N T
O N
IO
F
O R
T S
A M
H O
U S
T O
N T
X
K E
N A
L L
F N
I S
A V
O Y
D R
IV
E
S
U
IT
E
H O
U S
T O
N T
E X
A S
P H
O N
E (8
-8
D e s ig n e r
A u th o r
C h e c k e r
A U
G U
S T
K F
B
L D
G H
V A
C
FINAL SUBMITTAL
M D
-1
1/8" = 1'-0"1
HVAC - DEMOLITION PLAN - SECOND FLOOR
R E
E
NI
GNELANOI
SS
E F
O R
S
TATE O
SAXETF
P
RYAN EDWARDS
131050
NECI
L
SED
NORTH
0' 8' 16'
GRAPHIC SCALE 1/8" = 1'-0"
4'
1. REFER TO M-001 FOR LEGEND, ABBREVIATIONS, AND GENERAL
NOTES.
2. DEMOLISH ALL EQUIPMENT, DUCT WORK, PIPING, AND
SUPPORTS TO THE EXTENT SHOWN.
3. REPAIR EXISTING CONCRETE PAD FOR REUSE.
NOTES BY SYMBOL " "
1. DEMOLISH MULTI-ZONE AIR HANDLING UNIT, ASSOCIATED
SUPPORTS, PIPING, DUCTWORK, DIFFUSERS, AND CONTROL
WIRING.
2. DEMOLISH EXHAUST FAN, ASSOCIATED DUCTWORK, SUPPORTS,
AND CONTORL WIRING; REPAIR RESULTING ROOF OPENING FOR
REUSE. RE: ARCHITECTURAL DRAWING.
3. REMOVE EXISTING CONTROL PANEL AND ASSOCIATED CONTROL
WIRING. RETURN THE PANEL TO OWNER.
4. DEMOLISH WINDOW LOUVER; INFILL RESULTING OPENING. RE:
AD101.
GENERAL NOTES:
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
W
G
B
EE
EF
E7.2 E7.8
E
D
C
W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18
WA
WB
WC
WD
EA
EB
EC
ED
E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12
IND.
PRACTICE
ROOMS
COMM.
SUPPLY
OFFICE
MEN LOCKER
MEN SHOWER
MENS
CORR.
C108
INSTRUMENT
STORAGE
SPRINKLER
MECH / ELECT
INSTRUMENT
MAINTENANCE
116 STG
CORR.
C107
CORR.
C106
GROUP
REHEARSAL 1
STORAGE
STORAGE
CORR.
C110
CORR.
C105
MECHANICAL /
ELECTRICAL
GROUP
REHEARSAL 4
OPEN OFFICE
MACHINE
ELEV.
E1CORR.
C104
CORR.
C101
RECEPT.
CORR.
C102
WOMEN
WOMEN
LOCKER
STORAGE
SHOWERS
MECHANICAL
ELECTRICAL
JAN
C 125 C 125
C 140
E 225
C 150 C 140
B 140
EF-2
DOAS-1
FCU
1-4
FCU
1-3
FCC
1-2
FCC
1-1
CU-2
AHU-2-1
CU-1
AHU-1-1
FCU
1-7
FCU
1-8
FCU
1-9
A 20
A 50
G 20
G 20
A 50
A 30
B 75
B 65
A 25
A 55
B 80
E 225
E 120
E 175
E 175
E -
E - E -
H -
E 70
E -
G 100
E -
E 150E 180
F 70
E 200
B 60
B 85
C 185
C 180
C 150
E -
B 100
E -
D 270
E -
F -
F -
E -E -E -E -E -E - B 80
C 140
DH-1
B 70
C 185
C 185
E -
D 250D 250 C 150
C 150
6/4
8/6 4/4
8/6 10/8
8/6 4/4
10/6
12/8
6/4
10/6
/1
18/8
12/8
18/10
18/14
6/6
18/14 18/14 16/10
16/10
8/6
8/6
16/10
10/6
12/10
8/8
12/1010/10
8/6
10/8 10/8
14/8
10/6
12/10
8/6
14/12 10/8
14/12
14/8
10/6
8/6
16/8
12/8 10/6
10/6
/8
12/8 10/6
10/8
10/6
10/8
8/8
8/48/4
10/8
/1
6/6
6/6
12/612/612/6
12/6 8/6
8/6
12/6
6/6
8/6
E -
E -
E
E E
E
E
E
E
H
S
B-1
8/4
C 100C 100
G 60 C 160
E - E -E -
C 120 G 60 12/8
FCU
1-5
D 260
E -
E -E -
12/616/10
16/10
16/10
18/14
12/8
D 260D 280
18 18
E 150
(TYP.)
6/8
CORR.
C103
22 2222
8/6
10/6
GROUP
REHEARSAL 2
GROUP
REHEARSAL 3
8/6
FCU
1-6
18/14
10/8
12/818/14
8/8
10/6
10/8
14/8
10/6
8/8 12/8
8/6
/8
16/10
10/6
18/8
A 20
16/8
16/10
12/10
/2
/1
14/16
/6
2 2
18/10
HM-1
H
8/4
6/6
12/8
10/10
12/12
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
MH-101
H V
A C
F L O
O R
P L A
N
F
IR
S T
F L O
O R
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G
J O
IN
T
B A
S E
S A
N A
N T
O N
IO
F
O R
T S
A M
H O
U S
T O
N T
X
K E
N A
L L
F N
I S
A V
O Y
D R
IV
E
S
U
IT
E
H O
U S
T O
N T
E X
A S
P H
O N
E (8
-8
D e s ig n e r
A u th o r
C h e c k e r
A U
G U
S T
K F
B
L D
G H
V A
C
FINAL SUBMITTAL
M H
-1
1/8" = 1'-0"1
HVAC - EQUIPMENT/DUCTWORK PLAN - FIRST FLOOR
R E
E
NI
GNELANOI
SS
E F
O R
S
TATE O
SAXETF
P
RYAN EDWARDS
131050
NECI
L
SED
1. REFER TO M-001 FOR LEGEND, ABBREVIATIONS, AND GENERAL NOTES.
2. REFER TO DIVISION 23 FOR TECHNICAL SPECIFICATIONS.
3. REFER TO ELECTRICAL DRAWINGS FOR POWER ROUTING/CONNECTION
TO MECHANICAL EQUIPMENT.
4. PROVIDE 120V THERMOSTATICALLY CONTROLLED HEAT TRACE ON ALL
EXTERIOR PIPING BENEATH INSULATION. INSTALL PER MANUFACTURER
RECOMMENDATIONS.
5. ROUTE DUCT TO AVOID CONFLICTS WITH STRUCTURAL MEMBERS,
ELECTRICAL EQUIPMENT, LIGHTS, AND OTHER UTILITIES.
6. REFER TO M-103 & M-104 FOR CONDENSATE DRAIN AND PIPING
LAYOUT.
7. INSTALL THERMOSTATS AT 48" AFF.
8. USE EXISTING AIR INTAKE HOOD AND EXHAUST VENT ON ROOF. REFER
TO D1/A-520 FOR DETAILS ON CONNECTION OF DUCT AND
HOOD/VENT.
NOTES BY SYMBOL " "
12. DOAS-1 SUPPLY INLET, CONNECT TO SUPPLY DUCT; ROUTE DUCT FROM EXISTING AIR INTAKE
HOOD ON ROOF DOWN TO THE UNIT.
13. BOILER VENT OUTLET CONNECT TO 3" DIA EXHAUST DUCT. ROUTE DUCT UP THROUGH ROOF, TERMINATE WITH EXISTING VENT CAP ABOVE ROOF. REFER TO MH-102 FOR MORE INFORMATION
ON DUCT ROUTING.
14. PROVIDE BOILER, PUMPS, ACCESSORIES, AND ASSOCIATED PIPING; USE EXISTING CONCRETE PAD.
PROVIDE VIBRATION ISOLATION FOR THE UNIT; RE: M-602.
15. PROVIDE COOLING ONLY MINI SPLIT SYSTEM; SECURE OUTDOOR UNIT ON NEW CONCRETE PAD, MOUNT BOTTOM OF INDOOR UNIT AT 8 FT AFF. PROVIDE FULL-SIZE CONDENSATE DRAIN FOR
INDOOR UNIT. RE: M-103 FOR CONDENSATE DRAIN PIPING ROUTING. RE: 4/M503 FOR DETAIL. RE:
M-601 FOR EQUIPMENT SCHEDULE.
16. PROVIDE EMERGENCY SHUTDOWN SWITCH WITH NON-LOCKING CLEAR PLASTIC COVER TO SHUT
DOWN ALL EQUIPMENT CONNECTED TO BAS; INSTALL AT 48" AFF.
17. HUMIDIFIER; RH% SETPOINT: 47% (ADJ.). RE: M-602 FOR SCHEDULE. RE: PP-103 FOR POTABLE
WATER ROUTING. RE: M-103 FOR CONDENSATE DRAIN.
18. DUCTLESS CASSETTE FCU.
19. DUCTED FAN COIL UNIT.
20. 32"X28" EXHAUST LOUVER; FREE AREA: 3.2 SQ FT. DUCT TO IN-LINE EXHAUST FAN EF-2. REFER TO
SPECIFICATION SECTION 08 90 00 LOUVERS AND VENTS FOR DETAILS.
21. COMBUSTION AIR DUCT FOR BOILER, TAP FROM DOAS-1 SUPPLY DUCT.
22. DUCT PENETRATION THROUGH STC-55 RATED WALL. APPLY STC-55 RATED DOUBLE-WALL DUCT
SILENCER TO DUCT MIN. 6FT FROM BOTH SIDES OF THE WALL. RE: M-505.
23. PROVIDE COOLING ONLY MINI SPLIT SYSTEM; SECURE OUTDOOR UNIT ON NEW CONCRETE PAD, MOUNT BOTTOM OF INDOOR UNIT AT 8 FT AFF. PROVIDE FULL-SIZE CONDENSATE DRAIN FROM
INDOOR UNIT, EXTEND THROUGH WALL DROP DOWN AND TERMINATE AT APPROVED
TERMINATION POINT. RE: 4/M503 FOR DETAIL. RE: M-601 FOR EQUIPMENT SCHEDULE.
24. PROVIDE CHILLED WATER PUMPS, EXPANSION TANK, AND CHEMICAL INJECTOR; INSTALLED ON
NEW CONCRETE PAD. RE: M-103 FOR MORE INFORMATION ON CONNECTION AND PIPING
ROUTING.
25. PROVIDE BOILER WATER PUMPS, EXPANSIN TANK, AND CHEMICAL INJECTOR; INSTALLED ON NEW
CONCRETE PAD. RE: M-103 FOR MORE INFORMATION ON CONNECTION AND PIPING ROUTING.
26. EXISTING VENT FOR WATER HEATER TO REMAIN.
GENERAL NOTES:
NORTH
0' 8' 16'
GRAPHIC SCALE 1/8" = 1'-0"
4'
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
NOTES BY SYMBOL " " CONT.
1. PROVIDE DOAS UNIT AND INSTALL ON EXISTING CONCRETE PAD.
2. 24"x12" DOOR LOUVER FOR PRESSURE BALANCE; REFER TO
SPECIFICATION SECTION 08 90 00 LOUVERS AND VENTS FOR DETAILS.
3. ROUTE DUCTWORK UNDER THE BEAM.
4. EXHAUST DUCT UP TO SECOND FLOOR, AND CONNECT TO INLINE
EXHAUST FAN, EF-1.
5. OUTSIDE AIR SUPPLY/RETURN DUCT; ROUTE DOWN AND CONNECT TO
DOAS-1 INSTALLED IN ROOM 108. RETURN AIR SHALL BE DIRECTED TO
DOAS MIXING BOX FOR ENERGY RECOVERY.
6. OUTSIDE AIR SUPPLY/RETURN DUCT; ROUTE UP AND CONNECT TO
DOAS-2 INSTALLED IN ROOM 219. RETURN AIR SHALL BE DIRECTED TO
DOAS MIXING BOX FOR ENERGY RECOVERY.
7. EXISTING BEAM.
8. DEHUMIDIFIER; RH% SETPOINT: 50% (ADJ.). REFER TO M-602 FOR
SCHEDULE. RE: M-103 FOR CONDENSATE DRAIN.
9. CONTROL PANELS; RE: ELECTRICAL.
10. ACCEPTABLE LOCATION FOR DDC SUB-PANEL. CONTROL CONTRACTOR
SHALL VERIFY QUANTITIES AND LOCATIONS OF ALL CONTROLLERS
PRIOR TO BID AND COORDINATE POWER REQUIREMENTS WITH
ELECTRICAL CONTRACTOR.
11. DOAS-1 EXHAUST OUTLET, CONNECT TO EXHAUST DUCT; ROUTE DUCT
UP THROUGH ROOF, TERMINATE WITH EXISTING VENT CAP ABOVE
ROOF. RE: MD-102 FOR MORE INFORMATION ON DUCT ROUTING.
W
G
B
| General Sheets |
| Cover Sheet |
| Mechanical Sheets |
| M-001 |
| MD-101 |
| MD-102 |
| MH-101 |