W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_1A_of_5_Sampling_Methodology.pdf

PDF 1017 KB Posted

Attached to
JBSA FSH ARNORTH Bldg 615 Renovation Project for Army Band
Solicitation number
W9126G-19-B-3286
Issued by

About this file

B3_Solicitation_DIV 2_Attachment A Hazmat Survey Section 1A of 5_Sampling Methodology_JBSA FSH ARNORTH BLDG 615 Renovation Project for Army Band

View the file

Other files

File Type Posted
C1_Rev_2_SF_1409_Abstract_of_Offers-Page2of3_PRINT1.pdf PDF
C1_Rev_SF_1409_Abstract_of_Offers-Page_3of3.pdf PDF
C1_Rev_2_SF_1409_Abstract_of_Offers-Page1of3_Signed_29Sep_19.pdf PDF
am_0007.pdf PDF
am_0006.pdf PDF
am_0005_12_Sep_19.pdf PDF
Revise_Site_Visit_Form_11_Sep_19.pdf PDF
B3_Amendment_03_30_Aug_19.pdf PDF
Amendment_02_Change_of_Solicitation_closing_date_and_Bidder_Key_28_Aug_19.pdf PDF
B3_Unescorted_Access_Request_Form_pg_1-4-26_Aug_19-5.pdf PDF
JBSA_FSH_ARNORTH_Building_615-Amend_01.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-165__of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-136_-144__of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_1-7_of_191.pdf PDF
W9126G19B3286_DIV_02_Specifications_Appendix_A_Abatement_Guidelines_Part_2_of_2.pdf PDF
B3_W9126G19B3286_DIV_27_28_31_and_32_Specifications_23_Aug_19.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_20-22_of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-166_-170__of_191.pdf PDF
B3_W9126G19B3286_DIV_08_to_DIV_10_Specifications_23_Aug_19.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_1C.2_of_5_All_Other_areas__Lead_Based_Paint_Findings.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-113_-_115__of_191.pdf PDF
B3_W9126G19B3286_DIV_03_to_DIV_06_Specifications_23_Aug_19.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-127_-130__of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-123_-126__of_191.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_3_of_5.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-162__of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-160_-161__of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_-61-67_of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_-46-50_of_191.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_4_of_5_page_13_to_21_of_21.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_-51-55_of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_23-27_of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-186__of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-179_-183__of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_-75-77_of_191.pdf PDF
B3_W9126G19B3286_DIV_02_Specifications_Appendix_A_Abatement_Guidelines_ACM_Map.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_28-30_of_191.pdf PDF
B3_W9126G19B3286_DIV_26_Specifications_23_Aug_19.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_1C.3_of_5_Lead_Based_Paint_Findings.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_4_of_5_page_17_to_21_of_21.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_1E_of_5_Conclusions_and_recommendations.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_-78-81_of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-187__of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_36_-40_of_191.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_4_of_5_page_10-_11_of_21.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_31-35_of_191.pdf PDF
B3_W9126G19B3286_DIV_01_Specifications_23_Aug_19.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-184__of_191.pdf PDF
B3_W9126G19B3286_DIV_02_Specifications_Asbestos_Abatement_23_Aug_19.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_16-19_of_191.pdf PDF
Show 40 more

Latest 50 of 92 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEAD-BASED PAINT SAMPLING METHODOLOGY

This survey was conducted using a portable Olympus X-Ray Fluorescence Analyzer (XRF) to determine the levels of lead present in painted surfaces. The objective of this lead survey was to determine, as accurately as possible, the nature and extent of all paint which may be lead-containing.

Paints were grouped by the "Room Equivalent" (room number / function, etc.), "Building Component" (wall, door, window frame, etc.), "Substrate" (plaster, metal, wood, brick, etc.), and "Paint Color". This survey was conducted by Eric Eitzen, an EPA Certified Lead Inspector and a Texas Department of State Health Services (DSHS) Certified Lead Inspector (Certification # 2060568), who was assisted by Jennifer Mc Millin, an Industrial Hygiene Technician. Micro Air of Texas, Inc. is licensed by the DSHS as a Lead Firm in the state of Texas (TDSHS license #2110550).

The Department of Housing and Urban Development (HUD) testing protocol was not used for this inspection, as this facility is not considered to be included in the definition of "Target Housing" or "Child-Occupied Facility"; therefore, not every painted surface of every Room Equivalent was tested. A total of 246 XRF readings were collected at this facility during this inspection.

LIMITATIONS

Micro Air's scope of services was limited primarily to accessible interior and exterior building materials. Destructive sampling (partial or full demolition of wall cavities, plaster ceilings, etc.) was not part of the Scope of Work for this project. While Micro Air made every effort to perform a thorough (comprehensive) survey, the possibility exists that materials containing asbestos were not identified, inaccessible (i.e., pipes located in walls, chases, or above plaster ceilings), or different from those identified at other locations. If additional types of suspect building materials are found at a later date, they must be assumed to contain asbestos until sampled and shown otherwise. The findings and opinions presented are indicative of conditions on the date of our site inspection and should not be relied upon to represent conditions at substantially later dates, due to possible changes in the condition of building materials, renovations, and repairs.

The asbestos and lead-based paint surveys performed at this facility were not designed to determine exact quantities or limits of asbestos-containing materials (ACM) or lead-based paint (LBP), nor to develop removal cost estimates. This survey report is limited primarily to those building materials located inside and outside Building 615 that were accessible at the time of this survey. If additional areas of the building are added to the scope of work for this project that were not included in the original scope of work that Micro Air surveyed, the additional areas would need to be inspected for both asbestos and lead paint prior to any renovation / demolition occurring. This report is for the exclusive use of the client and its agents; any use by unauthorized parties in whole or in part, except as directed by legal jurisdiction, is at the sole risk of the user.

MICRO AIR OF TEXAS, INC. Fort Sam Houston; San Antonio, TX - Building 615 3

File details come from the government source that posted it.