B615 Final Design Plans Sheet 1-7 of 191

View the file

Other files

File Type Posted
C1_Rev_2_SF_1409_Abstract_of_Offers-Page2of3_PRINT1.pdf PDF
C1_Rev_SF_1409_Abstract_of_Offers-Page_3of3.pdf PDF
C1_Rev_2_SF_1409_Abstract_of_Offers-Page1of3_Signed_29Sep_19.pdf PDF
am_0007.pdf PDF
am_0006.pdf PDF
am_0005_12_Sep_19.pdf PDF
Revise_Site_Visit_Form_11_Sep_19.pdf PDF
B3_Amendment_03_30_Aug_19.pdf PDF
Amendment_02_Change_of_Solicitation_closing_date_and_Bidder_Key_28_Aug_19.pdf PDF
B3_Unescorted_Access_Request_Form_pg_1-4-26_Aug_19-5.pdf PDF
JBSA_FSH_ARNORTH_Building_615-Amend_01.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-165__of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-136_-144__of_191.pdf PDF
W9126G19B3286_DIV_02_Specifications_Appendix_A_Abatement_Guidelines_Part_2_of_2.pdf PDF
B3_W9126G19B3286_DIV_27_28_31_and_32_Specifications_23_Aug_19.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_20-22_of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-166_-170__of_191.pdf PDF
B3_W9126G19B3286_DIV_08_to_DIV_10_Specifications_23_Aug_19.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_1A_of_5_Sampling_Methodology.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_1C.2_of_5_All_Other_areas__Lead_Based_Paint_Findings.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-113_-_115__of_191.pdf PDF
B3_W9126G19B3286_DIV_03_to_DIV_06_Specifications_23_Aug_19.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-127_-130__of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-123_-126__of_191.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_3_of_5.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-162__of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-160_-161__of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_-61-67_of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_-46-50_of_191.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_4_of_5_page_13_to_21_of_21.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_-51-55_of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_23-27_of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-186__of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-179_-183__of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_-75-77_of_191.pdf PDF
B3_W9126G19B3286_DIV_02_Specifications_Appendix_A_Abatement_Guidelines_ACM_Map.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_28-30_of_191.pdf PDF
B3_W9126G19B3286_DIV_26_Specifications_23_Aug_19.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_1C.3_of_5_Lead_Based_Paint_Findings.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_4_of_5_page_17_to_21_of_21.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_1E_of_5_Conclusions_and_recommendations.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_-78-81_of_191.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-187__of_191.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_36_-40_of_191.pdf PDF
W9126G19B3286_Attachment_A_HAZMAT_SURVEY_Section_4_of_5_page_10-_11_of_21.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_31-35_of_191.pdf PDF
B3_W9126G19B3286_DIV_01_Specifications_23_Aug_19.pdf PDF
B615_Final_Design_Plans_Aug_12_2019_Sheet_-184__of_191.pdf PDF
B3_W9126G19B3286_DIV_02_Specifications_Asbestos_Abatement_23_Aug_19.pdf PDF
B3_B615_Final_Design_Plans_Aug_12_2019_Sheet_16-19_of_191.pdf PDF
Show 40 more

Latest 50 of 92 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5

D

C

B

A

US Army Corps of Engineers ®

JOINT BASE SAN ANTONIO

FORT SAM HOUSTON, TX

RENOVATION OF BUILDING 615

FINAL SUBMITTAL

AUGUST 12, 2019

323D ARMY BAND "FORT SAM'S OWN"

CONTRACT NUMBER : -

SOLICITATION NUMBER : W9126G19B3286

FORT SAM HOUSTON, TEXAS

INDEX OF SHEETS

SHEET SHEET. DESCRIPTION

REF NO. NO.

GENERAL SHEETS

G-001.1 01 COVER SHEET - SOUTH WING

G-002.1 02 INDEX SHEET, 1 OF 2

G-002.2 03 INDEX SHEET, 2 OF 2

G-002 04 GENERAL NOTES, ABBREVIATIONS

G-003 05 CONTRACTOR HAUL ROUTE MAP

G-004 06 CONTRACTOR STAGING AREA

G-102 07 CLIN ITEM SUMMARY

CIVIL SHEETS

C-001 08 INDEX OF SHEETS, ABBREVIATIONS, AND LEGEND

C-002 09 NOTES

C-101 10 SURVEY CONTROL POINTS PLAN

CS-101 11 EXISTING CONDITIONS PLAN

CS-102 12 SITE DEMOLITION PLAN

CS-103 13 SITE PLAN WITH DRAINAGE IMPROVEMENTS

CS-104 14 SITE PLAN WITH DRAINAGE IMPROVEMENTS - BASE BID

CS-105 15 LAYOUT OF OUTDOOR EQUIPMENT PADS

CS-106 16 FIRE LANE STRIPING PLAN

CU-101 17 WATER LINE IMPROVEMENTS

CU-102 18 SANITARY SEWER IMPROVEMENTS

C-301 19 UTILITY SECTIONS - 1 OF 2

C-302 20 UTILITY SECTIONS - 2 OF 2

CS-401 21 ENLARGED DRAINAGE PLAN - 1

CS-402 22 ENLARGED DRAINAGE PLAN - 2

CS-403 23 ENLARGED DRAINAGE PLAN - 3

CS-404 24 ENLARGED DRAINAGE PLAN - 4

CS-405 25 ENLARGED DRAINAGE PLAN - 5

C-501 26 ENLARGED DRAINAGE PLAN - 6

C-502 27 PAVEMENT AND SIDEWALK DETAILS - 1 OF 2

C-503 28 PAVEMENT AND SIDEWALK DETAILS - 2 OF 2

C-504 29 WATER LINE DETAILS - 1 OF 2

C-505 30 WATER LINE DETAILS - 2 OF 2

C-506 31 SEWER LINE DETAILS

C-507 32 DRAINAGE DETAILS

C-508 33 ADA DETAILS - 1 OF 2

C-509 34 ADA DETAILS - 2 OF 2

C-510 35 MISCELLANEOUS DETAILS

STRUCTURAL SHEETS

S-001 36 GENERAL NOTES

S-002 37 TYPICAL DETAILS

S-101 38 FOUNDATION PLAN

S-102 39 SECOND LEVEL FRAMING PLAN

S-103 40 LOW AND HIGH ROOF FRAMING PLAN

S-301 41 ELEVATOR AND FOUNDATION SECTIONS

S-302 42 STAIR, LANDING AND WALL SECTIONS

S-303 43 PORTICO AWNING AND TRUSS SECTIONS

S-304 44 PORTICO STAIR + LANDING AND AWNING SECTIONS

ARCHITECTURAL SHEETS

AD101 45 DEMOLITION PLAN - FIRST FLOOR

AD102 46 DEMOLITION PLAN - SECOND FLOOR

AD111 47 DEMOLITION REFLECTED CEILING PLAN - FIRST FLOOR

AD112 48 DEMOLITION REFLECTED CEILING PLAN - SECOND FLOOR

AD201 49 DEMOLITION NORTH AND SOUTH ELEVATIONS

AD202 50 DEMOLITION EAST AND WEST ELEVATIONS

AD203 51 DEMOLITION EAST AND WEST COURTYARD ELEVATIONS

A-100 52 AIR BARRIER PLANS

A-101 53 FLOOR PLAN - FIRST FLOOR

A-102 54 FLOOR PLAN - SECOND FLOOR

A-103 55 ROOF PLAN

A-104 56 SOFFIT PLAN - SECOND FLOOR

A-111 57 REFLECTED CEILING PLAN - FIRST FLOOR

A-112 58 REFLECTED CEILING PLAN - SECOND FLOOR

A-120 59 ENLARGED PLANS AND ELEVATIONS

A-201 60 EXTERIOR ELEVATIONS - NORTH & SOUTH

A-202 61 EXTERIOR ELEVATIONS - EAST & WEST

A-203 62 EXTERIOR ELEVATIONS - EAST & WEST COURTYARD

K e n a l l

C o n s u l t i n g

E n g i n e e r s

I n c

T e x a s

R e g i s t e r e d

E n g i n e e r i n g

F i r m

F e e s e a n d

N i c h o l s

I n c

T e x a s

R e g i s t e r e d

E n g i n e e r i n g

F i

SHEET SHEET. DESCRIPTION

REF NO. NO.

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C

N

O

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

P S

E

N G

I N

E E

R S

K E

N A

L L

R A

M

R

A O

P

E

D

D

A Y

A N

A N

D A

P

E

A N

S I

D

A U

G U

W G

D

J O

I N

T

B

A S

E

S

A

T

O N

I O

F O

R

M

H

U

S T

O N

T

X

W G

B

G-002.1

FINAL SUBMITTAL

I N

D E

X

S

H E

E T

ARCHITECTURAL SHEETS (CONTD)

A-301 63 BUILDING SECTION

A-302 64 BUILDING SECTION

A-303 65 ENLARGED SECTIONS

A-304 66 ENLARGED SECTIONS

A-305 67 ENLARGED SECTIONS

A-306 68 ENLARGED SECTIONS

A-307 69 ENLARGED SECTIONS

A-308 70 ENLARGED SECTIONS

A-309 71 ENLARGED SECTIONS

A-310 72 ENLARGED SECTIONS

A-321 73 WALL SECTIONS

A-322 74 WALL SECTIONS

A-401 75 ENLARGED PLANS & ELEVATIONS

A-402 76 ENLARGED PLANS & ELEVATIONS

A-403 77 ENLARGED PLANS & ELEVATIONS

A-404 78 ENLARGED PLANS & ELEVATIONS

A-405 79 ENLARGED PLANS & ELEVATIONS

A-406 80 ENLARGED PLANS & ELEVATIONS

A-501 81 DETAILS

A-502 82 DETAILS

A-503 83 DETAILS

A-504 84 DETAILS

A-505 85 DETAILS

A-511 86 DOOR DETAILS

A-512 87 DOOR DETAILS

A-513 88 DOOR DETAILS

A-514 89 WINDOW DETAILS

A-520 90 SECTION DETAILS

A-521 91 MILLWORK DETAILS

A-601 92 DOOR SCHEDULES & DETAILS

A-602 93 WINDOW TYPES & SCHEDULES

A-621 94 PARTITION TYPES

A-622 95 PARTITION DETAILS

A-801 96 PHOTOS - EXISTING BUILDING

A-901 97 EXTERIOR FINISH PERSPECTIVES

A-902 98 EXTERIOR FINISH PERSPECTIVES

I-101 99 FINISH PLAN - FIRST FLOOR

I-102 100 FINISH PLAN - SECOND FLOOR

I-531 101 SIGNAGE

I-611 102 ROOM FINISH SCHEDULE

I-901 103 PERFORMANCE HALL FINISHES

IF101 104 FURNITURE PLAN - FIRST FLOOR

IF102 105 FURNITURE PLAN - SECOND FLOOR

MECHANICAL, ELECTRICAL, PLUMBING, AND TELECOMMUNICATION SHEETS

M-001 106 LEGEND, ABBREVIATIONS AND GENERAL NOTES

MD-101 107 HVAC DEMOLITION PLAN - FIRST FLOOR

MD-102 108 HVAC DEMOLITION PLAN - SECOND FLOOR

MH-101 109 HVAC FLOOR PLAN - FIRST FLOOR

MH-102 110 HVAC FLOOR PLAN - SECOND FLOOR

M-103 111 HVAC EQUIPMENT/ PIPING PLAN - FIRST FLOOR

M-104 112 HVAC EQUIPMENT/ PIPING PLAN - SECOND FLOOR

M-105 113 HVAC PIPING RISER DIAGRAM - FIRST FLOOR

M-106 114 HVAC PIPING RISER DIAGRAM - SECOND FLOOR

M-501 115 HVAC DETAILS I

M-502 116 HVAC DETAILS II

M-503 117 HVAC DETAILS III

M-504 118 HVAC DETAILS V

M-505 119 HVAC SCHEDULE AND DETAILS IV

M-506 120 MECHANICAL CONTROL SCHEMATICS I

M-507 121 MECHANICAL CONTROL SCHEMATICS II

M-508 122 MECHANICAL CONTROL SCHEMATICS III

M-509 123 MECHANICAL CONTROL SCHEMATICS IV

M-510 124 MECHANICAL CONTROL SCHEMATICS V

M-511 125 MECHANICAL CONTROL SCHEMATICS VI

M-512 126 MECHANICAL CONTROL SCHEMATICS VII

M-601 127 HVAC SCHEDULES I

M-602 128 HVAC SCHEDULES II

M-603 129 HVAC SCHEDULES III

P-001 130 PLUMBING LEGEND, GENERAL NOTES, DETAIL AND SCHEDULES

PD-101 131 DEMOLITION PLAN - FIRST FLOOR

PD-102 132 DEMOLITION PLAN - SECOND FLOOR

PP-103 133 PLUMBING PLAN - FIRST FLOOR

J O

I N

T

B

A S

E

S

T

O N

I

O R

T

S

U

S T

O N

T

E X

A S

R E

N O

V A

T I O

N

O

F

B

U I L D

I N

G

K E

N A

L L

I

S

A V

Y

I V

E

S

U I T

E

H O

U S

T O

N

T

E X

P H

O N

E

INDEX OF SHEETS

SHEET SHEET. DESCRIPTION

REF NO. NO.

K e n a l l

C o n s u l t i n g

E n g i n e e r s

I n c

T e x a s

R e g i s t e r e d

E n g i n e e r i n g

F i e e s e a n d

N i c h o l s

I n c e x a s

R e g i s t e r e d

E n g i n e e r i n g

F i

K E

N A

L

I

S

A V

I V

E

S

U I T

E

H O

U S

T O

N

T

E X

P H

O N

E

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

K E

N A

L L

R A

M

R

A O

P

E

D

D

A Y

A N

A N

D A

P

E

A N

S I

D

A U

G U

W G

D

J O

I N

T

B

A S

E

S

T

O N

I O

F O

U

S T

O N

T

X

W G

B

G-002.2

FINAL SUBMITTAL

I N

D E

X

S

H E

E T

J O

I N

T

B

A S

E

S

T

O N

O R

T

S

U

S T

O N

T

E X

A S

R E

N O

V A

T I O

N

O

F

B

U I L D

I N

G

MECHANICAL, ELECTRICAL, PLUMBING, AND TELECOMMUNICATION SHEETS, CONTD

PP-104 134 PLUMBING PLAN - SECOND FLOOR

PP-401 135 PLUMBING ENLARGED PLANS I

PP-402 136 PLUMBING ENLARGED PLAN II

PP-501 137 PLUMBING RISER DIAGRAM I - FIRST FLOOR

PP-502 138 PLUMBING RISER DIAGRAM II - SECOND FLOOR

PP-503 139 ENLARGED SUMP PUMP/OIL WATER SEPARATOR DETAIL

E-001 140 LEGEND AND ABBREVIATIONS

E-002 141 GENERAL NOTES

ED-101 142 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR

ED-102 143 ELECTRICAL DEMOLITION PLAN - SECOND FLOOR

E-101 144 POWER FLOOR PLAN - FIRST FLOOR

E-102 145 POWER FLOOR PLAN - SECOND FLOOR

E-111 146 LIGHTING FLOOR PLAN - FIRST FLOOR

E-112 147 LIGHTING FLOOR PLAN - SECOND FLOOR

E-113 148 LIGHTING FLOOR PLAN - ATTIC

E-201 149 POWER HVAC FLOOR PLAN - FIRST FLOOR

E-202 150 POWER HVAC FLOOR PLAN - SECOND FLOOR

E-401 151 ELECTRICAL ENLARGED PLANS

E-501 152 ELECTRICAL DETAILS

E-601 153 ELECTRICAL ONE-LINE

E-602 154 ELECTRICAL PANEL SCHEDULES

E-603 155 ELECTRICAL PANEL SCHEDULES

E-604 156 ELECTRICAL PANEL SCHEDULES

E-605 157 LIGHTING FIXTURE SCHEDULE AND CONTROLS

E-606 158 LIGHTING CONTROL DIAGRAMS

E-607 159 LIGHTING CONTROL DIAGRAMS

E-608 160 GROUNDING DIAGRAM

TN-000 161 TECHNOLOGY ABBREVIATIONS AND LEGEND

TN-001 162 TECHNOLOGY GENERAL NOTES

TND-101 163 TECHNOLOGY LEVEL 1 DEMO PLAN

TND-102 164 TECHNOLOGY LEVEL 2 DEMO PLAN

TN-011 165 TECHNOLOGY SITE PLAN

TN-101 166 TECHNOLOGY LEVEL 1 FLOOR PLAN

TN-102 167 TECHNOLOGY LEVEL 2 FLOOR PLAN

TN-201 168 TECHNOLOGY LEVEL 1 REFLECTED CEILING PLAN

TN-202 169 TECHNOLOGY LEVEL 2 REFLECTED CEILING PLAN

TN401 170 TECHNOLOGY ENLARGED COMM ROOM

TN402 171 TECHNOLOGY ENLARGED COMM ROOM

TN501 172 TECHNOLOGY RISER DIAGRAM

TN601 173 TECHNOLOGY DETAILS

TN602 174 TECHNOLOGY DETAILS

TN603 175 TECHNOLOGY DETAILS

LIFE SAFETY AND FIRE PROTECTION SHEETS

LS-101 176 LIFE SAFETY PLAN

LS-102 177 LIFE SAFETY PLAN

FD-101 178 FIRE PROTECTION DEMOLITION PLAN

FP-001 179 FIRE SPRINKLER GENERAL NOTES

FP-101 180 FIRE SPRINKLER PLAN - FIRST FLOOR

FP-102 181 FIRE SPRINKLER PLAN - SECOND FLOOR

FP-103 182 FIRE SPRINKLER PLAN - ATTIC AREA

FP-501 183 FIRE SPRINKLER RISER AND GENERAL DETAILS

FP-502 184 FIRE SPRINKLER GENERAL DETAILS

FP-801 185 FIRE SPRINKLER DESIGN CRITERIA PLAN - FIRST FLOOR

FP-802 186 FIRE SPRINKLER DESIGN CRITERIA PLAN - SECOND FLOOR

FA-001 187 FIRE ALARM PLAN GENERAL NOTES

FA-101 188 FIRE ALARM PLAN

FA-102 189 FIRE ALARM PLAN

FA-501 190 GENERAL FIRE ALARM DETAILS

FA-601 191 GENERAL FIRE ALARM DIAGRAMS

DRAWING ABBREVIATIONS GENERAL LEGEND BUILDING SUMMARY GENERAL NOTES

LEGEND

NUMBERING SYSTEM:

A - 210

DISCIPLINE w/ LEVEL 2 DESINATOR:

C - CIVIL

L - LANDSCAPE

A - ARCHITECTURE

M - MECHANICAL

E - ELECTRICAL

P - PLUMBING

S - STRUCTURAL

K - FOOD SERVICE

SERIES NUMBER

SHEET NUMBER WITHIN

SERIES

CONCRETE/ PRECAST

CONCRETE

SOIL

SAND, EIFS FINISH COAT,

OR CEMENT PLASTER

BRICK

CMU

STONE

FIBERGLASS SEMI RIGID

INSULATION

FIBERGLASS BATT

INSULATION

MINERAL WOOL SEMI

RIGID INSULATION

EXPANDED

POLYSTYRENE RIGID

INSULATION

EXTRUDED

POLYSTYRENE RIGID

INSULATION

POLYISOCYANURATE

RIGID INSULATION

GYPSUM BOARD

EXTERIOR GYPSUM

SHEATHING

EXTERIOR CEMENT

BOARD

COATED GLASS MAT

WATER RESISTANT

GYP BD

PLYWOOD

COVER BOARD

MATERIALS

ANNOTATION CALLOUTS/DRAWING SYMBOLS

CEILING SYMBOLS

PROJECT INFORMATION:

PROJECT NAME: RENOVATE BUILDING B615

ADDRESS: JBSA - FORT SAM HOUSTON

PROPOSED USE: BUSINESS / ASSEMBLY OCCUPANCY

A ---------------------

A LABELCLASS A DOOR

A/C AIR CONDITION

A/C UNITAIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AB ANCHOR BOLT

ACC ACCESSIBLE

ACS AUTOMATIC CONTROL SYSTEM

ACS DR ACCESS DOOR

ACS PNLACCESS PANEL

ACT ACOUSTICAL CEILING TILE

ADA AMERICANS WITH DISABILITIES ACT

ADMIN ADMINISTRATION

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGGR AGGREGATE

AHU AIR HANDLING UNIT

AIB AIR INFILTRATION BARRIER

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZE

APC ACOUSTICAL PANEL CEILING

APPROX APPROXIMATE

AR AS REQUIRED

ARCH ARCHITECT

ASC ABOVE SUSPENDED CEILING

ASSY ASSEMBLY

ATC ACOUSTICAL TILE CEILING

AVG AVERAGE

AW ARCHITECTURAL WOODWORK

AWT ACOUSTICAL WALL TREATMENT

B ---------------------

B LABELCLASS B DOOR

BALC BALCONY

BB BASEBOARD

BC BOOKCASE

BD BOARD

BDRY BOUNDARY

BFF BELOW FINISH FLOOR

BHMA BUILDER'S HARDWARE MANUFACTURER'S

ASSOCIATION

BLDG BUILDING

BLKG BLOCKING

BLT IN BUILT-IN

BN BULLNOSE

BOS BOTTOM OF STEEL

BOT BOTTOM

BP BUILDING PAPER

BRKT BRACKET

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT-UP ROOFING

C ---------------------

C CONC CAST CONCRETE

C LABELCLASS C DOOR

CAB CABINET

CATW CATWALK

CAV CAVITY

CBB CEMENTITIOUS (BACKER) BOARD

CD CONSTRUCTION DOCUMENTS

CDW CHILLED DRINKING WATER

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/CONTRACTOR

INSTALLED

CFE CONTRACTOR FURNISHED EQUIPMENT

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CI CAST IRON

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLG DIFF CEILING DIFFUSER

CLG HT CEILING HEIGHT

CLL COLUMN LINE

CLO CLOSET

CLR COLOR

CLRM CLASSROOM

CMU CONCRETE MASONRY UNIT

CNDS CONDENSATE

CDR CARD READER

CO CLEANOUT

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONC FLR CONCRETE FLOOR

CONF CONFERENCE

CONT CONTINUE

COORD COORDINATE

CORR CORRIDOR

CP CONCRETE PIPE

CPT CARPET

CR CONTROL ROOM

CS CAST STONE

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTR CENTER

CU FT CUBIC FEET

CW CASEMENT WINDOW

D ---------------------

D DEPTH

D LABELCLASS D DOOR

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DIR DIRECTION

DIST DISTANCE

DOC DOCUMENT

DR DOOR

DS DOWNSPOUT

E ---------------------

E LABEL CLASS E DOOR

EA EACH

EF EACH FACE

EIFS EXTERIOR INSULATION AND FINISH SYSTEM

EJ EXPANSION JOINT

ES EACH SIDE

EL ELEVATION

ELEV ELEVATOR

ENTR ENTRANCE

EPS EXPANDED POLYSTYRENE BOARD

(INSULATION)

EQ EQUAL

ETR EXISTING TO REMAIN

EWC ELECTRIC WATER COOLER

EXP EXPOSED

EXT EXTERIOR

EXT EXTINGUISHER

EXT GR EXTERIOR GRADE

1i

GRID / COLUMN

LINE

DESIGNATOR

EQUIPMENT NUMBER

DOOR NUMBER

EXIT LIGHT

1i

WALL TYPE

WINDOW TYPE

Room name

101 ROOM NAME/NUMBER

REVISION TAG

PLAN NORTH

NORTH ARROW w/

TRUE NORTH

INDICATION

F ---------------------

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FAS BD FASCIA BOARD

FC BRK FACE BRICK

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FED FEDERAL

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF INSUL FOIL BACKED INSULATION

FGL FIBERGLASS

FH FIRE HOSE

FHP FULL HEIGHT PARTITION

FIN FINISH

FIN BS FINISH BOTH SIDES

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIXT FIXTURE

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLMT FLUSH MOUNT

FLR FLOOR

FM FACTORY MUTUAL

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FR FIRE RESISTANT

FRG FIBER REINFORCED GYPSUM

FRMG FRAMING

FRP FIBERGLASS REINFORCED PLASTIC

FRTW FIRE RETARDANT TREATED WOOD

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET

FTG FOOTING

FWC FABRIC WALLCOVERING

G ---------------------

G NATURAL GAS

GALV GALVANIZED

GB GRAB BAR

GFCI GOVERNMENT FURNISHED CONTRACTOR

INSTALLED

GFGI GOVERNMENT INSTALLED FURNISHED

INSTALLED BY GOVERNMENT

GFRG GLASS-FIBER-REINFORCED GYPSUM

GLZ GLAZING

GR FL GROUND FLOOR

GUT GUTTER

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H ---------------------

HB HOSE BIBB

HDPE HIGH DENSITY POLYETHYLENE

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HORIZ HORIZONTAL

HT HEIGHT

HYDR HYDRAULIC

I ---------------------

IBC INTERNATIONAL BUILDING CODE

INSUL INSULATION

INT INTERIOR

ILO IN LIEU OF

J ---------------------

JAN JANITOR

K ---------------------

KPD KEYPAD

KIT KITCHEN

KPL KICKPLATE

L ---------------------

LAM LAMINATE

LAV LAVATORY

LBR LUMBER

LBS POUND

LDG LANDING

LF LINEAR FEET (FOOT)

LIB LIBRARY

LIN LINEAR

LKR LOCKER

LOC LOCATION

LT LIGHT

LVDR LOUVER DOOR

LVR LOUVER

M ---------------------

MACH RM MACHINE ROOM

MATL MATERIAL

MAX MAXIMUM

MC MOISTURE CONTENT

MD METAL DECK

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MEMB MEMBRANE

MF MILL FINISH

MFR MANUFACTURER

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM, MINUTE

MIRR MIRROR

MISC MISCELLANEOUS

MLDG MOLDING (MOULDING)

MO MASONRY OPENING

MOD MODIFY

MB MOISTURE BARRIER

MTG MOUNTING

MTL METAL

MVBL MOVABLE

MWP MEMBRANE WATERPROOFING

N ---------------------

N NORTH

NA NOT APPLICABLE

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NP NO PAINT

NRC NOISE REDUCTION COEFFICIENT

NTS NOT TO SCALE

O -------------------

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OFF OFFICE

OGL OBSCURE GLASS

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPQ OPAQUE

OWSJ OPEN WEB STEEL JOIST

OPR OPERABLE

ORD OVERFLOW ROOF DRAIN

ORIG ORIGINAL

P --------------------

PA PUBLIC ADDRESS

PAR PARAPET

PAT PATTERN

PB PULL BOX

PBD PARTICLEBOARD

PCC PRECAST CONCRETE

PCF POUNDS PER CUBIC FOOT

PCT PERCENT

PERF PERFORATED

PERIM PERIMETER

PH PHASE

PIL PILASTER

PL PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLBG PLUMBING

PLG PILING

PLYWD PLYWOOD

PNL PANEL

PP PL PUSH/PULL PLATE

PR PAIR

PRCST PRECAST

PRKG PARKING

PS CONC PRESTRESSED CONCRETE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTDR PAPER TOWEL DISPENSER AND RECEPTACLE

PTN PARTITION

PWR POWER

Q --------------------

QT QUARRY TILE

QTY QUANTITY

R --------------------

RB RESILIENT BASE

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REINFORCED CONCRETE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RDG INS RIGID INSULATION, SOLID

REC RECESSED

REC ROOM RECREATION ROOM

REF REFERENCE

REM REMOVABLE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

REST RESTROOM

RF RESILIENT FLOORING

RFG ROOFING

RH ROOF HATCH

RHR RIGHT HAND REVERSE

RL ROOF LEADER

RLG RAILING

RM ROOM

RO ROUGH OPENING

RSD ROLLING STEEL DOOR

RV ROOF VENT

RVL REVEAL

S --------------------

SB SPLASH BLOCK

SCHED SCHEDULE

SD SMOKE DETECTOR

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGL SINGLE

SHT MTL FLASH SHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SKLT SKYLIGHT

SLNT SEALANT

SMK SMOKE

SMLS SEAMLESS

SP EL SPOT ELEVATION

SPEC SPECIFICATION

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SST STAINLESS STEEL

ST STAIRS

STD STANDARD

STL JST STEEL JOIST

STL RF DK STEEL ROOF DECK

STOR STORAGE

STR STRINGERS

STRB/HRN STROBE/HORN

SUB FL SUBFLOOR

SV SHEET VINYL

SW SIDEWALK

T --------------------

T TREAD

T/S TUB/SHOWER

TC TERRA COTTA

TD TRENCH DRAIN

TEL TELEPHONE

TEMP TEMPORARY

TER TERRAZZO

TFF TOP OF FINISH FLOOR

THK THICKNESS

TK BD TACKBOARD

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TOF TOP OF FOOTING

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOPO TOPOGRAPHY

TOS TOP OF SLAB

TRANS TRANSOM

TRTD TREATED

TV TELEVISION

2' x 2' ACT CEILING

4' x 4' ACT CEILING

EGRESS ROUTE ID

AND SECTION

LENGTH

S

1 HR FIRE

S

S

S

1 HR FIRE/SMOKE WALL

4 HR FIRE

4 HR FIRE/SMOKE WALL

2 HR FIRE

2 HR FIRE/SMOKE WALL

3 HR FIRE

3 HR FIRE/SMOKE WALL

FIRE RATED WALL SYMBOLS:

GYP. BD. CEILING

1' x 1' ACT CEILING

2 X 4 LIGHT FIXTURE

2 x 2 LIGHT FIXTURE

SUSP. FLUORESCENT

LIGHT

RETURN AIR GRILLE

SUPPLY AIR GRILLE

EXHAUST AIR GRILLE

Room

Rm_Occupancy

150 SF

EGRESS :Egress_ID

Egress_Length

ROOM OCCUPANCY

& AREA

ELEVATION NUMBER

SECTION

EXTERIOR ELEVATION

ENLARGEMENT,

DETAIL

SPOT ELEVATION

Name

Elevation

FLOOR LEVEL & NAME

PLATE NUMBER WHERE

SECTION/DETAIL IS

DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS

DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS

DRAWN

SHEET KEYNOTE

A-101

Ref

R e f

Ref

R e f

INTERIOR ELEVATION

A-101

PLATE NUMBER WHERE

SECTION/DETAIL IS

DRAWN

A-101

A-101

100000.A

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

J O

IN

T

B A

S E

S A

N A

N T

O N

IO

F O

R T

S A

M H

O U

S T

O N

T

E X

A S

G-002

G E

N E

R A

L N

O T

E S

A

B B

R E

V

IA

T

IO

N S

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G

J O

IN

T

B A

S E

S A

N A

N T

O N

IO

F

O R

T S

A M

H O

U S

T O

N T

X

K E

N A

L L

F N

I S

A V

O Y

D R

IV

E

S

U

IT

E

H O

U S

T O

N T

E X

A S

P H

O N

E (8

-8

S L A

A R

C H

IT

E

C T

S

J D

IX

O

N

C H

O P

K

IN

S

A U

G U

S T

W G

B

FINAL SUBMITTAL

AUGUST 12, 2019

M A

R K

D E

S C

R

IP

T

IO

N D

A

E

© 2019 Microsoft Corporation © 2019 DigitalGlobe ©CNES (2019) Distribution Airbus DS

US Army Corps of Engineers ®

SHEET ID

U

M

Y

C

O R

E

N G

I N

E E

R S

D R

A W

N

B

Y

R

R

D E

S I G

N E

D

B

Y

R

R

S U

B M

I T

T E

D

B

Y

K

F

N I

S I Z

E

C H

E C

K E

D

B

Y

D

D

A N

S I

D

F I

M

E

I S

S U

E

D

A T

E

A U

G U

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

F I

U M

B E

R

D

C

B

A

W G

B

K E

N A

L L

F

R E

E S

E

A

C

H O

L S

H O

U S

T O

N

T

E X

A S

G-003

C O

N T

R A

C T

U

L

R

O U

T E

H

W

HWY 35

HWY 35

J

A

D

W

PARKER RD

WILSON ST

N

B

R A

U N

F E

V E

L I S

C U

M

R

D

N

W

A L T

E R

S

S

T

HOOD ST

N

B

R A

U N

F E

V E

B615

CONTRACTOR

ENTRANCE

POINT

HAUL ROUTE

LEGEND

NOT TO SCALE

CONTRACTOR HAUL ROUTE PLAN

G-003

J O

I N

T

B

A S

E

S

T

O N

O R

T

S

U

S T

O N

T

E X

A S

R E

N O

V A

T I O

N

O

F

B

U I L D

I N

G

S O

U T

H W

E S

T E

V

I S

I O

N

F O

R

S

T R

I C

T

R E

Y N

O L D

S

R

AUG 12, 2019

K

N A

R E

E S

E

A

C

H O

L S

H O

U S

T O

N

T

E X

A S

FINAL SUBMITTAL

G-004

C O

N T

R A

C T

A

G I N

G

A

R E

A

EAST CARSON ST

I N

F A

N T

S

T

R

D

B615

NOT TO SCALE

CONTRACTOR STAGING AREA

CONTRACTOR STAGING AREA

G-004

HOOD ST

275 FT LONG X 125 FT WIDE

J O

I N

T

B

A S

E

S

T

O N

O R

T

S

U

S T

O N

T

E X

A S

R E

N O

V A

T I O

N

O

F

B

U I L

D I N

G

W

E S

T

W

I N

G

F R

A N

K

S

T

US Army Corps of Engineers ®

SHEET ID

D R

A W

N

B

Y

R

R

D E

S I G

N E

D

B

Y

R

R

S U

B M

I T

T E

D

B

Y

K

F

N I

S I Z

E

C H

E C

K E

D

B

Y

D

D

A N

S I

D

F I L

E

N

A M

E

I S

S U

E

D

A T

E

A U

G U

C O

N T

R A

S O

L I C

I T

A T

I O

N

N

O

F I L

E

N

U M

B E

R

1 2 3 4 5

D

C

B

A

W

G

B

AUG 12, 2019

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S O

U T

H W

E S

T E

V

I S

I O

N

F O

R

S

T R

I C

T

NOTES:

1) CONTRACTOR TO MAINTAIN 30 FT SETBACK FROM PERIMETER FENCE TO EDGE OF STAGING

AREA.

2) CONTRACTOR TO COORDINATE WITH THE GOVT PRIOR TO FINALIZATION OF STAGING AREA.

DN

DN

UP

W1 W8 W11 W18

WA

WD

EA

EC

ED

E1 E2 E3 E12

W3 W2 W1

N1

S2

S1

E1

BASE ITEM 2 OR

OPTIONAL BID ITEM 3

OPTIONAL

BID ITEM 4

OPTIONAL

BID ITEM 4

OPTIONAL

BID ITEM 5

OPTIONAL

BID ITEM 2

N2

W1 W8 W11 W18

WA

WD

EA

ED

E2 E3 E12

W3 W2 W1

N1

S2

S1

E1

BASE ITEM 2 OR

OPTIONAL BID ITEM 3

OPTIONAL

BID ITEM 4

OPTIONAL

BID ITEM 4

OPTIONAL

BID ITEM 5

OPTIONAL

BID ITEM 2

N2

W1 W8 W11 W18

WAWA

WDWD

EAEA

EC

EDED

E1 E2 E3 E12

W3 W2 W1

N1

S2

S1

E1 BASE ITEM 2 OR

OPTIONAL BID ITEM 3

OPTIONAL

BID ITEM 4

OPTIONAL

BID ITEM 4

PORCH, RAMP &

STAIRS TO REMAIN IF

ELEVATOR BID OPTION

IS NOT EXERCISED

BASE ITEM 1 - DEMO OF PORCH/STAIR,

SHED ROOF, AND INFILL OF 2ND FLOOR

DOOR IS REQUIRED WHETHER OPTIONAL

BID ITEM 2 IS EXERCISED OR NOT

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

J O

IN

T

B A

S E

S A

N A

N T

O N

IO

F O

R T

S A

M H

O U

S T

O N

T

E X

A S

G-102

C

IN

IT

M

S U

M M

A R

Y

R E

N O

V A

T

IO

N O

F B

U

IL

D

IN

G

J O

IN

T

B A

S E

S A

N A

N T

O N

IO

F

O R

T S

A M

H O

U S

T O

N T

X

K E

N A

L L

F N

I S

A V

O Y

D R

IV

E

S

U

IT

E

H O

U S

T O

N T

E X

A S

P H

O N

E (8

-8

S L A

A R

C H

IT

E

C T

S

J D

IX

O

N

C H

O P

K

IN

S

A U

G U

S T

W G

B

FINAL SUBMITTAL

1/16" = 1'-0"G-102

A1 CLIN ITEM FLOOR PLAN - FIRST FLOOR

1/16" = 1'-0"G-102

A2 CLIN ITEM FLOOR PLAN - SECOND FLOOR AUGUST 12, 2019

4'0' 8' 16'

GRAPHIC SCALE 1/16"=1'-0"

32'

NORTH

1. THIS SHEET PROVIDED FOR INFORMATION ONLY TO PROVIDE A VISUAL REFERENCE FOR THE CLIN

SCHEDULE. REFER TO THE CLIN SCHEDULE FOR ACTUAL CLIN ITEM NUMBERS.

2. UNLESS NOTED OTHERWISE, ALL WORK SHALL BE INCLUDED IN BASE ITEM 1.

GENERAL NOTES

1/16" = 1'-0"G-102

C3 CLIN ITEM DEMOLITION PLAN - FIRST FLOOR

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

CLIN ITEM SUMMARY

BASE:

• BASE ITEM 1: ALL WORK REQUIRED FOR THE RENOVATION OF BUILDING 615, INCLUSIVE OF

SITE UTILITY WORK OUTSIDE THE 5 FOOT BUILDING LINE REQUIRED TO SUPPORT THE

BUILDING RENOVATION AND EXCLUSIVE OF ALL OTHER WORK LISTED SEPARATELY.

• BASE ITEM 2 (CONDITIONAL AWARD): ALL WORK REQUIRED FOR THE RECONSTRUCTION OF

PORCH/STAIR NO. E1 (BASE BID) AND ASSOCIATED ELEMENTS, INCLUSIVE OF SITE

DEVELOPMENT AND UTILITY WORK OUTSIDE THE 5 FOOT BUILDING LINE REQUIRED TO

SUPPORT THE PORCH REPLACEMENT AND EXCLUSIVE OF ALL OTHER WORK LISTED

SEPARATELY. BASE ITEM 2 WILL BE AWARDED ONLY IF OPTIONAL BID ITEM 3 IS NOT

AWARDED.

OPTIONS:

• OPTIONAL BID ITEM 1: PROCUREMENT AND INSTALLATION OF FF&E PACKAGE, INCLUSIVE

OF CONTRACTOR FURNISHED/CONTRACTOR INSTALLED (CF/CI) AND GOVERNMENT

FURNISHED/CONTRACTOR INSTALLED (GF/CI) ELEMENTS IDENTIFIED IN THE CONTRACT

DOCUMENTS.

• OPTIONAL BID ITEM 2: ALL WORK REQUIRED FOR THE CONSTRUCTION OF THE ELEVATOR

ADDITION AND ASSOCIATED ELEMENTS, INCLUSIVE OF SITE UTILITY WORK OUTSIDE THE 5

FOOT BUILDING LINE REQUIRED TO SUPPORT THE BUILDING ADDITION AND EXCLUSIVE OF

ALL OTHER WORK LISTED SEPARATELY.

• OPTIONAL BID ITEM 3: ALL WORK REQUIRED FOR THE CONSTRUCTION OF THE EAST ENTRY

PORTICO/STAIR ADDITION NO. E1 (BID OPTION) AND ASSOCIATED ELEMENTS, INCLUSIVE OF

SITE UTILITY WORK OUTSIDE THE 5 FOOT BUILDING LINE REQUIRED TO SUPPORT THE

BUILDING ADDITION AND EXCLUSIVE OF ALL OTHER WORK LISTED SEPARATELY.

• OPTIONAL BID ITEM 4: ALL WORK REQUIRED FOR THE RECONSTRUCTION OF PORCH/STAIR

NO. S1, W2, AND W3 AND ASSOCIATED ELEMENTS, INCLUSIVE OF SITE DEVELOPMENT AND

UTILITY WORK OUTSIDE THE 5 FOOT BUILDING LINE REQUIRED TO SUPPORT THE PORCH

REPLACEMENT AND EXCLUSIVE OF ALL OTHER WORK LISTED SEPARATELY.

• OPTIONAL BID ITEM 5 (CONDITIONAL AWARD): ALL WORK REQUIRED FOR THE

RECONSTRUCTION OF PORCH/STAIR NO. N1 AND ASSOCIATED ELEMENTS, INCLUSIVE OF

COMPLETE RAMP DEMOLITION, SITE DEVELOPMENT AND UTILITY WORK OUTSIDE THE 5

FOOT BUILDING LINE REQUIRED TO SUPPORT THE PORCH REPLACEMENT AND EXCLUSIVE

OF ALL OTHER WORK LISTED SEPARATELY. OPTIONAL BID ITEM 5 WILL BE AWARDED ONLY

IF OPTIONAL BID ITEM 2 IS AWARDED.

• OPTIONAL BID ITEM 6: SITE DEVELOPMENT AND LANDSCAPE OUTSIDE THE 5 FOOT

BUILDING LINE AND EXCLUSIVE OF ALL OTHER WORK LISTED SEPARATELY.