1 2 3 4 5
D
C
B
A
US Army Corps of Engineers ®
JOINT BASE SAN ANTONIO
FORT SAM HOUSTON, TX
RENOVATION OF BUILDING 615
FINAL SUBMITTAL
AUGUST 12, 2019
323D ARMY BAND "FORT SAM'S OWN"
CONTRACT NUMBER : -
SOLICITATION NUMBER : W9126G19B3286
FORT SAM HOUSTON, TEXAS
INDEX OF SHEETS
SHEET SHEET. DESCRIPTION
REF NO. NO.
GENERAL SHEETS
G-001.1 01 COVER SHEET - SOUTH WING
G-002.1 02 INDEX SHEET, 1 OF 2
G-002.2 03 INDEX SHEET, 2 OF 2
G-002 04 GENERAL NOTES, ABBREVIATIONS
G-003 05 CONTRACTOR HAUL ROUTE MAP
G-004 06 CONTRACTOR STAGING AREA
G-102 07 CLIN ITEM SUMMARY
CIVIL SHEETS
C-001 08 INDEX OF SHEETS, ABBREVIATIONS, AND LEGEND
C-002 09 NOTES
C-101 10 SURVEY CONTROL POINTS PLAN
CS-101 11 EXISTING CONDITIONS PLAN
CS-102 12 SITE DEMOLITION PLAN
CS-103 13 SITE PLAN WITH DRAINAGE IMPROVEMENTS
CS-104 14 SITE PLAN WITH DRAINAGE IMPROVEMENTS - BASE BID
CS-105 15 LAYOUT OF OUTDOOR EQUIPMENT PADS
CS-106 16 FIRE LANE STRIPING PLAN
CU-101 17 WATER LINE IMPROVEMENTS
CU-102 18 SANITARY SEWER IMPROVEMENTS
C-301 19 UTILITY SECTIONS - 1 OF 2
C-302 20 UTILITY SECTIONS - 2 OF 2
CS-401 21 ENLARGED DRAINAGE PLAN - 1
CS-402 22 ENLARGED DRAINAGE PLAN - 2
CS-403 23 ENLARGED DRAINAGE PLAN - 3
CS-404 24 ENLARGED DRAINAGE PLAN - 4
CS-405 25 ENLARGED DRAINAGE PLAN - 5
C-501 26 ENLARGED DRAINAGE PLAN - 6
C-502 27 PAVEMENT AND SIDEWALK DETAILS - 1 OF 2
C-503 28 PAVEMENT AND SIDEWALK DETAILS - 2 OF 2
C-504 29 WATER LINE DETAILS - 1 OF 2
C-505 30 WATER LINE DETAILS - 2 OF 2
C-506 31 SEWER LINE DETAILS
C-507 32 DRAINAGE DETAILS
C-508 33 ADA DETAILS - 1 OF 2
C-509 34 ADA DETAILS - 2 OF 2
C-510 35 MISCELLANEOUS DETAILS
STRUCTURAL SHEETS
S-001 36 GENERAL NOTES
S-002 37 TYPICAL DETAILS
S-101 38 FOUNDATION PLAN
S-102 39 SECOND LEVEL FRAMING PLAN
S-103 40 LOW AND HIGH ROOF FRAMING PLAN
S-301 41 ELEVATOR AND FOUNDATION SECTIONS
S-302 42 STAIR, LANDING AND WALL SECTIONS
S-303 43 PORTICO AWNING AND TRUSS SECTIONS
S-304 44 PORTICO STAIR + LANDING AND AWNING SECTIONS
ARCHITECTURAL SHEETS
AD101 45 DEMOLITION PLAN - FIRST FLOOR
AD102 46 DEMOLITION PLAN - SECOND FLOOR
AD111 47 DEMOLITION REFLECTED CEILING PLAN - FIRST FLOOR
AD112 48 DEMOLITION REFLECTED CEILING PLAN - SECOND FLOOR
AD201 49 DEMOLITION NORTH AND SOUTH ELEVATIONS
AD202 50 DEMOLITION EAST AND WEST ELEVATIONS
AD203 51 DEMOLITION EAST AND WEST COURTYARD ELEVATIONS
A-100 52 AIR BARRIER PLANS
A-101 53 FLOOR PLAN - FIRST FLOOR
A-102 54 FLOOR PLAN - SECOND FLOOR
A-103 55 ROOF PLAN
A-104 56 SOFFIT PLAN - SECOND FLOOR
A-111 57 REFLECTED CEILING PLAN - FIRST FLOOR
A-112 58 REFLECTED CEILING PLAN - SECOND FLOOR
A-120 59 ENLARGED PLANS AND ELEVATIONS
A-201 60 EXTERIOR ELEVATIONS - NORTH & SOUTH
A-202 61 EXTERIOR ELEVATIONS - EAST & WEST
A-203 62 EXTERIOR ELEVATIONS - EAST & WEST COURTYARD
K e n a l l
C o n s u l t i n g
E n g i n e e r s
I n c
T e x a s
R e g i s t e r e d
E n g i n e e r i n g
F i r m
F e e s e a n d
N i c h o l s
I n c
T e x a s
R e g i s t e r e d
E n g i n e e r i n g
F i
SHEET SHEET. DESCRIPTION
REF NO. NO.
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C
N
O
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P S
E
N G
I N
E E
R S
K E
N A
L L
R A
M
R
A O
P
E
D
D
A Y
A N
A N
D A
P
E
A N
S I
D
A U
G U
W G
D
J O
I N
T
B
A S
E
S
A
T
O N
I O
F O
R
M
H
U
S T
O N
T
X
W G
B
G-002.1
FINAL SUBMITTAL
I N
D E
X
S
H E
E T
ARCHITECTURAL SHEETS (CONTD)
A-301 63 BUILDING SECTION
A-302 64 BUILDING SECTION
A-303 65 ENLARGED SECTIONS
A-304 66 ENLARGED SECTIONS
A-305 67 ENLARGED SECTIONS
A-306 68 ENLARGED SECTIONS
A-307 69 ENLARGED SECTIONS
A-308 70 ENLARGED SECTIONS
A-309 71 ENLARGED SECTIONS
A-310 72 ENLARGED SECTIONS
A-321 73 WALL SECTIONS
A-322 74 WALL SECTIONS
A-401 75 ENLARGED PLANS & ELEVATIONS
A-402 76 ENLARGED PLANS & ELEVATIONS
A-403 77 ENLARGED PLANS & ELEVATIONS
A-404 78 ENLARGED PLANS & ELEVATIONS
A-405 79 ENLARGED PLANS & ELEVATIONS
A-406 80 ENLARGED PLANS & ELEVATIONS
A-501 81 DETAILS
A-502 82 DETAILS
A-503 83 DETAILS
A-504 84 DETAILS
A-505 85 DETAILS
A-511 86 DOOR DETAILS
A-512 87 DOOR DETAILS
A-513 88 DOOR DETAILS
A-514 89 WINDOW DETAILS
A-520 90 SECTION DETAILS
A-521 91 MILLWORK DETAILS
A-601 92 DOOR SCHEDULES & DETAILS
A-602 93 WINDOW TYPES & SCHEDULES
A-621 94 PARTITION TYPES
A-622 95 PARTITION DETAILS
A-801 96 PHOTOS - EXISTING BUILDING
A-901 97 EXTERIOR FINISH PERSPECTIVES
A-902 98 EXTERIOR FINISH PERSPECTIVES
I-101 99 FINISH PLAN - FIRST FLOOR
I-102 100 FINISH PLAN - SECOND FLOOR
I-531 101 SIGNAGE
I-611 102 ROOM FINISH SCHEDULE
I-901 103 PERFORMANCE HALL FINISHES
IF101 104 FURNITURE PLAN - FIRST FLOOR
IF102 105 FURNITURE PLAN - SECOND FLOOR
MECHANICAL, ELECTRICAL, PLUMBING, AND TELECOMMUNICATION SHEETS
M-001 106 LEGEND, ABBREVIATIONS AND GENERAL NOTES
MD-101 107 HVAC DEMOLITION PLAN - FIRST FLOOR
MD-102 108 HVAC DEMOLITION PLAN - SECOND FLOOR
MH-101 109 HVAC FLOOR PLAN - FIRST FLOOR
MH-102 110 HVAC FLOOR PLAN - SECOND FLOOR
M-103 111 HVAC EQUIPMENT/ PIPING PLAN - FIRST FLOOR
M-104 112 HVAC EQUIPMENT/ PIPING PLAN - SECOND FLOOR
M-105 113 HVAC PIPING RISER DIAGRAM - FIRST FLOOR
M-106 114 HVAC PIPING RISER DIAGRAM - SECOND FLOOR
M-501 115 HVAC DETAILS I
M-502 116 HVAC DETAILS II
M-503 117 HVAC DETAILS III
M-504 118 HVAC DETAILS V
M-505 119 HVAC SCHEDULE AND DETAILS IV
M-506 120 MECHANICAL CONTROL SCHEMATICS I
M-507 121 MECHANICAL CONTROL SCHEMATICS II
M-508 122 MECHANICAL CONTROL SCHEMATICS III
M-509 123 MECHANICAL CONTROL SCHEMATICS IV
M-510 124 MECHANICAL CONTROL SCHEMATICS V
M-511 125 MECHANICAL CONTROL SCHEMATICS VI
M-512 126 MECHANICAL CONTROL SCHEMATICS VII
M-601 127 HVAC SCHEDULES I
M-602 128 HVAC SCHEDULES II
M-603 129 HVAC SCHEDULES III
P-001 130 PLUMBING LEGEND, GENERAL NOTES, DETAIL AND SCHEDULES
PD-101 131 DEMOLITION PLAN - FIRST FLOOR
PD-102 132 DEMOLITION PLAN - SECOND FLOOR
PP-103 133 PLUMBING PLAN - FIRST FLOOR
J O
I N
T
B
A S
E
S
T
O N
I
O R
T
S
U
S T
O N
T
E X
A S
R E
N O
V A
T I O
N
O
F
B
U I L D
I N
G
K E
N A
L L
I
S
A V
Y
I V
E
S
U I T
E
H O
U S
T O
N
T
E X
P H
O N
E
INDEX OF SHEETS
SHEET SHEET. DESCRIPTION
REF NO. NO.
K e n a l l
C o n s u l t i n g
E n g i n e e r s
I n c
T e x a s
R e g i s t e r e d
E n g i n e e r i n g
F i e e s e a n d
N i c h o l s
I n c e x a s
R e g i s t e r e d
E n g i n e e r i n g
F i
K E
N A
L
I
S
A V
I V
E
S
U I T
E
H O
U S
T O
N
T
E X
P H
O N
E
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
K E
N A
L L
R A
M
R
A O
P
E
D
D
A Y
A N
A N
D A
P
E
A N
S I
D
A U
G U
W G
D
J O
I N
T
B
A S
E
S
T
O N
I O
F O
U
S T
O N
T
X
W G
B
G-002.2
FINAL SUBMITTAL
I N
D E
X
S
H E
E T
J O
I N
T
B
A S
E
S
T
O N
O R
T
S
U
S T
O N
T
E X
A S
R E
N O
V A
T I O
N
O
F
B
U I L D
I N
G
MECHANICAL, ELECTRICAL, PLUMBING, AND TELECOMMUNICATION SHEETS, CONTD
PP-104 134 PLUMBING PLAN - SECOND FLOOR
PP-401 135 PLUMBING ENLARGED PLANS I
PP-402 136 PLUMBING ENLARGED PLAN II
PP-501 137 PLUMBING RISER DIAGRAM I - FIRST FLOOR
PP-502 138 PLUMBING RISER DIAGRAM II - SECOND FLOOR
PP-503 139 ENLARGED SUMP PUMP/OIL WATER SEPARATOR DETAIL
E-001 140 LEGEND AND ABBREVIATIONS
E-002 141 GENERAL NOTES
ED-101 142 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR
ED-102 143 ELECTRICAL DEMOLITION PLAN - SECOND FLOOR
E-101 144 POWER FLOOR PLAN - FIRST FLOOR
E-102 145 POWER FLOOR PLAN - SECOND FLOOR
E-111 146 LIGHTING FLOOR PLAN - FIRST FLOOR
E-112 147 LIGHTING FLOOR PLAN - SECOND FLOOR
E-113 148 LIGHTING FLOOR PLAN - ATTIC
E-201 149 POWER HVAC FLOOR PLAN - FIRST FLOOR
E-202 150 POWER HVAC FLOOR PLAN - SECOND FLOOR
E-401 151 ELECTRICAL ENLARGED PLANS
E-501 152 ELECTRICAL DETAILS
E-601 153 ELECTRICAL ONE-LINE
E-602 154 ELECTRICAL PANEL SCHEDULES
E-603 155 ELECTRICAL PANEL SCHEDULES
E-604 156 ELECTRICAL PANEL SCHEDULES
E-605 157 LIGHTING FIXTURE SCHEDULE AND CONTROLS
E-606 158 LIGHTING CONTROL DIAGRAMS
E-607 159 LIGHTING CONTROL DIAGRAMS
E-608 160 GROUNDING DIAGRAM
TN-000 161 TECHNOLOGY ABBREVIATIONS AND LEGEND
TN-001 162 TECHNOLOGY GENERAL NOTES
TND-101 163 TECHNOLOGY LEVEL 1 DEMO PLAN
TND-102 164 TECHNOLOGY LEVEL 2 DEMO PLAN
TN-011 165 TECHNOLOGY SITE PLAN
TN-101 166 TECHNOLOGY LEVEL 1 FLOOR PLAN
TN-102 167 TECHNOLOGY LEVEL 2 FLOOR PLAN
TN-201 168 TECHNOLOGY LEVEL 1 REFLECTED CEILING PLAN
TN-202 169 TECHNOLOGY LEVEL 2 REFLECTED CEILING PLAN
TN401 170 TECHNOLOGY ENLARGED COMM ROOM
TN402 171 TECHNOLOGY ENLARGED COMM ROOM
TN501 172 TECHNOLOGY RISER DIAGRAM
TN601 173 TECHNOLOGY DETAILS
TN602 174 TECHNOLOGY DETAILS
TN603 175 TECHNOLOGY DETAILS
LIFE SAFETY AND FIRE PROTECTION SHEETS
LS-101 176 LIFE SAFETY PLAN
LS-102 177 LIFE SAFETY PLAN
FD-101 178 FIRE PROTECTION DEMOLITION PLAN
FP-001 179 FIRE SPRINKLER GENERAL NOTES
FP-101 180 FIRE SPRINKLER PLAN - FIRST FLOOR
FP-102 181 FIRE SPRINKLER PLAN - SECOND FLOOR
FP-103 182 FIRE SPRINKLER PLAN - ATTIC AREA
FP-501 183 FIRE SPRINKLER RISER AND GENERAL DETAILS
FP-502 184 FIRE SPRINKLER GENERAL DETAILS
FP-801 185 FIRE SPRINKLER DESIGN CRITERIA PLAN - FIRST FLOOR
FP-802 186 FIRE SPRINKLER DESIGN CRITERIA PLAN - SECOND FLOOR
FA-001 187 FIRE ALARM PLAN GENERAL NOTES
FA-101 188 FIRE ALARM PLAN
FA-102 189 FIRE ALARM PLAN
FA-501 190 GENERAL FIRE ALARM DETAILS
FA-601 191 GENERAL FIRE ALARM DIAGRAMS
DRAWING ABBREVIATIONS GENERAL LEGEND BUILDING SUMMARY GENERAL NOTES
LEGEND
NUMBERING SYSTEM:
A - 210
DISCIPLINE w/ LEVEL 2 DESINATOR:
C - CIVIL
L - LANDSCAPE
A - ARCHITECTURE
M - MECHANICAL
E - ELECTRICAL
P - PLUMBING
S - STRUCTURAL
K - FOOD SERVICE
SERIES NUMBER
SHEET NUMBER WITHIN
SERIES
CONCRETE/ PRECAST
CONCRETE
SOIL
SAND, EIFS FINISH COAT,
OR CEMENT PLASTER
BRICK
CMU
STONE
FIBERGLASS SEMI RIGID
INSULATION
FIBERGLASS BATT
INSULATION
MINERAL WOOL SEMI
RIGID INSULATION
EXPANDED
POLYSTYRENE RIGID
INSULATION
EXTRUDED
POLYSTYRENE RIGID
INSULATION
POLYISOCYANURATE
RIGID INSULATION
GYPSUM BOARD
EXTERIOR GYPSUM
SHEATHING
EXTERIOR CEMENT
BOARD
COATED GLASS MAT
WATER RESISTANT
GYP BD
PLYWOOD
COVER BOARD
MATERIALS
ANNOTATION CALLOUTS/DRAWING SYMBOLS
CEILING SYMBOLS
PROJECT INFORMATION:
PROJECT NAME: RENOVATE BUILDING B615
ADDRESS: JBSA - FORT SAM HOUSTON
PROPOSED USE: BUSINESS / ASSEMBLY OCCUPANCY
A ---------------------
A LABELCLASS A DOOR
A/C AIR CONDITION
A/C UNITAIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ACC ACCESSIBLE
ACS AUTOMATIC CONTROL SYSTEM
ACS DR ACCESS DOOR
ACS PNLACCESS PANEL
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES ACT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHU AIR HANDLING UNIT
AIB AIR INFILTRATION BARRIER
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZE
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
ASSY ASSEMBLY
ATC ACOUSTICAL TILE CEILING
AVG AVERAGE
AW ARCHITECTURAL WOODWORK
AWT ACOUSTICAL WALL TREATMENT
B ---------------------
B LABELCLASS B DOOR
BALC BALCONY
BB BASEBOARD
BC BOOKCASE
BD BOARD
BDRY BOUNDARY
BFF BELOW FINISH FLOOR
BHMA BUILDER'S HARDWARE MANUFACTURER'S
ASSOCIATION
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BN BULLNOSE
BOS BOTTOM OF STEEL
BOT BOTTOM
BP BUILDING PAPER
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C ---------------------
C CONC CAST CONCRETE
C LABELCLASS C DOOR
CAB CABINET
CATW CATWALK
CAV CAVITY
CBB CEMENTITIOUS (BACKER) BOARD
CD CONSTRUCTION DOCUMENTS
CDW CHILLED DRINKING WATER
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR
INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CI CAST IRON
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG DIFF CEILING DIFFUSER
CLG HT CEILING HEIGHT
CLL COLUMN LINE
CLO CLOSET
CLR COLOR
CLRM CLASSROOM
CMU CONCRETE MASONRY UNIT
CNDS CONDENSATE
CDR CARD READER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONC FLR CONCRETE FLOOR
CONF CONFERENCE
CONT CONTINUE
COORD COORDINATE
CORR CORRIDOR
CP CONCRETE PIPE
CPT CARPET
CR CONTROL ROOM
CS CAST STONE
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTR CENTER
CU FT CUBIC FEET
CW CASEMENT WINDOW
D ---------------------
D DEPTH
D LABELCLASS D DOOR
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
E ---------------------
E LABEL CLASS E DOOR
EA EACH
EF EACH FACE
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
ES EACH SIDE
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPS EXPANDED POLYSTYRENE BOARD
(INSULATION)
EQ EQUAL
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EXP EXPOSED
EXT EXTERIOR
EXT EXTINGUISHER
EXT GR EXTERIOR GRADE
1i
GRID / COLUMN
LINE
DESIGNATOR
EQUIPMENT NUMBER
DOOR NUMBER
EXIT LIGHT
1i
WALL TYPE
WINDOW TYPE
Room name
101 ROOM NAME/NUMBER
REVISION TAG
PLAN NORTH
NORTH ARROW w/
TRUE NORTH
INDICATION
F ---------------------
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FAS BD FASCIA BOARD
FC BRK FACE BRICK
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF INSUL FOIL BACKED INSULATION
FGL FIBERGLASS
FH FIRE HOSE
FHP FULL HEIGHT PARTITION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FM FACTORY MUTUAL
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FR FIRE RESISTANT
FRG FIBER REINFORCED GYPSUM
FRMG FRAMING
FRP FIBERGLASS REINFORCED PLASTIC
FRTW FIRE RETARDANT TREATED WOOD
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET
FTG FOOTING
FWC FABRIC WALLCOVERING
G ---------------------
G NATURAL GAS
GALV GALVANIZED
GB GRAB BAR
GFCI GOVERNMENT FURNISHED CONTRACTOR
INSTALLED
GFGI GOVERNMENT INSTALLED FURNISHED
INSTALLED BY GOVERNMENT
GFRG GLASS-FIBER-REINFORCED GYPSUM
GLZ GLAZING
GR FL GROUND FLOOR
GUT GUTTER
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H ---------------------
HB HOSE BIBB
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HORIZ HORIZONTAL
HT HEIGHT
HYDR HYDRAULIC
I ---------------------
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J ---------------------
JAN JANITOR
K ---------------------
KPD KEYPAD
KIT KITCHEN
KPL KICKPLATE
L ---------------------
LAM LAMINATE
LAV LAVATORY
LBR LUMBER
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIB LIBRARY
LIN LINEAR
LKR LOCKER
LOC LOCATION
LT LIGHT
LVDR LOUVER DOOR
LVR LOUVER
M ---------------------
MACH RM MACHINE ROOM
MATL MATERIAL
MAX MAXIMUM
MC MOISTURE CONTENT
MD METAL DECK
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MEMB MEMBRANE
MF MILL FINISH
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM, MINUTE
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING (MOULDING)
MO MASONRY OPENING
MOD MODIFY
MB MOISTURE BARRIER
MTG MOUNTING
MTL METAL
MVBL MOVABLE
MWP MEMBRANE WATERPROOFING
N ---------------------
N NORTH
NA NOT APPLICABLE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NP NO PAINT
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
O -------------------
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OFF OFFICE
OGL OBSCURE GLASS
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPQ OPAQUE
OWSJ OPEN WEB STEEL JOIST
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P --------------------
PA PUBLIC ADDRESS
PAR PARAPET
PAT PATTERN
PB PULL BOX
PBD PARTICLEBOARD
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PH PHASE
PIL PILASTER
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLG PILING
PLYWD PLYWOOD
PNL PANEL
PP PL PUSH/PULL PLATE
PR PAIR
PRCST PRECAST
PRKG PARKING
PS CONC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTDR PAPER TOWEL DISPENSER AND RECEPTACLE
PTN PARTITION
PWR POWER
Q --------------------
QT QUARRY TILE
QTY QUANTITY
R --------------------
RB RESILIENT BASE
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REINFORCED CONCRETE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RDG INS RIGID INSULATION, SOLID
REC RECESSED
REC ROOM RECREATION ROOM
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
REST RESTROOM
RF RESILIENT FLOORING
RFG ROOFING
RH ROOF HATCH
RHR RIGHT HAND REVERSE
RL ROOF LEADER
RLG RAILING
RM ROOM
RO ROUGH OPENING
RSD ROLLING STEEL DOOR
RV ROOF VENT
RVL REVEAL
S --------------------
SB SPLASH BLOCK
SCHED SCHEDULE
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGL SINGLE
SHT MTL FLASH SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SKLT SKYLIGHT
SLNT SEALANT
SMK SMOKE
SMLS SEAMLESS
SP EL SPOT ELEVATION
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SST STAINLESS STEEL
ST STAIRS
STD STANDARD
STL JST STEEL JOIST
STL RF DK STEEL ROOF DECK
STOR STORAGE
STR STRINGERS
STRB/HRN STROBE/HORN
SUB FL SUBFLOOR
SV SHEET VINYL
SW SIDEWALK
T --------------------
T TREAD
T/S TUB/SHOWER
TC TERRA COTTA
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TFF TOP OF FINISH FLOOR
THK THICKNESS
TK BD TACKBOARD
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TRANS TRANSOM
TRTD TREATED
TV TELEVISION
2' x 2' ACT CEILING
4' x 4' ACT CEILING
EGRESS ROUTE ID
AND SECTION
LENGTH
S
1 HR FIRE
S
S
S
1 HR FIRE/SMOKE WALL
4 HR FIRE
4 HR FIRE/SMOKE WALL
2 HR FIRE
2 HR FIRE/SMOKE WALL
3 HR FIRE
3 HR FIRE/SMOKE WALL
FIRE RATED WALL SYMBOLS:
GYP. BD. CEILING
1' x 1' ACT CEILING
2 X 4 LIGHT FIXTURE
2 x 2 LIGHT FIXTURE
SUSP. FLUORESCENT
LIGHT
RETURN AIR GRILLE
SUPPLY AIR GRILLE
EXHAUST AIR GRILLE
Room
Rm_Occupancy
150 SF
EGRESS :Egress_ID
Egress_Length
ROOM OCCUPANCY
& AREA
ELEVATION NUMBER
SECTION
EXTERIOR ELEVATION
ENLARGEMENT,
DETAIL
SPOT ELEVATION
Name
Elevation
FLOOR LEVEL & NAME
PLATE NUMBER WHERE
SECTION/DETAIL IS
DRAWN
PLATE NUMBER WHERE
SECTION/DETAIL IS
DRAWN
PLATE NUMBER WHERE
SECTION/DETAIL IS
DRAWN
SHEET KEYNOTE
A-101
Ref
R e f
Ref
R e f
INTERIOR ELEVATION
A-101
PLATE NUMBER WHERE
SECTION/DETAIL IS
DRAWN
A-101
A-101
100000.A
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
J O
IN
T
B A
S E
S A
N A
N T
O N
IO
F O
R T
S A
M H
O U
S T
O N
T
E X
A S
G-002
G E
N E
R A
L N
O T
E S
A
B B
R E
V
IA
T
IO
N S
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G
J O
IN
T
B A
S E
S A
N A
N T
O N
IO
F
O R
T S
A M
H O
U S
T O
N T
X
K E
N A
L L
F N
I S
A V
O Y
D R
IV
E
S
U
IT
E
H O
U S
T O
N T
E X
A S
P H
O N
E (8
-8
S L A
A R
C H
IT
E
C T
S
J D
IX
O
N
C H
O P
K
IN
S
A U
G U
S T
W G
B
FINAL SUBMITTAL
AUGUST 12, 2019
M A
R K
D E
S C
R
IP
T
IO
N D
A
E
© 2019 Microsoft Corporation © 2019 DigitalGlobe ©CNES (2019) Distribution Airbus DS
US Army Corps of Engineers ®
SHEET ID
U
M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
R
R
D E
S I G
N E
D
B
Y
R
R
S U
B M
I T
T E
D
B
Y
K
F
N I
S I Z
E
C H
E C
K E
D
B
Y
D
D
A N
S I
D
F I
M
E
I S
S U
E
D
A T
E
A U
G U
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
F I
U M
B E
R
D
C
B
A
W G
B
K E
N A
L L
F
R E
E S
E
A
C
H O
L S
H O
U S
T O
N
T
E X
A S
G-003
C O
N T
R A
C T
U
L
R
O U
T E
H
W
HWY 35
HWY 35
J
A
D
W
PARKER RD
WILSON ST
N
B
R A
U N
F E
V E
L I S
C U
M
R
D
N
W
A L T
E R
S
S
T
HOOD ST
N
B
R A
U N
F E
V E
B615
CONTRACTOR
ENTRANCE
POINT
HAUL ROUTE
LEGEND
NOT TO SCALE
CONTRACTOR HAUL ROUTE PLAN
G-003
J O
I N
T
B
A S
E
S
T
O N
O R
T
S
U
S T
O N
T
E X
A S
R E
N O
V A
T I O
N
O
F
B
U I L D
I N
G
S O
U T
H W
E S
T E
V
I S
I O
N
F O
R
S
T R
I C
T
R E
Y N
O L D
S
R
AUG 12, 2019
K
N A
R E
E S
E
A
C
H O
L S
H O
U S
T O
N
T
E X
A S
FINAL SUBMITTAL
G-004
C O
N T
R A
C T
A
G I N
G
A
R E
A
EAST CARSON ST
I N
F A
N T
S
T
R
D
B615
NOT TO SCALE
CONTRACTOR STAGING AREA
CONTRACTOR STAGING AREA
G-004
HOOD ST
275 FT LONG X 125 FT WIDE
J O
I N
T
B
A S
E
S
T
O N
O R
T
S
U
S T
O N
T
E X
A S
R E
N O
V A
T I O
N
O
F
B
U I L
D I N
G
W
E S
T
W
I N
G
F R
A N
K
S
T
US Army Corps of Engineers ®
SHEET ID
D R
A W
N
B
Y
R
R
D E
S I G
N E
D
B
Y
R
R
S U
B M
I T
T E
D
B
Y
K
F
N I
S I Z
E
C H
E C
K E
D
B
Y
D
D
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
A U
G U
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
W
G
B
AUG 12, 2019
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S O
U T
H W
E S
T E
V
I S
I O
N
F O
R
S
T R
I C
T
NOTES:
1) CONTRACTOR TO MAINTAIN 30 FT SETBACK FROM PERIMETER FENCE TO EDGE OF STAGING
AREA.
2) CONTRACTOR TO COORDINATE WITH THE GOVT PRIOR TO FINALIZATION OF STAGING AREA.
DN
DN
UP
W1 W8 W11 W18
WA
WD
EA
EC
ED
E1 E2 E3 E12
W3 W2 W1
N1
S2
S1
E1
BASE ITEM 2 OR
OPTIONAL BID ITEM 3
OPTIONAL
BID ITEM 4
OPTIONAL
BID ITEM 4
OPTIONAL
BID ITEM 5
OPTIONAL
BID ITEM 2
N2
W1 W8 W11 W18
WA
WD
EA
ED
E2 E3 E12
W3 W2 W1
N1
S2
S1
E1
BASE ITEM 2 OR
OPTIONAL BID ITEM 3
OPTIONAL
BID ITEM 4
OPTIONAL
BID ITEM 4
OPTIONAL
BID ITEM 5
OPTIONAL
BID ITEM 2
N2
W1 W8 W11 W18
WAWA
WDWD
EAEA
EC
EDED
E1 E2 E3 E12
W3 W2 W1
N1
S2
S1
E1 BASE ITEM 2 OR
OPTIONAL BID ITEM 3
OPTIONAL
BID ITEM 4
OPTIONAL
BID ITEM 4
PORCH, RAMP &
STAIRS TO REMAIN IF
ELEVATOR BID OPTION
IS NOT EXERCISED
BASE ITEM 1 - DEMO OF PORCH/STAIR,
SHED ROOF, AND INFILL OF 2ND FLOOR
DOOR IS REQUIRED WHETHER OPTIONAL
BID ITEM 2 IS EXERCISED OR NOT
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
J O
IN
T
B A
S E
S A
N A
N T
O N
IO
F O
R T
S A
M H
O U
S T
O N
T
E X
A S
G-102
C
IN
IT
M
S U
M M
A R
Y
R E
N O
V A
T
IO
N O
F B
U
IL
D
IN
G
J O
IN
T
B A
S E
S A
N A
N T
O N
IO
F
O R
T S
A M
H O
U S
T O
N T
X
K E
N A
L L
F N
I S
A V
O Y
D R
IV
E
S
U
IT
E
H O
U S
T O
N T
E X
A S
P H
O N
E (8
-8
S L A
A R
C H
IT
E
C T
S
J D
IX
O
N
C H
O P
K
IN
S
A U
G U
S T
W G
B
FINAL SUBMITTAL
1/16" = 1'-0"G-102
A1 CLIN ITEM FLOOR PLAN - FIRST FLOOR
1/16" = 1'-0"G-102
A2 CLIN ITEM FLOOR PLAN - SECOND FLOOR AUGUST 12, 2019
4'0' 8' 16'
GRAPHIC SCALE 1/16"=1'-0"
32'
NORTH
1. THIS SHEET PROVIDED FOR INFORMATION ONLY TO PROVIDE A VISUAL REFERENCE FOR THE CLIN
SCHEDULE. REFER TO THE CLIN SCHEDULE FOR ACTUAL CLIN ITEM NUMBERS.
2. UNLESS NOTED OTHERWISE, ALL WORK SHALL BE INCLUDED IN BASE ITEM 1.
GENERAL NOTES
1/16" = 1'-0"G-102
C3 CLIN ITEM DEMOLITION PLAN - FIRST FLOOR
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
CLIN ITEM SUMMARY
BASE:
• BASE ITEM 1: ALL WORK REQUIRED FOR THE RENOVATION OF BUILDING 615, INCLUSIVE OF
SITE UTILITY WORK OUTSIDE THE 5 FOOT BUILDING LINE REQUIRED TO SUPPORT THE
BUILDING RENOVATION AND EXCLUSIVE OF ALL OTHER WORK LISTED SEPARATELY.
• BASE ITEM 2 (CONDITIONAL AWARD): ALL WORK REQUIRED FOR THE RECONSTRUCTION OF
PORCH/STAIR NO. E1 (BASE BID) AND ASSOCIATED ELEMENTS, INCLUSIVE OF SITE
DEVELOPMENT AND UTILITY WORK OUTSIDE THE 5 FOOT BUILDING LINE REQUIRED TO
SUPPORT THE PORCH REPLACEMENT AND EXCLUSIVE OF ALL OTHER WORK LISTED
SEPARATELY. BASE ITEM 2 WILL BE AWARDED ONLY IF OPTIONAL BID ITEM 3 IS NOT
AWARDED.
OPTIONS:
• OPTIONAL BID ITEM 1: PROCUREMENT AND INSTALLATION OF FF&E PACKAGE, INCLUSIVE
OF CONTRACTOR FURNISHED/CONTRACTOR INSTALLED (CF/CI) AND GOVERNMENT
FURNISHED/CONTRACTOR INSTALLED (GF/CI) ELEMENTS IDENTIFIED IN THE CONTRACT
DOCUMENTS.
• OPTIONAL BID ITEM 2: ALL WORK REQUIRED FOR THE CONSTRUCTION OF THE ELEVATOR
ADDITION AND ASSOCIATED ELEMENTS, INCLUSIVE OF SITE UTILITY WORK OUTSIDE THE 5
FOOT BUILDING LINE REQUIRED TO SUPPORT THE BUILDING ADDITION AND EXCLUSIVE OF
ALL OTHER WORK LISTED SEPARATELY.
• OPTIONAL BID ITEM 3: ALL WORK REQUIRED FOR THE CONSTRUCTION OF THE EAST ENTRY
PORTICO/STAIR ADDITION NO. E1 (BID OPTION) AND ASSOCIATED ELEMENTS, INCLUSIVE OF
SITE UTILITY WORK OUTSIDE THE 5 FOOT BUILDING LINE REQUIRED TO SUPPORT THE
BUILDING ADDITION AND EXCLUSIVE OF ALL OTHER WORK LISTED SEPARATELY.
• OPTIONAL BID ITEM 4: ALL WORK REQUIRED FOR THE RECONSTRUCTION OF PORCH/STAIR
NO. S1, W2, AND W3 AND ASSOCIATED ELEMENTS, INCLUSIVE OF SITE DEVELOPMENT AND
UTILITY WORK OUTSIDE THE 5 FOOT BUILDING LINE REQUIRED TO SUPPORT THE PORCH
REPLACEMENT AND EXCLUSIVE OF ALL OTHER WORK LISTED SEPARATELY.
• OPTIONAL BID ITEM 5 (CONDITIONAL AWARD): ALL WORK REQUIRED FOR THE
RECONSTRUCTION OF PORCH/STAIR NO. N1 AND ASSOCIATED ELEMENTS, INCLUSIVE OF
COMPLETE RAMP DEMOLITION, SITE DEVELOPMENT AND UTILITY WORK OUTSIDE THE 5
FOOT BUILDING LINE REQUIRED TO SUPPORT THE PORCH REPLACEMENT AND EXCLUSIVE
OF ALL OTHER WORK LISTED SEPARATELY. OPTIONAL BID ITEM 5 WILL BE AWARDED ONLY
IF OPTIONAL BID ITEM 2 IS AWARDED.
• OPTIONAL BID ITEM 6: SITE DEVELOPMENT AND LANDSCAPE OUTSIDE THE 5 FOOT
BUILDING LINE AND EXCLUSIVE OF ALL OTHER WORK LISTED SEPARATELY.