Text version
Design-Bid-Build
Renovation of Bldg 615 for Army Band Joint Base Fort Sam Houston AR North
San Antonio, TX
W9126G19B3286 August 2019
US Army Corps of Engineers Fort Worth District
M2RONABR
Sticky Note Completed set by M2RONABR
M2RONABR
Sticky Note Completed set by M2RONABR
M2RONABR
Sticky Note Completed set by M2RONABR
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 11 00.01 SOLICITATION, OFFER AND AWARD, SF-1442
00 11 00.02 CONTRACT LINE ITEM SCHEDULE
00 21 00 [INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS]
00 21 30 SITE VISITS
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 72 00 CONTRACT CLAUSES
00 73 00 SPECIAL CONTRACT REQUIREMENTS
00 73 46 WAGE DETERMINATION SCHEDULE
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00.00 44 CONSTRUCTION SCHEDULE
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 13.01 44 SPECIAL PROJECT PROCEDURES FOR JOINT BASE SAN
ANTONIO/FORT SAM HOUSTON
01 35 13.10 00 SPECIAL PROJECT PROCEDURES - SURVEYING
01 35 13.20 00 SPECIAL PROJECT PROCEDURES - CAD
01 35 13.30 00 SPECIAL PROJECT PROCEDURES - GIS
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 20 ENVIRONMENTAL PROTECTION
01 62 35 RECYCLED / RECOVERED MATERIALS
01 72 00.00 44 ALTERATIONS TO EXISTING FACILITIES
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 82 13.00 10 ASBESTOS ABATEMENT
02 83 13.00 20 LEAD IN CONSTRUCTION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 03 00 CONSERVATION TREATMENT FOR PERIOD MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 60 00 CELLULAR PVC FABRICATIONS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 11 13 BITUMINOUS DAMPPROOFING
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 36 SPRAY FOAM AIR BARRIERS
07 30 10 ROOFING UNDERLAYMENT
07 41 13 METAL ROOF PANELS
07 54 19 POLYVINYL-CHLORIDE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 01 90.50 PREPARATION OF HISTORIC WOOD AND METAL SURFACES FOR
PAINTING
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 51 13 METAL LOCKERS
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
12 50 00.13 10 FURNITURE AND FURNITURE INSTALLATION
12 59 00 SYSTEMS FURNITURE
DIVISION 14 - CONVEYING EQUIPMENT
14 24 23 HYDRAULIC PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 07 19.00 40 PLUMBING PIPING INSULATION
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 01 30.41 HVAC SYSTEM CLEANING
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 23 BACNET DIGITAL CONTROLS (DDC) SYSTEM
23 11 25 FACILITY GAS PIPING
23 21 23 HYDRONIC PUMPS
23 23 00 REFRIGERANT PIPING
23 31 13.00 40 METAL DUCTS
23 34 23.00 40 HVAC POWER VENTILATORS
23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS
23 52 00 HEATING BOILERS
23 54 16.00 10 HEATING SYSTEM; GAS-FIRED HEATERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 73 13.00 40 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS
23 82 19.00 40 FAN COIL UNITS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
26 05 19.10 10 INSULATED WIRE AND CABLE
26 05 71.00 40 LOW VOLTAGE OVERCURRENT PROTECTIVE DEVICES
26 09 23.00 40 LIGHTING CONTROL DEVICES
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 24 16.00 40 PANELBOARDS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 52 00.00 40 EMERGENCY LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 05 29.00 10 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET
COMMUNICATION SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 13 23.00 40 COMMUNICATIONS OPTICAL BACKBONE CABLING
27 21 00.00 20 INTERCOMMUNICATION SYSTEM
27 21 00.00 40 INTERCOMMUNICATION SYSTEM
27 21 10.00 40 FIBER OPTIC DATA TRANSMISSION SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 05 26.00 40 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERS
ATTACHMENTS
A. HAZMAT SURVEY
-- End of Project Table of Contents --
Bldg 615 FSH19B615
SECTION 33 11 00
WATER UTILITY DISTRIBUTION PIPING
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO HB-17 (2002; Errata 2003; Errata 2005, 17th Edition) Standard Specifications for Highway Bridges
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C104/A21.4 (2016) Cement-Mortar Lining for Ductile-Iron Pipe and Fittings for Water
AWWA C110/A21.10 (2012) Ductile-Iron and Gray-Iron Fittings for Water
AWWA C111/A21.11 (2017) Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings
AWWA C500 (2009) Metal-Seated Gate Valves for Water Supply Service
AWWA C508 (2017) Swing-Check Valves for Waterworks Service, 2 In. Through 48-In. (50-mm Through 1,200-mm) NPS
AWWA C509 (2015) Resilient-Seated Gate Valves for Water Supply Service
AWWA C515 (2015) Reduced-Wall, Resilient-Seated Gate Valves for Water Supply Service
AWWA C550 (2017) Protective Interior Coatings for Valves and Hydrants
AWWA C605 (2014) Underground Installation of Polyvinyl Chloride (PVC) and Molecularly Oriented Polyvinyl Chloride (PVCO) Pressure Pipe and Fittings
AWWA C701 (2015) Cold-Water Meters - Turbine Type for Customer Service
AWWA C800 (2014) Underground Service Line Valves and Fittings
SECTION 33 11 00 Page 1
AWWA C900 (2016) Polyvinyl Chloride (PVC) Pressure Pipe, and Fabricated Fittings, 4 In.
Through 60 In. (100 mm Through 1,500 mm)
AWWA M23 (2002; 2nd Ed) Manual: PVC Pipe - Design and Installation
AWWA M6 (2012) Water Meters - Selection, Installation, Testing, and Maintenance
AWWA M9 (2008; Errata 2013) Manual: Concrete Pressure Pipe
ASTM INTERNATIONAL (ASTM)
ASTM A48/A48M (2003; R 2012) Standard Specification for Gray Iron Castings
ASTM C94/C94M (2017a) Standard Specification for Ready-Mixed Concrete
ASTM D1784 (2011) Standard Specification for Rigid Poly(Vinyl Chloride) (PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds
ASTM D1785 (2012) Standard Specification for Poly(Vinyl Chloride) (PVC), Plastic Pipe, Schedules 40, 80, and 120
ASTM D2241 (2015) Standard Specification for Poly(Vinyl Chloride) (PVC) Pressure-Rated Pipe (SDR Series)
ASTM D2466 (2017) Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40
ASTM D2467 (2015) Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80
ASTM D2855 (2015) Standard Practice for Making Solvent-Cemented Joints with Poly(Vinyl Chloride) (PVC) Pipe and Fittings
ASTM D3139 (1998; R 2011) Joints for Plastic Pressure Pipes Using Flexible Elastomeric Seals
ASTM F1674 (2011) Standard Test Method for Joint Restraint Products for Use with PVC Pipe
ASTM F402 (2005; R 2012) Safe Handling of Solvent Cements, Primers, and Cleaners Used for Joining Thermoplastic Pipe and Fittings
ASTM F477 (2014) Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe
SECTION 33 11 00 Page 2
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 24 (2016; ERTA 2016) Standard for the Installation of Private Fire Service Mains and Their Appurtenances
NSF INTERNATIONAL (NSF)
NSF 372 (2011) Drinking Water System Components - Lead Content
NSF/ANSI 14 (2017b) Plastics Piping System Components and Related Materials
NSF/ANSI 61 (2016) Drinking Water System Components - Health Effects
UNDERWRITERS LABORATORIES (UL)
UL 262 (2004; Reprint Oct 2011) Gate Valves for Fire-Protection Service
UL 312 (2010; Reprint Mar 2015) Check Valves for Fire-Protection Service
1.2 DEFINITIONS
1.2.1 Water Transmission Mains
Water transmission mains include water piping having diameters greater than 14 inch, specific materials, methods of joining and any appurtenances deemed necessary for a satisfactory system.
1.2.2 Water Mains
Water mains include water piping having diameters 4 through 14 inch, specific materials, methods of joining and any appurtenances deemed necessary for a satisfactory system.
1.2.3 Water Service Lines
Water service lines include water piping from a water main to a building service at a point approximately 5 feet from building or the point indicated on the drawings, specific materials, methods of joining and any appurtenances deemed necessary for a satisfactory system.
1.2.4 Additional Definitions
For additional definitions refer to the definitions in the applicable referenced standard.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
SECTION 33 11 00 Page 3
PROCEDURES:
SD-01 Preconstruction Submittals
Connections; G
SD-03 Product Data
Pipe, Fittings, Joints and Couplings; G
Ball And Socket Joint; G
Valves; G
Valve Boxes; G
Pipe Restraint; G
Tapping Sleeves; G
Precast Concrete Thrust Blocks; G
SD-06 Test Reports
Leakage Test
Hydrostatic Test
SD-07 Certificates
Pipe, Fittings, Joints and Couplings
Shop-Applied Lining and Coating Lining Lining for Fittings
Valves
SD-08 Manufacturer's Instructions
PVC Piping
PVC Piping For Service Lines
SECTION 33 11 00 Page 4
1.4 QUALITY CONTROL
1.4.1 Regulatory Requirements
Comply with NSF/ANSI 14 or NSF/ANSI 61 and NSF 372 for materials for potable water systems; comply with lead content requirements for "lead-free" plumbing as defined by the U.S. Safe Drinking Water Act effective January 2014. Provide materials bearing the seal of the National Sanitation Foundation (NSF) for potable water service.
Comply with NFPA 24 for materials, installation, and testing of fire main piping and components.
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery and Storage
Inspect materials delivered to site for damage. Unload and store with minimum handling and in accordance with manufacturer's instructions. Store materials on site in enclosures or under protective covering. Store plastic piping, jointing materials and rubber gaskets under cover out of direct sunlight. Do not store materials directly on the ground. Keep inside of pipes, fittings, valves, and other accessories free of dirt and debris.
1.5.2 Handling
Handle pipe, fittings, valves, and other accessories in accordance with manufacturer's instructions and in a manner to ensure delivery to the trench in sound undamaged condition. Avoid injury to coatings and linings on pipe and fittings; make repairs if coatings or linings are damaged. Do not place other material, hooks, or pipe inside a pipe or fitting after the coating has been applied. Inspect the pipe for defects before installation. Carry, do not drag pipe to the trench. Use of pinch bars and tongs for aligning or turning pipe will be permitted only on the bare ends of the pipe. Clean the interior of pipe and accessories of foreign matter before being lowered into the trench and keep them clean during laying operations by plugging. Replace defective material without additional expense to the Government. Store rubber gaskets, not immediately installed, under cover or out of direct sunlight.
Handle PVC pipe, fittings, and accessories in accordance with AWWA C605.
PART 2 PRODUCTS
2.1 MATERIALS
Provide all materials in accordance with AWWA C800 and as indicated herein. Provide valves and fittings with pressure ratings equivalent to the pressure ratings of the pipe.
2.1.1 Pipe, Fittings, Joints And Couplings
Submit manufacturer's standard drawings or catalog cuts, except submit both drawings and cuts for push-on and rubber-gasketed bell-and-spigot joints.
Include information concerning gaskets with submittal for joints and couplings.
SECTION 33 11 00 Page 5
2.1.1.1 Plastic Piping
2.1.1.1.1 PVC Piping
2.1.1.1.1.1 PVC Piping
AWWA C900 plain end or gasket bell end pipe meeting or exceeding ASTM D1784 cell class 12454, with a minimum Pressure Class 150 (DR27.5)with ductile iron outside diameter (DIOD).
2.1.1.1.1.2 Fittings for PVC Pipe
Gray iron or ductile iron fittings, AWWA C110/A21.10 with special fittings in accordance with Appendix B or AWWA C153/A21.53, with cement-mortar lining for fittings, AWWA C104/A21.4, standard thickness. Fittings with push-on joint ends are to conform to the same requirements as fittings with mechanical-joint ends, except for the factory modified bell design compatible for use with PVC pipe as specified.
Fittings from material that meets or exceeds ASTM D1784 cell class 12454 and is the same material as the pipe with elastomeric gaskets, in conformance with AWWA C605 and AWWA C900.
2.1.1.1.1.3 Joints and Jointing Material for PVC
a. Push-on joints: Use jointing material in accordance with ASTM D3139 and AWWA C111/A21.11 between pipes, pipes and metal fittings, valves, and other accessories or compression-type joints/mechanical joints.
Provide each joint connection with an elastomeric gasket compatible for the bell or coupling used. Gaskets for push-on joints for pipe, ASTM F477. Gaskets for push-on joints and compression-type joints/mechanical joints for joint connections between pipe and metal fittings, valves, and other accessories, AWWA C111/A21.11, respectively, for push-on joints and mechanical joints.
b. Mechanical Joint: Use mechanically coupled joints having a sleeve-type mechanical coupling, as specified in the paragraph SLEEVE-TYPE MECHANICAL COUPLINGS, as an optional jointing method for plain-end PVC pipe, subject to the limitations specified for mechanically coupled joints using a sleeve-type mechanical coupling as specified for compression-type joints in ASTM D3139. Provide jointing material in accordance with AWWA C111/A21.11 between pipe and sleeve-type mechanical couplings.
2.1.1.1.2 PVC Piping for Service Lines
2.1.1.1.2.1 Pipe and Fittings
Provide ASTM D1784 cell class 12454 pipe and fittings of the same PVC material.
a. ASTM D1785, Schedule 40 with ASTM D2466 Schedule 40 or ASTM D2467 Schedule 80 fittings.
b. ASTM D2241 pipe and fittings with SDR as necessary to provide 150 psi minimum pressure rating with ASTM D2466 Schedule 40 or ASTM D2467 Schedule 80 fittings.
SECTION 33 11 00 Page 6
2.1.1.1.2.2 Joints and Connections
Fittings may be joined by the solvent-cement method or threading.
2.1.1.1.2.3 Solvent Joining
Provide solvent joints in accordance with ASTM D2855.
2.1.2 Valves
Provide a protective interior coating in accordance with AWWA C550.
2.1.2.1 Gate Valves 3 Inch Size and Larger on Buried Piping
AWWA C500, AWWA C509, AWWA C515, or UL 262 and:
a. AWWA C500: nonrising stem type with double-disc gate and mechanical-joint ends or push-on joint ends compatible for the adjoining pipe
b. AWWA C509 or AWWA C515: nonrising stem type with mechanical-joint ends or resilient-seated gate valves 3 to 12 inches in size
c. UL 262: inside-screw type with operating nut, double-disc or split-wedge type gate, designed for a hydraulic working pressure of 175 psi, and have mechanical-joint ends or push-on joint ends as appropriate for the pipe to which it is joined.
Match materials for UL 262 gate valves to the reference standards specified in AWWA C500. Gate valves open by counterclockwise rotation of the valve stem. Stuffing boxes have 0-ring stem seals, except for those valves for which gearing is specified, in which case use conventional packing in place of 0-ring seal. Stuffing boxes are bolted and constructed so as to permit easy removal of parts for repair.Provide AWWA C500 inch gate valves with gearing and indicator. Where an indicator post are shown, provide an indicator post flange for AWWA C500, AWWA C509, or AWWA C515 gate valves conforming to the requirements of UL 262. Provide AWWA C500 inch gate valves with bypasses.
2.1.2.2 Check Valves
Provide a protective interior coating in accordance with AWWA C550.
Swing-check type, AWWA C508 or UL 312 and:
a. AWWA C508: Iron or steel body and cover and flanged ends
b. UL 312: Cast iron or steel body and cover, flanged ends, and designed for a minimum working pressure of150 psi.
Materials for UL 312 check valves are to match the reference standards specified in AWWA C508. Provide check valves with a clear port opening.
Provide spring-loadedweight-loaded check valves where indicated. Class 125 flanges are to match ASME B16.1. Provide all check valves from one manufacturer.
2.1.2.3 Valve Boxes
Provide a valve box for each gate valve on buried piping, except where indicator post is shown. Construct adjustable valve boxes manufactured
SECTION 33 11 00 Page 7 from cast iron or precast concrete of a size compatible for the valve on which it is used. Provide cast iron valve boxes with a minimum cover and wall thickness of 3/16 inch and conforming to ASTM A48/A48M, Class 35B.
Coat the cast-iron box with a heavy coat of bituminous paint. Provide a round head. Cast the word "WATER" on the lid. The minimum diameter of the shaft of the box is 5 1/4 inchesas indicated. Provide ASTM C1433 precast concrete valve box. Provide precast concrete boxes installed in locations subjected to vehicular traffic to withstand AASHTO load designation as outlined in AASHTO HB-17.
2.1.3 Meters
Submit certificates certifying all required and recommended tests set forth in the referenced standard and AWWA M6 have been performed and comply with all applicable requirements of the referenced standard and AWWA M6 within the past three years. Include certification that each meter has been tested for accuracy of registration and that each meter complies with the accuracy and capacity requirements of the referenced standard when tested in accordance with AWWA M6.
Include a register with all meters whether they are or are not connected to a remote reading system.
2.1.3.1 Strainers
Provide AWWA C701AWWA C702AWWA C703 strainer recommended and supplied by the meter manufacturer. Provide strainer of the same material as the meter body (i.e., bronze, ductile, or stainless).
2.1.3.2 Meter Connections
Provide flanged female screw threads main case connection fittings.Provide connections compatible with the type of pipe and conditions encountered.
2.1.3.3 Meter Boxes or Vaults
Provide meter boxes of sufficient size to completely enclose the meter and shutoff valve or service stop and in accordance with the details shown on the drawings. Provide a meter boxes or vaults with a height equal to the distance from invert of the service line to finished grade at the meter location.
2.1.3.3.1 Cast Iron
Provide ASTM A48/A48M, Class 25 cast iron meter box and lid. Provide a roundlid with precast holes for remote electronic meter reading modules having the word "WATER" cast on the top surface.
2.1.3.3.2 Precast Concrete Meter Boxes
Provide ASTM C1433precast concrete meter boxes precast concrete meter boxes with ASTM A48/A48M, Class 25 cast iron lid. Provide a ASTM A48/A48M, Class 25 cast iron with precast holes for remote electronic meter reading modules round lid having the word "WATER" cast on it. Provide meter boxes of sufficient size to completely enclose the meter and shutoff valve or service stop and in accordance with the details shown on the drawings.
2.1.3.3.2.1 Fittings
Provide flanged fittings for pipe 3 inches and larger.
SECTION 33 11 00 Page 8
2.1.3.3.2.2 Vault Valves
Provide balloutside screw and yoke (OS&Y) butterfly valves in meter vault.
2.1.3.3.3 Plastic Meter Boxes
Provide manufactured plastic boxes and lids meeting the following requirements:
a. One-piece molded construction
b. Vertical load rating for medium duty use of 15,000 lbs
c. Ultraviolet (UV) exterior surface protection
d. White interior surface
Provide a ASTM A48/A48M, Class 25 cast iron ring and round lid.
2.2 ACCESSORIES
2.2.1 Pipe Restraint
2.2.1.1 Thrust Blocks
Use ASTM C94/C94M concrete having a minimum compressive strength of 3,000 psi at 28 days or use concrete of a mix not leaner than one part cement, two and one half parts sand, and five parts gravel, having the same minimum compressive strength.
2.2.1.2 Precast Thrust Blocks
Provide precast concrete thrust blocks.
2.2.1.3 Joint Restraint
Provide restrained joints in accordance with NFPA 24, Chapter 10 and in accordance with ASTM F1674.
Provide mechanical joint restraintrestraint devices with gripper wedges incorporated into a follower gland and specifically designed for the pipe material and meeting the requirements of AWWA C110/A21.10 or metal harness fabricated by the pipe manufacturer.
2.2.2 Protective Enclosures2.2.2.1 Housing
Reinforced and insulated aluminum orfiberglass construction; with anchoring devices for attaching housing to concrete base, access doors with locking devices, sized to allow access and service of the protected unit, drain openings, and an electric heating cable or heater with self-limiting temperature control.
2.2.3 Tapping Sleeves
Provide cast gray, ductile, malleable iron or stainless steel, split-sleeve type tapping sleeves of the sizes indicated for connection to existing main with flanged or grooved outlet, and with bolts, follower rings and gaskets on each end of the sleeve. Utilize similar metals for bolts, nuts, and
SECTION 33 11 00 Page 9 washers to minimize the possibility of galvanic corrosion. Provide dielectric gaskets where dissimilar metals adjoin. Provide a tapping sleeve assembly with a maximum working pressure of150 psi. Provide bolts with square heads and hexagonal nuts. Longitudinal gaskets and mechanical joints with gaskets as recommended by the manufacturer of the sleeve. When using grooved mechanical tee, utilize an upper housing with full locating collar for rigid positioning which engages a machine-cut hole in pipe, encasing an elastomeric gasket which conforms to the pipe outside diameter around the hole and a lower housing with positioning lugs, secured together during assembly by nuts and bolts as specified, pre-torqued to 50 foot-pound.
2.2.4 Tracer Wire for Nonmetallic Piping
Provide a continuous bare copper or aluminum wire not less than 0.10 inch in diameter in sufficient length over each separate run of nonmetallic pipe.
2.2.5 Water Service Line Appurtenances
2.2.5.1 Corporation Stops
Ground key type; lead-free bronze, ASTM B61 or ASTM B62; compatible with the working pressure of the system and solder-joint, or flared tube compression type joint. Threaded ends for inlet and outlet of corporation stops, AWWA C800; coupling nut for connection to flared copper tubing, ASME B16.26.
2.2.5.2 Curb or Service Stops
Ground key, round way, inverted key type; made of lead-free bronze, ASTM B61 or ASTM B62; and compatible with the working pressure of the system.
Provide compatible ends for connection to the service piping. Cast an arrow into body of the curb or service stop indicating direction of flow.
2.2.5.3 Service Clamps
Provide single or double flattened strap type service clamps used for repairing damaged cast-iron, steel or PVC pipe with a pressure rating not less than that of the pipe being repaired. Provide clamps with a galvanized malleable-iron body with cadmium plated straps and nuts and a rubber gasket cemented to the body.
2.2.5.4 Curb Boxes
Provide a curb box for each curb or service stop manufactured from cast iron, size capable of containing the stop where it is used. Provide a round head. Cast the word "WATER" on the lid. Factory coat the box with a heavy coat of bituminous paint.
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Connections to Existing System
Perform all connections to the existing water system in the presence of the Contracting Officer.
SECTION 33 11 00 Page 10
3.1.2 Operation of Existing Valves
Do not operate valves within or directly connected to the existing water system unless expressly directed to do so by the Contracting Officer.
3.1.3 Earthwork
Perform earthwork operations in accordance with Section 31 00 00 EARTHWORK.
3.2 INSTALLATION
Install all materials in accordance with the applicable reference standard, manufacturers instructions and as indicated herein.
3.2.1 Piping
3.2.1.1 General Requirements
Install pipe, fittings, joints and couplings in accordance with the applicable referenced standard, the manufacturer's instructions and as specified herein.
3.2.1.1.1 Termination of Water Lines
Terminate the work covered by this section at a point approximately 5 feet from the building, unless otherwise indicated.
Do not lay water lines in the same trench with gas lines, fuel lines, electric wiring, or any other utility. Where nonferrous metallic pipe (i.e., copper tubing) crosses any ferrous piping, provide a minimum vertical separation of 12 inches between pipes.
3.2.1.1.2 Pipe Laying and Jointing
Remove fins and burrs from pipe and fittings. Before placing in position, clean pipe, fittings, valves, and accessories, and maintain in a clean condition. Provide proper facilities for lowering sections of pipe into trenches. Under no circumstances is it permissible to drop or dump pipe, fittings, valves, or other water line material into trenches. Cut pipe cleanly, squarely, and accurately to the length established at the site and work into place without springing or forcing. Replace a pipe or fitting that does not allow sufficient space for installation of jointing material. Blocking or wedging between bells and spigots is not permitted.
Lay bell-and-spigot pipe with the bell end pointing in the direction of laying. Grade the pipeline in straight lines; avoid the formation of dips and low points. Support pipe at the design elevation and grade. Secure firm, uniform support. Wood support blocking is not permitted. Lay pipe so that the full length of each section of pipe and each fitting rests solidly on the pipe bedding; excavate recesses to accommodate bells, joints, and couplings. Provide anchors and supports for fastening work into place. Make provision for expansion and contraction of pipelines.
Keep trenches free of water until joints have been assembled. At the end of each work day, close open ends of pipe temporarily with wood blocks or bulkheads. Do not lay pipe when conditions of trench or weather prevent installation. Provide a minimum of 2 1/2 feet depth of cover over top of pipe.
SECTION 33 11 00 Page 11
3.2.1.1.3 Tracer Wire
Install a continuous length of tracer wire for the full length of each run of nonmetallic pipe. Attach wire to top of pipe in such manner that it will not be displaced during construction operations.
3.2.1.1.4 Connections to Existing Water Lines
Make connections to existing water lines after coordination with the facility and with a minimum interruption of service on the existing line.
Make connections to existing lines under pressure in accordance with the recommended procedures of the manufacturer of the pipe being tapped and as indicated, except as otherwise specified.
3.2.1.1.5 Sewer Manholes
No water piping is to pass through or come in contact with any part of a sewer manhole.
3.2.1.1.6 Water Piping Parallel With Sewer Piping
Where the location of the water line is not clearly defined by dimensions on the drawings, do not lay water line closer than 10 feet, horizontally, from any sewer line.
3.2.1.1.7 Water Piping Crossing Sewer Piping
Provide at least 18 inches above the top (crown) of the sewer piping and the bottom (invert) of the water piping whenever possible. Measure the distance edge-to-edge. Where water lines cross under gravity sewer lines, construct sewer line of AWWA compliant ductile iron water piping with rubber-gasketed joints and no joint located within 10 feet, horizontally, of the crossing. Lay water lines which cross sewer force mains and inverted siphons at least 2 feet above these sewer lines; when joints in the sewer line are closer than 3 feet horizontally from the water line relay the sewer line to ensure no joint closer than 3 feet.
3.2.1.1.8 Penetrations
Provide ductile-iron or Schedule 40 steel wall sleeves for pipe passing through walls of valve pits and structures. Fill annular space between walls and sleeves with rich cement mortar. Fill annular space between pipe and sleeves with mastic.
3.2.1.2 PVC Water Main Pipe
Unless otherwise specified, install pipe and fittings in accordance with the paragraph GENERAL REQUIREMENTS and with the requirements of AWWA C605 for laying of pipe, joining PVC pipe to fittings and accessories, setting of fire hydrants, valves, and fittings; and with the recommendations for pipe joint assembly and appurtenance installation in AWWA M23, Chapter 7, "Installation."
a. Jointing: Make push-on joints with the elastomeric gaskets specified for this type joint, using either elastomeric-gasket bell-end pipe or elastomeric-gasket couplings. For pipe-to-pipe push-on joint connections, use only pipe with push-on joint ends having factory-made bevel; for push-on joint connections to metal fittings, valves, and other accessories, cut spigot end of pipe off square and re-bevel pipe
SECTION 33 11 00 Page 12 end to a bevel approximately the same as that on ductile-iron pipe used for the same type of joint. Use a lubricant recommended by the pipe manufacturer for push-on joints. Assemble push-on joints for pipe-to-pipe joint connections in accordance with the requirements of AWWA C605 for laying the pipe and the recommendations in AWWA M23, Chapter 7, "Installation," for pipe joint assembly. Assemble push-on joints for connection to fittings, valves, and other accessories in accordance with the requirements of AWWA C605 for joining PVC pipe to fittings and accessories and with the requirements of AWWA C600 for joint assembly. Make compression-type joints/mechanical joints with the gaskets, glands, bolts, nuts, and internal stiffeners previously specified for this type joint; assemble in accordance with the requirements of AWWA C605 for joining PVC pipe to fittings and accessories, with the requirements of AWWA C600 for joint assembly, and with the recommendations of Appendix A to AWWA C111/A21.11. Cut off spigot end of pipe for compression-type joint/mechanical-joint connections and do not re-bevel. Assemble joints made with sleeve-type mechanical couplings in accordance with the recommendations of the coupling manufacturer using internal stiffeners as previously specified for compression-type joints.
b. Joint Offset: Construct joint offset in accordance AWWA C605. Do not exceed the minimum longitudinal bending as indicated by AWWA C605.
c. Fittings: Install in accordance with AWWA C605.
3.2.1.3 Plastic Service Piping
Install pipe and fittings in accordance with the paragraph GENERAL REQUIREMENTS and with the applicable requirements of ASTM D2774 and ASTM D2855, unless otherwise specified. Handle solvent cements used to join plastic piping in accordance with ASTM F402.
3.2.1.3.1 Jointing
Make solvent-cemented joints for PVC piping using the solvent cement previously specified for this material; assemble joints in accordance with ASTM D2855. Make plastic pipe joints to other pipe materials in accordance with the recommendations of the plastic pipe manufacturer.
3.2.1.3.2 Plastic Pipe Connections to Appurtenances
Connect plastic service lines to corporation stops and gate valves in accordance with the recommendations of the plastic pipe manufacturer.
3.2.1.4 Fire Protection Service Lines for Sprinkler Supplies
Connect water service lines used to supply building sprinkler systems for fire protection to the water main in accordance with NFPA 24.
3.2.2 Meters
Install meters and meter boxes at the locations shown on the drawings.
Center meters in the boxes to allow for reading and ease of removal or maintenance. Set top of box or vault at finished grade.
SECTION 33 11 00 Page 13
3.2.3 Pipe Restraint
3.2.3.1 Concrete Thrust Blocks
Install concrete thrust blocks where indicated.
3.2.4 Valves
3.2.4.1 Gate Valves
Install gate valves, AWWA C500 and UL 262, in accordance with the requirements of AWWA C600 for valve-and-fitting installation and with the recommendations of the Appendix ("Installation, Operation, and Maintenance of Gate Valves") to AWWA C500. Install gate valves, AWWA C509 or AWWA C515, in accordance with the requirements of AWWA C600 for valve-and-fitting installation and with the recommendations of the Appendix ("Installation, Operation, and Maintenance of Gate Valves") to AWWA C509 or AWWA C515.
Install gate valves on PVC water mains in accordance with the recommendations for appurtenance installation in AWWA M23, Chapter 7, "Installation." Make and assemble joints to gate valves as specified for making and assembling the same type joints between pipe and fittings.
3.2.4.2 Check Valves
Install check valves in accordance with the applicable requirements of AWWA C600 for valve-and-fitting installation , except as otherwise indicated. Make and assemble joints to check valves as specified for making and assembling the same type joints between pipe and fittings.
3.3 FIELD QUALITY CONTROL
3.3.1 Tests
Notify the Contracting Officer a minimum of five days in advance of hydrostatic testing. Coordinate the proposed method for disposal of waste water from hydrostatic testing. Perform field tests, and provide labor, equipment, and incidentals required for testing, except that water needed for field tests will be furnished as set forth in paragraph AVAILABILITY AND USE OF UTILITY SERVICES in Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS. Provide documentation that all items of work have been constructed in accordance with the Contract documents.
3.3.1.1 Hydrostatic Test
Test the water system in accordance with the applicable AWWA standard specified below. Where water mains provide fire service, test in accordance with the special testing requirements given in the paragraph SPECIAL TESTING REQUIREMENTS FOR FIRE SERVICE. Test PVCplastic water systems made with PVC pipe in accordance with the requirements of AWWA C605 for pressure and leakage tests. The amount of leakage on pipelines made of PVC water main pipe is not to exceed the amounts given in AWWA C605, except that at joints made with sleeve-type mechanical couplings, no leakage will be allowed. Test concrete water mains in accordance with the recommendations in AWWA M9, "Hydrostatic Testing and Disinfection of Mains." The amount of leakage on concrete pipelines is not to exceed 20 gallons per 24 hours per inch of pipe diameter per mile of pipeline. Test steel water mains in accordance with applicable requirements of AWWA C600 for hydrostatic testing. The amount of leakage on steel pipelines with rubber-gasketed bell-and-spigot joints is not to exceed 20 gallons per 24
SECTION 33 11 00 Page 14 hours per inch of pipe diameter per mile of pipeline; no leakage will be allowed at joints made by any other method. To stop leakage, repair welded joints only by welding. Test water service lines in accordance with requirements of AWWA C600 for hydrostatic testing. No leakage will be allowed at plastic pipe joints, and screwed joints. Do not backfill utility trench or begin testing on any section of a pipeline where concrete thrust blocks have been provided until at least 7 days after placing of the concrete.
3.3.1.2 Leakage Test
For leakage test, use a hydrostatic pressure not less than the maximum working pressure of the system. Leakage test may be performed at the same time and at the same test pressure as the pressure test.
For PE perform leak testing in accordance with ASTM F2164.
3.3.1.3 Special Testing Requirements for Fire Service
Test water mains and water service lines providing fire service or water and fire service in accordance with NFPA 24. The additional water added to the system must not exceed the limits given in NFPA 24
3.3.1.4 Tracer Wire Continuity Test
Test tracer wire for continuity after service connections have been completed and prior to final pavement or restoration. Verify that tracer wire is locatable with electronic utility locating equipment. Repair breaks or separations and re-test for continuity.
3.4 SYSTEM STARTUP
Water mains and appurtenances must be completely installed, disinfected, flushed, and satisfactory bacteriological sample results received prior to permanent connections being made to the active distribution system. Obtain approval by the Contracting Officer prior to the new water piping being placed into service.
3.5 CLEANUP
Upon completion of the installation of water lines and appurtenances, remove all debris and surplus materials resulting from the work.
-- End of Section --
SECTION 33 11 00 Page 15
SECTION 33 30 00
SANITARY SEWERS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C605 (2014) Underground Installation of Polyvinyl Chloride (PVC) and Molecularly Oriented Polyvinyl Chloride (PVCO) Pressure Pipe and Fittings
AWWA C900 (2016) Polyvinyl Chloride (PVC) Pressure Pipe, and Fabricated Fittings, 4 In.
Through 60 In. (100 mm Through 1,500 mm)
AWWA M23 (2002; 2nd Ed) Manual: PVC Pipe - Design and Installation
ASTM INTERNATIONAL (ASTM)
ASTM C478 (2015a) Standard Specification for Precast Reinforced Concrete Manhole Sections
ASTM C478M (2015a) Standard Specification for Precast Reinforced Concrete Manhole Sections (Metric)
ASTM C969 (2017) Standard Practice for Infiltration and Exfiltration Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines
ASTM C972 (2000; R 2011) Compression-Recovery of Tape Sealant
ASTM D3034 (2016) Standard Specification for Type PSM Poly(Vinyl Chloride) (PVC) Sewer Pipe and Fittings
ASTM D3139 (1998; R 2011) Joints for Plastic Pressure Pipes Using Flexible Elastomeric Seals
ASTM D3212 (2007; R 2013) Standard Specification for Joints for Drain and Sewer Plastic Pipes Using Flexible Elastomeric Seals
SECTION 33 30 00 Page 1
ASTM F477 (2014) Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe
ASTM F794 (2003; R 2014) Standard Specification for Poly(Vinyl Chloride) (PVC) Profile Gravity Sewer Pipe and Fittings Based on Controlled Inside Diameter
ASTM F949 (2015) Poly(Vinyl Chloride) (PVC) Corrugated Sewer Pipe with a Smooth Interior and Fittings
UNI-BELL PVC PIPE ASSOCIATION (UBPPA)
UBPPA UNI-B-6 (1998) Recommended Practice for Low-Pressure Air Testing of Installed Sewer Pipe
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Existing Conditions
SD-02 Shop Drawings
Drawings
Precast Concrete Manhole
Metal Items
Frames, Covers, and Gratings
SD-03 Product Data
Pipeline Materials
SD-06 Test Reports
Reports
SD-07 Certificates
Portland Cement
Gaskets
SECTION 33 30 00 Page 2
1.3 QUALITY ASSURANCE
1.3.1 Installer Qualifications
Install specified materials by a licensed underground utility Contractor licensed for such work in the state where the work is to be performed.
Installing Contractor's License shall be current and be state certified or state registered.
1.3.2 Drawings
a. Submit Installation Drawings showing complete detail, both plan and side view details with proper layout and elevations.
b. Submit As-Built Drawings for the complete sanitary sewer system showing complete detail with all dimensions, both above and below grade, including invert elevation.
c. Sign and seal As-Built Drawings by a Professional Surveyor and Mapper.
Include the following statement: "All potable water lines crossed by sanitary hazard mains are in accordance with the permitted utility separation requirements."
1.4 DELIVERY, STORAGE, AND HANDLING
1.4.1 Delivery and Storage
1.4.1.1 Piping
Inspect materials delivered to site for damage; store with minimum of handling. Store materials on site in enclosures or under protective coverings. Store plastic piping and jointing materials and rubber gaskets under cover out of direct sunlight. Do not store materials directly on the ground. Keep inside of pipes and fittings free of dirt and debris.
1.4.1.2 Metal Items
Check upon arrival; identify and segregate as to types, functions, and sizes. Store off the ground in a manner affording easy accessibility and not causing excessive rusting or coating with grease or other objectionable materials.
1.4.1.3 Cement, Aggregate, and Reinforcement
As specified in Section03 30 00 CAST-IN-PLACE CONCRETE.
1.4.2 Handling
Handle pipe, fittings, and other accessories in such manner as to ensure delivery to the trench in sound undamaged condition. Take special care not to damage linings of pipe and fittings; if lining is damaged, make satisfactory repairs. Carry, do not drag, pipe to trench.
1.5 PROJECT/SITE CONDITIONS
Submit drawings of existing conditions, after a thorough inspection of the area in the presence of the Contracting Officer. Details shall include the environmental conditions of the site and adjacent areas. Submit copies of the records for verification before starting work.
SECTION 33 30 00 Page 3
PART 2 PRODUCTS
2.1 PIPELINE MATERIALS
Pipe shall conform to the respective specifications and other requirements specified below. Submit manufacturer's standard drawings or catalog cuts.
2.1.1 PVC Plastic Gravity Sewer Piping
2.1.1.1 PVC Plastic Gravity Pipe and Fittings
ASTM D3034, SDR 35, or ASTM F949 with ends suitable for elastomeric gasket joints.ASTM F794, Series 46, for ribbed sewer pipe with smooth interior, size 8 inch through 48 inch diameters.
2.1.1.2 PVC Plastic Gravity Joints and Jointing Material
Joints shall conform to ASTM D3212. Gaskets shall conform to ASTM F477.
2.1.2 PVC Plastic Pressure Pipe and Associated Fittings
2.1.2.1 PVC Plastic Pressure Pipe and Fittings
2.1.2.1.1 Pipe and Fittings 4 inch Diameter to 12 inch
Pipe shall conform to AWWA C900 and shall be plain end or gasket bell end, Pressure Class 150 (DR 18), with cast-iron-pipe-equivalent OD. Fittings shall be gray-iron or ductile-iron conforming to AWWA C110/A21.10 or AWWA C153/A21.53 and shall have cement-mortar lining conforming to AWWA C104/A21.4, standard thickness. Fittings with push-on joint ends shall conform to the same requirements as fittings with mechanical-joint ends, except that bell design shall be modified, as approved, for push-on joint suitable for use with the PVC plastic pressure pipe specified in this paragraph.
2.1.2.2 PVC Plastic Pressure Joints and Jointing Material
Joints for pipe, 4 inch to 12 inch diameter, shall be push-on joints as specified in ASTM D3139. Joints between pipe and fittings shall be push-on joints as specified in ASTM D3139 or shall be compression-type joints/mechanical-joints as respectively specified in ASTM D3139 and AWWA C111/A21.11. Each joint connection shall be provided with an elastomeric gasket suitable for the bell or coupling with which it is to be used. Gaskets for push-on joints for pipe shall conform to ASTM F477.
Gaskets for push-on joints and compression-type joints/mechanical-joints for joint connections between pipe and fittings shall be as specified in AWWA C111/A21.11, respectively, for push-on joints and mechanical-joints.
2.2 MISCELLANEOUS MATERIALS
2.2.1 Precast Concrete Manholes & Glass-Fiber-Reinforced Polyester Manholes
Precast concrete manhole risers, base sections, and tops shall conform to
ASTM C478 .
2.2.2 Gaskets and Connectors
Gaskets for joints between manhole sections shall conform to ASTM C443.
Resilient connectors for making joints between manhole and pipes entering manhole shall conform to ASTM C923 or ASTM C990.
SECTION 33 30 00 Page 4
2.2.3 External Preformed Rubber Joint Seals
An external preformed rubber joint seal shall be an accepted method of sealing cast iron covers to precast concrete sections to prevent ground water infiltration into sewer systems. All finished and sealed manholes constructed in accordance with paragraph entitled "Manhole Construction" shall be tested for leakage in the same manner as pipelines as described in paragraph entitled "Leakage Tests." The seal shall be multi-section with a neoprene rubber top section and all lower sections made of Ethylene Propylene Diene Monomer (EPDM) rubber with a minimum thickness of 60 mils.
Each unit shall consist of a top and bottom section and shall have mastic on the bottom of the bottom section and mastic on the top and bottom of the top section. The mastic shall be a non-hardening butyl rubber sealant and shall seal to the cone/top slab of the manhole/catch basin and over the lip of the casting. Extension sections shall cover up to two more adjusting rings. Properties and values are listed in the following table:
Properties, Test Methods and Minimum Values for Rubber used in Preformed Joint Seals
Physical Properties Test Methods EPDM Neoprene Butyl Mastic
Tensile, psi ASTM D412 1840 2195 --
Elongation, percent ASTM D412 553 295 350
Tear Resistance, ppi ASTM D624 (Die B)
280 160 --
Rebound, percent, 5 minutes
ASTM C972
(mod.)
-- -- 11
Rebound, percent, 2 hours ASTM C972 -- -- 12
2.2.4 Metal Items
2.2.4.1 Frames, Covers, and Gratings for Manholes
Submit certification on the ability of frame and cover to carry the imposed live load. Frame and cover must be cast gray iron, ASTM A48/A48M, Class 35B, cast ductile iron, ASTM A536, Grade 65-45-12, or reinforced concrete, ASTM C478 ASTM C478M. Frames and covers must be circular with vent holes.
Size must be as indicated on the plans for 24 inch opening. The words "Sanitary Sewer" shall be stamped or cast into covers so that it is plainly visible.
2.2.4.2 Manhole Ladders
A steel ladder shall be provided where the depth of a manhole exceeds 12 feet. The ladder shall not be less than 16 inches in width, with 3/4 inch diameter rungs spaced 12 inches apart. The two stringers shall be a minimum 3/8 inch thick and 2 inches wide. Ladders and inserts shall be galvanized after fabrication in conformance with ASTM A123/A123M.
SECTION 33 30 00 Page 5
2.3 REPORTS
Compaction and density test shall be in accordance with Section 31 00 00 EARTHWORK. Submit Test Reports. Submit Inspection Reports for daily activities during the installation of the sanitary system. Information in the report shall be detailed enough to describe location of work and amount of pipe laid in place, measured in linear feet.
PART 3 EXECUTION
3.1 INSTALLATION OF PIPELINES AND APPURTENANT CONSTRUCTION
3.1.1 Connections to Existing Lines
Obtain approval from the Contracting Officer before making connection to existing line. Conduct work so that there is minimum interruption of service on existing line.
Submit request for field support from the Installation's Utilities Field Support two weeks prior to making connection. Submit request for pre-connection inspection to be conducted after trenching and layout is completed, but before the proposed service has been connected.
3.1.2 General Requirements for Installation of Pipelines
These general requirements apply except where specific exception is made in the following paragraphs entitled "Special Requirements."
3.1.2.1 Location
The work covered by this section shall terminate at a point approximately 5 feet from the building , unless otherwise indicated. Where the location of the sewer is not clearly defined by dimensions on the drawings, do not lay sewer line closer horizontally than 10 feet to a water main or service line. Install pressure sewer lines beneath water lines only, with the top of the sewer line being at least 2 feet below bottom of water line.Where sanitary sewer lines pass above water lines, encase sewer in concrete for a distance of 10 feet on each side of the crossing, or substitute rubber-gasketed pressure pipe for the pipe being used for the same…
This is the start of the file's text. The full file is on GovTribe.