Attachment 5 - Questions and Answers_Elevator Maintenance Re-compete_8.10.2026.pdf

PDF 208 KB Posted

Attached to
Fort Sill Elevator Maintenance Services
Solicitation number
W9124L-26-Q-A008
Issued by

About this file

This is a Contractor Questions and Government Answers document for the Elevator Maintenance ReCompete solicitation at Fort Sill, Oklahoma, dated August 10, 2026.

The document addresses three contractor inquiries regarding the submission format for Attachment 3 Pricing Worksheet. The Government clarifies that the completed pricing worksheet must be submitted in its original Excel (xlsx) format, not in PDF or dual formats. The Government further specifies that all service levels (Black, Red, Amber, and Green Levels of Service) and Overtime Man-Hours pricing information should be provided on the Attachment 3 Pricing Worksheet. The Black Level of Service will be evaluated and added to the CLINs provided in the solicitation. The Government references an updated Addendum to FAR 52.212-1 Instructions to Offerors for additional clarification on submission requirements. The Contracting Officer is Brandi O'Daniel, MICC Fort Sill.

View the file

Other files

File Type Posted
Attachment 6 - Questions_Answers Elevator Maintenance Re-compete_8.14.2026.pdf PDF
Attachment 1 PWS Elevevator Maintenance Service (FY26-FY33)_8.14.2026.pdf PDF
MOD COPY AMENDMENT 03 Solicitation_W9124L26QA008_Elevator Maintenance.pdf PDF
REVISED Solicitation Amendment 03_ W9124L26QA0080003_Elevator Maintenance.pdf PDF
REVISED Solicitation Amendment 02_ W9124L26QA0080002_Elevator Maintenance.pdf PDF
MOD COPY AMENDMENT 02 Solicitation_W9124L26QA008_Elevator Maintenance.pdf PDF
Attachment 4 - Questions and Answers_Elevator Maintenance Re-Compete_8.05.2026.pdf PDF
MOD COPY AMENDMENT 01 Solicitation_W9124L26WA008_Elevator Maintenance.pdf PDF
REVISED Solicitation Amendment 01_ W9124L26QA0080001_Elevator Maintenance.pdf PDF
Attachment 3 Pricing Worksheet_Elevator Maintenance FY26-FY33_8.04.2026.xlsx XLSX spreadsheet
Attachment 1 PWS Elevator Maintenance Service (FY26-FY33)_8.05.2026.pdf PDF
TE-C Estimated Workload (Elevator Locations)_8.0.2026.xlsx XLSX spreadsheet
TE-B Deliverables (FY27-FY33 Elevator Maint)_8.05.2026.xlsx XLSX spreadsheet
TE-D Task and Frequency Performance Standards.xlsx XLSX spreadsheet
TE-A Performance Requirements (FY27-FY33 Elevator Maint)v2.xlsx XLSX spreadsheet
Solicitation - W9124L26QA008_Elevator Maintenance.pdf PDF
TE-E Fort Sill Main Post-Cantonment Map.pdf PDF
TE-B Deliverables (FY27-FY33 Elevator Maint).xlsx XLSX spreadsheet
TE-C Estimated Workload (Elevator Locations).xlsx XLSX spreadsheet
TE-F Hazardous Waste Management Plan.pdf PDF
Attachment 3 Pricing Worksheet_Elevator Maintenance FY26-FY33.xlsx XLSX spreadsheet
Attachment 1 PWS Elevator Maintenance Service (FY26-FY33).pdf PDF
Attachment 2 REGISTER OF WAGE DETERMINATIONS 1986-0773 Rev 57_6.05.2026.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

Mission and Installation Contracting Command

1803 Macomb Road

FORT SILL, OK 73503

August 10, 2026

SUBJECT: Contractor Questions and Government Answers – Elevator Maintenance Re- Compete, Fort Sill, Oklahoma

1. Question: Should the completed Attachment 3 Pricing Worksheet be submitted in its original Excel (xlsx) format, converter to PDF, or submitted in both Excel and PDF formats?

Government Answer: The completed Attachment 3 Pricing Worksheet shall be submitted in its original Excel format. Addendum to FAR 52.212-1 Instructions to Offerors has been updated for clarification.

2. Question: If the Pricing Worksheet is required in PDF format, is there a preferred or recommended layout for presenting the pricing?

Government Answer: Attachment 3 Pricing Worksheet shall remain in Excel format.

3. Question: Specifically, would it be acceptable to present the worksheet as separate, clearly labeled PDF pages for:

Provided that all original CLINs, quantities, contract periods, pricing fields, and required pricing information from the Government-issued worksheet are retained?

Black Level of Service Red Level of Service Amber Level of Service Green Level of Service Overtime Man-Hours Evaluated Price Summary

Government Answer: See Addendum to FAR 52.212-1 – Instructions to Offerors has been updated for clarification.

All levels and Overtime Man-Hours should be provided on Attachment 3 Pricing Worksheet. The Black Level of Service will be evaluated and shall be added to the CLINs provided in the solicitation.

Brandi O’Daniel Contracting Officer MICC Fort Sill

2026-08-10T12:35:30-0500