FJRP159073-EI-501-Amd03.pdf

PDF 304 KB Posted

Attached to
C-17 Refueling Hydrant System Ramp Expansion
Solicitation number
W91242-18-R-0002
Issued by

View the file

Other files

File Type Posted
Questions_and_Answers_96-101__W91242-18-R-0002.pdf PDF
FJRP159073-CG104-Amendment_0007.pdf PDF
FJRP159073-CG103-Amendment_0007.pdf PDF
Amendment_0007.pdf PDF
33_52_43.28_Amd03.pdf PDF
Questions_and_Answers_78-95__W91242-18-R-0002.pdf PDF
Revised_33_52_80_Amendment_0006.pdf PDF
Revised_08_71_00_Amendment_0006.pdf PDF
Revised_33_52_43_Amendment_0006.pdf PDF
Revised_09_96_00_Amendment_0006.pdf PDF
Revised_09_97_13.27_Amendment_0006.pdf PDF
FJRP159073-A-201-Amendment_0006.pdf PDF
Revised_13_34_19_Amendment_0006.pdf PDF
W91242-18-R-0002_0006.pdf PDF
Revised_09_90_00_Amendment_0006.pdf PDF
FJRP159073-A-601-Amendment_0006.pdf PDF
Amendment_0005_Revised_01_45_00.pdf PDF
Amendment_0004_Section_0010_Price_Schedule.pdf PDF
Amendment_0005.pdf PDF
Questions_and_Answers_40-77__W91242-18-R-0002.pdf PDF
Revised_EXIBIT_H_Proposal_Price_Schedule_Amendment_0004.pdf PDF
Amendment_0004.pdf PDF
Questions_and_Answers_18-38__W91242-18-R-0002.pdf PDF
1._Drawings_-COVER_SHEET.pdf PDF
FJRP159073-M-002-Amd03.pdf PDF
FJRP159073-M-301-Amd03.pdf PDF
FJRP159073-GC-003-Amd03.pdf PDF
32_05_33_Amd03.pdf PDF
FJRP159073-EI-503-Amd03.pdf PDF
Exhibit_F_Small_Business_Participation_Format.pdf PDF
33_09_53_Amd03.pdf PDF
FJRP159073-MS502-Amd03.pdf PDF
FJRP159073-CS-121-Amd03.pdf PDF
FJRP159073-MS504-Amd03.pdf PDF
FJRP159073-M-401-Amd03.pdf PDF
FJRP159073-M-512-Amd03_(1).pdf PDF
33_52_43.13_Amd03.pdf PDF
FJRP159073-EP-101-Amd03.pdf PDF
Exhibit_G_-_Subcontracting_Plan_Format.pdf PDF
33_52_43.11_Amd03.pdf PDF
FJRP159073-EI-602-Amd03.pdf PDF
FJRP159073-C-511-Amd03.pdf PDF
FJRP159073-M-003-Amd03.pdf PDF
FJRP159073-MD902-Amd03.pdf PDF
FJRP159073-MS503-Amd03.pdf PDF
FJRP159073-C-510-Amd03.pdf PDF
FJRP159073-CU-121-Amd03.pdf PDF
FJRP159073-CU-224-Amd03.pdf PDF
W91242-18-R-0002_0003.pdf PDF
FJRP159073-M-502-Amd03.pdf PDF
Show 40 more

Latest 50 of 114 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOT USED

NOT USED

FREE STANDING ENCLOSURE

PUMP CONTROL PANEL LEGEND

VIBRATING ALARM HORN (70db at 10 ft)

CABINET WITHIN PCP FOR SPARE PARTS

24 VOLT POWER SUPPLIES

RELAYS AND OTHER MISCELLANEOUS DEVICES

SYS-1 CPU RACK SYS-2 CPU RACK

T B

I N

ITEM DESCRIPTION ITEM DESCRIPTION

NOT USED

VENTS

UNINTERRUPTABLE POWER SUPPLY (UPS) WITHIN CABINET

PUMP CONTROL PANEL LEGEND CONT.

FANS

NOT USED

NAMEPLATE "SYSTEM INPUT SELECT"

NAMEPLATE "FUELING MODE SELECT"

NAMEPLATE "LEAD FUEL PUMP"

BACKLIGHT WINDOW ANNUNCIATOR

MOMENTARY CONTACT PUSHBUTTON WITH LEGEND PLATE "TEST"

NAMEPLATE "ANNUNCIATOR SYSTEM"

WHITE INDICATOR LIGHT

NAMEPLATE "CPU-2 ON"

NAMEPLATE "CPU-1 ON"

GREEN INDICATOR LIGHT

SYS-1 I/O RACK 1A

SYS-2 I/O RACK 2A

NAMEPLATE "EMERGENCY CIRCUIT POWER ON"

2 POSITION MAINTAINED CONTACT SELECTOR

SWITCH WITH LEGEND PLATE " SYS-1 SYS-2"

4 POSITION KEY OPERATED MAINTAINED CONTACT

SELECTOR SWITCH WITH LEGEND PLATE "AUTO

OFF FLUSH TEST"

3 POSITION MAINTAINED CONTACT SELECTOR SWITCH WITH

LEGEND PLATE "1 2 3" (CIRCULAR AROUND SWITCH)

LOCKABLE CABINET LOCATED WITHIN THE PCP FOR THE LAPTOP

COMPUTER.

MOMENTARY CONTACT PUSHBUTTON WITH LEGEND PLATE

"ACKNOWLEDGE"

MOMENTARY CONTACT PUSHBUTTON WITH LEGEND

PLATE "EMERGENCY STOP RESET"

RED JUMBO MUSHROOM MOMENTARY CONTACT

PUSHBUTTON WITH LEGEND PLATE "EMERGENCY

STOP"

SYS-1 I/O

RACK 1B (AS

REQUIRED)

SYS-2 I/O

RACK 2B (AS

REQUIRED)

24" MAX

M

A X

72" MAX

LEFT SIDE VIEW

FRONT VIEW

RIGHT SIDE VIEW

INTERIOR BACKPLANE MOUNTING PANEL

NOTES:

1. PROVIDE WIRE MANAGEMENT DUCTS.

2. FOLLOW THE ABOVE LAYOUT AS CLOSE AS POSSIBLE TO PROVIDE

UNIFORMITY WITH EXISTING AND FUTURE FUELING SYSTEM CONTROL PANELS.

VARIANCES CAN BE MADE TO ACCOMMODATE TANK LEVEL INTRINSICALLY

SAFE RELAYS WITHOUT EXPANDING PHYSICAL SIZE OF PANEL. SIDE PANELS

MAY BE UTILIZED FOR ADDITIONAL SPACE.

S c a l e

F o r

M i c r o f i l m i n g

I n c h e s

M i l l i m e t e r s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

NORTH CAROLINA AIR NATIONAL GUARD

DOUGLAS INTERNATIONAL AIRPORT

CHARLOTTE, NORTH CAROLINA

KANSAS CITY, MISSOURI

ENGINEERS ARCHITECTS & CONSULTANTS

Project No. - FJRP159073

C-17 TYPE III HYDRANT

REFUELING SYSTEM/

RAMP EXPANSION

94893

C O

P Y

R I G

H T

B U

R N

S

M c D

O N

N E

L L

E

N G

I N

E E

R I N

G

C

O M

P A

N Y

I N

C

D

2 3

C

4 5

A

B

16 18

26 27

24 24

B1

PUMP CONTROL PANEL (PCP)

SCALE: NOT TO SCALE

SURGE ARRESTORS, THERMOSTATS,

POWER TERMINAL BLOCKS

T B

I N

T B

I N

T B

I N

T B

I N

T B

I N

T B

I N

T B

I N

T B

I N

T B

O

U T

T B

O

U T

T B

O

U T

QUICK DISCONNECT

RECEPTACLE

NAMEPLATE (TYP.)

28 EI501

94893EI501.DWG

PUMP CONTROL PANEL ELEVATION

A. FANGMAN

NOVEMBER 2016 J. LITTLE

S. LACY

1. SEE DRAWINGS EI502 THRU EI504 AND

EI601 THRU EI604 FOR OTHER CONTROL

PANEL RELATED REQUIREMENTS.

GENERAL NOTES: THIS DRAWING ONLY

RIGHT SIDE

PANEL LAYOUT

TB-IS-IN

TANK LEVEL

INTRINSICALLY

SAFE RELAYS

File details come from the government source that posted it.