SF33 Attachment C-1 Hill AFB_PWS Enclosure 2B GFI List Hill AFB_20200113.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Optimized Remediation Contract for Hill AFB, UT
Solicitation number
W91238-19-R-0050
Issued by

About this file

This sources sought synopsis requests information from potential offerors for an optimized remediation contract at Hill Air Force Base in Utah. The government seeks environmental remediation and construction services at 23 Installation Restoration Program sites and two Military Munitions Response Program sites. Interested firms should respond with their capabilities, experience on similar projects, business size, and joint venture information by 29 March 2019. The resulting contract is expected to be firm-fixed-price for a period of ten years, awarded using a best-value tradeoff source selection. The NAICS code is 562910 and the size standard is $20.5 million. At least 50% of contract costs for personnel must be expended on the prime contractor's own employees. The Army Corps of Engineers district in Sacramento will issue the solicitation and evaluate responses to determine competition for the requirement.

View the file

Other files

File Type Posted
EPA Comments OU6memotofile.pdf PDF
EPA Comments OU 15 2016-2017 letter work plan.pdf PDF
W923819R0050 Am 0005.pdf PDF
SF33 Attachment L-1 Labor Category Qualifications REV 16 Dec 2019.pdf PDF
SF33 Attachment C-1 Hill AFB_PWS Enclosure 2B GFI List Hill AFB_20191219.xlsx XLSX spreadsheet
W9123819R0050 Amendment 0004.pdf PDF
Hill AFB_PWS_REV_20191213.pdf PDF
SF33 Attachment B-1 Hill AFB_Sub-CLIN Structure_20191213.xlsx XLSX spreadsheet
W9123819R0050 Amendment 0003.pdf PDF
W9123819R0050 Amendment 0002 .pdf PDF
Am02 REV SF33 Attachment L-2 Past Performance Quality Questionaire.docx DOCX document
Am02 REV SF33 Attachment C-1 Hill AFB_PWS Enclosure 2B GFI List Hill AFB_20191031.xlsx XLSX spreadsheet
Solicitation_Phase_Site_Visit_Attendees_16-17_Oct_2019.pdf PDF
Hill_AFB_ORC_Existing_QandA_(PreRFP)_20191101.pdf PDF
W9123819R0050_Hill_ORC_Sol_Amendment_0001.pdf PDF
SF33_Attachment_B-1_Hill_AFB_Sub-CLIN_Structure_REV1_20191101.xlsx XLSX spreadsheet
Hill_AFB_PWS_REV_20191101.pdf PDF
Hill_AFB_Optimized_Remediation_Site_Visit_Attendees_16-17_October_2019.pdf PDF
Hill_AFB_ORC_Solicitation_Package_W9123819R0050.zip ZIP file
SF33_Attachment_L-2_Past_Performance_Quality_Questionaire.docx DOCX document
Hill_AFB_Sub-CLIN_Structure_20191016.xlsx XLSX spreadsheet
SF33_Attachment_L-1_Labor_Category_Qualifications_16_Oct_2019.docx DOCX document
Hill_AFB_PWS_V9_20191016.pdf PDF
6._Interim_Guidance_on_1-4_Dioxane,_Environmental_Restoration_Program.pdf PDF
5._Ensuring_Chemistry_Data_Fact_Sheet_April_2013.pdf PDF
3._Optimization_Benefit_Template_190520_MD_190710.docx DOCX document
2._CPSMR_template-_25Aug2019.docx DOCX document
1._ORC_PMP_Guidance_v1.0_20190920.docx DOCX document
4._AFGM2019-32-01,_AFFF_Related_Waste_Mgmt_Implementation_Guidance.pdf PDF
7._QASP_Template_v1_20190913_FINAL.DOCX DOCX document
Itinerary_HAFB_ORC_Pre-Solicitation_Tour_16-17_Oct.pdf PDF
W9123819R0050_Hill_AFB_ORC_DRAFT_Solicitation_SF33.pdf PDF
Hill_AFB_PWS_V8_Updated_20191009.pdf PDF
A01.12_Hill_AFB_PWS_V8_20190918.pdf PDF
Hill_ORC_RFIs_w_Responses_20190919.pdf PDF
8560-0006_HillAFB_OU_10_SS109_PMR4_Draft_9MAY19.pdf PDF
8560-0006_HillAFB_OU_9_GCA_Bioreactor_OM_Manual_Final_6SEP19.pdf PDF
Hill_ORC_Docs_10_Sep_2019.zip ZIP file
HillAFB_OU_15_ZZ113_ROD_Draft_2NOV17.pdf PDF
Hill_AFB_ORC_QandA_19_Aug_2019.pdf PDF
Hill_AFB_PWS_20190726.pdf PDF
Sampling_Transition_Table_HillAFB_20190701.docx DOCX document
Hill_AFB_PWS_20190603.pdf PDF
Hill_AFB_CLIN-SubCLIN_Structure.xlsx XLSX spreadsheet
Hill_AFB_PWS_Enclosure_4_OPSEC_Addendum.pdf PDF
Hill_AFB__PWS_Enclosure_2.2_List_of_Available_GFI_in_HAFB_Administrative_Record.xlsx XLSX spreadsheet
Hill_AFB_PWS_Enclosure_2.1_List_of_Available_GFI.xlsx XLSX spreadsheet
Hill_AFB_PWS_Enclosure_1_Acronyms_and_Definitions.pdf PDF
Hill_AFB_PWS_Enclosure_3_List_of_Available_GFP.PDF PDF
Itinerary_HAFB_ORC_Pre-Solicitation_Tour_26-27June.pdf PDF
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GFI List Template

GOVERNMENT-FURNISHED INFORMATION (GFI)
ORC Name:Hill AFB ORC
Installation:Hill Air Force Base
Date:3/21/2019 Updated 01-13-2020
ItemDocument DateDocument TitleSiteDVD Number
16/4/14Final Operable Unit 1 Sites LF001 and WP002 Optimized Exit Strategy Performance Plan, Hill Air Force Base, UtahOU1 (LF001 and WP002)1
25/25/16Final Operable Unit 1 – Sites LF001 and WP002 Performance Monitoring Report # 1, Hill Air Force Base, Utah, May 2016OU1 (LF001 and WP002)1
35/23/17Final Operable Unit 1 - Sites LF001 and WP002 Performance Monitoring Report #2, Hill Air Force Base, UtahOU1 (LF001 and WP002)1
49/14/18Operable Unit 1 - Sites LF001 and WP002 Performance Monitoring Report #3, Hill Air Force Base, UtahOU1 (LF001 and WP002)1
511/25/15Final Operable Unit 2 Site WP007 Optimized Exit Strategy Performance Plan, Hill Air Force Base, Utah November 2015OU2 (WP007)1
66/23/17Final Operable Unit 2 - Site WP007 Performance Monitoring Report #1, Hill Air Force Base, UtahOU2 (WP007)1
79/10/18Final Operable Unit 2 - Site WP007 Performance Monitoring Report #2 Hill Air Foce Base, UtahOU2 (WP007)1
85/8/14Final Operable Unit 3 Site WP005 Berman Pond Optimized Exit Strategy Plan Hill Air Force Base, UtahOU3 (WP005)1
912/12/14Final Operable Unit 4 - Site LF011 - Optimized Exit Strategy Performance Plan, Hill Air Force Base, UtahOU4 (LF011)1
1012/11/17Final Operable Unti 4 - Site LF011 Performance Monitoring Report # 1, Hill Air Force Base, UtahOU4 (LF011)1
1111/24/18Final Operable Unit 4 - Site LF011 Performance Monitoring Report #2, Hill Air Force Base, UtahOU4 (LF011)1
1212/12/14Final Operable Unit 5 - Sites SS017 and SS091 Optimized Exit Strategy Performance Plan Hill Air Force Base, UtahOU5 (SS017, SS091)1
133/3/17Final Operable Unit 5 - Sites SS017 and SS091 Performance Monitoring Report # 1OU5 (SS017, SS091)1
143/22/18Final Operable Unit 5 - Sites SS017 and SS091 Performance Monitoring Report #2 Hill Air Force Base, UtahOU5 (SS017, SS091)1
151/22/19Final Operable Unit 5 - Sites SS017 and SS091 Performance Monitoring Report #3 Hill Air Force Base, UtahOU5 (SS017, SS091)1
161/28/14Final Operable Unit 6 Site OT026 Former Waste Asphalt Pile Optimized Exit Strategy Plan Hill Air Force Base UtahOU6 (ST022, OT026)1
1711/16/16Final Operable Unit 6 Site OT026 Perfromance Monitoring Report #1, Hill Air Force Base, UtahOU6 (ST022, OT026)1
182/2/18Operable Unit 6 Site OT026 Performance Monitoring Report #2 Hill Air Force Base, UtahOU6 (ST022, OT026)1
193/26/14Final Operable Unit 7 Site SS027 - Building 225 Chromium Spill Optimized Exit Strategy Plan Hill Air Force Base UtahOU7 (SS027)1
202/12/18Operable Unit 7 – Site SS027 Performance Monitoring Report #1 Hill Air Force Base, UtahOU7 (SS027)1
2112/12/14Preliminary Conceptual Final Operable Unit 8 - Site OT033 - Optimized Exit Strategy Performance Plan Hill Air Force Base, UtahOU8 (OT033)1
224/21/16Final Operable Unit 8 - Site OT033 Optimized Exit Strategy Performance Plan Update, Hill Air Force Base UtahOU8 (OT033)1
232/16/17Final Operable Unit 8 - Site OT033 Performance Monitoring Report # 1, Hill Air Force Base, UtahOU8 (OT033)1
243/28/18Final Operable Unit 8 - Site OT033 Performance Monitoring Report #2, Hill Air Force Base, UTOU8 (OT033)1
253/16/16Final Operable Unit 9 Site SS090 (Golf Course Area) Optimized Exit Strategy Performance Plan, Hill Air Force Base, Utah, 16 March 2016OU9 (SS090)1
2610/4/16Final Operable Unit 9 – Site SS090 (Golf Course Area) Optimized Exit Strategy Performance Monitoring Report #1 Hill Air Force Base, UtahOU9 (SS090)1
271/30/18Final Operable Unit 9 Site SS090 (Golf Course Area) Opetimized Exit Strategy Performance Monitoring Report #2 Hill Air Force Base, UtahOU9 (SS090)1
285/15/07Aquifer Age Dating and Well Screen Profiling for Shallow and Deep Groundwater Plumes Operable Unit 10 Hill Air Force Base Utah - Technical MemorandumOU10 (SS109)1
291/28/08Analysis Summary of Stable Isotope Data for TCE from OU10 Hill Air Force Base UtahOU10 (SS109)1
303/11/08Final 2007-2008 Groundwater Age Dating Investigation, Operable Unit 10, Hill Air Force Base Utah - Technical MemorandumOU10 (SS109)1
317/16/08Final Operable Unit 10 Soil Gas Investigations Hill Air Force Base Utah - Technical MemorandumOU10 (SS109)1
3212/23/15Final Operable Unit 10 Site SS109 Optimized Exit Strategy Performance Plan, Hill Air Force Base UtahOU10 (SS109)1
338/24/16Final Operable Unit 10 - Site SS109 Performance Monitoring Report # 1, Hill Air Force Base, UtahOU10 (SS109)1
348/18/17Operable Unit 10 – Site SS109 Performance Monitoring Report No 2, Hill Air Force Base, UtahOU10 (SS109)1
3511/16/18Final Operable Unit 10 - Site SS109 Performance Monitoirng Report #3 Hill Air Force Base, UTOU10 (SS109)1
361/11/17Final Operable Unit 11 - Site OT097 Optimized Exit Strategy Plan Hill Air Force Base, UtahOU11 (OT097)1
378/21/17Operable Unit 11 Site OT097 Performance Monitoring Report No 1, Hill Air Force Base, UtahOU11 (OT097)1
388/27/18Final Operable Unit 11 site OT097 Performance Monitoring Report #2 Hill Air Force Base, UTOU11 (OT097)1
393/13/15Final Operable Unit 12 - Site SD107 - Optimized Exit Strategy Performance Plan Hill Air Force Base, UtahOU12 (SD107)1
409/2/16Final Operable Unit 12 - Site SD107 Performance Monitoring Report # 1, Hill Air Force Base, UTOU12 (SD107)1
416/7/17Final Opeable Unit 12 - Site SD107 Performance Monitoring Report # 2, Hill Air Force Base,UtahOU12 (SD107)1
429/25/18Final Operable Unit 12 - Site SD107 Performance Monitoring Report #3, Hill Air Force Base, UtahOU12 (SD107)1
433/23/09Memorandum of Agreement (MOA) Between Hill Air Force Base and Boyer Hill Military Housing L.C., Regarding Post-PCB Removal Responsibilities in Upper Area FOU13 (SS112)1
443/22/11Change 1 to Memorandum of Agreement between Hill Air Force Base, Utah and Boyer Hill Military Housing, L.C., Regarding Post-PCB Remediation Responsibilities in Upper Area FOU13 (SS112)1
454/11/17Final Site ST061 LUST Site EGSS Optimized Exit Strategy Performance Plan, Hill Air Force Base, UTDeferred Site (ST061)1
467/17/17Draft Final Operable Unit 15 - Site ZZ113 Record of Decision, Hill Air Force Base, UtahOU15 (ZZ113)1
473/12/19BULLET BACKGROUND PAPER ON AIR FORCE AND ENVIRONMENTAL PROTECTION AGENCY’S NEGOTIATIONS OF “NOTICE OF ENVIRONMENTAL CONDITION” BEING ATTACHED TO OFF-BASE PROPERTY RECORDS
OU15 (ZZ113)1
4810/1/18Draft Final Operable Unit 14 Record of Decision, Hill Air Force Base, UtahOU14 (MRA 200, MRA 201, MRA202)1
49OPERABLE UNIT 1 REMEDIAL ACTION OBJECTIVES MONITORING PLANOU11
50OPERABLE UNIT 2 REMEDIAL ACTION OBJECTIVES MONITORING PLANOU21
51OPERABLE UNIT 3 REMEDIAL ACTION OBJECTIVES MONITORING PLANOU31
52OPERABLE UNIT 4 REMEDIAL ACTION OBJECTIVES MONITORING PLANOU41
53OPERABLE UNIT 5 REMEDIAL ACTION OBJECTIVES MONITORING PLANOU51
54OPERABLE UNIT 6 REMEDIAL ACTION OBJECTIVES MONITORING PLANOU61
55OPERABLE UNIT 7 REMEDIAL ACTION OBJECTIVES MONITORING PLANOU71
56OPERABLE UNIT 8 REMEDIAL ACTION OBJECTIVES MONITORING PLANOU81
57OPERABLE UNIT 9 REMEDIAL ACTION OBJECTIVES MONITORING PLANOU91
58OPERABLE UNIT 10 REMEDIAL ACTION OBJECTIVES MONITORING PLANOU101
59OPERABLE UNIT 11 REMEDIAL ACTION OBJECTIVES MONITORING PLANOU111
60OPERABLE UNIT 12 REMEDIAL ACTION OBJECTIVES MONITORING PLANOU121
61Remedial Action Objectives Performance Monitoring Plan and Summary Reports Guidance, Hill Air Force Base, UtahBW1
62Appraisals Under ORC ("Backup Files" folder)BW2
63Att Utility Information Backup Data ("Backup Files" folder)Ous 1, 2, 4, 5, 82
64HAFB Water Bills - South Weber ("Backup Files" folder)Ous 1, & 22
65Utility Accounts ("Backup Files" folder)BW2
666/10/19GFI Hill AFB Off-Base Utility AccountsBW2
67DB001 Info ("Backup Files" folder)DB0012
6825-Apr-19DB001 PresentationDB0012
69AFMC-HL-03-413 ("Martin Lease & Investigation Rpt" folder)OU52
70Sep-08Detailed Field Investigation of Vapor Intrusion Processes ("Martin Lease & Investigation Rpt" folder)OU52
71Sep-08Detailed Field Investigation of Vapor Intrusion Processes, Table 5.2.1 ("Martin Lease & Investigation Rpt" folder)OU52
72Martin MP List plat 2010 ("Martin Lease & Investigation Rpt" folder)OU52
73USAF-AFMC-KRSM-15-1-0475_L No PII ("Martin Lease & Investigation Rpt" folder)OU52
74Analytical Data Folder ("OT106" folder)OT1062
7519-Feb-1919 Feb_OT106 DSs Bldgs 1, 2401, 2405-2408, 11420 PCB Sampling Analytical Data ("OT106" folder)OT1062
7625-Oct-18NOTSET(Untitiled)NOTSET ("OT106" folder)OT1062
7731-May-180-OT106 Memo May 2018_CZOM Edits_ltr 31 May 18OT1062
782-Nov-17HillAFB_OU15_ZZ113_ROD_Draft_2NOV17OU153
79Jan-14HEDP Operation Manual_Jan2014BW4
80Dec-10Rem Waste Mangment Plan_Dec2010BW4
81Jun-11SMS Operation Manual_Jun2011BW4
82Dec-12OU A_Passive Soil Gas Venting O-M Plan_Dec2012Little Mnt OUA4
8313-Jun-0701-OU 1_O-M Plan_Sects1-8OU14
8413-Jun-0702-OU 1_O-M Plan_App AOU14
8513-Jun-0703-OU 1_O-M Plan_Apps B-IOU14
8613-Jun-0705-OU 1_O-M Plan_Apps K-LOU14
8713-Jun-0704-OU1_O-M Plan_Apps JOU14
88Dec-12OU 4_O-M Manual_Dec2012_v1OU44
89Jan-19OU 10_Maint Plan_Jan2011OU104
908/28/19HillAFB_CERCLA Caps O-M Plan_Final_28AUG19OUs 1,3,4, & 74
918/30/19HillAFB_OU 1_OM_Manual_Final_30AUG19OU14
929/6/19HillAFB_OU 9_GCA_Bioreactor_OM_Manual_Final_6SEP19OU94
937/22/19HillAFB_OU 11_OT097_PTS_O-M Manual_Final_22Jul19OU114
946/13/19HillAFB_OU 11_OT097_SVE_O-M Manual_Final_13Jun19OU114
95Sep-12OU 12_BBHCS O-M Manual_Sep2012OU124
9611/2/09OU13 LTM_2 Nov 09OU13 (SS112)4
97Apr-09OU 15_LongTerm Site Mngmnt Summ_Apr2009OU154
98Apr-09OU 15_VRS O-M Manual_Apr2009OU154
9910/20/192018 FYR Recommendation_Status_20191020BWEMAIL 10-30-19
1001/30/178560-0006_HillAFB_OU15_ZZ113_2016-2017_IAPSamplingLWP_Final_30JAN17OU15EMAIL 10-30-19
10110/29/19GFI Off-Base Utility Accounts_Revised 10-29-2019BWEMAIL 10-30-19
102Oct-19Hill AFB Road Closure-Other Outage Request Form Oct 19BWEMAIL 10-30-19
103Mar-19Hill AFB Road Closure-Other Outage Request Form Cheat Sheet Mar 2019BWEMAIL 10-30-19
104Oct-19USAF-AFMC-KRSM-20-1-0001OU15EMAIL 10-30-19
1056/24/19HOU6-2019-0002-Request to Removed Cooley Pond Remedial ActionOU6EMAIL 10-30-19
106Sep-198560-0006_HillAFB_OU 15_ZZ113_AAPR_Jun18-Apr19_DRAFT_18SEP19 (1)OU15EMAIL 10-30-19
1075/30/11Example Hill AFB EBSBW5
108Dec-1612_8560-0006_HILLAFB_SMS and HEDP_DEC 2016 MSR_17JAN17BW5
109Dec-1712_8560-0006_HILLAFB_SMS and HEDP_DEC 2017 MSR_16JAN18BW5
110Dec-1812_8560-0006_HILLAFB_SMS and HEDP_DEC 2018 MSR_15JAN19BW5
111Oct-198560-0006_HILLAFB_SMS and HEDP_SEP 2019 MSR_15OCT19BW5
11210/20/192018 FYR Recommendations_Status_20191020_rev3BW5
11311/21/178560 0006_HillAFB_RMMR APR-JUN 2017_Draft_21Nov2017BW5
11412/13/188560 0006_HillAFB_RMMR APR-JUN 2018_Draft_13Dec2018BW5
1158/29/188560 0006_HillAFB_RMMR JAN-MAR 2018_Draft_29Aug2018BW5
11610/11/198560-0006_HillAFB_RMMR JAN-MAR 2019_Draft_11Oct19BW5
1175/14/198560-0006_HillAFB_RMMR JUL-SEP 2018_Draft_14May19BW5
1188/6/198560-0006_HillAFB_RMMR OCT-DEC 2018_Draft_06Aug19BW5
119Oct-19U11.089_Well Construction Log_LocationOU115
12012/4/19EPA Human Exposure Under Control Criteria for Hill AFB OU 15_12-4-2019OU15EMAIL 12-06-19
121Oct-198560-0006_HILLAFB_OU 1_OCT 2019 MSR_15NOV19OU 1SAFE 12-12-19
122Oct-198560-0006_HILLAFB_OU 4_HDUS_OCT 2019 MSR_15NOV19OU4SAFE 12-12-19
123Oct-198560-0006_HILLAFB_OU 6_Cooleys_OCT 2019 MSR_15NOV19OU6SAFE 12-12-19
124Oct-198560-0006_HILLAFB_OU 6_off-Base_OCT 2019 MSR_15NOV19OU6SAFE 12-12-19
125Oct-198560-0006_HILLAFB_OU 7_OCT 2019 MSR_15NOV19OU7SAFE 12-12-19
126Oct-198560-0006_HILLAFB_OU 8_BBHCS_OCT 2019 MSR_15NOV19OU8SAFE 12-12-19
127Oct-198560-0006_HILLAFB_OU 8_DCA_OCT 2019 MSR_15NOV19OU8SAFE 12-12-19
128Oct-198560-0006_HILLAFB_OU 12_BBHCS_OCT 2019 MSR_15NOV19OU12SAFE 12-12-19
129Oct-198560-0006_HILLAFB_OU 12_PRB_OCT 2019 MSR_15NOV19OU12SAFE 12-12-19
130Oct-198560-0006_HILLAFB_SMS and HEDP_OCT 2019 MSR_15NOV19SMS/HEDPSAFE 12-12-19
131Oct-198560-006_HILLAFB_OU 2_OCT 2019 MSR_15NOV19OU2SAFE 12-12-19
132Oct-198560-006_HILLAFB_OU 3_OCT 2019 MSR_15NOV19OU3SAFE 12-12-19
133Oct-198560-006_HILLAFB_OU 5_ACS_OCT 2019 MSR_15NOV19OU5SAFE 12-12-19
134Oct-198560-006_HILLAFB_OU 5_GWETS_OCT 2019 MSR_15NOV19OU5SAFE 12-12-19
135Oct-198560-006_HILLAFB_OU 6_on-Base_OCT 2019 MSR_15NOV19OU6SAFE 12-12-19
136Oct-198560-006_HILLAFB_OU 11 PTS_OCT 2019 MSR_15NOV19OU11SAFE 12-12-19
137Oct-198560-006_HILLAFB_OU 11_SVE_OCT 2019 MSR_15NOV19OU11SAFE 12-12-19
138Oct-198560-006_HILLAFB_OU a_LtlMtn_OCT 2019 MSR_15NOV19OUASAFE 12-12-19
139Oct-19OU 8 BBHCS_Oct_2019_Figure B-3OU8SAFE 12-12-19
140Oct-19OU 8 DCA Oct19_Figure C-5OU8SAFE 12-12-19
141Oct-19OU12_Potentio_201910OU12SAFE 12-12-19
142Dec-19DERR-2019-020432OU6SAFE 12-12-19
143Nov-19Draft_OU12_PRB_StormwaterOptimization_Landscaping_Photo_Log_Dec2019OU12SAFE 12-12-19
144Nov-19OU12Landscape_DailyReport_20191114OU12SAFE 12-12-19
145Nov-178560-0006_HillAFB_OU15_ZZ113_ROD_2Nov2017_RTCOU15SAFE 12-12-19
146Nov-178560-0006_HillAFB_OU15_ZZ113_ROD_2Nov2017_RTC_aOU15SAFE 12-12-19
147Nov-178560-0006_HillAFB_OU15_ZZ113_ROD_EPA_UDEQ_Comments_RTC_revOU15SAFE 12-12-19
148Nov-178650-0006_HillAFB_OU 15_ZZ113_ROD_Final_2NOV17_REDLINEOU15SAFE 12-12-19
149Nov-17HOU15 ROD cmntOU15SAFE 12-12-19
150Nov-17Non-DoD Source FW Hill AFB OU15 Draft LUC CommentsOU15SAFE 12-12-19
151Nov-17Non-DoD Source FW Part 1 EPA Response to Hill AFB Response to Comments on the Hill AFB OU 15 ROD EXTERNALOU15SAFE 12-12-19
152Nov-17V3 8560-0006_HillAFB_OU15_BackgroundHistory_25OCT17 (FFEO WL) jml SD (00...OU15SAFE 12-12-19
153Nov-19UDEQ Comments_OU15 Letter WP for 2016-2017 IAP EventOU15SAFE 12-12-19
15410/18/198560-0006_HillAFB_OU 1_LF001-WP002_InclinometerMemo_DraftFinal_18OCT19OU1SAFE 12-12-19
1551/13/20EPA Comments OU 15 2016-2017 letter work planOU15Email 1/13/20
1561/13/20EPA Comments OU6memotofileOU6Email 1/13/20

&"-,Bold"&12PWS Enclosure X GFI List XXX AFB &12Contract Number Enclosure 2 xx Month 2019 Page &P of &N

File details come from the government source that posted it. Updated .