Hill_AFB__PWS_Enclosure_2.2_List_of_Available_GFI_in_HAFB_Administrative_Record.xlsx

XLSX spreadsheet 388 KB Posted

Attached to
Optimized Remediation Contract for Hill AFB, UT
Solicitation number
W91238-19-R-0050
Issued by

About this file

This document is a draft solicitation for an optimized remediation contract at Hill Air Force Base in Utah. The solicitation seeks environmental remediation and assessment services at 25 Installation Restoration Program and Military Munitions Response Program sites over a 10-year period. Services include environmental services, minor construction, and architecture and engineering work. Responses are requested from small and other-than-small businesses by March 29, 2019. The contract type will be firm-fixed-price. At least 50% of costs must be for employee expenses. Joint ventures may apply. The solicitation has not yet been issued and the acquisition source has not been determined.

Hill AFB _PWS Enclosure 2.2 List of Available GFI in HAFB Administrative Record

View the file

Other files

File Type Posted
EPA Comments OU6memotofile.pdf PDF
SF33 Attachment C-1 Hill AFB_PWS Enclosure 2B GFI List Hill AFB_20200113.xlsx XLSX spreadsheet
EPA Comments OU 15 2016-2017 letter work plan.pdf PDF
W923819R0050 Am 0005.pdf PDF
SF33 Attachment L-1 Labor Category Qualifications REV 16 Dec 2019.pdf PDF
SF33 Attachment C-1 Hill AFB_PWS Enclosure 2B GFI List Hill AFB_20191219.xlsx XLSX spreadsheet
W9123819R0050 Amendment 0004.pdf PDF
Hill AFB_PWS_REV_20191213.pdf PDF
SF33 Attachment B-1 Hill AFB_Sub-CLIN Structure_20191213.xlsx XLSX spreadsheet
W9123819R0050 Amendment 0003.pdf PDF
W9123819R0050 Amendment 0002 .pdf PDF
Am02 REV SF33 Attachment L-2 Past Performance Quality Questionaire.docx DOCX document
Am02 REV SF33 Attachment C-1 Hill AFB_PWS Enclosure 2B GFI List Hill AFB_20191031.xlsx XLSX spreadsheet
Solicitation_Phase_Site_Visit_Attendees_16-17_Oct_2019.pdf PDF
Hill_AFB_ORC_Existing_QandA_(PreRFP)_20191101.pdf PDF
W9123819R0050_Hill_ORC_Sol_Amendment_0001.pdf PDF
SF33_Attachment_B-1_Hill_AFB_Sub-CLIN_Structure_REV1_20191101.xlsx XLSX spreadsheet
Hill_AFB_PWS_REV_20191101.pdf PDF
Hill_AFB_Optimized_Remediation_Site_Visit_Attendees_16-17_October_2019.pdf PDF
Hill_AFB_ORC_Solicitation_Package_W9123819R0050.zip ZIP file
SF33_Attachment_L-2_Past_Performance_Quality_Questionaire.docx DOCX document
Hill_AFB_Sub-CLIN_Structure_20191016.xlsx XLSX spreadsheet
SF33_Attachment_L-1_Labor_Category_Qualifications_16_Oct_2019.docx DOCX document
Hill_AFB_PWS_V9_20191016.pdf PDF
6._Interim_Guidance_on_1-4_Dioxane,_Environmental_Restoration_Program.pdf PDF
5._Ensuring_Chemistry_Data_Fact_Sheet_April_2013.pdf PDF
3._Optimization_Benefit_Template_190520_MD_190710.docx DOCX document
2._CPSMR_template-_25Aug2019.docx DOCX document
1._ORC_PMP_Guidance_v1.0_20190920.docx DOCX document
4._AFGM2019-32-01,_AFFF_Related_Waste_Mgmt_Implementation_Guidance.pdf PDF
7._QASP_Template_v1_20190913_FINAL.DOCX DOCX document
Itinerary_HAFB_ORC_Pre-Solicitation_Tour_16-17_Oct.pdf PDF
W9123819R0050_Hill_AFB_ORC_DRAFT_Solicitation_SF33.pdf PDF
Hill_AFB_PWS_V8_Updated_20191009.pdf PDF
A01.12_Hill_AFB_PWS_V8_20190918.pdf PDF
Hill_ORC_RFIs_w_Responses_20190919.pdf PDF
8560-0006_HillAFB_OU_10_SS109_PMR4_Draft_9MAY19.pdf PDF
8560-0006_HillAFB_OU_9_GCA_Bioreactor_OM_Manual_Final_6SEP19.pdf PDF
Hill_ORC_Docs_10_Sep_2019.zip ZIP file
HillAFB_OU_15_ZZ113_ROD_Draft_2NOV17.pdf PDF
Hill_AFB_ORC_QandA_19_Aug_2019.pdf PDF
Hill_AFB_PWS_20190726.pdf PDF
Sampling_Transition_Table_HillAFB_20190701.docx DOCX document
Hill_AFB_PWS_20190603.pdf PDF
Hill_AFB_CLIN-SubCLIN_Structure.xlsx XLSX spreadsheet
Hill_AFB_PWS_Enclosure_4_OPSEC_Addendum.pdf PDF
Hill_AFB_PWS_Enclosure_2.1_List_of_Available_GFI.xlsx XLSX spreadsheet
Hill_AFB_PWS_Enclosure_1_Acronyms_and_Definitions.pdf PDF
Hill_AFB_PWS_Enclosure_3_List_of_Available_GFP.PDF PDF
Itinerary_HAFB_ORC_Pre-Solicitation_Tour_26-27June.pdf PDF
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Export Worksheet

Installation NameAR FileInstallation FileDocument DateSubject/TitleAuthorAuthor AffiliationRecipientRecipient AffiliationSite #Rod #Image Number
Hill AFB, UT4253314431-JAN-94100 Percent Submittal Landfill Removal Action Flowchart and Detailed Cost Estimating Model for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, Utah January 1994Montgomery Watson, Inc.U.S. Air Force Logistics CommandFT009|FT081|LF001|LF003|OT014|WP002|WP080S05f068.PDF
Hill AFB, UT425355905-JUN-96OU1 12th Monitoring Round 1996, Analytical Data, May 13 - 17, 1996Environmental Science and Engineering, Inc.Montgomery Watson, Inc.s03f001.PDF
Hill AFB, UT425376108-JUL-97OU1 14th Monitoring Round 1997, Analytical Data, April 7 through June 12, 1997Applied Physics and Chemistry LaboratoryMontgomery Watson, Inc.S03f003.pdf
Hill AFB, UT425586215-JUL-97OU1 14th Monitoring Round 1997, Analytical Data, June 16 through 23, 1997Applied Physics and Chemistry LaboratoryMontgomery Watson, Inc.S03f004.pdf
Hill AFB, UT425606317-JUL-97OU1 14th Monitoring Round 1997, Analytical Data, June 24 through 26, 1997Applied Physics and Chemistry LaboratoryMontgomery Watson, Inc.S03f005.pdf
Hill AFB, UT4256216312-MAR-96Comments for the Comprehensive Remedial Investigation Report for Operable Unit 1S10bf002.PDF
Hill AFB, UT4256413415-JAN-90Final Addendum A - E Quality Assurance Project Plan for Operable Unit 1 Hill Air Force Base, Utah January 1990 Remedial Investigation/Feasibility StudyJames M. Montgomery, Consulting Engineers, Inc.U.S. Army Corps of EngineersLF001|LF003|WP002S05f054.PDF
Hill AFB, UT4256513315-JAN-90Final Addendum, A-E Work Plan and Safety, Health and Emergency Response Plan for Operable Unit 1 Hill Air Force Base, Utah Remedial Investigation/Feasibility StudyJames M. Montgomery, Consulting Engineers, Inc.U.S. Corps of EngineersLF001|LF003|WP002S05f053.PDF
Hill AFB, UT4256713031-DEC-76An Investigation of Ground and Surface Water Pollution in the vicinity of the deactivated Landfill Burnpit, Hill Air Force Base, UtahJames T. GoodwinUSAFFT009|FT081|LF001|LF003|WP002|WP080S05f047.pdf
Hill AFB, UT425698631-MAR-99Analytical Data Report for the Seventeenth Groundwater Sampling Round at Operable Unit 1 Hill Air Force Base, Utah March 1999CH2M HillEnvironmental Management DirectorateFT009|FT081|LF001|LF003|OT014|WP002|WP080S03f037.PDF
Hill AFB, UT425718730-APR-99Analytical Data Validation Report for the Eighteenth Groundwater Sampling Round at Operable Unit 1 Hill Air Force Base, Utah April 1999CH2M HillEnvironmental Management DirectorateFT009|FT081|LF001|LF003|OT014|WP002|WP080S03f039.PDF
Hill AFB, UT425738830-NOV-99Analytical Data Validation Report for the Spring 1999 Operable Unit 1 Spring, Seep, and Surface Water Sampling RoundCH2M HILLEnvironmental Management DirectorateS03f040.PDF
Hill AFB, UT425755631-MAR-99Analytical Data Validation Summary Report for Operable Unit 1 Investigations in 1997 and 1998 Hill Air Force Base, UtahCH2M HillEnvironmental Management DirectorateLF001|LF003S02f032.pdf
Hill AFB, UT4257714330-NOV-93Preprint Final Remedial Investigation Report Addendum for Operable Unit 1 Hill Air Force Base, Utah (IRP Sites LF01, LF03, WP02, FT09, FT81 OT14, WP80) - Volume 2 - Appendix G - Final Baseline Risk Assessment Addendum Dec 93, Nov 93 (cover)Montgomery Watson, Inc.FT009|FT081|LF001|LF003|OT014|WP002|WP080S05f067.PDF
Hill AFB, UT4257964.131-DEC-95Comprehensive Remedial Investigation Report for Operable Unit 1 (IRP Site LF01, LF03, WP02, FT09, OT14, FT81, and WP80) - Volume 1 - ReportMontgomery Watson, Inc.FT009|FT081|LF001|LF003|OT014|WP002|WP080S03f006.PDF
Hill AFB, UT4260064.231-DEC-95Comprehensive Remedial Investigation Report for Operable Unit 1 (IRP Site LF01, LF03, WP02, FT09, OT14, FT81, and WP80) - Volume 2 - Appendix AMontgomery Watson, Inc.FT009|FT081|LF001|LF003|OT014|WP002|WP080S03f007.pdf
Hill AFB, UT4260164.331-DEC-95Comprehensive Remedial Investigation Report for Operable Unit 1 (IRP Site LF01, LF03, WP02, FT09, OT14, FT81, and WP80) - Volume 3 - Appendices B through IMontgomery Watson, Inc.FT009|FT081|LF001|LF003|OT014|WP002|WP080S03f008.pdf
Hill AFB, UT4260464.431-DEC-95Comprehensive Remedial Investigation Report for Operable Unit 1 (IRP Site LF01, LF03, WP02, FT09, OT14, FT81, and WP80) - Volume 4 - Appendices J through PMontgomery Watson, Inc.FT009|FT081|LF001|LF003|OT014|WP002|WP080S03f009.pdf
Hill AFB, UT4260664.531-DEC-95Comprehensive Remedial Investigation Report for Operable Unit 1 (IRP Site LF01, LF03, WP02, FT09, OT14, FT81, and WP80) - Volume 5 - Appendices Q through AAMontgomery Watson, Inc.FT009|FT081|LF001|LF003|OT014|WP002|WP080S03f010.pdf
Hill AFB, UT4260813201-AUG-89Data Analysis Report for Operable Unit One, U.S. Air Force Installation Restoration Program Hill Air Force Base, UtahScience Applications International CorporationU.S. Department of EnergyLF001|LF003|WP002S05f052.PDF
Hill AFB, UT426095203-NOV-97Data Validation Summary Report for the Fifteenth Sampling Round at Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT02, OT014, FT91, and WP080) Hill Air Force Base, UtahMontgomery WatsonHill AFB, UTFT009|FT081|LF001|LF003|OT014|OT033|WP002|WP080S02f028.pdf
Hill AFB, UT426116031-AUG-97Data Validation Summary Report for the Fourteenth Sampling Round at Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT02, OT1, FT81, and WP80) Hill Air Force Base, UtahMontgomery Watson, Inc.Hill AFB, UTFT009|FT081|LF001|LF003|OT014|OT033|WP002|WP080S03f002.pdf
Hill AFB, UT426134231-MAY-97Data Validation Summary Report for the Thirteenth Sampling Round at Operable Unit 1 (IRP Sites LF01, LF03, WP02, OT014, FT81, and WP80) Hill Air Force Base, UtahMontgomery WatsonHill AFB, UTFT009|FT081|LF001|LF003|OT014|WP002|WP080S02f018.PDF
Hill AFB, UT4261579.225-JAN-98Final Report Demonstration of Bioventing for Remediation of Chlorinated Solvent Contamination at HAFB, Ogden, Utah - Volume II - Data PackageBattelleUSAF, Air Force Research LaboratoryWP002S03f027.PDF
Hill AFB, UT4261779.125-JAN-98Final Report Demonstration of Bioventing for Remediation of Chlorinated Solvent Contamination at HAFB, Ogden, Utah - Volume IBattelleUSAF, Air Force Research LaboratoryWP002S03f028.PDF
Hill AFB, UT42619138.114-FEB-92Draft Final Remedial Investigation Report for Operable Unit 1 Hill Air Force Base, Utah (IRP Sites LF01, LF03, WP02, FT09, OT14) - Volume 1 - Report February 1992James M. Montgomery, Consulting Engineers, Inc.U.S. Army Corps of EngineersFT009|FT081|LF001|LF003|OT014|WP002S05f059.PDF
Hill AFB, UT42622138.214-FEB-92Draft Final Remedial Investigation Report for Operable Unit 1 Hill Air Force Base, Utah (IRP Sites LF01, LF03, WP02, FT09, OT14) Volume 2 Appendices February 1992James M. Montgomery, Consulting Engineers, Inc.U.S. Army Corps of EngineersFT009|FT081|LF001|LF003|OT014|WP002s05f060.PDF
Hill AFB, UT4262312201-MAY-95Eighth Monitoring Round Data Evaluation for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, UtahMontgomery Watson, Inc.Hill AFBFT009|FT081|LF001|LF003|OT014|WP002|WP080S04f032.PDF
Hill AFB, UT426253601-MAY-96Eleventh Sampling Round Data Evaluation for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, FT81, OT14, and WP80) Hill Air Force Base, UtahMontgomery Watson, Inc.Hill AFB, UTFT009|FT081|LF001|LF003|OT014|WP002|WP080S02f011.pdf
Hill AFB, UT4262817030-APR-95Draft Engineering Evaluation/Cost Analysis of Containment Alternatives for Operable Unit 1 Hill Air Force Base, Utah April 1995Montgomery Watson, IncHill AFBFT009|FT081|LF001|LF003|WP002|WP080s15f167.PDF
Hill AFB, UT4263015230-NOV-94Final Environmental Assessment and Baseline Survey for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, Utah November 1994Montgomery Watson, IncHill AFB, UTFT009|FT081|LF001|LF003|OT014|WP002|WP080S05f080.PDF
Hill AFB, UT4263115328-APR-95Final Existing Containment System Evaluation and Pre-Design Data Report for Operable Unit 1 Hill Air Force Base, Utah April 1995Montgomery Watson, Inc.OO-ALC/EMRFT081|LF001S05f081.PDF
Hill AFB, UT426347701-JAN-98Final Feasibility Study Report for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, OT014, FT09, OT14, FT91, and WP80) Hill Air Force Base, UtahHill AFB, UTFT009|FT081|LF001|LF003|OT014|WP002|WP080S03f025.PDF
Hill AFB, UT4263615731-OCT-95Final Fall 1995 Field Investigation Work Plan for Operable Unit 1, Hill Air Force Base, Utah DO 5075 (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) October 1995Montgomery Watson, IncHill AFB, UTFT009|FT081|LF001|LF003|OT014|WP002|WP080S05f085.PDF
Hill AFB, UT4263716831-MAR-97Final Field Manual for Site Activities at Operable Unit 1, Quality Assurance Project Plan, Health and Safety Plan, and Field Procedures Hill Air Force Base, UtahCH2M HILLHill AFBLF001|LF003s15f165.PDF
Hill AFB, UT4263911131-AUG-94Fifth Monitoring Round Data Evaluation for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, Utah August 1994Montgomery Watson, Inc.Hill AFB, UTFT009|FT081|LF001|LF003|OT014|WP002|WP080S04f020.pdf
Hill AFB, UT426599731-DEC-93First Quarter Data Evaluation for 1993 Ground-Water and Surface Water Sampling for Operable Unit 1, Hill Air Force Base, Utah (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Dec 93Montgomery Watson, Inc.FT009|FT081|LF001|LF003|OT014|WP002|WP080S04f004.PDF
Hill AFB, UT4267910631-MAY-94Fourth Quarter Data Evaluation for 1993 Ground-Water and Surface Water Sampling for Operable Unit 1 (IRP Sties LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, Utah - May 1994Montgomery Watson, Inc.Hill AFB, UTFT009|FT081|LF001|LF003|OT014|WP002|WP080S04f015.pdf
Hill AFB, UT4269912121-MAR-95OU1 8th Monitoring Round 1995 Analytical Data, February 2 through February 17, 1995Quanterra Environmental ServicesMontgomery Watson, Inc.FT009|FT081|LF001|LF003|OT014|WP002|WP080S04f031.PDF
Hill AFB, UT4270016028-FEB-88Health and Safety Plan February 1988 - October 1988 Installation Restoration Program Remedial Investigation and Feasibility Study (RI/FS) Chemical Disposal Pit 3, Hill Air Force Base, UtahRadian CorporationHQ AFLC/DEV/USAFOEHLWP007S06f002.PDF
Hill AFB, UT4270215928-FEB-88Quality Assurance Project Plan February 1988 - October 1988 Installation Restoration Program Remedial Investigation and Feasibility Study (RI/FS) Chemical Disposal Pit 3, Hill Air Force Base, UtahRadian CorporationHQ AFLC/DEV/USAFOEHLWP007S06f001.PDF
Hill AFB, UT4270416131-MAY-88Work Plan May 1988 - June 1989 Installation Restoration Program Remedial Investigation and Feasibility Study (RI/FS) Work Plan Chemical Disposal Pit 3, Hill Air Force Base, UtahRadian CorporationHQ AFLC/DEV/USAFOEHLWP007S06f003.PDF
Hill AFB, UT427054131-AUG-95Interim Report, Evaluation of Bench Test Results for the Surfactant Flushing Treatability Study at Operable Unit 1Applied Physics and Chemistry LaboratoryMontgomery WatsonFT009|FT081|LF001|LF003|OT014|WP002|WP080S02f017.PDF
Hill AFB, UT4271816431-MAY-95Investigation Report for the Three - Mile Long Dual - Wall Industrial Wastewater Pipeline Hill Air Force Base, UtahRadian CorporationPaul BettsOO-ALC/EMRs14f044.PDF
Hill AFB, UT427205531-MAR-99Final Landfills 3 and 4 Summary Investigation Report Hill Air Force Base, UtahCH2M HillEnvironmental Management DirectorateLF001|LF003S02f031.pdf
Hill AFB, UT4272212401-AUG-81Leachate Investigation at the HAFB Landfill (LF-4)Calscience Research, Inc.Department of the Air Force, Headquarters Odgen Air Logistics CenterLF001S05f041.PDF
Hill AFB, UT427233323-FEB-96OU1 11th Monitoring Round 1996, Analytical Data, February 19 through March 6, 1996Quanterra Environmental ServicesMontgomery Watson, Inc.S02f008.pdf
Hill AFB, UT427259201-FEB-00Analytical Data Validation Report for the Fall 1999 Operable Unit 1 Groundwater Monitoring Well Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring ProjectCH2M HILLEnvironmental Management DirectorateFT009|FT081|LF001|LF003|WP002|WP080s03f044.PDF
Hill AFB, UT427279101-FEB-00Summer 1999 Operable Unit 1 Groundwater Monitoring Well Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring ProjectCH2M HILLEnvironmental Management DirectorateFT009|FT081|LF001|LF003|WP002|WP080s03f043.PDF
Hill AFB, UT427385330-NOV-98Monitoring Well Installations and Impact Assessment / South Weber No.2 ReportCH2M HILLEnvironmental Management Directorates02f029.pdf
Hill AFB, UT427402730-SEP-95Ninth Monitoring Round Data Evaluation for Operable Unit 1 (IPR Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, UtahMontgomery WatsonHill AFB, UTFT009|FT081|LF001|LF003|OT014|WP002|WP080S02f002.pdf
Hill AFB, UT427427031-MAY-96Operable Unit 1 and Operable Unit 8 Field Sampling Plan, April 1996 - March 1997Montgomery WatsonFT009|FT081|LF001|LF003|OT014|OT033|WP002|WP080S03f014.PDF
Hill AFB, UT427448005-FEB-98Operable Unit 1 Environmental Open House Hill Air Force Base, UtahHill AFBFT009|FT081|LF001|LF003|OT014|WP002|WP080S03f029.PDF
Hill AFB, UT4274657.131-AUG-99Operable Unit 1 Groundwater Pre-Design Summary Investigation Report - Volume 1 - ReportCH2M HILLEnvironmental Management Directorates02f033.pdf
Hill AFB, UT427489301-MAR-00Final Operable Unit 1 Monitoring Point Closure Report Hill Air Force Base, UtahCH2M HILLEnvironmental Management DirectorateFT009|FT081|LF001|LF003|WP002|WP080s03f045.PDF
Hill AFB, UT427502430-NOV-98Operable Unit 1 Monitoring Well Installation and Impact Assessment of South Weber No.2 ReportCH2M HILLEnvironmental Management DirectorateS01f029.pdf
Hill AFB, UT427525130-JUN-97Final Operable Unit 1 Work Plan for Statistical Evaluation of Baseline Concentrations Hill Air Force Base, UtahMontgomery WatsonHill AFBFT009|FT081|LF001|LF003|WP002|WP080S02f027.PDF
Hill AFB, UT427542819-OCT-95OU1 10th Monitoring Round 1995, Analytical Data, Hill Air Force Base, Utah, September 6 through October 3, 1995Quanterra Environmental ServicesMontgomery Watson, Inc.S02f003.pdf
Hill AFB, UT427563001-NOV-95OU1 10th Monitoring Round 1995, Analytical Data, Hill Air Force Base, Utah, October 4 through October 14, 1995Quanterra Environmental ServicesMontgomery Watson, Inc.S02f005.pdf
Hill AFB, UT427582907-NOV-95OU1 10th Monitoring Round 1995, Analytical Data, Hill Air Force Base, Utah, October 13 through October 18, 1995Quanterra Environmental ServicesMontgomery Watson, Inc.S02f004.pdf
Hill AFB, UT427593224-FEB-96OU1 11th Monitoring Round 1996, Analytical Data, February 6 through February 16, 1996Quanterra Environmental ServicesMontgomery Watson, Inc.S02f007.pdf
Hill AFB, UT427613415-APR-96OU1 11th Monitoring Round 1996, Analytical Data, March 7 through March 19, 1996Quanterra Environmental ServicesMontgomery Watson, Inc.S02f009.PDF
Hill AFB, UT427633524-APR-96OU1 11th Monitoring Round 1996, Analytical Data, March 20 through April 5, 1996Quanterra Environmental ServicesMontgomery Watson, Inc.S02f010.PDF
Hill AFB, UT427653701-AUG-96OU1 12th Monitoring Round 1996, Analytical Data, June 2 through July 19, 1996Quanterra Environmental ServicesMontgomery Watson, Inc.S02f012.pdf
Hill AFB, UT427673806-AUG-96OU1 12th Monitoring Round 1996, Analytical Data, May 20 through July 16, 1996Quanterra Environmental ServicesMontgomery Watson, Inc.S02f013.pdf
Hill AFB, UT427704010-APR-97OU1 13th Monitoring Round 1997, Analytical Data, March 6 -19, 1997Applied Physics and Chemistry LaboratoryMontgomery Watson, Inc.S02f016.PDF
Hill AFB, UT427723907-APR-97OU1 13th Monitoring Round 1997, Analytical Data, March 4 -15, 1997Applied Physics and Chemistry LaboratoryMontgomery Watson, Inc.S02f015.PDF
Hill AFB, UT427782628-JUL-95OU1 9th Monitoring Round 1995 Analytical Data, June 14 through June 29, 1995Quanterra Environmental ServicesMontgomery Watson, Inc.FT009|FT081|LF001|LF003|OT014|WP002|WP080S02f001.pdf
Hill AFB, UT427804302-OCT-97OU1 15th Monitoring Round 1997, Analytical Data, September 3 - 12, 1997Applied Physics and Chemistry LaboratoryMontgomery WatsonS02f019.pdf
Hill AFB, UT427834410-OCT-97OU1 15th Monitoring Round 1997, Analytical Data, September 15 - 23, 1997Applied Physics and Chemistry LaboratoryMontgomery WatsonS02f020.PDF
Hill AFB, UT427859401-JUL-93OU1 1st Qtr. 1993, Analytical Data, May 13 through May 21, 1993EnsecoMontgomery Watson, Inc.S04f001.pdf
Hill AFB, UT427879629-JUL-93OU1 1st Qtr. 1993, Analytical Data, June 8 through June 21, 1993EnsecoMontgomery Watson, Inc.S04f003.pdf
Hill AFB, UT427899526-JUN-93OU1 1st Qtr. 1993, Analytical Data, May 25 through June 4, 1993EnsecoMontgomery Watson, Inc.S04f002.PDF
Hill AFB, UT427919804-OCT-93OU1 2nd Qtr. 1993 Analytical Data, September 2 through September 9, 1993EnsecoMontgomery Watson, Inc.S04f005.PDF
Hill AFB, UT427929911-OCT-93OU1 2nd Qtr. 1993 Analytical Data, September 10 through September 17, 1993EnsecoMontgomery Watson, Inc.S04f006.PDF
Hill AFB, UT4279411415-SEP-94OU1 3rd Qtr. 1994 Analytical Data, July 19 through August 17, 1994Environmental Science and Engineering, Inc.Montgomery Watson, Inc.S04f023.PDF
Hill AFB, UT4279611204-OCT-94OU1 3rd Qtr. 1994 Analytical Data, September 1 through September 13, 1994Enseco (Corning Environmental Services)Montgomery Watson, Inc.s04f021.pdf
Hill AFB, UT4279810220-DEC-93OU1 3rd Qtr. 1993 Analytical Data, November 12 through December 3, 1993EnsecoMontgomery Watson, Inc.S04f009.PDF
Hill AFB, UT4280010304-JAN-94OU1 3rd Qtr. 1993 Analytical Data, November 23 through December 14, 1993EnsecoMontgomery Watson, Inc.S04f010.PDF
Hill AFB, UT4280310115-DEC-93OU1 3rd Qtr. 1993, Analytical Data, November 10 through November 22, 1993EnsecoMontgomery Watson, Inc.S04f008.PDF
Hill AFB, UT4280411322-SEP-94OU1 3rd Qtr. 1994 Analytical Data, August 18 through August 26, 1994Enseco (Corning Environmental Services)Montgomery Watson, Inc.S04f022.pdf
Hill AFB, UT4280610424-FEB-94OU1 4th Qtr. 1993 Analytical Data, January 5 through February 3, 1994EnsecoMontgomery Watson, Inc.s04f012.PDF
Hill AFB, UT4280810508-MAR-94OU1 4th Qtr. 1993 Analytical Data, January 31 through February 10, 1994EnsecoMontgomery Watson, Inc.S04f013.pdf
Hill AFB, UT4281010707-JUN-94OU1 5th Monitoring Round 1994, Analytical Data, May 5 through May 13, 1994EnsecoMontgomery Watson, Inc.S04f016.pdf
Hill AFB, UT4281210821-JUN-94OU1 5th Monitoring Round 1994, Analytical Data, May 16 through May 23, 1994EnsecoMontgomery Watson, Inc.S04f017.pdf
Hill AFB, UT4281310913-JUL-94OU1 5th Monitoring Round 1994, Analytical Data, May 15 through June 7, 1994EnsecoMontgomery Watson, Inc.S04f018.pdf
Hill AFB, UT4281511020-JUL-94OU1 5th Monitoring Round 1994, Analytical Data, June 8 through June 20, 1994EnsecoMontgomery Watson, Inc.S04f019.pdf
Hill AFB, UT4281711730-DEC-94OU1 7th Monitoring Round 1994 Analytical Data, November 11 through December 5, 1994Quanterra Environmental ServicesMontgomery Watson, Inc.FT009|FT081|LF001|LF003|OT014|WP002|WP080S04f026.PDF
Hill AFB, UT4282011607-DEC-94OU1 7th Monitoring Round 1994 Analytical Data, November 1 through November 10, 1994Quanterra Environmental ServicesMontgomery Watson, Inc.FT009|FT081|LF001|LF003|OT014|WP002|WP080S04f025.PDF
Hill AFB, UT4282211805-JAN-95OU1 7th Monitoring Round 1994 Analytical Data, December 6 through December 8, 1994Quanterra Environmental ServicesMontgomery Watson, Inc.FT009|FT081|LF001|LF003|OT014|WP002|WP080S04f027.PDF
Hill AFB, UT4282412030-MAR-95OU1 8th Monitoring Round 1995 Analytical Data, February 20 through March 6, 1995Quanterra Environmental ServicesMontgomery Watson, Inc.FT009|FT081|LF001|LF003|OT014|WP002|WP080S04f029.PDF
Hill AFB, UT4282612315-AUG-95OU1 9th Monitoring Round 1995 Analytical Data, June 30 through July 27, 1995Quanterra Environmental ServicesMontgomery Watson, Inc.FT009|FT081|LF001|LF003|OT014|WP002|WP080S04f033.pdf
Hill AFB, UT428287131-MAY-97Final Phase I Groundwater Pre-Design Data Collection Work Plan for Operable Unit 1 Hill Air Force Base, UtahMWHHill AFBFT009|FT081|LF001|LF003|WP002|WP080S03f017.PDF
Hill AFB, UT428304901-SEP-97Final Phase II Groundwater Pre-Design Data Collection Work Plan for Operable Unit 1 Hill Air Force Base, UtahCH2M HILLEnvironmental Management DirectorateFT009|FT081|LF001|LF003|WP002|WP080S02f025.PDF
Hill AFB, UT428327330-JUN-97Final Phase II Landfill 3 and 4 Work Plan for Operable Unit 1Hill Air Force Base, UtahCH2M HILLEnvironmental Management DirectorateLF001|LF003S03f019.PDF
Hill AFB, UT4283314230-NOV-93Preprint Final Remedial Investigation Report Addendum for Operable Unit 1 Hill Air Force Base, Utah (IRP Sites LF01, LF03, WP02, FT09, FT81 OT14, WP80) - Volume 1 - Report November 1993Montgomery Watson, Inc.FT009|FT081|LF001|LF003|OT014|WP002|WP080S05f066.PDF
Hill AFB, UT4283515531-OCT-95Proposed Final Engineering Evaluation Cost Analysis for Operable Unit 1 Hill Air Force Base, Utah October 1995Montgomery Watson, IncHill AFBFT009|FT081|LF001|LF003|WP002|WP080S05f083.PDF
Hill AFB, UT4283814531-JAN-94QCSR for the Phase II Operable Unit 1 Remedial Investigation (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80Montgomery Watson Americas, Inc.U.S. Air Force Logistics CommandFT009|FT081|LF001|LF003|OT014|WP002|WP080S05f069.PDF
Hill AFB, UT4284014631-JAN-94QCSR for the Phase II Operable Unit 1 Remedial Investigation (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) AppendicesMontgomery Watson Americas, Inc.U.S. Air Force Logistics CommandFT009|FT081|LF001|LF003|OT014|WP002|WP080S05f070.PDF
Hill AFB, UT42842173.231-JAN-94QCSR for the Phase II Operable Unit 1 Remedial Investigation (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, Utah - Volume 2 of 2 - Appendices A-GMontgomery Watson Americas, IncOO-ALC/EMRHill AFB, UTFT009|FT081|LF001|LF003|OT014|WP002|WP080s15f166.PDF
Hill AFB, UT42844149.231-AUG-94Final Quality Control Summary Report for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, FT81, OT14, WP80) Hill Air Force Base, Utah - Volume 2 of 2 - Appendices D-F August 1994Montgomery Watson, Inc.Hill AFB, UTFT009|FT081|LF001|LF003|OT014|WP002|WP080S05f077.PDF
Hill AFB, UT42846149.131-AUG-94Final Quality Control Summary Report for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, FT81, OT14, WP80) Hill Air Force Base, Utah - Volume 1 of 2 - Report and Appendices A-C August 1994Montgomery Watson, Inc.Hill AFB, UTFT009|FT081|LF001|LF003|OT014|WP002|WP080S05f076.PDF
Hill AFB, UT428488901-FEB-00Final Remedial Action Work Plan Operable Unit 1 Hill Air Force Base, UtahCH2M HILLEnvironmental Management DirectorateFT009|FT081|LF001|LF003|WP002|WP080S03f041.PDF
Hill AFB, UT428499001-FEB-00Final Remedial Design Report and Work Plan Operable Unit 1 Hill Air Force Base, UtahCH2M HILLHill AFB, UTFT009|FT081|LF001|LF003|WP002|WP080S03f042.PDF
Hill AFB, UT4285115802-APR-92Draft Remedial Investigation/Feasibility Study Work Plan Addendum for Operable Unit 1 Hill Air Force Base, Utah (IRP Sites LF01, LF03, WP02, FT09, OT14) April 1992James M. Montgomery, Consulting Engineers, Inc.US Army Corps of EngineersFT009|FT081|LF001|LF003|OT014|WP002S05f087.PDF
Hill AFB, UT428535830-SEP-99Final Remediation by Natural Attenuation Treatability Study for Operable Unit 1 Hill Air Force Base, UtahParsons EngineeringAFCEE, Techology Transfer Division/00-ALC/EMRFT009|FT081|LF001|LF003|WP002|WP080S02f035.PDF
Hill AFB, UT4285615625-OCT-95Draft Request for a Removal Action for Operable Unit 1 Hill Air Force Base, Utah - MemorandumMontgomery Watson, IncHill AFB, UTFT009|FT081|LF001|LF003|WP002|WP080S05f084.PDF
Hill AFB, UT4285715430-APR-95Final Sampling and Analysis Plan Addendum Spring 1995 for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, Utah April 1995Montgomery Watson, IncHill AFB, UTFT009|FT081|LF001|LF003|OT014|WP002|WP080S05f082.PDF
Hill AFB, UT4285910028-FEB-94Second Quarter Data Evaluation for 1993 Ground-Water and Surface Water Sampling for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, )T14, FT81, and WP80) Hill Air Force Base, UtahMontgomery Watson, Inc.Hill AFB, UTFT009|FT081|LF001|LF003|OT014|WP002|WP080S04f007.PDF
Hill AFB, UT428618430-SEP-98Final SERDP Treatability Studies Data Comparison Report Operable Unit 1 Hill Air Force Base, Utah September 1998Montgomery WatsonHill AFB. UTWP002|WP080S03f034.pdf
Hill AFB, UT428668301-JUL-98SERDP Treatability Studies Data Validation Report, Operable Unit 1 Hill Air Force Base, Utah July 1998Montgomery WatsonHill AFBFT009|FT081|LF001|LF003|OT014|WP002|WP080S03f033.PDF
Hill AFB, UT4287011931-JAN-95Seventh Monitoring Round Data Evaluation for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, Utah January 1995Montgomery Watson, Inc.Hill AFB, UTFT009|FT081|LF001|LF003|OT014|WP002|WP080S04f028.PDF
Hill AFB, UT4287111530-NOV-94Sixth Monitoring Round Data Evaluation for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, Utah November 1994Montgomery Watson, Inc.Hill AFB, UTFT009|FT081|LF001|LF003|OT014|WP002|WP080S04f024.PDF
Hill AFB, UT428734513-MAR-96Report on Soil - Bentonite/Site Liquid Compatibility Hill Air Force Base, UtahHaley and Aldrich, Inc.Montgomery WatsonS02f021.PDF
Hill AFB, UT4287513116-MAR-87Soil Testing Landfill Cell #3 and Chem Pits #1 and #2, Hill Air Force Base, UtahJames E. Nordquist, Donald E. BresslerChen and AssociatesScott J. LamondDirectorate of Contracting and Manufacturing OO-ALC/PMKSC, Hill AFBLF003|WP002s05f048.PDF
Hill AFB, UT428766931-JAN-96Final Soil Vapor Extraction and Bioventing Treatability Study Evaluation Report for Operable Unit 1 Hill Air Force Base, UtahMontgomery WatsonHill AFB, UTFT081|WP002S03f011.PDF
Hill AFB, UT4287814731-MAR-94Soil Vapor Extraction and Bioventing Treatability Study Work Plan for OU1 (IRP Sites LF01, LF03, WP02, FT09, FT81, OT14, WP80)FT009|FT081|LF001|LF003|OT014|WP002|WP080S05f073.PDF
Hill AFB, UT4287916731-MAR-94Soil Vapor Extraction and Bioventing Treatability Study Work Plan for OU1(IRP Sites LF01, LF03, WP02, FT09, FT81, OT14, WP80)Hill AFBFT009|FT081|LF001|LF003|OT014|WP002|WP080s15f164.PDF
Hill AFB, UT428808131-MAR-98Final South Weber No. 2 Monitoring Well Installation Work Plan for Operable Unit 1 Hill Air Force Base, UtahCH2M HillEnvironmental Management DirectorateFT009|FT081|LF001|LF003|WP002|WP080S03f031.PDF
Hill AFB, UT428812215-APR-97OU1 13th Monitoring Round 1997, Analytical Data, March 10 - 24, 1997Kevin XieApplied Physics and Chemistry LaboratoryJennifer HeMontgomery WatsonS01f017.PDF
Hill AFB, UT4288515117-AUG-94Summary of Qualifications OU1 Infiltration/Collection System Phase I and Phase II Hill Air Force Base, Utah August 1994Howard Saxion, Christopher D. MikellCH2M HILLSharon K. PriceOO-ALC/PKOE, Hill AFBS05f078.PDF
Hill AFB, UT4288714830-APR-94Final Surfactant Flushing Treatability Study Work Plan for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, FT81, OT14, WP80) Hill Air Force Base, Utah - April 1994Montgomery Watson, Inc.Hill AFB, UTFT009|FT081|LF001|LF003|OT014|WP002|WP080S05f074.PDF
Hill AFB, UT4289016525-OCT-95Technical Memorandum for Manhole #4 and #5 Investigation, Three - Mile - Long Dual Wall Contaminated Groundwater PipelineSteve GodardRadian CorporationPaul BettsOO-ALC/EMRs14f045.PDF
Hill AFB, UT428924622-MAR-96Technical Review of Operable Unit 1 Groundwater Containment System Hill Air Force Base, UtahRobert D. Mutch, Jr.Eckenfelder, Inc.Kevin W. BourneDepartment of the Air Force, Environmental Management DirectorateFT009|FT081|LF001|LF003|WP002|WP080S02f022.pdf
Hill AFB, UT428943130-NOV-95Tenth Monitoring Round Data Evaluation for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, Utah November 1995Montgomery Watson, Inc.Hill AFB, UTFT009|FT081|LF001|LF003|OT014|WP002|WP080S02f006.pdf
Hill AFB, UT4289916604-OCT-93Draft Final Treatability Study Work Plan and Site Safety Plan for Site 870/Patriot Hills and Operable Unit 1 Hill Air Force Base, Utah (IRP Site Codes ST61, FT09, and LF03) October 1993Montgomery WatsonOO-ALC/EMRFT009|LF003|ST061s15f079.PDF
Hill AFB, UT4290112924-JUL-89Decision Document for Fire Training Area 1, U.S. Air Force Installation Restoration Program Hill Air Force Base, UtahScience Applications International CorporationU.S. Department of EnergyFT009ROD_129S05f046.PDF
Hill AFB, UT4290316225-JUN-97Final Work Plan for Demonstration of Bioventing of Non-Petroleum Hydrocarbon Contamination at Hill Air Force Base, UtahBattelle Columbus OperationsUSAFWP002S06f115.PDF
Hill AFB, UT4290612811-APR-88Installation Restoration Program Remedial Investigation/Feasibility Study OU1 (Landfills 3 and 4 and Chemical disposal Pits 1 and 2) Hill Air Force Base, Utah, WORK PLANScience Applications International CorporationU.S. Department of Energy/HILL AFBLF001|LF003|WP002S05f045.PDF
Hill AFB, UT4307732530-JUN-92100 .pct Design Industrial Waste Treatment Plant Modifications Construction Specifications Hill AFB, UtahRadian CorporationAFCEE/ESR/OO-ALC/EMSS021|WP007S06f039.pdf
Hill AFB, UT4308152231-OCT-953-Mile Pipeline Design Options ReportRadian CorporationPaul BettsOO-ALC/EMRWP006S06f089.PDF
Hill AFB, UT4308434028-FEB-94Addendum to the Feasibility Study for Operable Unit 2 Hill Air Force Base, UtahCH2M HILLSS021|WP007S06f057.pdf
Hill AFB, UT43088344.130-APR-94Addendum to the Remedial Investigation Report for Operable Unit 2 Sites WP07, SS21 - Volume 1 of 3 - ReportRadian CorporationAFCEE/ESRSS021|WP007S06f062.PDF
Hill AFB, UT43093344.230-APR-94Addendum to the Remedial Investigation Report for Operable Unit 2 Sites WP07, SS21 - Volume 2 of 3 - Appendices A-JRadian CorporationAFCEE/ESRSS021|WP007S06f063.pdf
Hill AFB, UT43098344.330-APR-94Addendum to the Remedial Investigation Report for Operable Unit 2 Sites WP07, SS21 - Volume 3 of 3 - Appendices K-ORadian CorporationAFCEE/ESRSS021|WP007S06f064.pdf
Hill AFB, UT4310332931-AUG-92Addendum to the Work Plan for Operable Unit 2 Sites WP07, SS21Radian CorporationSS021|WP007S06f043.pdf
Hill AFB, UT4310622231-MAR-03Final Report Analytical Data Validation Report for the Fall 2002 Operable Unit 1 Groundwater Monitoring Point Sampling Round Hill Air Force Base, Utah Long-Term Groundwater MonitoringCH2M HILLAFCEE/Environmental Management DirectorateFT009|FT081|LF001|LF003|OT014|WP002|WP080OU1_ADVR_Fall02_GWMPSR_March2003.pdf
Hill AFB, UT4311024331-MAR-04Final Report Analytical Data Validation Report for the Fall 2003 Operable Unit 1 Groundwater Monitoring Point Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring ProjectCH2M HILLEnvironmental Management Directorate, Hill AFBFT009|FT081|LF001|LF003|OT014|WP002|WP080OU1_ADVR Fall03_March 2004.pdf
Hill AFB, UT4311423131-MAR-05Final Report Analytical Data Validation Report for the Fall 2004 Operable Unit 1 Groundwater Monitoring Point Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring ProjectCH2M HILL75th Air Base WingFT009|FT081|LF001|LF003|WP002|WP080OU1_04 Fall_ADVR_GWMP_March 2005.pdf
Hill AFB, UT4311824401-MAR-06Final Report Analytical Data Validation Report for the Fall 2005 Operable Unit 1 Groundwater Monitoring Point Sampling Round Hill air Force Base, Utah Long-Term Groundwater Monitoring ProjectCH2M HILL75 CEG/CEVRFT009|FT081|LF001|LF003|OT014|WP002|WP080OU1_ADVR Fall 05_March 2006.pdf
Hill AFB, UT4312322001-JUL-02Final Report Analytical Data Validation Report for the Spring 2002 Operable Unit 1 Seep, Spring, and Surface Water Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring ProjectCH2M HILLAFCEE/Environmental Management DirectorateFT009|FT081|LF001|LF003|OT014|WP002|WP080OU1_ADVR_Spr02_July2002.pdf
Hill AFB, UT4312523501-AUG-03Final Report Analytical Data Validation Report for the Spring 2003 Operable Unit 1 Seep, Spring, and Surface Water Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring ProjectCH2M HILLEnvironmental Management DirectorateFT009|FT081|LF001|LF003|OT014|WP002|WP080OU1_ADVR 03 Spr_SSSW_August 2003.pdf
Hill AFB, UT4312622931-MAR-05Final Report Analytical Data Validation Report for the Spring 2004 Operable Unit 1 Seep, Spring, and Surface Water Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring ProjectCH2M HILL75th Air Base WingFT009|FT081|LF001|LF003|WP002|WP080OU1_04Spring ADVR_GWMP_March 2005.pdf
Hill AFB, UT4312923901-JUL-05Final Report Analytical Data Validation Report for the Spring 2005 Operable Unit 1 Seep, Spring, and Surface Water Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring ProjectCH2M HILL75 CEG/CEVRFT009|FT081|LF001|LF003|WP002|WP080OU1 Spr05_ADV_SSSW SR_July 2005.pdf
Hill AFB, UT4313126131-JUL-06Final Report Analytical Data Validation Report for the Spring 2006 Operable Unit 1 Seep, Spring, and Surface Water Sampling Round Hill Air Force Base, Utah Operable Unit 1 Groundwater Monitoring ProjectCH2M HILL75th CEG/CEVRFT009|FT081|LF001|LF003|OT014|WP002|WP080OU1_ADVR Spr06 SSSWSR_July 2006.pdf
Hill AFB, UT4313522131-MAR-03Final Report Analytical Data Validation Report for the Summer 2002 Operable Unit 1 Groundwater Monitoring Point Sampling Round Hill Air Force Base, Utah Long-Term Groundwater MonitoringCH2M HILLAFCEE/Environmental Management DirectorateFT009|FT081|LF001|LF003|OT014|WP002|WP080OU1_ADVR_Sum02_March 2003.pdf
Hill AFB, UT4313924801-MAR-04Final Report Analytical Data Validation Report for the Summer 2003 Operable Unit 1 Groundwater Monitoring Point Sampling Round, Hill Air Force Base, Utah Long-Term Groundwater Monitoring ProjectCH2M HILL75th Air Base WingFT009|FT081|LF001|LF003|OT014|WP002|WP080OU1_ADVR sum03 GWMPSR_March 2004.pdf
Hill AFB, UT4314423031-MAR-05Final Report Analytical Data Validation Report for the Summer 2004 Operable Unit 1 Groundwater Monitoring Point Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring ProjectCH2M HILL75th Air Base WingFT009|FT081|LF001|LF003|WP002|WP080OU1_04 Summer_ADVR_GWMPS_March 2005.pdf
Hill AFB, UT4315024101-DEC-05Final Report Analytical Data Validation Report for the Summer 2005 Operable Unit 1 Groundwater Monitoring Point Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring ProjectCH2M HILL75 CEG/CEVRFT009|FT081|LF001|LF003|OT014|WP002|WP080OU1_ADVR Sum05 GWMP_December 2005.pdf
Hill AFB, UT4315426415-DEC-97OU2 Property Owners Data Packages for the September 1997 Sampling EventChris MikellCH2M HILLSteve HickenOO-ALC/EMRs05f001.pdf
Hill AFB, UT4315717501-JAN-11AquaTrack Survey Hill AFB OU1Hydro Geophysics, IncLF001|LF003s15f175.PDF
Hill AFB, UT4315935201-AUG-94Aquifer Data Evaluation Report Operable Unit 2Radian CorporationOO-ALC/EMRWP007S06f073.PDF
Hill AFB, UT4316151601-FEB-95Aquifer Pumping Test Report/DNAPL Recovery Optimization Source Recovery System Interim Remedial Action, OU2Radian CorporationOO-ALC/EMRSS021|WP007S06f081.PDF
Hill AFB, UT4316332431-MAR-92Draft Assembled Alternatives Screening Memorandum for Operable Unit 2 Site WP07 Hill AFB, UtahRadian CorporationBarbara Smith TownsendAFCEE/ESRWP007S06f037.pdf
Hill AFB, UT4316623212-NOV-91Draft Final Baseline Risk Assessment for Operable Unit 1 Hill Air Force Base, Utah November 1991Gary A. ColganJames M. MontgomeryTaunya HoweU.S. Army Corps of EngineersFT009|LF001|LF003|OT014|WP002OU1_BRA_November 1991.pdf
Hill AFB, UT43169322.131-MAR-92Final Baseline Risk Assessment for Operable Unit 2 Sites WP07, SS21 Hill AFB - Volume 1 - ReportRadian CorporationAFCEE-ESO/ERT/OO-ALC/EMSS021|WP007S06f035.pdf
Hill AFB, UT43172322.231-MAR-92Final Baseline Risk Assessment for Operable Unit 2 Sites WP07, SS21 Hill AFB - Volume 2 - AppendicesRadian CorporationAFCEE-ESO/ERT/OO-ALC/EMSS021|WP007S06f036.pdf
Hill AFB, UT4317722315-NOV-04Calendar Year 2004 Basewide Monitoring and Maintenance Program Operable Unit 1 Off-Base Soil and Sediment Sampling Letter ReportSandy RheaCH2M HILLShannon SmithOO-ALC/EMRFT009|FT081|LF001|LF003OU1_CY04BWMMP_OBSSSltrRpt_November 2004.pdf
Hill AFB, UT4317820231-JAN-02Canyon Meadows Subdivision Water Sampling Results Hill Air Force Base, UtahMichael A. CoxCH2M HILLJeffery WatkinsOO-ALC/EMROU1_CanyonMeadows_Jan2002.pdf
Hill AFB, UT4318027230-MAR-98Complex Resistivity Geophysics Demonstration Task 1X ReportDr. Gary Olhoeft, David WardwellMission Research CorporationSS021|WP007S05f010.pdf
Hill AFB, UT4318429830-JUN-90Conceptual Design Report, Source Recovery and Groundwater Pre-Treatment System at Operable Unit 2 Hill Air Force Base, UtahRadian CorporationAFOEHLWP007S06f007.PDF
Hill AFB, UT4318528730-JUN-99Construction Report Spring U2-326 Ground Water Extraction Trench Remedial Action, June 1999Hill AFBWP007S05f031.PDF
Hill AFB, UT4318828530-APR-99Construction Report Spring U2-326 Ground Water Extraction Trench Remedial Action, April 1999CH2M HillHill AFBWP007S05f028.PDF
Hill AFB, UT4319128428-FEB-99Construction Report, Schedule B Remedial Action North Interceptor Trench and Air Stripper Treatment Plant OU2HAFBSS021|WP007S05f027.PDF
Hill AFB, UT4319533824-NOV-93Construction Specifications for Non-Source Area Seeps and Springs Collection and Treatment System Improvements at OU2Radian CorporationSS021|WP007S06f053.pdf
Hill AFB, UT4319817828-FEB-98Data Validation Summary Report for the Sixteenth Sampling Round at Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT02, OT1, FT81, and WP80) Hill Air Force Base, UtahMontgomery Watson, Inc.Hill AFBFT009|FT081|LF001|LF003|OT014|WP002|WP080S03f030.PDF
Hill AFB, UT4320326715-JAN-98Demonstration of Surfactant-Enhanced Aquifer Remediation of Chlorinated Solvent DNAPL at Operable Unit 2Intera, Inc.AFCEE, Technology Transfer Division/OO-ALC/EMRWP007S05f005.PDF
Hill AFB, UT4320926827-FEB-98Dense Nonaqueous Phase Liquid (DNAPL) Source Delineation Project Work Plan Operable Unit 2URS Consultants, Inc., Duke Engineering and ServicesAFCEE/Ogden Air Logistics CenterSS021|WP007S05f006.pdf
Hill AFB, UT4321127725-NOV-98Draft-Final Design Data Collection Work Plan Cometabolic Bioventing Field Test, Operable Unit 2Radian International, Duke Engineering and ServicesPaul DePercinLand Remediation and Pollution Control Division, National Risk Management Research Laboratory, USEPAWP007S05f017.pdf
Hill AFB, UT4321417628-FEB-96Design Submittal Technical Specifications for the Ground-Water Containment System at Operable Unit 1Montgomery Watson, IncAFLC, Hill AFBS03f012.PDF
Hill AFB, UT4321751818-MAY-95DLOG3D Application at Operable Unit 2Nathan RichUtah State University, Department of Civil and Environmental EngineeringKyle KirchnerOO-ALC-EMRS06f084.PDF
Hill AFB, UT4321928930-SEP-99DNAPL Extraction Report Griffith Pool Operable Unit 2, September 1999Stephen T. GodardRradian International, LLCDr. Jon GinnOO-ALC/EMR, Hill AFBWP007S05f033.PDF
Hill AFB, UT4322133631-AUG-93Engineering Evaluation/Cost Analysis for Operable Unit 2, Sites WP07, SS21 Non-Source Area Seeps and SpringsRadian CorporationHill AFBSS021|WP007S06f051.pdf
Hill AFB, UT4322452001-JUN-95Environmental Assessment for Operable Unit 2 (IRP Sites WP07 and SS21) Environmental Baseline Survey, and Finding of No Significant ImpactHill AFBSS021|WP007S06f087.PDF
Hill AFB, UT4322718402-SEP-94Ethanol Flushing Treatability Study at OU1Kristine S. BurgessMontgomery Watson, Inc.Kevin BourneOO-ALC/EMR Hill AFB, UTFT009|FT081|LF001|LF003|WP002|WP080s18f020.PDF
Hill AFB, UT4323033130-NOV-92Draft Evaluation of Treatment System Alternatives for the OU2 Off-Base Area Seeps and SpringsRadian CorporationWP007S06f046.pdf
Hill AFB, UT4323225031-JUL-06Final Explanation of Significant Difference for Operable Unit 1 Hill Air Force Base, Utah75th CEGFT009|FT081|LF001|LF003|WP080OU 1_ESD_July 2006.pdf
Hill AFB, UT43233333.130-APR-93Feasibility Study Report for Operable Unit 2 Sites WP07, SS21 - Volume 1 of 2 - ReportRadian CorporationAFCEE/ESRSS021|WP007S06f048.pdf
Hill AFB, UT43237333.230-APR-93Feasibility Study Report for Operable Unit 2 Sites WP07, SS21 - Volume 2 of 2 - AppendicesRadian CorporationAFCEE/ESRSS021|WP007S06f049.pdf
Hill AFB, UT4324118730-AUG-94Final Soil Vapor Extraction and Bioventing Treatability Study Work Plan for OU1 (IRP Sites LF01, LF03, WP02, FT09, FT81, OT14, and WP80) Hill Air Force Base, Utah August 1994Montgomery WatsonHill AFB, UTFT009|FT081|LF001|LF003|OT014|WP002|WP080s15f163.PDF
Hill AFB, UT4324550021-APR-03First Quarter of 2003 Effluent Discharge Report for Discharges to the Shallow Groundwater and Storm Drain Operable Unit 6Staci HillCH2M HILLPaul BettsOO-ALC/EMROU6_1Q EDR_April 2003.pdf
Hill AFB, UT4324631028-FEB-91Final Focused Feasibility Study for Operable Unit 2 Hill Air Force Base, UtahEdward Heyse, Robert JamesEnvironmental Restoration Division, Environmental Management DirectorateWP007S06f021.pdf
Hill AFB, UT4324851401-NOV-94Geophysical Electrical Resistance Mapping Report Operable Unit 2Radian CorporationKyle KirchnerOO-ALC/EMRWP007S06f078.PDF
Hill AFB, UT4325027530-SEP-98Griffith Pool Well Field at OU2 Construction Specifications, September 1998Radian InternationalDr. Jon GinnU.S. Air Force, Ogden Air Logistics Center/Environmental ManagementS05f015.pdf
Hill AFB, UT4325352530-APR-96Health and Safety Plan for Demonstration of Surfactant Enhanced Aquifer Remediation of DNAPLs at Hill Air force BaseInteraAFCEEWP007S06f094.PDF
Hill AFB, UT4325823330-APR-05Final Operable Unit 1 High Recharge Contingency Evaluation Hill Air Force Base, UtahURSBarbara Hall75 CEG/CEVORFT009|FT081|LF001|LF003|WP002|WP080OU1_rechargecont_report_April 2005.pdf
Hill AFB, UT4326129531-JAN-89Informal Technical Information Report for Soil Gas Survey Conducted along Perimeter Road and Spoils Area Hill Air Force Base, UtahRadian CorporationSS021|WP007S06f004.pdf
Hill AFB, UT4326521802-FEB-04Inspection Maintenance and Monitoring Reports Operable Unit 1 Landfill Caps 3 and 4 CERCLA Caps Hill Air Force Base, Utah January-December 2003URSOscar TorresOO-ALC/EMRLF001|LF003OU1_ Landfill 3_ 4 IMMR 2003_February2004.pdf
Hill AFB, UT4327130728-FEB-91Installation Restoration Program Superfund Proposed Plan for Interim Action at Operable Unit 2 Hill Air Force Base, UtahHill AFBHill AFBWP007S06f017.pdf
Hill AFB, UT43274296.130-SEP-89Draft Lithologic Logs for Chemical Disposal Pit 3 Hill Air Force Base, Utah Volume 1Radian CorporationLogan VanLeighAFOEHLWP007S06f005.PDF
Hill AFB, UT43277296.230-SEP-89Draft Lithologic Logs for Chemical Disposal Pit 3 Hill Air Force Base, Utah Volume 2Radian CorporationAFOEHLWP007S06f006.PDF
Hill AFB, UT4327829328-FEB-00Long-Term Groundwater Monitoring Project Analytical Data Validation Report for the Fall 1999 Operable Unit 2 Groundwater Monitoring Well Sampling RoundCH2M HILLEnvironmental Management DirectorateS05f037.PDF
Hill AFB, UT4328019001-FEB-01Final Report Analytical Data Validation Report for the Fall 2000 Operable Unit 1 Groundwater Monitoring Well Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring ProjectCH2M HILLEnvironmental Management DirectorateFT009|FT081|LF001|LF003|OT014|WP002|WP080OU1_Fall00GWM_Feb2001.pdf
Hill AFB, UT4328319401-NOV-00Final Report Analytical Data Validation Report for the Spring 2000 Operable Unit 1 Spring, Seep, and Surface Water Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring ProjectCH2M HILLAFCEE/Environmental Management DirectorateFT009|FT081|LF001|LF003|OT014|WP002|WP080OU1_Spring00GWM_Nov2000.pdf
Hill AFB, UT4328520601-MAR-02Final Report Analytical Data Validation Report for the Spring 2001 Operable Unit 1 Seep, Spring, and Surface Water Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring ProjectCH2M HILLAFCEE/Environmental Management DirectorateFT009|FT081|LF001|LF003|OT014|WP002|WP080OU1_SeepSpringSurfaceWate_Sampling_March2002.pdf
Hill AFB, UT4328729231-JAN-00Long-Term Groundwater Monitoring Project Analytical Data Validation Report for the Summer 1999 Operable Unit 2 Groundwater Monitoring Well Sampling RoundCH2M HILLEnvironmental Management DirectorateS05f036.PDF
Hill AFB, UT4328919501-NOV-00Final Report Analytical Data Validation Report for the Summer 2000 Operable Unit 1 Groundwater Monitoring Well Sampling Round, Hill Air Force Base, Utah Long-Term Groundwater Monitoring ProjectCH2M HILLEnvironmental Management DirectorateFT009|FT081|LF001|LF003|OT014|WP002|WP080OU1_Summer00GWM_Nov2000.pdf
Hill AFB, UT4329323609-JUL-03Monitoring Points U1-174 and U1-175 Abandonment ReportCH2M HILLOO-ALC/EMRMP U1-174|MP U1-175U1_ Abandonment U1-174 and U1-175_July 2003.pdf
Hill AFB, UT4329518230-AUG-98Natural Attenuation Evaluation Summary for a Chlorinated Solvent Plume, OU1 Hill AFB, UtahR.Ryan DupontUtah State UniversitySummer Faculty Research ProgramFT009|FT081|LF001|LF003|WP002|WP080s18f018.PDF
Hill AFB, UT4330020101-AUG-01Final Report Operable Unit 1 Fire Training Area 2 No Further Response Action Planned (NFRAP) Decision Document, IRP Site FT081 State of Utah, Department of Environmental Quality, Leaking Underground Storage Tank Site EIIK, Hill Air Force Base, UtahCH2M HILLHill AFB, UTFT081ROD_201OU1_fta2nfrap_Aug2001.pdf
Hill AFB, UT4330220501-FEB-01Final Operable Unit 1 Fire Training Area 2 No Further Response Action Planned (NFRAP) Decision Document, IRP Site FT81, State of Utah, Department of Environmental Quality, Leaking Underground Storage Tanks Site EIIK, Hill Air Force Base, UtahCH2M HILLEnvironmental Management DirectorateFT081ROD_205OU1_NFRAPFT81_Feb2001.pdf
Hill AFB, UT4330521031-AUG-99Operable Unit 1 Groundwater Pre-Design Summary Investigation Report Volume 1- ReportCH2M HILLEnvironmental Management DirectorateOU1_PreDesignInv_Aug1999.pdf
Hill AFB, UT4330957.230-AUG-99Final Operable Unit 1 Groundwater Pre-Design Summary Investigation Report - Volume 2 - Appendices Hill Air Force Base, UtahCH2M HILLEnvironmental Management DirectorateFT009|FT081|LF001|LF003|WP002|WP080S02F034.pdf
Hill AFB, UT4331919131-OCT-99Final Operable Unit 1 Monitoring Point Abandonment Work Plan Hill Air Force Base, UtahCH2M HILLEnvironmental Management DirectorateFT009|FT081|LF001|LF003|WP002|WP080OU1_MonAbandWP_Oct1999.pdf
Hill AFB, UT4332122619-MAY-94Operable Unit 1 Response to Draft Comments Volume 2 of 2 - FS, PP, RS, ROD, RD, EE-CA, LF Investigation 1996-1998 and Pre-Design Data Collection 1996-1998 - 17 Sep 1993 through 1 Jan 1999Montgomery Watson, Inc.Kent P. GaryDERR, Utah DEQOperable Unit 1 Response to Comments on the Draft Feasibility Study Volume 2 of 2.pdf
Hill AFB, UT4332422731-MAY-00Operable Unit 1 Response to Draft Comments Volume 1 of 2 - WP, RI, BRA - 25 Oct 1991 through 30 Apr 1997CH2M HILLEnvironmental Management DirectorateOperable Unit 1 Response to Comments Volume 1 of 2.pdf
Hill AFB, UT4332827807-DEC-98Operable Unit 2 Property Owners Data Packages for September 1998 Groundwater Sampling EventCH2M HILLDr. Jon GinnOO-ALC/EMRWP007S05f018.pdf
Hill AFB, UT4333133931-JAN-94Operable Unit 2 Source Removal System and Industrial Waste Treatment Plan Modifications Construction ReportRadian CorporationOO-ALC/EMRS06f056.pdf
Hill AFB, UT4333219830-AUG-01Final Report OU 1 Geosystem Model and Feasibility SimulationsDuke Engineering and ServicesCH2M HILLFT009|FT081|LF001|LF003|WP002|WP080OU1_GeoSys_Aug2001.pdf
Hill AFB, UT4333719922-MAR-94OU1 4th Qtr. 1993 Analytical Data, January 31 through March 16, 1994Enseco - CRLMontgomery Watson, Co.S04f014.pdf
Hill AFB, UT4333917901-APR-98OU1 Treatability Study analytical Results July 1997 - April 1998Quanterra, IncMontgomery Watson, Inc.s18f002.PDF
Hill AFB, UT4334430805-MAR-91Public Meeting Interim Remedial Action for OU2 South Weber Elementary School March 5, 1991 7 PMHill AFBS06f019.pdf

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .