Hill_AFB__PWS_Enclosure_2.2_List_of_Available_GFI_in_HAFB_Administrative_Record.xlsx
XLSX spreadsheet 388 KB Posted
- Attached to
- Optimized Remediation Contract for Hill AFB, UT
- Solicitation number
- W91238-19-R-0050
About this file
This document is a draft solicitation for an optimized remediation contract at Hill Air Force Base in Utah. The solicitation seeks environmental remediation and assessment services at 25 Installation Restoration Program and Military Munitions Response Program sites over a 10-year period. Services include environmental services, minor construction, and architecture and engineering work. Responses are requested from small and other-than-small businesses by March 29, 2019. The contract type will be firm-fixed-price. At least 50% of costs must be for employee expenses. Joint ventures may apply. The solicitation has not yet been issued and the acquisition source has not been determined.
Hill AFB _PWS Enclosure 2.2 List of Available GFI in HAFB Administrative Record
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Export Worksheet
| Installation Name | AR File | Installation File | Document Date | Subject/Title | Author | Author Affiliation | Recipient | Recipient Affiliation | Site # | Rod # | Image Number | |
| Hill AFB, UT | 42533 | 144 | 31-JAN-94 | 100 Percent Submittal Landfill Removal Action Flowchart and Detailed Cost Estimating Model for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, Utah January 1994 | Montgomery Watson, Inc. | U.S. Air Force Logistics Command | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S05f068.PDF | ||||
| Hill AFB, UT | 42535 | 59 | 05-JUN-96 | OU1 12th Monitoring Round 1996, Analytical Data, May 13 - 17, 1996 | Environmental Science and Engineering, Inc. | Montgomery Watson, Inc. | s03f001.PDF | |||||
| Hill AFB, UT | 42537 | 61 | 08-JUL-97 | OU1 14th Monitoring Round 1997, Analytical Data, April 7 through June 12, 1997 | Applied Physics and Chemistry Laboratory | Montgomery Watson, Inc. | S03f003.pdf | |||||
| Hill AFB, UT | 42558 | 62 | 15-JUL-97 | OU1 14th Monitoring Round 1997, Analytical Data, June 16 through 23, 1997 | Applied Physics and Chemistry Laboratory | Montgomery Watson, Inc. | S03f004.pdf | |||||
| Hill AFB, UT | 42560 | 63 | 17-JUL-97 | OU1 14th Monitoring Round 1997, Analytical Data, June 24 through 26, 1997 | Applied Physics and Chemistry Laboratory | Montgomery Watson, Inc. | S03f005.pdf | |||||
| Hill AFB, UT | 42562 | 163 | 12-MAR-96 | Comments for the Comprehensive Remedial Investigation Report for Operable Unit 1 | S10bf002.PDF | |||||||
| Hill AFB, UT | 42564 | 134 | 15-JAN-90 | Final Addendum A - E Quality Assurance Project Plan for Operable Unit 1 Hill Air Force Base, Utah January 1990 Remedial Investigation/Feasibility Study | James M. Montgomery, Consulting Engineers, Inc. | U.S. Army Corps of Engineers | LF001|LF003|WP002 | S05f054.PDF | ||||
| Hill AFB, UT | 42565 | 133 | 15-JAN-90 | Final Addendum, A-E Work Plan and Safety, Health and Emergency Response Plan for Operable Unit 1 Hill Air Force Base, Utah Remedial Investigation/Feasibility Study | James M. Montgomery, Consulting Engineers, Inc. | U.S. Corps of Engineers | LF001|LF003|WP002 | S05f053.PDF | ||||
| Hill AFB, UT | 42567 | 130 | 31-DEC-76 | An Investigation of Ground and Surface Water Pollution in the vicinity of the deactivated Landfill Burnpit, Hill Air Force Base, Utah | James T. Goodwin | USAF | FT009|FT081|LF001|LF003|WP002|WP080 | S05f047.pdf | ||||
| Hill AFB, UT | 42569 | 86 | 31-MAR-99 | Analytical Data Report for the Seventeenth Groundwater Sampling Round at Operable Unit 1 Hill Air Force Base, Utah March 1999 | CH2M Hill | Environmental Management Directorate | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S03f037.PDF | ||||
| Hill AFB, UT | 42571 | 87 | 30-APR-99 | Analytical Data Validation Report for the Eighteenth Groundwater Sampling Round at Operable Unit 1 Hill Air Force Base, Utah April 1999 | CH2M Hill | Environmental Management Directorate | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S03f039.PDF | ||||
| Hill AFB, UT | 42573 | 88 | 30-NOV-99 | Analytical Data Validation Report for the Spring 1999 Operable Unit 1 Spring, Seep, and Surface Water Sampling Round | CH2M HILL | Environmental Management Directorate | S03f040.PDF | |||||
| Hill AFB, UT | 42575 | 56 | 31-MAR-99 | Analytical Data Validation Summary Report for Operable Unit 1 Investigations in 1997 and 1998 Hill Air Force Base, Utah | CH2M Hill | Environmental Management Directorate | LF001|LF003 | S02f032.pdf | ||||
| Hill AFB, UT | 42577 | 143 | 30-NOV-93 | Preprint Final Remedial Investigation Report Addendum for Operable Unit 1 Hill Air Force Base, Utah (IRP Sites LF01, LF03, WP02, FT09, FT81 OT14, WP80) - Volume 2 - Appendix G - Final Baseline Risk Assessment Addendum Dec 93, Nov 93 (cover) | Montgomery Watson, Inc. | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S05f067.PDF | |||||
| Hill AFB, UT | 42579 | 64.1 | 31-DEC-95 | Comprehensive Remedial Investigation Report for Operable Unit 1 (IRP Site LF01, LF03, WP02, FT09, OT14, FT81, and WP80) - Volume 1 - Report | Montgomery Watson, Inc. | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S03f006.PDF | |||||
| Hill AFB, UT | 42600 | 64.2 | 31-DEC-95 | Comprehensive Remedial Investigation Report for Operable Unit 1 (IRP Site LF01, LF03, WP02, FT09, OT14, FT81, and WP80) - Volume 2 - Appendix A | Montgomery Watson, Inc. | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S03f007.pdf | |||||
| Hill AFB, UT | 42601 | 64.3 | 31-DEC-95 | Comprehensive Remedial Investigation Report for Operable Unit 1 (IRP Site LF01, LF03, WP02, FT09, OT14, FT81, and WP80) - Volume 3 - Appendices B through I | Montgomery Watson, Inc. | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S03f008.pdf | |||||
| Hill AFB, UT | 42604 | 64.4 | 31-DEC-95 | Comprehensive Remedial Investigation Report for Operable Unit 1 (IRP Site LF01, LF03, WP02, FT09, OT14, FT81, and WP80) - Volume 4 - Appendices J through P | Montgomery Watson, Inc. | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S03f009.pdf | |||||
| Hill AFB, UT | 42606 | 64.5 | 31-DEC-95 | Comprehensive Remedial Investigation Report for Operable Unit 1 (IRP Site LF01, LF03, WP02, FT09, OT14, FT81, and WP80) - Volume 5 - Appendices Q through AA | Montgomery Watson, Inc. | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S03f010.pdf | |||||
| Hill AFB, UT | 42608 | 132 | 01-AUG-89 | Data Analysis Report for Operable Unit One, U.S. Air Force Installation Restoration Program Hill Air Force Base, Utah | Science Applications International Corporation | U.S. Department of Energy | LF001|LF003|WP002 | S05f052.PDF | ||||
| Hill AFB, UT | 42609 | 52 | 03-NOV-97 | Data Validation Summary Report for the Fifteenth Sampling Round at Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT02, OT014, FT91, and WP080) Hill Air Force Base, Utah | Montgomery Watson | Hill AFB, UT | FT009|FT081|LF001|LF003|OT014|OT033|WP002|WP080 | S02f028.pdf | ||||
| Hill AFB, UT | 42611 | 60 | 31-AUG-97 | Data Validation Summary Report for the Fourteenth Sampling Round at Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT02, OT1, FT81, and WP80) Hill Air Force Base, Utah | Montgomery Watson, Inc. | Hill AFB, UT | FT009|FT081|LF001|LF003|OT014|OT033|WP002|WP080 | S03f002.pdf | ||||
| Hill AFB, UT | 42613 | 42 | 31-MAY-97 | Data Validation Summary Report for the Thirteenth Sampling Round at Operable Unit 1 (IRP Sites LF01, LF03, WP02, OT014, FT81, and WP80) Hill Air Force Base, Utah | Montgomery Watson | Hill AFB, UT | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S02f018.PDF | ||||
| Hill AFB, UT | 42615 | 79.2 | 25-JAN-98 | Final Report Demonstration of Bioventing for Remediation of Chlorinated Solvent Contamination at HAFB, Ogden, Utah - Volume II - Data Package | Battelle | USAF, Air Force Research Laboratory | WP002 | S03f027.PDF | ||||
| Hill AFB, UT | 42617 | 79.1 | 25-JAN-98 | Final Report Demonstration of Bioventing for Remediation of Chlorinated Solvent Contamination at HAFB, Ogden, Utah - Volume I | Battelle | USAF, Air Force Research Laboratory | WP002 | S03f028.PDF | ||||
| Hill AFB, UT | 42619 | 138.1 | 14-FEB-92 | Draft Final Remedial Investigation Report for Operable Unit 1 Hill Air Force Base, Utah (IRP Sites LF01, LF03, WP02, FT09, OT14) - Volume 1 - Report February 1992 | James M. Montgomery, Consulting Engineers, Inc. | U.S. Army Corps of Engineers | FT009|FT081|LF001|LF003|OT014|WP002 | S05f059.PDF | ||||
| Hill AFB, UT | 42622 | 138.2 | 14-FEB-92 | Draft Final Remedial Investigation Report for Operable Unit 1 Hill Air Force Base, Utah (IRP Sites LF01, LF03, WP02, FT09, OT14) Volume 2 Appendices February 1992 | James M. Montgomery, Consulting Engineers, Inc. | U.S. Army Corps of Engineers | FT009|FT081|LF001|LF003|OT014|WP002 | s05f060.PDF | ||||
| Hill AFB, UT | 42623 | 122 | 01-MAY-95 | Eighth Monitoring Round Data Evaluation for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, Utah | Montgomery Watson, Inc. | Hill AFB | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S04f032.PDF | ||||
| Hill AFB, UT | 42625 | 36 | 01-MAY-96 | Eleventh Sampling Round Data Evaluation for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, FT81, OT14, and WP80) Hill Air Force Base, Utah | Montgomery Watson, Inc. | Hill AFB, UT | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S02f011.pdf | ||||
| Hill AFB, UT | 42628 | 170 | 30-APR-95 | Draft Engineering Evaluation/Cost Analysis of Containment Alternatives for Operable Unit 1 Hill Air Force Base, Utah April 1995 | Montgomery Watson, Inc | Hill AFB | FT009|FT081|LF001|LF003|WP002|WP080 | s15f167.PDF | ||||
| Hill AFB, UT | 42630 | 152 | 30-NOV-94 | Final Environmental Assessment and Baseline Survey for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, Utah November 1994 | Montgomery Watson, Inc | Hill AFB, UT | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S05f080.PDF | ||||
| Hill AFB, UT | 42631 | 153 | 28-APR-95 | Final Existing Containment System Evaluation and Pre-Design Data Report for Operable Unit 1 Hill Air Force Base, Utah April 1995 | Montgomery Watson, Inc. | OO-ALC/EMR | FT081|LF001 | S05f081.PDF | ||||
| Hill AFB, UT | 42634 | 77 | 01-JAN-98 | Final Feasibility Study Report for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, OT014, FT09, OT14, FT91, and WP80) Hill Air Force Base, Utah | Hill AFB, UT | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S03f025.PDF | |||||
| Hill AFB, UT | 42636 | 157 | 31-OCT-95 | Final Fall 1995 Field Investigation Work Plan for Operable Unit 1, Hill Air Force Base, Utah DO 5075 (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) October 1995 | Montgomery Watson, Inc | Hill AFB, UT | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S05f085.PDF | ||||
| Hill AFB, UT | 42637 | 168 | 31-MAR-97 | Final Field Manual for Site Activities at Operable Unit 1, Quality Assurance Project Plan, Health and Safety Plan, and Field Procedures Hill Air Force Base, Utah | CH2M HILL | Hill AFB | LF001|LF003 | s15f165.PDF | ||||
| Hill AFB, UT | 42639 | 111 | 31-AUG-94 | Fifth Monitoring Round Data Evaluation for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, Utah August 1994 | Montgomery Watson, Inc. | Hill AFB, UT | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S04f020.pdf | ||||
| Hill AFB, UT | 42659 | 97 | 31-DEC-93 | First Quarter Data Evaluation for 1993 Ground-Water and Surface Water Sampling for Operable Unit 1, Hill Air Force Base, Utah (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Dec 93 | Montgomery Watson, Inc. | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S04f004.PDF | |||||
| Hill AFB, UT | 42679 | 106 | 31-MAY-94 | Fourth Quarter Data Evaluation for 1993 Ground-Water and Surface Water Sampling for Operable Unit 1 (IRP Sties LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, Utah - May 1994 | Montgomery Watson, Inc. | Hill AFB, UT | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S04f015.pdf | ||||
| Hill AFB, UT | 42699 | 121 | 21-MAR-95 | OU1 8th Monitoring Round 1995 Analytical Data, February 2 through February 17, 1995 | Quanterra Environmental Services | Montgomery Watson, Inc. | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S04f031.PDF | ||||
| Hill AFB, UT | 42700 | 160 | 28-FEB-88 | Health and Safety Plan February 1988 - October 1988 Installation Restoration Program Remedial Investigation and Feasibility Study (RI/FS) Chemical Disposal Pit 3, Hill Air Force Base, Utah | Radian Corporation | HQ AFLC/DEV/USAFOEHL | WP007 | S06f002.PDF | ||||
| Hill AFB, UT | 42702 | 159 | 28-FEB-88 | Quality Assurance Project Plan February 1988 - October 1988 Installation Restoration Program Remedial Investigation and Feasibility Study (RI/FS) Chemical Disposal Pit 3, Hill Air Force Base, Utah | Radian Corporation | HQ AFLC/DEV/USAFOEHL | WP007 | S06f001.PDF | ||||
| Hill AFB, UT | 42704 | 161 | 31-MAY-88 | Work Plan May 1988 - June 1989 Installation Restoration Program Remedial Investigation and Feasibility Study (RI/FS) Work Plan Chemical Disposal Pit 3, Hill Air Force Base, Utah | Radian Corporation | HQ AFLC/DEV/USAFOEHL | WP007 | S06f003.PDF | ||||
| Hill AFB, UT | 42705 | 41 | 31-AUG-95 | Interim Report, Evaluation of Bench Test Results for the Surfactant Flushing Treatability Study at Operable Unit 1 | Applied Physics and Chemistry Laboratory | Montgomery Watson | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S02f017.PDF | ||||
| Hill AFB, UT | 42718 | 164 | 31-MAY-95 | Investigation Report for the Three - Mile Long Dual - Wall Industrial Wastewater Pipeline Hill Air Force Base, Utah | Radian Corporation | Paul Betts | OO-ALC/EMR | s14f044.PDF | ||||
| Hill AFB, UT | 42720 | 55 | 31-MAR-99 | Final Landfills 3 and 4 Summary Investigation Report Hill Air Force Base, Utah | CH2M Hill | Environmental Management Directorate | LF001|LF003 | S02f031.pdf | ||||
| Hill AFB, UT | 42722 | 124 | 01-AUG-81 | Leachate Investigation at the HAFB Landfill (LF-4) | Calscience Research, Inc. | Department of the Air Force, Headquarters Odgen Air Logistics Center | LF001 | S05f041.PDF | ||||
| Hill AFB, UT | 42723 | 33 | 23-FEB-96 | OU1 11th Monitoring Round 1996, Analytical Data, February 19 through March 6, 1996 | Quanterra Environmental Services | Montgomery Watson, Inc. | S02f008.pdf | |||||
| Hill AFB, UT | 42725 | 92 | 01-FEB-00 | Analytical Data Validation Report for the Fall 1999 Operable Unit 1 Groundwater Monitoring Well Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring Project | CH2M HILL | Environmental Management Directorate | FT009|FT081|LF001|LF003|WP002|WP080 | s03f044.PDF | ||||
| Hill AFB, UT | 42727 | 91 | 01-FEB-00 | Summer 1999 Operable Unit 1 Groundwater Monitoring Well Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring Project | CH2M HILL | Environmental Management Directorate | FT009|FT081|LF001|LF003|WP002|WP080 | s03f043.PDF | ||||
| Hill AFB, UT | 42738 | 53 | 30-NOV-98 | Monitoring Well Installations and Impact Assessment / South Weber No.2 Report | CH2M HILL | Environmental Management Directorate | s02f029.pdf | |||||
| Hill AFB, UT | 42740 | 27 | 30-SEP-95 | Ninth Monitoring Round Data Evaluation for Operable Unit 1 (IPR Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, Utah | Montgomery Watson | Hill AFB, UT | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S02f002.pdf | ||||
| Hill AFB, UT | 42742 | 70 | 31-MAY-96 | Operable Unit 1 and Operable Unit 8 Field Sampling Plan, April 1996 - March 1997 | Montgomery Watson | FT009|FT081|LF001|LF003|OT014|OT033|WP002|WP080 | S03f014.PDF | |||||
| Hill AFB, UT | 42744 | 80 | 05-FEB-98 | Operable Unit 1 Environmental Open House Hill Air Force Base, Utah | Hill AFB | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S03f029.PDF | |||||
| Hill AFB, UT | 42746 | 57.1 | 31-AUG-99 | Operable Unit 1 Groundwater Pre-Design Summary Investigation Report - Volume 1 - Report | CH2M HILL | Environmental Management Directorate | s02f033.pdf | |||||
| Hill AFB, UT | 42748 | 93 | 01-MAR-00 | Final Operable Unit 1 Monitoring Point Closure Report Hill Air Force Base, Utah | CH2M HILL | Environmental Management Directorate | FT009|FT081|LF001|LF003|WP002|WP080 | s03f045.PDF | ||||
| Hill AFB, UT | 42750 | 24 | 30-NOV-98 | Operable Unit 1 Monitoring Well Installation and Impact Assessment of South Weber No.2 Report | CH2M HILL | Environmental Management Directorate | S01f029.pdf | |||||
| Hill AFB, UT | 42752 | 51 | 30-JUN-97 | Final Operable Unit 1 Work Plan for Statistical Evaluation of Baseline Concentrations Hill Air Force Base, Utah | Montgomery Watson | Hill AFB | FT009|FT081|LF001|LF003|WP002|WP080 | S02f027.PDF | ||||
| Hill AFB, UT | 42754 | 28 | 19-OCT-95 | OU1 10th Monitoring Round 1995, Analytical Data, Hill Air Force Base, Utah, September 6 through October 3, 1995 | Quanterra Environmental Services | Montgomery Watson, Inc. | S02f003.pdf | |||||
| Hill AFB, UT | 42756 | 30 | 01-NOV-95 | OU1 10th Monitoring Round 1995, Analytical Data, Hill Air Force Base, Utah, October 4 through October 14, 1995 | Quanterra Environmental Services | Montgomery Watson, Inc. | S02f005.pdf | |||||
| Hill AFB, UT | 42758 | 29 | 07-NOV-95 | OU1 10th Monitoring Round 1995, Analytical Data, Hill Air Force Base, Utah, October 13 through October 18, 1995 | Quanterra Environmental Services | Montgomery Watson, Inc. | S02f004.pdf | |||||
| Hill AFB, UT | 42759 | 32 | 24-FEB-96 | OU1 11th Monitoring Round 1996, Analytical Data, February 6 through February 16, 1996 | Quanterra Environmental Services | Montgomery Watson, Inc. | S02f007.pdf | |||||
| Hill AFB, UT | 42761 | 34 | 15-APR-96 | OU1 11th Monitoring Round 1996, Analytical Data, March 7 through March 19, 1996 | Quanterra Environmental Services | Montgomery Watson, Inc. | S02f009.PDF | |||||
| Hill AFB, UT | 42763 | 35 | 24-APR-96 | OU1 11th Monitoring Round 1996, Analytical Data, March 20 through April 5, 1996 | Quanterra Environmental Services | Montgomery Watson, Inc. | S02f010.PDF | |||||
| Hill AFB, UT | 42765 | 37 | 01-AUG-96 | OU1 12th Monitoring Round 1996, Analytical Data, June 2 through July 19, 1996 | Quanterra Environmental Services | Montgomery Watson, Inc. | S02f012.pdf | |||||
| Hill AFB, UT | 42767 | 38 | 06-AUG-96 | OU1 12th Monitoring Round 1996, Analytical Data, May 20 through July 16, 1996 | Quanterra Environmental Services | Montgomery Watson, Inc. | S02f013.pdf | |||||
| Hill AFB, UT | 42770 | 40 | 10-APR-97 | OU1 13th Monitoring Round 1997, Analytical Data, March 6 -19, 1997 | Applied Physics and Chemistry Laboratory | Montgomery Watson, Inc. | S02f016.PDF | |||||
| Hill AFB, UT | 42772 | 39 | 07-APR-97 | OU1 13th Monitoring Round 1997, Analytical Data, March 4 -15, 1997 | Applied Physics and Chemistry Laboratory | Montgomery Watson, Inc. | S02f015.PDF | |||||
| Hill AFB, UT | 42778 | 26 | 28-JUL-95 | OU1 9th Monitoring Round 1995 Analytical Data, June 14 through June 29, 1995 | Quanterra Environmental Services | Montgomery Watson, Inc. | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S02f001.pdf | ||||
| Hill AFB, UT | 42780 | 43 | 02-OCT-97 | OU1 15th Monitoring Round 1997, Analytical Data, September 3 - 12, 1997 | Applied Physics and Chemistry Laboratory | Montgomery Watson | S02f019.pdf | |||||
| Hill AFB, UT | 42783 | 44 | 10-OCT-97 | OU1 15th Monitoring Round 1997, Analytical Data, September 15 - 23, 1997 | Applied Physics and Chemistry Laboratory | Montgomery Watson | S02f020.PDF | |||||
| Hill AFB, UT | 42785 | 94 | 01-JUL-93 | OU1 1st Qtr. 1993, Analytical Data, May 13 through May 21, 1993 | Enseco | Montgomery Watson, Inc. | S04f001.pdf | |||||
| Hill AFB, UT | 42787 | 96 | 29-JUL-93 | OU1 1st Qtr. 1993, Analytical Data, June 8 through June 21, 1993 | Enseco | Montgomery Watson, Inc. | S04f003.pdf | |||||
| Hill AFB, UT | 42789 | 95 | 26-JUN-93 | OU1 1st Qtr. 1993, Analytical Data, May 25 through June 4, 1993 | Enseco | Montgomery Watson, Inc. | S04f002.PDF | |||||
| Hill AFB, UT | 42791 | 98 | 04-OCT-93 | OU1 2nd Qtr. 1993 Analytical Data, September 2 through September 9, 1993 | Enseco | Montgomery Watson, Inc. | S04f005.PDF | |||||
| Hill AFB, UT | 42792 | 99 | 11-OCT-93 | OU1 2nd Qtr. 1993 Analytical Data, September 10 through September 17, 1993 | Enseco | Montgomery Watson, Inc. | S04f006.PDF | |||||
| Hill AFB, UT | 42794 | 114 | 15-SEP-94 | OU1 3rd Qtr. 1994 Analytical Data, July 19 through August 17, 1994 | Environmental Science and Engineering, Inc. | Montgomery Watson, Inc. | S04f023.PDF | |||||
| Hill AFB, UT | 42796 | 112 | 04-OCT-94 | OU1 3rd Qtr. 1994 Analytical Data, September 1 through September 13, 1994 | Enseco (Corning Environmental Services) | Montgomery Watson, Inc. | s04f021.pdf | |||||
| Hill AFB, UT | 42798 | 102 | 20-DEC-93 | OU1 3rd Qtr. 1993 Analytical Data, November 12 through December 3, 1993 | Enseco | Montgomery Watson, Inc. | S04f009.PDF | |||||
| Hill AFB, UT | 42800 | 103 | 04-JAN-94 | OU1 3rd Qtr. 1993 Analytical Data, November 23 through December 14, 1993 | Enseco | Montgomery Watson, Inc. | S04f010.PDF | |||||
| Hill AFB, UT | 42803 | 101 | 15-DEC-93 | OU1 3rd Qtr. 1993, Analytical Data, November 10 through November 22, 1993 | Enseco | Montgomery Watson, Inc. | S04f008.PDF | |||||
| Hill AFB, UT | 42804 | 113 | 22-SEP-94 | OU1 3rd Qtr. 1994 Analytical Data, August 18 through August 26, 1994 | Enseco (Corning Environmental Services) | Montgomery Watson, Inc. | S04f022.pdf | |||||
| Hill AFB, UT | 42806 | 104 | 24-FEB-94 | OU1 4th Qtr. 1993 Analytical Data, January 5 through February 3, 1994 | Enseco | Montgomery Watson, Inc. | s04f012.PDF | |||||
| Hill AFB, UT | 42808 | 105 | 08-MAR-94 | OU1 4th Qtr. 1993 Analytical Data, January 31 through February 10, 1994 | Enseco | Montgomery Watson, Inc. | S04f013.pdf | |||||
| Hill AFB, UT | 42810 | 107 | 07-JUN-94 | OU1 5th Monitoring Round 1994, Analytical Data, May 5 through May 13, 1994 | Enseco | Montgomery Watson, Inc. | S04f016.pdf | |||||
| Hill AFB, UT | 42812 | 108 | 21-JUN-94 | OU1 5th Monitoring Round 1994, Analytical Data, May 16 through May 23, 1994 | Enseco | Montgomery Watson, Inc. | S04f017.pdf | |||||
| Hill AFB, UT | 42813 | 109 | 13-JUL-94 | OU1 5th Monitoring Round 1994, Analytical Data, May 15 through June 7, 1994 | Enseco | Montgomery Watson, Inc. | S04f018.pdf | |||||
| Hill AFB, UT | 42815 | 110 | 20-JUL-94 | OU1 5th Monitoring Round 1994, Analytical Data, June 8 through June 20, 1994 | Enseco | Montgomery Watson, Inc. | S04f019.pdf | |||||
| Hill AFB, UT | 42817 | 117 | 30-DEC-94 | OU1 7th Monitoring Round 1994 Analytical Data, November 11 through December 5, 1994 | Quanterra Environmental Services | Montgomery Watson, Inc. | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S04f026.PDF | ||||
| Hill AFB, UT | 42820 | 116 | 07-DEC-94 | OU1 7th Monitoring Round 1994 Analytical Data, November 1 through November 10, 1994 | Quanterra Environmental Services | Montgomery Watson, Inc. | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S04f025.PDF | ||||
| Hill AFB, UT | 42822 | 118 | 05-JAN-95 | OU1 7th Monitoring Round 1994 Analytical Data, December 6 through December 8, 1994 | Quanterra Environmental Services | Montgomery Watson, Inc. | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S04f027.PDF | ||||
| Hill AFB, UT | 42824 | 120 | 30-MAR-95 | OU1 8th Monitoring Round 1995 Analytical Data, February 20 through March 6, 1995 | Quanterra Environmental Services | Montgomery Watson, Inc. | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S04f029.PDF | ||||
| Hill AFB, UT | 42826 | 123 | 15-AUG-95 | OU1 9th Monitoring Round 1995 Analytical Data, June 30 through July 27, 1995 | Quanterra Environmental Services | Montgomery Watson, Inc. | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S04f033.pdf | ||||
| Hill AFB, UT | 42828 | 71 | 31-MAY-97 | Final Phase I Groundwater Pre-Design Data Collection Work Plan for Operable Unit 1 Hill Air Force Base, Utah | MWH | Hill AFB | FT009|FT081|LF001|LF003|WP002|WP080 | S03f017.PDF | ||||
| Hill AFB, UT | 42830 | 49 | 01-SEP-97 | Final Phase II Groundwater Pre-Design Data Collection Work Plan for Operable Unit 1 Hill Air Force Base, Utah | CH2M HILL | Environmental Management Directorate | FT009|FT081|LF001|LF003|WP002|WP080 | S02f025.PDF | ||||
| Hill AFB, UT | 42832 | 73 | 30-JUN-97 | Final Phase II Landfill 3 and 4 Work Plan for Operable Unit 1Hill Air Force Base, Utah | CH2M HILL | Environmental Management Directorate | LF001|LF003 | S03f019.PDF | ||||
| Hill AFB, UT | 42833 | 142 | 30-NOV-93 | Preprint Final Remedial Investigation Report Addendum for Operable Unit 1 Hill Air Force Base, Utah (IRP Sites LF01, LF03, WP02, FT09, FT81 OT14, WP80) - Volume 1 - Report November 1993 | Montgomery Watson, Inc. | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S05f066.PDF | |||||
| Hill AFB, UT | 42835 | 155 | 31-OCT-95 | Proposed Final Engineering Evaluation Cost Analysis for Operable Unit 1 Hill Air Force Base, Utah October 1995 | Montgomery Watson, Inc | Hill AFB | FT009|FT081|LF001|LF003|WP002|WP080 | S05f083.PDF | ||||
| Hill AFB, UT | 42838 | 145 | 31-JAN-94 | QCSR for the Phase II Operable Unit 1 Remedial Investigation (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80 | Montgomery Watson Americas, Inc. | U.S. Air Force Logistics Command | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S05f069.PDF | ||||
| Hill AFB, UT | 42840 | 146 | 31-JAN-94 | QCSR for the Phase II Operable Unit 1 Remedial Investigation (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Appendices | Montgomery Watson Americas, Inc. | U.S. Air Force Logistics Command | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S05f070.PDF | ||||
| Hill AFB, UT | 42842 | 173.2 | 31-JAN-94 | QCSR for the Phase II Operable Unit 1 Remedial Investigation (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, Utah - Volume 2 of 2 - Appendices A-G | Montgomery Watson Americas, Inc | OO-ALC/EMR | Hill AFB, UT | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | s15f166.PDF | |||
| Hill AFB, UT | 42844 | 149.2 | 31-AUG-94 | Final Quality Control Summary Report for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, FT81, OT14, WP80) Hill Air Force Base, Utah - Volume 2 of 2 - Appendices D-F August 1994 | Montgomery Watson, Inc. | Hill AFB, UT | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S05f077.PDF | ||||
| Hill AFB, UT | 42846 | 149.1 | 31-AUG-94 | Final Quality Control Summary Report for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, FT81, OT14, WP80) Hill Air Force Base, Utah - Volume 1 of 2 - Report and Appendices A-C August 1994 | Montgomery Watson, Inc. | Hill AFB, UT | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S05f076.PDF | ||||
| Hill AFB, UT | 42848 | 89 | 01-FEB-00 | Final Remedial Action Work Plan Operable Unit 1 Hill Air Force Base, Utah | CH2M HILL | Environmental Management Directorate | FT009|FT081|LF001|LF003|WP002|WP080 | S03f041.PDF | ||||
| Hill AFB, UT | 42849 | 90 | 01-FEB-00 | Final Remedial Design Report and Work Plan Operable Unit 1 Hill Air Force Base, Utah | CH2M HILL | Hill AFB, UT | FT009|FT081|LF001|LF003|WP002|WP080 | S03f042.PDF | ||||
| Hill AFB, UT | 42851 | 158 | 02-APR-92 | Draft Remedial Investigation/Feasibility Study Work Plan Addendum for Operable Unit 1 Hill Air Force Base, Utah (IRP Sites LF01, LF03, WP02, FT09, OT14) April 1992 | James M. Montgomery, Consulting Engineers, Inc. | US Army Corps of Engineers | FT009|FT081|LF001|LF003|OT014|WP002 | S05f087.PDF | ||||
| Hill AFB, UT | 42853 | 58 | 30-SEP-99 | Final Remediation by Natural Attenuation Treatability Study for Operable Unit 1 Hill Air Force Base, Utah | Parsons Engineering | AFCEE, Techology Transfer Division/00-ALC/EMR | FT009|FT081|LF001|LF003|WP002|WP080 | S02f035.PDF | ||||
| Hill AFB, UT | 42856 | 156 | 25-OCT-95 | Draft Request for a Removal Action for Operable Unit 1 Hill Air Force Base, Utah - Memorandum | Montgomery Watson, Inc | Hill AFB, UT | FT009|FT081|LF001|LF003|WP002|WP080 | S05f084.PDF | ||||
| Hill AFB, UT | 42857 | 154 | 30-APR-95 | Final Sampling and Analysis Plan Addendum Spring 1995 for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, Utah April 1995 | Montgomery Watson, Inc | Hill AFB, UT | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S05f082.PDF | ||||
| Hill AFB, UT | 42859 | 100 | 28-FEB-94 | Second Quarter Data Evaluation for 1993 Ground-Water and Surface Water Sampling for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, )T14, FT81, and WP80) Hill Air Force Base, Utah | Montgomery Watson, Inc. | Hill AFB, UT | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S04f007.PDF | ||||
| Hill AFB, UT | 42861 | 84 | 30-SEP-98 | Final SERDP Treatability Studies Data Comparison Report Operable Unit 1 Hill Air Force Base, Utah September 1998 | Montgomery Watson | Hill AFB. UT | WP002|WP080 | S03f034.pdf | ||||
| Hill AFB, UT | 42866 | 83 | 01-JUL-98 | SERDP Treatability Studies Data Validation Report, Operable Unit 1 Hill Air Force Base, Utah July 1998 | Montgomery Watson | Hill AFB | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S03f033.PDF | ||||
| Hill AFB, UT | 42870 | 119 | 31-JAN-95 | Seventh Monitoring Round Data Evaluation for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, Utah January 1995 | Montgomery Watson, Inc. | Hill AFB, UT | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S04f028.PDF | ||||
| Hill AFB, UT | 42871 | 115 | 30-NOV-94 | Sixth Monitoring Round Data Evaluation for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, Utah November 1994 | Montgomery Watson, Inc. | Hill AFB, UT | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S04f024.PDF | ||||
| Hill AFB, UT | 42873 | 45 | 13-MAR-96 | Report on Soil - Bentonite/Site Liquid Compatibility Hill Air Force Base, Utah | Haley and Aldrich, Inc. | Montgomery Watson | S02f021.PDF | |||||
| Hill AFB, UT | 42875 | 131 | 16-MAR-87 | Soil Testing Landfill Cell #3 and Chem Pits #1 and #2, Hill Air Force Base, Utah | James E. Nordquist, Donald E. Bressler | Chen and Associates | Scott J. Lamond | Directorate of Contracting and Manufacturing OO-ALC/PMKSC, Hill AFB | LF003|WP002 | s05f048.PDF | ||
| Hill AFB, UT | 42876 | 69 | 31-JAN-96 | Final Soil Vapor Extraction and Bioventing Treatability Study Evaluation Report for Operable Unit 1 Hill Air Force Base, Utah | Montgomery Watson | Hill AFB, UT | FT081|WP002 | S03f011.PDF | ||||
| Hill AFB, UT | 42878 | 147 | 31-MAR-94 | Soil Vapor Extraction and Bioventing Treatability Study Work Plan for OU1 (IRP Sites LF01, LF03, WP02, FT09, FT81, OT14, WP80) | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S05f073.PDF | ||||||
| Hill AFB, UT | 42879 | 167 | 31-MAR-94 | Soil Vapor Extraction and Bioventing Treatability Study Work Plan for OU1(IRP Sites LF01, LF03, WP02, FT09, FT81, OT14, WP80) | Hill AFB | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | s15f164.PDF | |||||
| Hill AFB, UT | 42880 | 81 | 31-MAR-98 | Final South Weber No. 2 Monitoring Well Installation Work Plan for Operable Unit 1 Hill Air Force Base, Utah | CH2M Hill | Environmental Management Directorate | FT009|FT081|LF001|LF003|WP002|WP080 | S03f031.PDF | ||||
| Hill AFB, UT | 42881 | 22 | 15-APR-97 | OU1 13th Monitoring Round 1997, Analytical Data, March 10 - 24, 1997 | Kevin Xie | Applied Physics and Chemistry Laboratory | Jennifer He | Montgomery Watson | S01f017.PDF | |||
| Hill AFB, UT | 42885 | 151 | 17-AUG-94 | Summary of Qualifications OU1 Infiltration/Collection System Phase I and Phase II Hill Air Force Base, Utah August 1994 | Howard Saxion, Christopher D. Mikell | CH2M HILL | Sharon K. Price | OO-ALC/PKOE, Hill AFB | S05f078.PDF | |||
| Hill AFB, UT | 42887 | 148 | 30-APR-94 | Final Surfactant Flushing Treatability Study Work Plan for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, FT81, OT14, WP80) Hill Air Force Base, Utah - April 1994 | Montgomery Watson, Inc. | Hill AFB, UT | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S05f074.PDF | ||||
| Hill AFB, UT | 42890 | 165 | 25-OCT-95 | Technical Memorandum for Manhole #4 and #5 Investigation, Three - Mile - Long Dual Wall Contaminated Groundwater Pipeline | Steve Godard | Radian Corporation | Paul Betts | OO-ALC/EMR | s14f045.PDF | |||
| Hill AFB, UT | 42892 | 46 | 22-MAR-96 | Technical Review of Operable Unit 1 Groundwater Containment System Hill Air Force Base, Utah | Robert D. Mutch, Jr. | Eckenfelder, Inc. | Kevin W. Bourne | Department of the Air Force, Environmental Management Directorate | FT009|FT081|LF001|LF003|WP002|WP080 | S02f022.pdf | ||
| Hill AFB, UT | 42894 | 31 | 30-NOV-95 | Tenth Monitoring Round Data Evaluation for Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT09, OT14, FT81, and WP80) Hill Air Force Base, Utah November 1995 | Montgomery Watson, Inc. | Hill AFB, UT | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S02f006.pdf | ||||
| Hill AFB, UT | 42899 | 166 | 04-OCT-93 | Draft Final Treatability Study Work Plan and Site Safety Plan for Site 870/Patriot Hills and Operable Unit 1 Hill Air Force Base, Utah (IRP Site Codes ST61, FT09, and LF03) October 1993 | Montgomery Watson | OO-ALC/EMR | FT009|LF003|ST061 | s15f079.PDF | ||||
| Hill AFB, UT | 42901 | 129 | 24-JUL-89 | Decision Document for Fire Training Area 1, U.S. Air Force Installation Restoration Program Hill Air Force Base, Utah | Science Applications International Corporation | U.S. Department of Energy | FT009 | ROD_129 | S05f046.PDF | |||
| Hill AFB, UT | 42903 | 162 | 25-JUN-97 | Final Work Plan for Demonstration of Bioventing of Non-Petroleum Hydrocarbon Contamination at Hill Air Force Base, Utah | Battelle Columbus Operations | USAF | WP002 | S06f115.PDF | ||||
| Hill AFB, UT | 42906 | 128 | 11-APR-88 | Installation Restoration Program Remedial Investigation/Feasibility Study OU1 (Landfills 3 and 4 and Chemical disposal Pits 1 and 2) Hill Air Force Base, Utah, WORK PLAN | Science Applications International Corporation | U.S. Department of Energy/HILL AFB | LF001|LF003|WP002 | S05f045.PDF | ||||
| Hill AFB, UT | 43077 | 325 | 30-JUN-92 | 100 .pct Design Industrial Waste Treatment Plant Modifications Construction Specifications Hill AFB, Utah | Radian Corporation | AFCEE/ESR/OO-ALC/EM | SS021|WP007 | S06f039.pdf | ||||
| Hill AFB, UT | 43081 | 522 | 31-OCT-95 | 3-Mile Pipeline Design Options Report | Radian Corporation | Paul Betts | OO-ALC/EMR | WP006 | S06f089.PDF | |||
| Hill AFB, UT | 43084 | 340 | 28-FEB-94 | Addendum to the Feasibility Study for Operable Unit 2 Hill Air Force Base, Utah | CH2M HILL | SS021|WP007 | S06f057.pdf | |||||
| Hill AFB, UT | 43088 | 344.1 | 30-APR-94 | Addendum to the Remedial Investigation Report for Operable Unit 2 Sites WP07, SS21 - Volume 1 of 3 - Report | Radian Corporation | AFCEE/ESR | SS021|WP007 | S06f062.PDF | ||||
| Hill AFB, UT | 43093 | 344.2 | 30-APR-94 | Addendum to the Remedial Investigation Report for Operable Unit 2 Sites WP07, SS21 - Volume 2 of 3 - Appendices A-J | Radian Corporation | AFCEE/ESR | SS021|WP007 | S06f063.pdf | ||||
| Hill AFB, UT | 43098 | 344.3 | 30-APR-94 | Addendum to the Remedial Investigation Report for Operable Unit 2 Sites WP07, SS21 - Volume 3 of 3 - Appendices K-O | Radian Corporation | AFCEE/ESR | SS021|WP007 | S06f064.pdf | ||||
| Hill AFB, UT | 43103 | 329 | 31-AUG-92 | Addendum to the Work Plan for Operable Unit 2 Sites WP07, SS21 | Radian Corporation | SS021|WP007 | S06f043.pdf | |||||
| Hill AFB, UT | 43106 | 222 | 31-MAR-03 | Final Report Analytical Data Validation Report for the Fall 2002 Operable Unit 1 Groundwater Monitoring Point Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring | CH2M HILL | AFCEE/Environmental Management Directorate | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | OU1_ADVR_Fall02_GWMPSR_March2003.pdf | ||||
| Hill AFB, UT | 43110 | 243 | 31-MAR-04 | Final Report Analytical Data Validation Report for the Fall 2003 Operable Unit 1 Groundwater Monitoring Point Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring Project | CH2M HILL | Environmental Management Directorate, Hill AFB | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | OU1_ADVR Fall03_March 2004.pdf | ||||
| Hill AFB, UT | 43114 | 231 | 31-MAR-05 | Final Report Analytical Data Validation Report for the Fall 2004 Operable Unit 1 Groundwater Monitoring Point Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring Project | CH2M HILL | 75th Air Base Wing | FT009|FT081|LF001|LF003|WP002|WP080 | OU1_04 Fall_ADVR_GWMP_March 2005.pdf | ||||
| Hill AFB, UT | 43118 | 244 | 01-MAR-06 | Final Report Analytical Data Validation Report for the Fall 2005 Operable Unit 1 Groundwater Monitoring Point Sampling Round Hill air Force Base, Utah Long-Term Groundwater Monitoring Project | CH2M HILL | 75 CEG/CEVR | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | OU1_ADVR Fall 05_March 2006.pdf | ||||
| Hill AFB, UT | 43123 | 220 | 01-JUL-02 | Final Report Analytical Data Validation Report for the Spring 2002 Operable Unit 1 Seep, Spring, and Surface Water Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring Project | CH2M HILL | AFCEE/Environmental Management Directorate | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | OU1_ADVR_Spr02_July2002.pdf | ||||
| Hill AFB, UT | 43125 | 235 | 01-AUG-03 | Final Report Analytical Data Validation Report for the Spring 2003 Operable Unit 1 Seep, Spring, and Surface Water Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring Project | CH2M HILL | Environmental Management Directorate | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | OU1_ADVR 03 Spr_SSSW_August 2003.pdf | ||||
| Hill AFB, UT | 43126 | 229 | 31-MAR-05 | Final Report Analytical Data Validation Report for the Spring 2004 Operable Unit 1 Seep, Spring, and Surface Water Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring Project | CH2M HILL | 75th Air Base Wing | FT009|FT081|LF001|LF003|WP002|WP080 | OU1_04Spring ADVR_GWMP_March 2005.pdf | ||||
| Hill AFB, UT | 43129 | 239 | 01-JUL-05 | Final Report Analytical Data Validation Report for the Spring 2005 Operable Unit 1 Seep, Spring, and Surface Water Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring Project | CH2M HILL | 75 CEG/CEVR | FT009|FT081|LF001|LF003|WP002|WP080 | OU1 Spr05_ADV_SSSW SR_July 2005.pdf | ||||
| Hill AFB, UT | 43131 | 261 | 31-JUL-06 | Final Report Analytical Data Validation Report for the Spring 2006 Operable Unit 1 Seep, Spring, and Surface Water Sampling Round Hill Air Force Base, Utah Operable Unit 1 Groundwater Monitoring Project | CH2M HILL | 75th CEG/CEVR | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | OU1_ADVR Spr06 SSSWSR_July 2006.pdf | ||||
| Hill AFB, UT | 43135 | 221 | 31-MAR-03 | Final Report Analytical Data Validation Report for the Summer 2002 Operable Unit 1 Groundwater Monitoring Point Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring | CH2M HILL | AFCEE/Environmental Management Directorate | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | OU1_ADVR_Sum02_March 2003.pdf | ||||
| Hill AFB, UT | 43139 | 248 | 01-MAR-04 | Final Report Analytical Data Validation Report for the Summer 2003 Operable Unit 1 Groundwater Monitoring Point Sampling Round, Hill Air Force Base, Utah Long-Term Groundwater Monitoring Project | CH2M HILL | 75th Air Base Wing | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | OU1_ADVR sum03 GWMPSR_March 2004.pdf | ||||
| Hill AFB, UT | 43144 | 230 | 31-MAR-05 | Final Report Analytical Data Validation Report for the Summer 2004 Operable Unit 1 Groundwater Monitoring Point Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring Project | CH2M HILL | 75th Air Base Wing | FT009|FT081|LF001|LF003|WP002|WP080 | OU1_04 Summer_ADVR_GWMPS_March 2005.pdf | ||||
| Hill AFB, UT | 43150 | 241 | 01-DEC-05 | Final Report Analytical Data Validation Report for the Summer 2005 Operable Unit 1 Groundwater Monitoring Point Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring Project | CH2M HILL | 75 CEG/CEVR | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | OU1_ADVR Sum05 GWMP_December 2005.pdf | ||||
| Hill AFB, UT | 43154 | 264 | 15-DEC-97 | OU2 Property Owners Data Packages for the September 1997 Sampling Event | Chris Mikell | CH2M HILL | Steve Hicken | OO-ALC/EMR | s05f001.pdf | |||
| Hill AFB, UT | 43157 | 175 | 01-JAN-11 | AquaTrack Survey Hill AFB OU1 | Hydro Geophysics, Inc | LF001|LF003 | s15f175.PDF | |||||
| Hill AFB, UT | 43159 | 352 | 01-AUG-94 | Aquifer Data Evaluation Report Operable Unit 2 | Radian Corporation | OO-ALC/EMR | WP007 | S06f073.PDF | ||||
| Hill AFB, UT | 43161 | 516 | 01-FEB-95 | Aquifer Pumping Test Report/DNAPL Recovery Optimization Source Recovery System Interim Remedial Action, OU2 | Radian Corporation | OO-ALC/EMR | SS021|WP007 | S06f081.PDF | ||||
| Hill AFB, UT | 43163 | 324 | 31-MAR-92 | Draft Assembled Alternatives Screening Memorandum for Operable Unit 2 Site WP07 Hill AFB, Utah | Radian Corporation | Barbara Smith Townsend | AFCEE/ESR | WP007 | S06f037.pdf | |||
| Hill AFB, UT | 43166 | 232 | 12-NOV-91 | Draft Final Baseline Risk Assessment for Operable Unit 1 Hill Air Force Base, Utah November 1991 | Gary A. Colgan | James M. Montgomery | Taunya Howe | U.S. Army Corps of Engineers | FT009|LF001|LF003|OT014|WP002 | OU1_BRA_November 1991.pdf | ||
| Hill AFB, UT | 43169 | 322.1 | 31-MAR-92 | Final Baseline Risk Assessment for Operable Unit 2 Sites WP07, SS21 Hill AFB - Volume 1 - Report | Radian Corporation | AFCEE-ESO/ERT/OO-ALC/EM | SS021|WP007 | S06f035.pdf | ||||
| Hill AFB, UT | 43172 | 322.2 | 31-MAR-92 | Final Baseline Risk Assessment for Operable Unit 2 Sites WP07, SS21 Hill AFB - Volume 2 - Appendices | Radian Corporation | AFCEE-ESO/ERT/OO-ALC/EM | SS021|WP007 | S06f036.pdf | ||||
| Hill AFB, UT | 43177 | 223 | 15-NOV-04 | Calendar Year 2004 Basewide Monitoring and Maintenance Program Operable Unit 1 Off-Base Soil and Sediment Sampling Letter Report | Sandy Rhea | CH2M HILL | Shannon Smith | OO-ALC/EMR | FT009|FT081|LF001|LF003 | OU1_CY04BWMMP_OBSSSltrRpt_November 2004.pdf | ||
| Hill AFB, UT | 43178 | 202 | 31-JAN-02 | Canyon Meadows Subdivision Water Sampling Results Hill Air Force Base, Utah | Michael A. Cox | CH2M HILL | Jeffery Watkins | OO-ALC/EMR | OU1_CanyonMeadows_Jan2002.pdf | |||
| Hill AFB, UT | 43180 | 272 | 30-MAR-98 | Complex Resistivity Geophysics Demonstration Task 1X Report | Dr. Gary Olhoeft, David Wardwell | Mission Research Corporation | SS021|WP007 | S05f010.pdf | ||||
| Hill AFB, UT | 43184 | 298 | 30-JUN-90 | Conceptual Design Report, Source Recovery and Groundwater Pre-Treatment System at Operable Unit 2 Hill Air Force Base, Utah | Radian Corporation | AFOEHL | WP007 | S06f007.PDF | ||||
| Hill AFB, UT | 43185 | 287 | 30-JUN-99 | Construction Report Spring U2-326 Ground Water Extraction Trench Remedial Action, June 1999 | Hill AFB | WP007 | S05f031.PDF | |||||
| Hill AFB, UT | 43188 | 285 | 30-APR-99 | Construction Report Spring U2-326 Ground Water Extraction Trench Remedial Action, April 1999 | CH2M Hill | Hill AFB | WP007 | S05f028.PDF | ||||
| Hill AFB, UT | 43191 | 284 | 28-FEB-99 | Construction Report, Schedule B Remedial Action North Interceptor Trench and Air Stripper Treatment Plant OU2 | HAFB | SS021|WP007 | S05f027.PDF | |||||
| Hill AFB, UT | 43195 | 338 | 24-NOV-93 | Construction Specifications for Non-Source Area Seeps and Springs Collection and Treatment System Improvements at OU2 | Radian Corporation | SS021|WP007 | S06f053.pdf | |||||
| Hill AFB, UT | 43198 | 178 | 28-FEB-98 | Data Validation Summary Report for the Sixteenth Sampling Round at Operable Unit 1 (IRP Sites LF01, LF03, WP02, FT02, OT1, FT81, and WP80) Hill Air Force Base, Utah | Montgomery Watson, Inc. | Hill AFB | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | S03f030.PDF | ||||
| Hill AFB, UT | 43203 | 267 | 15-JAN-98 | Demonstration of Surfactant-Enhanced Aquifer Remediation of Chlorinated Solvent DNAPL at Operable Unit 2 | Intera, Inc. | AFCEE, Technology Transfer Division/OO-ALC/EMR | WP007 | S05f005.PDF | ||||
| Hill AFB, UT | 43209 | 268 | 27-FEB-98 | Dense Nonaqueous Phase Liquid (DNAPL) Source Delineation Project Work Plan Operable Unit 2 | URS Consultants, Inc., Duke Engineering and Services | AFCEE/Ogden Air Logistics Center | SS021|WP007 | S05f006.pdf | ||||
| Hill AFB, UT | 43211 | 277 | 25-NOV-98 | Draft-Final Design Data Collection Work Plan Cometabolic Bioventing Field Test, Operable Unit 2 | Radian International, Duke Engineering and Services | Paul DePercin | Land Remediation and Pollution Control Division, National Risk Management Research Laboratory, USEPA | WP007 | S05f017.pdf | |||
| Hill AFB, UT | 43214 | 176 | 28-FEB-96 | Design Submittal Technical Specifications for the Ground-Water Containment System at Operable Unit 1 | Montgomery Watson, Inc | AFLC, Hill AFB | S03f012.PDF | |||||
| Hill AFB, UT | 43217 | 518 | 18-MAY-95 | DLOG3D Application at Operable Unit 2 | Nathan Rich | Utah State University, Department of Civil and Environmental Engineering | Kyle Kirchner | OO-ALC-EMR | S06f084.PDF | |||
| Hill AFB, UT | 43219 | 289 | 30-SEP-99 | DNAPL Extraction Report Griffith Pool Operable Unit 2, September 1999 | Stephen T. Godard | Rradian International, LLC | Dr. Jon Ginn | OO-ALC/EMR, Hill AFB | WP007 | S05f033.PDF | ||
| Hill AFB, UT | 43221 | 336 | 31-AUG-93 | Engineering Evaluation/Cost Analysis for Operable Unit 2, Sites WP07, SS21 Non-Source Area Seeps and Springs | Radian Corporation | Hill AFB | SS021|WP007 | S06f051.pdf | ||||
| Hill AFB, UT | 43224 | 520 | 01-JUN-95 | Environmental Assessment for Operable Unit 2 (IRP Sites WP07 and SS21) Environmental Baseline Survey, and Finding of No Significant Impact | Hill AFB | SS021|WP007 | S06f087.PDF | |||||
| Hill AFB, UT | 43227 | 184 | 02-SEP-94 | Ethanol Flushing Treatability Study at OU1 | Kristine S. Burgess | Montgomery Watson, Inc. | Kevin Bourne | OO-ALC/EMR Hill AFB, UT | FT009|FT081|LF001|LF003|WP002|WP080 | s18f020.PDF | ||
| Hill AFB, UT | 43230 | 331 | 30-NOV-92 | Draft Evaluation of Treatment System Alternatives for the OU2 Off-Base Area Seeps and Springs | Radian Corporation | WP007 | S06f046.pdf | |||||
| Hill AFB, UT | 43232 | 250 | 31-JUL-06 | Final Explanation of Significant Difference for Operable Unit 1 Hill Air Force Base, Utah | 75th CEG | FT009|FT081|LF001|LF003|WP080 | OU 1_ESD_July 2006.pdf | |||||
| Hill AFB, UT | 43233 | 333.1 | 30-APR-93 | Feasibility Study Report for Operable Unit 2 Sites WP07, SS21 - Volume 1 of 2 - Report | Radian Corporation | AFCEE/ESR | SS021|WP007 | S06f048.pdf | ||||
| Hill AFB, UT | 43237 | 333.2 | 30-APR-93 | Feasibility Study Report for Operable Unit 2 Sites WP07, SS21 - Volume 2 of 2 - Appendices | Radian Corporation | AFCEE/ESR | SS021|WP007 | S06f049.pdf | ||||
| Hill AFB, UT | 43241 | 187 | 30-AUG-94 | Final Soil Vapor Extraction and Bioventing Treatability Study Work Plan for OU1 (IRP Sites LF01, LF03, WP02, FT09, FT81, OT14, and WP80) Hill Air Force Base, Utah August 1994 | Montgomery Watson | Hill AFB, UT | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | s15f163.PDF | ||||
| Hill AFB, UT | 43245 | 500 | 21-APR-03 | First Quarter of 2003 Effluent Discharge Report for Discharges to the Shallow Groundwater and Storm Drain Operable Unit 6 | Staci Hill | CH2M HILL | Paul Betts | OO-ALC/EMR | OU6_1Q EDR_April 2003.pdf | |||
| Hill AFB, UT | 43246 | 310 | 28-FEB-91 | Final Focused Feasibility Study for Operable Unit 2 Hill Air Force Base, Utah | Edward Heyse, Robert James | Environmental Restoration Division, Environmental Management Directorate | WP007 | S06f021.pdf | ||||
| Hill AFB, UT | 43248 | 514 | 01-NOV-94 | Geophysical Electrical Resistance Mapping Report Operable Unit 2 | Radian Corporation | Kyle Kirchner | OO-ALC/EMR | WP007 | S06f078.PDF | |||
| Hill AFB, UT | 43250 | 275 | 30-SEP-98 | Griffith Pool Well Field at OU2 Construction Specifications, September 1998 | Radian International | Dr. Jon Ginn | U.S. Air Force, Ogden Air Logistics Center/Environmental Management | S05f015.pdf | ||||
| Hill AFB, UT | 43253 | 525 | 30-APR-96 | Health and Safety Plan for Demonstration of Surfactant Enhanced Aquifer Remediation of DNAPLs at Hill Air force Base | Intera | AFCEE | WP007 | S06f094.PDF | ||||
| Hill AFB, UT | 43258 | 233 | 30-APR-05 | Final Operable Unit 1 High Recharge Contingency Evaluation Hill Air Force Base, Utah | URS | Barbara Hall | 75 CEG/CEVOR | FT009|FT081|LF001|LF003|WP002|WP080 | OU1_rechargecont_report_April 2005.pdf | |||
| Hill AFB, UT | 43261 | 295 | 31-JAN-89 | Informal Technical Information Report for Soil Gas Survey Conducted along Perimeter Road and Spoils Area Hill Air Force Base, Utah | Radian Corporation | SS021|WP007 | S06f004.pdf | |||||
| Hill AFB, UT | 43265 | 218 | 02-FEB-04 | Inspection Maintenance and Monitoring Reports Operable Unit 1 Landfill Caps 3 and 4 CERCLA Caps Hill Air Force Base, Utah January-December 2003 | URS | Oscar Torres | OO-ALC/EMR | LF001|LF003 | OU1_ Landfill 3_ 4 IMMR 2003_February2004.pdf | |||
| Hill AFB, UT | 43271 | 307 | 28-FEB-91 | Installation Restoration Program Superfund Proposed Plan for Interim Action at Operable Unit 2 Hill Air Force Base, Utah | Hill AFB | Hill AFB | WP007 | S06f017.pdf | ||||
| Hill AFB, UT | 43274 | 296.1 | 30-SEP-89 | Draft Lithologic Logs for Chemical Disposal Pit 3 Hill Air Force Base, Utah Volume 1 | Radian Corporation | Logan VanLeigh | AFOEHL | WP007 | S06f005.PDF | |||
| Hill AFB, UT | 43277 | 296.2 | 30-SEP-89 | Draft Lithologic Logs for Chemical Disposal Pit 3 Hill Air Force Base, Utah Volume 2 | Radian Corporation | AFOEHL | WP007 | S06f006.PDF | ||||
| Hill AFB, UT | 43278 | 293 | 28-FEB-00 | Long-Term Groundwater Monitoring Project Analytical Data Validation Report for the Fall 1999 Operable Unit 2 Groundwater Monitoring Well Sampling Round | CH2M HILL | Environmental Management Directorate | S05f037.PDF | |||||
| Hill AFB, UT | 43280 | 190 | 01-FEB-01 | Final Report Analytical Data Validation Report for the Fall 2000 Operable Unit 1 Groundwater Monitoring Well Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring Project | CH2M HILL | Environmental Management Directorate | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | OU1_Fall00GWM_Feb2001.pdf | ||||
| Hill AFB, UT | 43283 | 194 | 01-NOV-00 | Final Report Analytical Data Validation Report for the Spring 2000 Operable Unit 1 Spring, Seep, and Surface Water Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring Project | CH2M HILL | AFCEE/Environmental Management Directorate | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | OU1_Spring00GWM_Nov2000.pdf | ||||
| Hill AFB, UT | 43285 | 206 | 01-MAR-02 | Final Report Analytical Data Validation Report for the Spring 2001 Operable Unit 1 Seep, Spring, and Surface Water Sampling Round Hill Air Force Base, Utah Long-Term Groundwater Monitoring Project | CH2M HILL | AFCEE/Environmental Management Directorate | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | OU1_SeepSpringSurfaceWate_Sampling_March2002.pdf | ||||
| Hill AFB, UT | 43287 | 292 | 31-JAN-00 | Long-Term Groundwater Monitoring Project Analytical Data Validation Report for the Summer 1999 Operable Unit 2 Groundwater Monitoring Well Sampling Round | CH2M HILL | Environmental Management Directorate | S05f036.PDF | |||||
| Hill AFB, UT | 43289 | 195 | 01-NOV-00 | Final Report Analytical Data Validation Report for the Summer 2000 Operable Unit 1 Groundwater Monitoring Well Sampling Round, Hill Air Force Base, Utah Long-Term Groundwater Monitoring Project | CH2M HILL | Environmental Management Directorate | FT009|FT081|LF001|LF003|OT014|WP002|WP080 | OU1_Summer00GWM_Nov2000.pdf | ||||
| Hill AFB, UT | 43293 | 236 | 09-JUL-03 | Monitoring Points U1-174 and U1-175 Abandonment Report | CH2M HILL | OO-ALC/EMR | MP U1-174|MP U1-175 | U1_ Abandonment U1-174 and U1-175_July 2003.pdf | ||||
| Hill AFB, UT | 43295 | 182 | 30-AUG-98 | Natural Attenuation Evaluation Summary for a Chlorinated Solvent Plume, OU1 Hill AFB, Utah | R.Ryan Dupont | Utah State University | Summer Faculty Research Program | FT009|FT081|LF001|LF003|WP002|WP080 | s18f018.PDF | |||
| Hill AFB, UT | 43300 | 201 | 01-AUG-01 | Final Report Operable Unit 1 Fire Training Area 2 No Further Response Action Planned (NFRAP) Decision Document, IRP Site FT081 State of Utah, Department of Environmental Quality, Leaking Underground Storage Tank Site EIIK, Hill Air Force Base, Utah | CH2M HILL | Hill AFB, UT | FT081 | ROD_201 | OU1_fta2nfrap_Aug2001.pdf | |||
| Hill AFB, UT | 43302 | 205 | 01-FEB-01 | Final Operable Unit 1 Fire Training Area 2 No Further Response Action Planned (NFRAP) Decision Document, IRP Site FT81, State of Utah, Department of Environmental Quality, Leaking Underground Storage Tanks Site EIIK, Hill Air Force Base, Utah | CH2M HILL | Environmental Management Directorate | FT081 | ROD_205 | OU1_NFRAPFT81_Feb2001.pdf | |||
| Hill AFB, UT | 43305 | 210 | 31-AUG-99 | Operable Unit 1 Groundwater Pre-Design Summary Investigation Report Volume 1- Report | CH2M HILL | Environmental Management Directorate | OU1_PreDesignInv_Aug1999.pdf | |||||
| Hill AFB, UT | 43309 | 57.2 | 30-AUG-99 | Final Operable Unit 1 Groundwater Pre-Design Summary Investigation Report - Volume 2 - Appendices Hill Air Force Base, Utah | CH2M HILL | Environmental Management Directorate | FT009|FT081|LF001|LF003|WP002|WP080 | S02F034.pdf | ||||
| Hill AFB, UT | 43319 | 191 | 31-OCT-99 | Final Operable Unit 1 Monitoring Point Abandonment Work Plan Hill Air Force Base, Utah | CH2M HILL | Environmental Management Directorate | FT009|FT081|LF001|LF003|WP002|WP080 | OU1_MonAbandWP_Oct1999.pdf | ||||
| Hill AFB, UT | 43321 | 226 | 19-MAY-94 | Operable Unit 1 Response to Draft Comments Volume 2 of 2 - FS, PP, RS, ROD, RD, EE-CA, LF Investigation 1996-1998 and Pre-Design Data Collection 1996-1998 - 17 Sep 1993 through 1 Jan 1999 | Montgomery Watson, Inc. | Kent P. Gary | DERR, Utah DEQ | Operable Unit 1 Response to Comments on the Draft Feasibility Study Volume 2 of 2.pdf | ||||
| Hill AFB, UT | 43324 | 227 | 31-MAY-00 | Operable Unit 1 Response to Draft Comments Volume 1 of 2 - WP, RI, BRA - 25 Oct 1991 through 30 Apr 1997 | CH2M HILL | Environmental Management Directorate | Operable Unit 1 Response to Comments Volume 1 of 2.pdf | |||||
| Hill AFB, UT | 43328 | 278 | 07-DEC-98 | Operable Unit 2 Property Owners Data Packages for September 1998 Groundwater Sampling Event | CH2M HILL | Dr. Jon Ginn | OO-ALC/EMR | WP007 | S05f018.pdf | |||
| Hill AFB, UT | 43331 | 339 | 31-JAN-94 | Operable Unit 2 Source Removal System and Industrial Waste Treatment Plan Modifications Construction Report | Radian Corporation | OO-ALC/EMR | S06f056.pdf | |||||
| Hill AFB, UT | 43332 | 198 | 30-AUG-01 | Final Report OU 1 Geosystem Model and Feasibility Simulations | Duke Engineering and Services | CH2M HILL | FT009|FT081|LF001|LF003|WP002|WP080 | OU1_GeoSys_Aug2001.pdf | ||||
| Hill AFB, UT | 43337 | 199 | 22-MAR-94 | OU1 4th Qtr. 1993 Analytical Data, January 31 through March 16, 1994 | Enseco - CRL | Montgomery Watson, Co. | S04f014.pdf | |||||
| Hill AFB, UT | 43339 | 179 | 01-APR-98 | OU1 Treatability Study analytical Results July 1997 - April 1998 | Quanterra, Inc | Montgomery Watson, Inc. | s18f002.PDF | |||||
| Hill AFB, UT | 43344 | 308 | 05-MAR-91 | Public Meeting Interim Remedial Action for OU2 South Weber Elementary School March 5, 1991 7 PM | Hill AFB | S06f019.pdf |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .