This document contains a draft performance work statement and sources sought synopsis for an optimized remediation contract at Hill Air Force Base in Utah. The U.S. Army Corps of Engineers seeks information from businesses interested in a potential ten-year firm-fixed-price contract to perform environmental remediation services at 23 Installation Restoration Program sites and two Military Munitions Response Program sites on and around the base. Services include site cleanup activities, minor construction, and architectural and engineering work. Responses to the sources sought notice are requested by March 29, 2019 to provide business capability statements, relevant project examples, and business profile information. The resulting contract is expected to be awarded using best-value tradeoff procedures to a small or other-than-small business.

Hill AFB_PWS Enclosure 3 List of Available GFP

View the file

Other files

File Type Posted
EPA Comments OU6memotofile.pdf PDF
SF33 Attachment C-1 Hill AFB_PWS Enclosure 2B GFI List Hill AFB_20200113.xlsx XLSX spreadsheet
EPA Comments OU 15 2016-2017 letter work plan.pdf PDF
W923819R0050 Am 0005.pdf PDF
SF33 Attachment L-1 Labor Category Qualifications REV 16 Dec 2019.pdf PDF
SF33 Attachment C-1 Hill AFB_PWS Enclosure 2B GFI List Hill AFB_20191219.xlsx XLSX spreadsheet
W9123819R0050 Amendment 0004.pdf PDF
Hill AFB_PWS_REV_20191213.pdf PDF
SF33 Attachment B-1 Hill AFB_Sub-CLIN Structure_20191213.xlsx XLSX spreadsheet
W9123819R0050 Amendment 0003.pdf PDF
W9123819R0050 Amendment 0002 .pdf PDF
Am02 REV SF33 Attachment L-2 Past Performance Quality Questionaire.docx DOCX document
Am02 REV SF33 Attachment C-1 Hill AFB_PWS Enclosure 2B GFI List Hill AFB_20191031.xlsx XLSX spreadsheet
Solicitation_Phase_Site_Visit_Attendees_16-17_Oct_2019.pdf PDF
Hill_AFB_ORC_Existing_QandA_(PreRFP)_20191101.pdf PDF
W9123819R0050_Hill_ORC_Sol_Amendment_0001.pdf PDF
SF33_Attachment_B-1_Hill_AFB_Sub-CLIN_Structure_REV1_20191101.xlsx XLSX spreadsheet
Hill_AFB_PWS_REV_20191101.pdf PDF
Hill_AFB_Optimized_Remediation_Site_Visit_Attendees_16-17_October_2019.pdf PDF
Hill_AFB_ORC_Solicitation_Package_W9123819R0050.zip ZIP file
SF33_Attachment_L-2_Past_Performance_Quality_Questionaire.docx DOCX document
Hill_AFB_Sub-CLIN_Structure_20191016.xlsx XLSX spreadsheet
SF33_Attachment_L-1_Labor_Category_Qualifications_16_Oct_2019.docx DOCX document
Hill_AFB_PWS_V9_20191016.pdf PDF
6._Interim_Guidance_on_1-4_Dioxane,_Environmental_Restoration_Program.pdf PDF
5._Ensuring_Chemistry_Data_Fact_Sheet_April_2013.pdf PDF
3._Optimization_Benefit_Template_190520_MD_190710.docx DOCX document
2._CPSMR_template-_25Aug2019.docx DOCX document
1._ORC_PMP_Guidance_v1.0_20190920.docx DOCX document
4._AFGM2019-32-01,_AFFF_Related_Waste_Mgmt_Implementation_Guidance.pdf PDF
7._QASP_Template_v1_20190913_FINAL.DOCX DOCX document
Itinerary_HAFB_ORC_Pre-Solicitation_Tour_16-17_Oct.pdf PDF
W9123819R0050_Hill_AFB_ORC_DRAFT_Solicitation_SF33.pdf PDF
Hill_AFB_PWS_V8_Updated_20191009.pdf PDF
A01.12_Hill_AFB_PWS_V8_20190918.pdf PDF
Hill_ORC_RFIs_w_Responses_20190919.pdf PDF
8560-0006_HillAFB_OU_10_SS109_PMR4_Draft_9MAY19.pdf PDF
8560-0006_HillAFB_OU_9_GCA_Bioreactor_OM_Manual_Final_6SEP19.pdf PDF
Hill_ORC_Docs_10_Sep_2019.zip ZIP file
HillAFB_OU_15_ZZ113_ROD_Draft_2NOV17.pdf PDF
Hill_AFB_ORC_QandA_19_Aug_2019.pdf PDF
Hill_AFB_PWS_20190726.pdf PDF
Sampling_Transition_Table_HillAFB_20190701.docx DOCX document
Hill_AFB_PWS_20190603.pdf PDF
Hill_AFB_CLIN-SubCLIN_Structure.xlsx XLSX spreadsheet
Hill_AFB_PWS_Enclosure_4_OPSEC_Addendum.pdf PDF
Hill_AFB__PWS_Enclosure_2.2_List_of_Available_GFI_in_HAFB_Administrative_Record.xlsx XLSX spreadsheet
Hill_AFB_PWS_Enclosure_2.1_List_of_Available_GFI.xlsx XLSX spreadsheet
Hill_AFB_PWS_Enclosure_1_Acronyms_and_Definitions.pdf PDF
Itinerary_HAFB_ORC_Pre-Solicitation_Tour_26-27June.pdf PDF
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Government-Furnished Property (GFP) at Hill AFB

Encl 3 Hill AFB GFP.xlsx 1 of 5 6/10/2019

Hill AFB Site Item Name Item Description Manufacturer Model

Number Serial Number Qty Location

Groundwater extraction and treatment system (source area)

• Extraction Drain line System (drain lines and sumps)

• Sump Dewatering Pumps and LNAPL Recovery Pumps

• Central Facilities Building and Sump Meter Buildings

• Groundwater Pre-Treatment and LNAPL Collection System

— OWS

— LNAPL Storage Tank

— LNAPL Storage and Containment Systems

• Pump Station and Discharge Pipeline

Landfill caps and gas venting system (on-base)

• Low-permeability cap

— Three (3) slope inclinometers

• Gas venting system

— Twelve (12) vents

Source recovery system (on-base)

• Collection/feed system

• Phase separation tanks and treated effluent tank

• Recovered solvent storage and disposal tank (Building 754)

• Steam stripper (inactive)

• OU 1 transfer pipeline

• Air compressor

Groundwater Extraction and Treatment System

• Source area containment wall

• Upgradient Control System (UCS) extraction trench

• Two (2) Spring gravel interceptor trenches

• North Interceptor Trench (NIT)

• Collection/feed system

• Air Stripper Treatment Plant (ASTP)

• Slope inclinometer

Cap

• Asphalt cap − Aggregate base subgrade overlain by a 2-in. layer of hydraulic asphalt − 2- to 3-in. layer of stone-matrix asphalt overlay

Groundwater extraction system (inactive)

• Dewatering system − Four (4) extraction wells − Double-walled pipeline − Leak detection system

Eastern & Western caps on Landfill 1 (on-base)

• Multi-component soil cap system

— Bentonite mat with 2 ft of soil cover

Horizontal drain collection system (on-base)

• Three horizontal drains

• Treatment Building

— 2,000-gallon equalization tank

— Low-profile tray air stripper (inactive)

LF001OU1

WP007OU2

WP005OU3

LF011OU 4

Encl 3 Hill AFB GFP.xlsx 2 of 5 6/10/2019

Hill AFB Site Item Name Item Description Manufacturer Model

Number Serial Number Qty Location

Subgrade Biogeochemical Reactor (SBGR)

• Five (5) extraction wells

• Solar panel array

• Conveyance piping from five (5) extraction wells to column array (infiltration wells)

• Ten columns with coarse gravel and mulch coated soybean oil and zero-valent iron (ZVI)

— 2-in.-diameter injection well in the center of each column

Groundwater Extraction Trench System (GWETS) (off-base)

• 600 foot long drain Line

• 650 foot long Soil Bentonite Cutoff Wall (SBCW)

• 4-foot diameter pre-cast concrete sump

• 4-inch diameter stainless steel butterfly valve

• Two (2) rail guided sump pumps

• Control panel and variable frequency drives (VFD)

• Programmable logic controller (PLC)

• Twenty-two (22) transducers located in nineteen (19) piezometers and three (3) well points

• Double wall HDPE conveyance piping

• 900 square foot maintenance building complete with office and bathroom facilities

• Piping header inside the maintenance building consisting of valves, flow totalizer, & sample port

Aeration curtain (off-base)

• Blower building

• Sparge system

— Air sparge blower

— Gravel-filled trench

— Air-air heat exchanger

— Three (3) sub-modules consisting of four (4) sparge sub-modules designed as either 30 ft long piece of 4” HDPE piping installed horizontally 30 ft bgs or vertical wells constructed with 2” HDPE piping and completed at approximately 24 ft bgs.

• Interlock/Alarm System

• Trench and Cap

On-base groundwater extraction system

• Eight (8) 6-inch extraction wells and pumps

• Conveyance piping

• Secondary containment system

• Treatment system (building)

• Air stripper (inactive)

• Discharge system

— air stripper sump

— centrifugal discharge pump

— pump controller

— effluent flow totalizer

— drain field (inactive)

• Interlock/alarm system

SS017OU5

Encl 3 Hill AFB GFP.xlsx 3 of 5 6/10/2019

Hill AFB Site Item Name Item Description Manufacturer Model

Number Serial Number Qty Location

Groundwater extraction system (off-base)

• Six (6) 6-inch extraction wells and pumps

• Seep diversion (U6-305)

• Conveyance piping

• Secondary containment system

• Treatment system (building)

— air stripper (inactive)

• Discharge system

— air stripper sump

— centrifugal discharge pump

— pump controller

— effluent flow totalizer

• Interlock/alarm system

— Programmable Logic Control System

The Liquid Phase Granular Activated Carbon (LGAC) Treatment System (off-base) • LGAC unit: Geotech Model GAC-L-55 vessel pre-filled with 200 pounds of coal-based GAC (inactive)

Concrete floor cap • Concrete floor inside Building 225

Soil moisture monitoring system under the building

• Three (3) monitoring wells

• Six (6) soil moisture probes

1,2-DCA extraction system (off-base)

• Three (3) 6-inch diameter extraction wells with submersible pumps

• Conveyance lines

• Manholes/vaults and

• Electronic control systems

Base boundary groundwater containment system

• Eight (8) groundwater extraction wells

• Doublewalled conveyance piping

• Instrumentation and controls to operate the system and monitor system performance (building)

• Discharge line to sanitary sewer

OU9 SS090 Bioreactor

• Recirculation piping

• Extraction well and vault

Groundwater Mass Removal System(on-base)

• Four (4) groundwater extraction wells (3 wells in operation, 4th well being installed)

• Doublewalled conveyance piping

• Air stripper (shed)

• Discharge line to sanitary sewer

Source Area Treatment • SVE

OU8 OT033

OU11 OT097

SS027OU7

OT026OU6

Encl 3 Hill AFB GFP.xlsx 4 of 5 6/10/2019

Hill AFB Site Item Name Item Description Manufacturer Model

Number Serial Number Qty Location

Base Boundary Hydraulic Containment System

(HCS)

• Treatment building

• Programmable Logic Controller (PLC)

• Seven (7) extraction wellheads, well vaults, piping infrastructure within the vaults, extraction pumps and pump motor termination filter, and electrical connections at the wellhead

• Extraction and discharge piping runs and building penetrations, including the piping run trace location wiring and instrument terminal connection points, the discharge line leak detection sump alarm, and the HCS building leak detection sump alarm

• HCS building equalization tank, including tank level instrumentation, and tank isolation valve. The HCS building equalization tank discharge pumping system, including the discharge

Permeable reactive barrier (PRB) off-base PRB is constructed of a granular zero-valent iron (ZVI) and sand mixture (inactive)

Vapor intrusion mitigation systems (VIMS)

• 128 VIMS

— Carbon monoxide detector

— Piping

— Fan and fan shroud

— Approx. twelve (12) sump pumps

— Approx. twenty (20) sump covers

Sewer Vent systems

• Two (2) Sewer vent systems

— Vent fan

— Utility meter

— Tamper resistant enclosure

— Electrical conduit

OUA

Little

Mountain WP008 Assisted Passive Soil Vapor Extraction

• Two (2) microblower systems

— Passive vent stacks

— One-way passive vent valves

— Blower motors

— Solar panels

— Batteries

— Control boxes and locks

Misc Cord, SO for generator hook up CED 1 OU1

Misc Pipe/Cable and Magnetic Locator, Dual Frequency with Case and Transmitter

MAC-51Bx Schonstedt MAC-51Bx 171780 1 OU2

Misc Pump, diaphragm, 2" Polypropylene and PVDF air operated

2A0D-PVVT Price Pump Company

2A0D-PVVT SN 88378 1 OU2

Misc Brush Cutter, walk behind, self-propelled Outback BC2401-H Billy Goat Outback

BC2401-H

31301111 1 OU2

Misc Plow, 7'6" cutting edge Minute Mount MM2 DBI/SALA L1850-60S-1 I1441697103863 1 OU2

Misc Controller with pump and hoses, DNAPL pump 2010DA Carson Pneumatic Pump

2010DA 1 OU2

Misc Trailer, dual axel, Government license 96X2714 7000 lbs A-Z Mfg 7000 lbs 4PSUE1620TL010244 1 OU2

Misc Trailer, single axel, Government License #91X2715

2995 lbs Big Tex 16VAX0313M1A12616 1 OU2

Misc Trailer, single axle, utility, not licensed 2000 lbs Big Bubba's Trailer 5F7U80144000224 1 OU2

Misc Winch (and tripod) for confined space entry L1850-60S-1 DBI/SALA L1850-60S-1 1 OU2

OU12 SD107

OU15 ZZ113

Encl 3 Hill AFB GFP.xlsx 5 of 5 6/10/2019

Hill AFB Site Item Name Item Description Manufacturer Model

Number Serial Number Qty Location

Notes:

1. Specific component information for each treatment system can be found in the OU specific O&M manuals and the CERCLA Caps O&M manual accessible through the Hill AFB Admin Record http://afcec.publicadmin-record.us.af.mil

2. Operable Units 9 (SS089), 10, 13, and 14 do not contain GFP http://afcec.publicadmin-record.us.af.mil/