This document contains a draft performance work statement and sources sought synopsis for an optimized remediation contract at Hill Air Force Base in Utah. The U.S. Army Corps of Engineers seeks information from businesses interested in a potential ten-year firm-fixed-price contract to perform environmental remediation services at 23 Installation Restoration Program sites and two Military Munitions Response Program sites on and around the base. Services include site cleanup activities, minor construction, and architectural and engineering work. Responses to the sources sought notice are requested by March 29, 2019 to provide business capability statements, relevant project examples, and business profile information. The resulting contract is expected to be awarded using best-value tradeoff procedures to a small or other-than-small business.
Hill AFB_PWS Enclosure 3 List of Available GFP
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Government-Furnished Property (GFP) at Hill AFB
Encl 3 Hill AFB GFP.xlsx 1 of 5 6/10/2019
Hill AFB Site Item Name Item Description Manufacturer Model
Number Serial Number Qty Location
Groundwater extraction and treatment system (source area)
• Extraction Drain line System (drain lines and sumps)
• Sump Dewatering Pumps and LNAPL Recovery Pumps
• Central Facilities Building and Sump Meter Buildings
• Groundwater Pre-Treatment and LNAPL Collection System
— OWS
— LNAPL Storage Tank
— LNAPL Storage and Containment Systems
• Pump Station and Discharge Pipeline
Landfill caps and gas venting system (on-base)
• Low-permeability cap
— Three (3) slope inclinometers
• Gas venting system
— Twelve (12) vents
Source recovery system (on-base)
• Collection/feed system
• Phase separation tanks and treated effluent tank
• Recovered solvent storage and disposal tank (Building 754)
• Steam stripper (inactive)
• OU 1 transfer pipeline
• Air compressor
Groundwater Extraction and Treatment System
• Source area containment wall
• Upgradient Control System (UCS) extraction trench
• Two (2) Spring gravel interceptor trenches
• North Interceptor Trench (NIT)
• Collection/feed system
• Air Stripper Treatment Plant (ASTP)
• Slope inclinometer
Cap
• Asphalt cap − Aggregate base subgrade overlain by a 2-in. layer of hydraulic asphalt − 2- to 3-in. layer of stone-matrix asphalt overlay
Groundwater extraction system (inactive)
• Dewatering system − Four (4) extraction wells − Double-walled pipeline − Leak detection system
Eastern & Western caps on Landfill 1 (on-base)
• Multi-component soil cap system
— Bentonite mat with 2 ft of soil cover
Horizontal drain collection system (on-base)
• Three horizontal drains
• Treatment Building
— 2,000-gallon equalization tank
— Low-profile tray air stripper (inactive)
LF001OU1
WP007OU2
WP005OU3
LF011OU 4
Encl 3 Hill AFB GFP.xlsx 2 of 5 6/10/2019
Hill AFB Site Item Name Item Description Manufacturer Model
Number Serial Number Qty Location
Subgrade Biogeochemical Reactor (SBGR)
• Five (5) extraction wells
• Solar panel array
• Conveyance piping from five (5) extraction wells to column array (infiltration wells)
• Ten columns with coarse gravel and mulch coated soybean oil and zero-valent iron (ZVI)
— 2-in.-diameter injection well in the center of each column
Groundwater Extraction Trench System (GWETS) (off-base)
• 600 foot long drain Line
• 650 foot long Soil Bentonite Cutoff Wall (SBCW)
• 4-foot diameter pre-cast concrete sump
• 4-inch diameter stainless steel butterfly valve
• Two (2) rail guided sump pumps
• Control panel and variable frequency drives (VFD)
• Programmable logic controller (PLC)
• Twenty-two (22) transducers located in nineteen (19) piezometers and three (3) well points
• Double wall HDPE conveyance piping
• 900 square foot maintenance building complete with office and bathroom facilities
• Piping header inside the maintenance building consisting of valves, flow totalizer, & sample port
Aeration curtain (off-base)
• Blower building
• Sparge system
— Air sparge blower
— Gravel-filled trench
— Air-air heat exchanger
— Three (3) sub-modules consisting of four (4) sparge sub-modules designed as either 30 ft long piece of 4” HDPE piping installed horizontally 30 ft bgs or vertical wells constructed with 2” HDPE piping and completed at approximately 24 ft bgs.
• Interlock/Alarm System
• Trench and Cap
On-base groundwater extraction system
• Eight (8) 6-inch extraction wells and pumps
• Conveyance piping
• Secondary containment system
• Treatment system (building)
• Air stripper (inactive)
• Discharge system
— air stripper sump
— centrifugal discharge pump
— pump controller
— effluent flow totalizer
— drain field (inactive)
• Interlock/alarm system
SS017OU5
Encl 3 Hill AFB GFP.xlsx 3 of 5 6/10/2019
Hill AFB Site Item Name Item Description Manufacturer Model
Number Serial Number Qty Location
Groundwater extraction system (off-base)
• Six (6) 6-inch extraction wells and pumps
• Seep diversion (U6-305)
• Conveyance piping
• Secondary containment system
• Treatment system (building)
— air stripper (inactive)
• Discharge system
— air stripper sump
— centrifugal discharge pump
— pump controller
— effluent flow totalizer
• Interlock/alarm system
— Programmable Logic Control System
The Liquid Phase Granular Activated Carbon (LGAC) Treatment System (off-base) • LGAC unit: Geotech Model GAC-L-55 vessel pre-filled with 200 pounds of coal-based GAC (inactive)
Concrete floor cap • Concrete floor inside Building 225
Soil moisture monitoring system under the building
• Three (3) monitoring wells
• Six (6) soil moisture probes
1,2-DCA extraction system (off-base)
• Three (3) 6-inch diameter extraction wells with submersible pumps
• Conveyance lines
• Manholes/vaults and
• Electronic control systems
Base boundary groundwater containment system
• Eight (8) groundwater extraction wells
• Doublewalled conveyance piping
• Instrumentation and controls to operate the system and monitor system performance (building)
• Discharge line to sanitary sewer
OU9 SS090 Bioreactor
• Recirculation piping
• Extraction well and vault
Groundwater Mass Removal System(on-base)
• Four (4) groundwater extraction wells (3 wells in operation, 4th well being installed)
• Doublewalled conveyance piping
• Air stripper (shed)
• Discharge line to sanitary sewer
Source Area Treatment • SVE
OU8 OT033
OU11 OT097
SS027OU7
OT026OU6
Encl 3 Hill AFB GFP.xlsx 4 of 5 6/10/2019
Hill AFB Site Item Name Item Description Manufacturer Model
Number Serial Number Qty Location
Base Boundary Hydraulic Containment System
(HCS)
• Treatment building
• Programmable Logic Controller (PLC)
• Seven (7) extraction wellheads, well vaults, piping infrastructure within the vaults, extraction pumps and pump motor termination filter, and electrical connections at the wellhead
• Extraction and discharge piping runs and building penetrations, including the piping run trace location wiring and instrument terminal connection points, the discharge line leak detection sump alarm, and the HCS building leak detection sump alarm
• HCS building equalization tank, including tank level instrumentation, and tank isolation valve. The HCS building equalization tank discharge pumping system, including the discharge
Permeable reactive barrier (PRB) off-base PRB is constructed of a granular zero-valent iron (ZVI) and sand mixture (inactive)
Vapor intrusion mitigation systems (VIMS)
• 128 VIMS
— Carbon monoxide detector
— Piping
— Fan and fan shroud
— Approx. twelve (12) sump pumps
— Approx. twenty (20) sump covers
Sewer Vent systems
• Two (2) Sewer vent systems
— Vent fan
— Utility meter
— Tamper resistant enclosure
— Electrical conduit
OUA
Little
Mountain WP008 Assisted Passive Soil Vapor Extraction
• Two (2) microblower systems
— Passive vent stacks
— One-way passive vent valves
— Blower motors
— Solar panels
— Batteries
— Control boxes and locks
Misc Cord, SO for generator hook up CED 1 OU1
Misc Pipe/Cable and Magnetic Locator, Dual Frequency with Case and Transmitter
MAC-51Bx Schonstedt MAC-51Bx 171780 1 OU2
Misc Pump, diaphragm, 2" Polypropylene and PVDF air operated
2A0D-PVVT Price Pump Company
2A0D-PVVT SN 88378 1 OU2
Misc Brush Cutter, walk behind, self-propelled Outback BC2401-H Billy Goat Outback
BC2401-H
31301111 1 OU2
Misc Plow, 7'6" cutting edge Minute Mount MM2 DBI/SALA L1850-60S-1 I1441697103863 1 OU2
Misc Controller with pump and hoses, DNAPL pump 2010DA Carson Pneumatic Pump
2010DA 1 OU2
Misc Trailer, dual axel, Government license 96X2714 7000 lbs A-Z Mfg 7000 lbs 4PSUE1620TL010244 1 OU2
Misc Trailer, single axel, Government License #91X2715
2995 lbs Big Tex 16VAX0313M1A12616 1 OU2
Misc Trailer, single axle, utility, not licensed 2000 lbs Big Bubba's Trailer 5F7U80144000224 1 OU2
Misc Winch (and tripod) for confined space entry L1850-60S-1 DBI/SALA L1850-60S-1 1 OU2
OU12 SD107
OU15 ZZ113
Encl 3 Hill AFB GFP.xlsx 5 of 5 6/10/2019
Hill AFB Site Item Name Item Description Manufacturer Model
Number Serial Number Qty Location
Notes:
1. Specific component information for each treatment system can be found in the OU specific O&M manuals and the CERCLA Caps O&M manual accessible through the Hill AFB Admin Record http://afcec.publicadmin-record.us.af.mil
2. Operable Units 9 (SS089), 10, 13, and 14 do not contain GFP http://afcec.publicadmin-record.us.af.mil/