Hill_AFB_PWS_20190603.pdf
PDF 598 KB Posted
- Attached to
- Optimized Remediation Contract for Hill AFB, UT Federal contract opportunity
- Solicitation number
- W91238-19-R-0050
About this file
This sources sought synopsis requests capability statements from interested parties for an optimized remediation contract at Hill Air Force Base in Utah. The ten-year contract will provide environmental remediation services at 23 Installation Restoration Program sites and two Military Munitions Response Program sites. Services include environmental services, minor construction, and architecture and engineering. Interested parties must submit capability statements by March 29th that include their experience, past performance on similar projects, and business size designation. The contract type will be firm-fixed-price and awarded using a best-value tradeoff acquisition. The estimated value is over $20.5 million to qualify as a small business set-aside. Responses are limited to ten pages and must include key contact information and descriptions of at least four relevant past projects demonstrating experience in environmental remediation and managing multi-site projects over wide geographical areas.
Hill AFB_PWS_20190603
View the file
Other files for this federal contract opportunity
Show all 50
Optimized Remediation Contract for Hill AFB, UT has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
OPTIMIZED REMEDIATION CONTRACT (ORC)
AT
HILL AIR FORCE BASE (AFB), UT
CONTRACT NUMBER: TBD
3 June 2019
1.0 SCOPE
This requirement is for environmental remediation activities at Hill AFB. This Performance Work Statement (PWS) defines the scope of environmental services necessary to conduct site restoration. The range of activities include maintenance of established remedies, implementation of optimization to enhance remedial progress at applicable sites, and achievement of site specific objectives as identified in each contract. The Contractor shall undertake Environmental Remediation activities to achieve Performance Objectives (POs) at 23 Installation Restoration Program (IRP) sites and three (3) Military Munitions Response Program (MMRP) sites.
1.1 Introduction
HAFB is located in northern Utah, approximately 25 miles north of Salt Lake City and about five miles south of Ogden. The Installation occupies approximately 6,700 acres in Davis and Weber counties. The Installation is bounded on the west by Interstate 15 and the Davis-Weber Canal; and on the east by private property. HAFB and earlier military installations that occupied the Installation operated industrial facilities related to military aircraft since the construction of the Ogden Air Depot in 1940. Many different aircraft, missile, and weapons systems have been maintained and tested in the course of continuous operation and expansion of the Installation since its inception. Industrial activities at HAFB have created a number of hazardous waste sites. Contamination from chemicals has impacted the groundwater and formed large plumes, both on and off Installation.
HAFB is also responsible for two off-base properties – Little Mountain Test Facility (LMTF) and the Utah Test and Training Range (UTTR). LMTF is a 740-acre annex located 12 miles northwest of HAFB. It has been used from the 1950’s through the present for missile component testing. The UTTR is not included in this contract.
Remediation activities at HAFB are being conducted pursuant to Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act (SARA), and National Oil and Hazardous Substances Contingency Plan (NCP) requirements. Regulatory oversight is provided by the US Environmental Protection Agency (USEPA) and Utah Department of Environmental Quality
(UDEQ).
HAFB was placed on the National Priorities List (NPL) in 1987. The IRP and MMRP sites at the installation are being administered under a Federal Facility Agreement (FFA) signed by USEPA and UDEQ in 1991.
Environmental remediation activities at LMTF are being conducted pursuant to the CERCLA in accordance with an Integration Agreement (IA) with regulatory oversight provided by UDEQ.
The LMTF is not on the NPL.
FOR OFFICIAL USE ONLY
The Contractor is solely responsible for reviewing all publicly available information and forming their independent, professional conclusions/interpretation of site conditions and requirements to achieve the POs of this contract.
1.2 Overview of ORC Scope and Requirements
The Contractor shall perform all the necessary environmental remediation activities required to achieve the POs of this PWS. This PWS and enclosures listed below include general requirements of the project to meet the Air Force (AF) objectives:
• Enclosure 1 – Acronyms and Definitions
• Enclosure 2 – Government Furnished Information
• Enclosure 3 – Government Furnished Property
• Enclosure 4 – Operations Security (OPSEC) Addendum
The AF is required to implement remedies as necessary to enable the mission, protect human health and the environment and comply with laws and regulations. The goal of the ORC initiative is to ensure the AF continues to fulfill all facets of its Environmental Restoration Program (ERP) mission, while effectively and efficiently managing the program in a performance-based, results-oriented and cost conscious framework. The AF desires all sites be cleaned up to standards that allow for the current or reasonably anticipated future land use of the property. The intent of the ORC initiative is to advance site cleanup during the Period of Performance (POP) in the most efficient and cost-effective manner as supported by a business case analysis that achieves the greatest reduction in life-cycle cost (LCC). The AF is interested in substantial reduction of long-term environmental liabilities and total LCCs. Hand in hand, accurate documentation and reporting of contaminant removal and cost savings are critical adjuncts to optimization success. The AF defines optimization, under the ORC, as the reduction of contaminant mass and concentrations, reduction in LCC, or any combination of activities leading to acceleration of Response Complete (RC)/Site Closeout (SC), as a result of remedial implementation the Contractor undertakes, above and beyond what is required to maintain compliance in accordance with an approved Decision Document (DD).
The Contractor shall function as an integral team member in support of the Air Force Civil Engineer Center (AFCEC) mission to include the sharing of information with United States Army Corps of Engineers (USACE), other AFCEC Contractors and AF personnel; and cooperation with community stakeholders, regulators, and other Government entities in accordance with the Community Involvement Plan.
Requirements for efficient management of this contract include, but are not limited to, the achievement of the POs in the Performance Period (PP) per Table 1 of this PWS, and timely identification and solution of impediments to successful project execution. The Contractor shall provide all personnel, equipment, supplies, tools, materials and other items necessary to perform the tasks defined in this PWS. The Contractor is solely responsible for reviewing all publicly available information and forming their independent, professional conclusions/interpretations of site conditions and requirements to achieve the POs of this contract within PP specified for each site. AFCEC will rely on the Contractor’s expertise in recognizing and addressing problematic issues during the execution of this contract. The Contractor shall perform all work in accordance with federal, state, and local statutes and regulations. The Contractor shall also comply with Installation regulations. Remedies shall conform to environmental permits, DD requirements, or other legal requirements.
Site specific POs are identified in Table 1: Performance Table below. POs that are in keeping with standard Defense Environmental Restoration Program (DERP) milestones are defined in Enclosure 1. In addition, for certain categories of sites, the AF has set data-driven POs based on current site conditions in keeping with the POP of the contract and ORC goal. These POs are Optimized Exit Strategy (OES), Alternate Objectives, and Reduce LCC; these terms are described below.
The PP specified in Table 1 starts from the Obligation Date of the first Sub-CLIN for the site unless otherwise specified. All approvals (both Government and regulator) per the Performance Standard are required in writing.
1.2.1 Optimized Exit Strategy (OES)
Not Applicable.
1.2.2 Alternate Objectives
Table 1 of the PWS identifies Alternate Objectives as the PO for selected sites. These sites have complex attributes that have, to date, inhibited progress towards the achievement of RC. For Alternate Objective sites, as for all sites in Table 1 of the PWS where applicable, the Contractor shall maintain compliance throughout the POP of the contract with all existing regulatory requirements including but not limited to regulations, Federal Facility Agreements, RCRA Permits, final or interim RODs, or other equivalent remedial DDs. The Contractor is responsible for implementing changes to the monitoring program based activities in the Advanced Site Characterization (PWS Section 1.2.2.1).
Based on technical review of existing site conditions/activities, the AF placed sites in the category of Alternate Objective if one or more of the following conditions exist:
a) Achieving RC is expected to require substantially longer than 30 years
b) Achieving RC is unattainable with standard characterization and/or existing remediation technology due to technical or other limitations related to site conditions
c) Achieving RC is anticipated to require advanced site characterization technologies to improve the Conceptual Site Model (CSM), determine appropriate remedial technology, and/or characterize recently regulated contaminants
The AF will use data and information obtained during execution of this PWS to determine restoration potential and future investment strategies at Alternative Objective sites. Each Sub- CLIN for the Alternate Objective sites will only be awarded if the activities are needed to determine the future investment strategy for the site. The decision to award each Sub-CLIN resides solely at discretion of the AF.
For each Alternate Objective site, a summary of site-specific considerations is provided as Government Furnished Information (GFI). As with all GFI provided, this GFI is provided for informational purposes only; the Contractor remains responsible for developing their own independent, professional conclusions/interpretation of site conditions and requirements to achieve the PO. The Contractor shall conduct project scoping sessions before work plan development and throughout the planning and execution of the project to meet the PO including the Installation Point(s) of Contact (POC[s]), the AFCEC Program Manager, the AF technical support team, and USACE COR. Upon approval by the Government team, the Contractor shall participate in scoping sessions with the regulators, as appropriate.
1.2.2.1 Advanced Site Characterization
Based on existing data, the AF has determined that the existing remedial approaches at the Alternative Objective sites are not achieving satisfactory remedial progress towards their intended goals. In order for the AF to determine the best path forward for these sites, the Contractor shall conduct Advanced Site Characterization to collect data to update and refine the CSM in order to achieve the following goals: (1) Fill data gaps; and (2) Collect data needed to:
(A) Determine why existing and previous remedial actions are not effective at achieving remedial progress; (B) Determine appropriate remedial technology(ies) based on site conditions;
C) Develop remediation design parameters for recommended technology(ies); and D) Characterize recently regulated contaminants, if required.
Advanced Site Characterization includes the following three activities: (1) Supplemental Site Investigation (SSI), (2) Revised CSM, and (3) Groundwater Monitoring Program Update.
1.2.2.1.1 Supplemental Site Investigation (SSI)
The Contractor shall conduct an SSI to collect data necessary to improve the CSM, determine appropriate remedial technology, support remediation design and construction, and/or characterize recently regulated contaminants. The Contractor shall implement advanced characterization methods, both established approaches and state-of-science techniques consistent with AF, regulatory, Interstate Technology and Regulatory Council (ITRC), and Strategic Environmental Research and Development Program/Environmental Security Technology Certification Program (SERDP/ESTCP) guidance to attain these objectives. Data collection includes better definition of the geology, hydrogeology, geochemistry, and/or distribution of Contaminants of Concern (COCs), as required. The Contractor shall evaluate the need for, and collect the following data where appropriate in support of: (1) Source Zone Delineation; (2) Source Strength1,2,3 ; (3) Vertical and lateral extent of contamination, if not sufficiently defined;
(4) Plume Stability4; (5) Migration pathway, rates, and fluxes in 3-D; (6) Mass distribution; (7) Biogeochemical framework; (8) Impact of recent and historical remedies on site conditions; and
1 ITRC. (2015). Integrated DNAPL Site Characterization and Tool Selection.
2 SERDP/ESTCP. (2012). Matrix Diffusion Tool Kit.
3 USEPA. (2009). Evaluating Natural Source Zone Depletion at Sites with LNAPL.
4 USEPA. (2014). High Resolution Site Characterization for Groundwater Short Course, 23rd Annual NARPM Training Program.
(9) Comprehensive Risk including updating the baseline risk assessment, if needed, and the vapor intrusion pathway.
The SSI report shall document data collection efforts to include a risk evaluation, if appropriate.
The Contractor shall evaluate and provide recommendations regarding whether additional source control is needed or whether the plume, or portions of the plume, are amenable to natural attenuation by conducting source strength and plume stability evaluations as needed.
1.2.2.1.2 Revised Conceptual Site Model
The Contractor shall develop a revised CSM in 3-D to include establishing or updating existing fate and transport models based on existing data and data gathered during the SSI. The CSM should cover the source area and the distal plume, to include the lateral and vertical extent of the contaminants in the context of geologic/hydrogeological parameters and the remedial actions conducted to date.
1.2.2.1.3 Groundwater Monitoring Program Update
The Contractor shall evaluate the current horizontal and vertical well distribution to determine if the following can be properly evaluated:
Remedy performance in treatment areas Hydrogeology, plume geometry, horizontal and vertical plume stability, and matrix diffusion across site Plume migration through use of perimeter/boundary wells and sentinel wells
Based on the well network evaluation, and coordinated and approved by the Government and regulators (if required), the Contractor shall optimize the monitoring well network to include adjusting sample collection frequency and the addition of new wells as appropriate. The Contractor shall update the Basewide or Site-specific Monitoring Plan or other equivalent document, as appropriate.
1.2.2.2 Remedy Evaluation and Recommendation
Based on all existing data and data gathered during the Advanced Site Characterization, the Contractor shall evaluate the existing active and/or passive remedy(ies)5,6,7. The Contractor shall provide recommendations to augment, modify, and/or replace the existing remedy8. The evaluation and recommendations will include a cost-benefit analyses and evaluation of the usability, expandability, and/or discontinued use of any existing infrastructure. All remedy recommendations must include design performance model addressing all COCs and breakdown products. Performance models need to address reductions in contaminant mass, concentration, and risk as well as reductions in remedial timeframe.
5 USEPA. (2010). Best Management Practices.
6 USEPA. (2014). Groundwater Remedy Completion Strategy.
7 ITRC. (2006). Performance-Based Management.
8 ITRC. (2010). Use and Measurement of Mass Flux and Mass Discharge.
Where necessary to evaluate the proposed technology, the Contractor shall conduct pilot scale technology demonstrations. The Contractor shall identify appropriate remedial technologies and target zones, design/plan, conduct, and evaluate the pilot and/or field scale technology consistent with AF, regulatory, and ITRC guidance. The Contractor shall determine performance monitoring criteria and identify a control sub-site (current state) for comparison and to evaluate results.
In some instances, achievement of RC may not be feasible with currently available technologies within a reasonable timeframe. If this is the case, Contractor shall develop and evaluate alternatives for site management that will be protective of human and ecological health. If this recommendation is made, it must include the rationale, recommended metric when active remediation can cease, and a strategy for obtaining regulatory buy-in.
1.2.2.3 Decision Document Amendment
Based on the results of the remedy evaluation and recommendation, it may be necessary to amend the DD to augment, modify, and/or replace the existing remedy. If warranted, the Contractor shall update the DD.
1.2.3 Remedial Action – Operation (RA-O) and Reduce Life-cycle Cost (LCC)/Long Term
Management (LTM) and Reduce LCC
Table 1 of the PWS identifies RA-O and Reduce LCC or LTM and Reduce LCC as the PO for selected sites in accordance with the optimization initiative. The goal of these POs is to minimize future AF liability and cost to the greatest degree feasible utilizing remedial optimization techniques. Reduce LCC sites have achieved Remedy in Place (RIP) or RC, have remedies that are effective (source control, risk mitigation, and plume stability) and have the potential for LCC reduction through a variety of optimization actions, for example:
• Reducing sampling frequency
• Reducing system operations
• Reducing number of wells sampled per event
• Reducing number of analytes per sampling event The Contractor shall achieve the following objectives for each Reduce LCC site:
• Maintain compliance with all DDs and Permits (currently in place or to be approved) throughout the POP.
• Deliver a Reduce LCC Plan, as a stand-alone plan or in the PMP, that identifies opportunities to improve cost efficiency of RA-O or LTM activities, and the planned approach for implementation. The Reduce LCC Plan shall:
o Provide a basis for proposed reductions in LCC throughout the POP compared to the cost of status-quo activities (those required to maintain compliance). The planned reduction can be illustrated using a line graph (current, planned, achieved) or verbiage describing the current and planned reductions.
o Estimate reduction of LCC proposed within the POP as well as post-POP.
o Document risk and mitigation strategies for implementing optimization activities to reduce LCC.
• Update or revise site-specific work plans, monitoring plans, and/or DDs, as appropriate.
• Deliver Reduce LCC Reports to document progress in achieving the planned reductions when those reductions are achieved. Reduce LCC Reports may be combined with monitoring reports. Payments for cost avoidance as a result of reductions in required activities are contingent upon regulatory approval.
• Deliver a Reduce LCC Summary and Forecasting Report two years prior to the POP end date. The Reduce LCC Summary and Forecasting Report shall:
o Document optimization activities to date, the cost avoidance during the PoP (paid to the Contractor) as a result of those activities, the projected reduced cost of RA- O or LTM activities for 30 years post POP, and forecast remaining opportunities to Reduce LCC 10 years post POP.
o Provide a realistic schedule to achieve SC or RC after the POP (the Contractor shall identify which PO is the optimal endpoint).
Table 1: Performance Table
Site Performance Objective Performance
Period Performance Standard
N/A Project Management Plan (PMP):
1) Draft PMP
2) Final PMP
3) Updates as necessary
Draft PMP within 60 calendar days from contract award, Final PMP within 14 calendar days of receipt of Contracting Officer’s Representative (COR) comments on the draft, and update as necessary throughout the
POP
AF and USACE approval of PMP.
The PMP should be maintained with accuracy and completeness based on the current technical approach for each site, management structure, etc.
N/A Quality Assurance Surveillance Plan (QASP)
Draft QASP within 60 calendar days from contract award and updates as necessary throughout the
POP.
AF and USACE approval of QASP.
Period
Performance Standard
N/A Integrated Master Schedule (IMS)/Milestone Payment Schedule (MPS)
Draft IMS/MPS within 60 calendar days from contract award, Final IMS/MPS within 14 calendar days of receipt of COR comments on the draft, and updates monthly throughout the
POP
AF and USACE approval of
IMS/MPS.
N/A Basewide Quality Program Plans (QPP) Draft Basewide QPP within 60 calendar days from contract award and update as necessary throughout the
POP
AF and USACE and regulatory approval of Basewide QPP.
N/A Operate Soil Management System (SMS) and/or the Heavy Equipment Decontamination Pad (HEDP)
Through the duration of the
POP
Operate the SMS in compliance with the SMS Operation and Maintenance Manual and without any Notices of Violation (NOVs). Operate the HEDP in compliance with the HEDP Operation Manual.
Hill AFB, UT
BP504
(OU 14)
Long Term Management (LTM) in accordance with the approved Decision Document(s) (DDs)
Through the duration of the
POP
AF, USACE, and regulatory approval of LTM documentation (e.g., Assessment Report for Land Use Controls).
BP504A
(OU 14)
LTM in accordance with the approved DDs Through the duration of the
POP
AF, USACE, and regulatory approval of LTM documentation (e.g., Assessment Report for Land Use Controls).
BP504B
(OU 14)
LTM in accordance with the approved DDs Through the duration of the
POP
AF, USACE, and regulatory approval of LTM documentation (e.g., Assessment Report for Land Use Controls).
DB001 Response Complete (RC)
Upon achievement of RC, continue LTM in accordance with the approved DDs throughout the duration of the
POP
Five (5) years AF, USACE, and regulatory approval of RC (i.e., AF signature on Final Remedial Action Completion Report).
AF, USACE, and regulatory approval of LTM documentation (e.g., Assessment Report for Land Use Controls).
LF001
(OU 1)
Remedial Action – Operations (RA-O) in accordance with the approved DDs and any DD changes
Through the duration of the
POP
AF, USACE, and regulatory approval of RAO documentation (e.g., Annual RA-O Reports, Monthly O&M Reports, etc.).
Period
Performance Standard
LF001
(OU 1)
ROD Amendment, if necessary, based on the cis-1,2- DCE and chlorobenzene evaluation
Two (2) years from the Obligation Date of Sub-CLIN
0013AA
AF, USACE, and regulatory approval of ROD Amendment (i.e., AF and Regulatory signatures on Final ROD Amendment).
LF011
(OU 4)
Remedial Action – Operations (RA-O) in accordance with the approved DDs
Through the duration of the
POP
AF, USACE, and regulatory approval of RAO documentation (e.g., Annual RA-O Reports, Monthly O&M Reports, etc.).
LF011
(OU 4)
Decommission OU4 Phytostabilization Study Site including removal of wire woven mesh fence from around two (2) plots of trees, weather station, and data acquisition system
One (1) year from the Obligation Date of Sub-CLIN
0014AA
AF and USACE approval of a letter report describing removal efforts and final disposition of equipment.
LF011
(OU 4)
Evaluate effectiveness, efficacy, and adequacy of the existing remedy(ies) across site to include the landfill cap, five enhanced reductive dechlorination (ERD) biobarriers, ERD bioreactor and horizontal drain upgradient system (HUDS), per the current ROD and RD/RA Work Plan to target the plume (in accordance with (USEPA, 20109; USEPA, 201410), and (ITRC, 200611)). Evaluation should include usability and expandability of the existing infrastructure. Implement comprehensive performance monitoring of the ERD area and ensure up-/side-/downgradient monitoring of the flux through ERD biobarriers.
Two (2) years from the Obligation Date of Sub-CLIN
0014AB
AF and USACE approval of the Remedy Evaluation and Recommendations Report.
LF012
(OU 4)
ROD Amendment addressing the 2013 Five-Year Review finding
Four (4) years AF, USACE, and regulatory approval of ROD Amendment (i.e., AF and regulatory signatures on Final ROD Amendment).
LF012
(OU 4)
LTM in accordance with the approved DDs and any post- ROD changes
Through the duration of the
POP
AF, USACE, and regulatory approval of LTM documentation (e.g., Assessment Report for Land Use Controls).
OT026
(OU 6)
RA-O in accordance with the approved DDs (includes incorporating changes based on revisions to the monitoring program)
Through the duration of the
POP
AF, USACE, and regulatory approval of RA-O documentation (e.g., Annual RA-O Reports, Monthly O&M Reports, etc.).
OT026
(OU 6)
Alternate Objectives in accordance with Section 1.2.2 of the PWS including one or more of the following:
1) Advanced Site Characterization (Supplemental Site Investigation and Revised Conceptual Site Model)
2) Remedy Evaluation and Recommendation
3) Decision Document Amendment
Within the POP AF, USACE, and regulatory approval of SSI Report and revised CSM.
AF and USACE approval of the remedy evaluation and recommended proposed remedial strategy including successful demonstration of the existing or alternate remedy.
AF, USACE, and regulatory approval of ESD or ROD Amendment (i.e., AF and Regulatory signatures on Final ESD or ROD Amendment).
9 US EPA. (2010). Best Management Practices. Washington DC.
10 US EPA. (2014). Groundwater Remedy Completion Strategy. Washington DC.
11 ITRC. (2006). Performance-Based Management. Washington DC: ITRC.
Period
Performance Standard
OT033
(OU 8)
RA-O in accordance with the approved DDs (includes incorporating changes based on revisions to the monitoring program)
Through the duration of the
POP
AF, USACE, and regulatory approval of RA-O documentation (e.g., Annual RA-O Reports, Monthly O&M Reports, etc.).
OT033
(OU 8)
Alternate Objectives in accordance with Section 1.2.2 of the PWS including one or more of the following:
1) Advanced Site Characterization (Supplemental Site Investigation) of SSI Report.
AF and USACE approval of the remedy evaluation and recommended proposed remedial strategy including successful demonstration of the existing or alternate remedy.
AF, USACE, and regulatory approval of ESD or ROD Amendment (i.e., AF and Regulatory signatures on Final ESD or ROD Amendment).
OT097
(OU 11)
RA-O in accordance with the approved DDs and the RD/RA Work Plan and Reduce LCC
Through the duration of the
POP
AF, USACE, and regulatory approval of RA-O documentation (e.g., Annual RA-O Reports, Monthly O&M Reports, etc.).
OT097
(OU 11)
Evaluate and rehabilitate pump and treat and SVE systems as necessary to achieve the objectives specified in the ROD and RD/RA Work Plan.
Two (2) years from the Obligation Date of Sub-CLIN
0018AA
AF, USACE, and regulatory approval of system evaluation and rehabilitation.
OT106 Record of Decision Within the POP AF, USACE, and regulatory approval of ROD (i.e., AF and Regulatory signatures on Final ROD).
SD107
(OU 12)
RA-O in accordance with the approved DDs and Reduce
LCC
Through the duration of the
POP
AF, USACE, and regulatory approval of RA-O documentation (e.g., Annual RA-O Reports, Monthly O&M Reports, etc.).
SD107
(OU 12)
Evaluate effectiveness, efficacy, and adequacy of the existing remedy(ies) per the current ROD and potential mid-plume remedy(ies) (in accordance with (USEPA, 2010; USEPA, 2014), and (ITRC, 2006)).
Two (2) years from the Obligation Date of Sub-CLIN
0020AA
AF and USACE approval of the Remedy Evaluation Report.
SS017
(OU 5)
RA-O in accordance with the approved DDs and Reduce LCCs
Through the duration of the
POP
AF, USACE, and regulatory approval of RA-O documentation (e.g., Annual RA-O Reports, Monthly O&M Reports, etc.).
SS017
(OU 5)
Abandon Monitoring Points Associated with Lease
USAF-AFMC-KRSM-15-1-0475
30 September
AF and USACE approval of the Monitoring Point Abandonment and Site Restoration Letter Report.
SS027
(OU 7)
LTM in accordance with the approved DDs
Through the duration of the
POP
AF, USACE, and regulatory approval of RA-O documentation (e.g., Annual LTM Reports, etc.).
Period
Performance Standard
SS030 Response Complete (RC)
Upon achievement of RC, continue LTM in accordance with the approved DDs throughout the duration of the
POP
of RC documentation (e.g., AF signature on Final Remedial Action Completion Report).
AF, USACE, and regulatory approval of LTM documentation (e.g., Assessment Report for Land Use Controls).
SS089
(OU 9)
Site Closeout (SC) Within the POP AF, USACE, and regulatory approval of SC documentation (e.g., Site Closeout Report and Well Abandonment Confirmation Report).
SS090
(OU 9)
Explanation of Significant Differences (ESD) or ROD Amendment
Two (2) years from the Obligation Date of Sub-CLIN
0025AA
AF, USACE, and regulatory approval of ESD or ROD Amendment (i.e., AF and Regulatory signatures on Final ESD or ROD Amendment).
SS090
(OU 9)
RA-O in accordance with the approved DDs and any post-ROD changes
Through the duration of the
POP
AF, USACE, and regulatory approval of RA-O documentation (e.g., Annual RA-O Reports, Monthly O&M Reports, etc.).
SS091
(OU 5)
RA-O in accordance with the approved DDs Through the duration of the
POP
AF, USACE, and regulatory approval of RA-O documentation (e.g., Annual RA-O Reports, Monthly O&M Reports, etc.).
SS109
(OU 10)
Explanation of Significant Differences (ESD) or ROD Amendment
Two (2) years AF, USACE, and regulatory approval of ESD or ROD Amendment (i.e., AF and Regulatory signatures on Final ESD or ROD Amendment).
SS109
(OU 10)
RA-O in accordance with the approved DDs and any post-ROD changes
Through the duration of the
POP
AF, USACE, and regulatory approval of RA-O documentation (e.g., Annual RA-O Reports, Monthly O&M Reports, etc.).
SS112
(OU 13)
Remedial Design / Remedial Action (RD/RA) Work Plan One (1) year from the Obligation Date of Sub-CLIN
0028AA
AF, USACE, and regulatory approval of RD/RA Work Plan.
ST061 Site Closeout (SC) Within the POP AF, USACE, and regulatory approval of SC documentation (e.g., Site Closeout Report and Well Abandonment Confirmation Report).
ST071 Site Closeout (SC) Within the POP AF, USACE, and regulatory approval of SC documentation (e.g., Site Closeout Report and Well Abandonment Confirmation Report).
WP005
(OU 3)
Explanation of Significant Differences (ESD) of ESD (i.e., AF and Regulatory signatures on Final ESD).
WP005
(OU 3)
RA-O in accordance with the approved DDs and any post-ROD changes and Reduce LCCs
Through the duration of the
POP
AF, USACE, and regulatory approval of RA-O documentation (e.g., Annual
Period
Performance Standard
WP007
(OU 2)
RA-O in accordance with the approved DDs (includes incorporating changes based on revisions to the monitoring program)
Through the duration of the
POP
AF, USACE, and regulatory approval of RA-O documentation (e.g., Annual RA-O Reports, Monthly O&M Reports, etc.).
WP007
(OU 2)
Remedial Investigation for 1,4 Dioxane Two (2) years AF, USACE, and regulatory approval of the Remedial Investigation.
WP007
(OU 2)
Alternate Objectives in accordance with Section 1.2.2 of the PWS including one or more of the following:
1) Advanced Site Characterization (Supplemental Site Investigation, Revised Conceptual Site Model, and Monitoring Program Update) of SSI Report, revised CSM, CCR and Basewide Monitoring Plan.
AF and USACE approval of the remedy evaluation and recommended proposed remedial strategy including successful demonstration of the existing or alternate remedy.
AF, USACE, and regulatory approval of ESD or ROD Amendment (i.e., AF and Regulatory signatures on Final ESD or ROD Amendment).
WP008
(OU A)
RA-O in accordance with the approved DDs including addressing all 2020 Five Year Review findings
Through the duration of the
POP
AF, USACE, and regulatory approval of RA-O documentation (e.g., Annual RA-O Reports, Monthly O&M Reports, etc.).
ZZ113
(OU 15)
RA-O in accordance with the approved DDs Through the duration of the
POP
AF, USACE, and regulatory approval of RA-O documentation (e.g., Annual
2.0 APPLICABLE DOCUMENTS
The Contractor shall identify and comply with all applicable federal, state, and local statutes;
Department of Defense (DoD) and AF instructions, manuals, handbooks, regulations, guidance, and policy letters (including AF policy and guidance for IRP, and MMRP), Executive Orders (EOs), American Society for Testing and Materials (ASTM), American Petroleum Institute (API) Codes, National Association of Corrosions Engineers (NACE), National Fire Protection (NFPA), Steel Structures and Painting Counsel (SSPC), National Electrical Code (NEC), Uniform Fire Code (UFC), and International Building Code (IBC) including all changes and amendments in effect on the date of issuance of this contract. It is the Contractor’s responsibility to identify and comply with all applicable requirements. In addition, the Contractor shall refer to the current versions of the DoD Policy and Guidelines for Acquisitions Involving Environmental Sampling or Testing and The United States AF Construction Management Implementation Guide.
The Contractor shall identify and comply with all applicable documents for the Installations including RODs, ROD Amendments, ESDs, Resource Conservation and Recovery Act (RCRA) Permits and subsequent modifications, Risk Evaluation Corrective Action Program (RECAP) documents, the Endangered Species Act, other Decision Documents, deeds, discharge permits and conveyance notices.
The information provided in this PWS is not intended as a substitute for complete analysis of technical data available, nor is it intended to be a guide on how the Contractor should address achievement of the POs.
3.0 GOVERNMENT FURNISHED INFORMATION AND PROPERTY (GFI AND GFP)
Government Furnished Information is contained in the Administrative Record (http://afcec.publicadmin-record.us.af.mil) or listed in Enclosure 2. The AF believes the documentation provided represents the most recent and appropriate documentation available for the Installation(s) and sites identified in this PWS. The Contractor is solely responsible for reviewing all available information and forming their own independent, professional conclusions/interpretation of site conditions and requirements to achieve the POs of this contract.
Specific documents not included in the Administrative Record or in Enclosure 2 may be made available following a request to the Contracting Officer (KO), if the documentation can be distributed in a timely manner. Electronic format is not guaranteed.
The Contractor shall properly account for and manage all new and existing GFP procured and utilized at the Installation as-is where-is in accordance with the applicable Federal Acquisition Regulation (FAR). Lists of current GFP are provided in Enclosure 3. All Real Property installed during the contract shall be turned over to the Government consistent with procedures identified in section 8.2.3.
The Contractor is responsible for providing all other supplies and equipment, not already installed and not listed in Enclosure 3, that are required to achieve the POs of this contract. All AF owned property, including real property used for remediation purposes must be maintained by the Contractor in accordance with applicable maintenance requirements and usability for the intended purpose. The Contractor is responsible for disposal of unneeded, unusable, or obsolete GFP as required, and transition of remaining GFP to other AF Contractors at the end of the contract POP. Prior to disposal of excess or unserviceable equipment listed in Enclosures 3, the Contractor shall coordinate activities with the KO for disposition instructions.
4.0 MANAGEMENT, PLANNING, AND REPORTING REQUIREMENTS
The Contractor shall implement a full range of environmental remediation activities as required to meet objectives of this contract and in accordance with all applicable or relevant and appropriate federal, state, and local laws and regulations; DoD policies; and Installation-specific orders, agreements or rules. The Contractor shall supply all labor, equipment, and materials necessary to accomplish the work through the entire PP of the contract. The Contractor shall perform management and planning functions, including performance measurement and fund status reporting. The Integrated Master Schedule (IMS), Milestone Payment Schedule (MPS), and Project Management Plan (PMP) shall be consistent.
4.1 Project Management Plan (PMP)
The Contractor shall develop and maintain a detailed PMP. The PMP shall specify the project’s resources and tasks corresponding to the Sub-CLINs for this contract as required for the planning, execution, control, and completion of the stated POs. At a minimum, the PMP shall http://afcec.publicadmin-record.us.af.mil/ include the following sections: technical approach for achieving the POs in accordance with the PWS, performance models, organization and integration of the project team, schedule management and project controls, transitional activities, risk management, quality management;
health and safety management, procurement management, and security management. The Contractor is responsible for complying with the AFCEC ORC PMP Guidance.
The first draft of the PMP shall be due within sixty (60) calendar days of contract award (or a more aggressive schedule if agreed upon). The Draft PMP and subsequent revisions shall be subject to AF review and approval. The Final PMP shall be due within 14 calendar days of receipt of AF and USACE comments on the Draft versions. A one-time payment milestone will be established for AF acceptance of the final PMP. The PMP shall be maintained throughout the duration of the contract utilizing dated page changes and additions as practicable. PMP updates during the life of the ORC will be made as necessary based on the accumulation of small incremental changes or significant changes (e.g., contract requirements, technical approaches, risk and issue management, or key personnel). Updates to the PMP shall be coordinated with the
KO/COR.
4.2 Schedule and Planning Requirements – Integrated Master Schedule (IMS)
The Contractor shall prepare and submit an IMS in hardcopy and electronic format (Microsoft Project, Microsoft Excel, and Adobe Acrobat portable document file (.pdf)).
The following are minimum AF requirements for the IMS:
• Presents a realistic sequence and timing of all activities and documents necessary to demonstrate achievement of the PO within the PP.
• Organized in a Work Breakdown Structure (WBS) aligned with the CLINs/Sub-CLINs in Section B and includes the following columns:
o Installation Name: Identify EESOH-MIS Installation Name per Table 1.
o Site Number: Identify EESOH-MIS Site Number per Table 1 and Site Alias, if applicable.
o CLIN/Sub-CLIN: Identify CLIN and/or Sub-CLIN per Section B of the contract.
Note Sub-CLINs for compliance activities (routine regulatory requirements to comply with binding agreements) are denoted as ####CX and Sub-CLINs for performance activities (remedial advancement or progress towards the PO) are denoted as ####AX.
o Task Description: Include detailed description of all activities (e.g., meetings, permitting, site access, work plans, mobilization, field work, documents, reviews, coordination with stakeholders, etc.) associated with achievement of the PO and a clear indication of regulatory (CERCLA) phase completions (e.g., RIP Achieved, RC Achieved, etc.) and PO achievement.
o Start and Finish Dates: Document Start date and Finish date for each required activity and document including appropriate durations and realistic Government and Regulatory review periods.
a. Include an obligation date, notice to proceed date, or projected award date as the first activity for each Sub-CLIN.
b. Include a clearly identified final field work (e.g., FINAL FIELD ACTIVITY) Start date and Finish Date for each site (i.e., indicate when the final set of field activities such as injections, groundwater sampling, or others will be complete).
o Milestone Payment Amount: Include negotiated amount consistent with the approved Milestone Payment Schedule (MPS) ensuring the sum of all milestone payments equals the value of the CLIN/Sub-CLIN per Section B of the contract.
o Percent Complete: Record completion status of all activities and documents as approved by the COR.
o Predecessor and Successor: Define relationships and constraints associated with activities and documents.
The Contractor shall maintain and submit an IMS monthly in electronic format in accordance with the requirements above and include updates to progress and approved changes (e.g., Government or regulatory review periods, technical approaches, milestone payment updates, or contract requirements). The IMSs shall be submitted electronically to the Contractor’s ORC document repository and in accordance with instructions from the COR. The Contractor shall prepare and maintain the IMS in accordance with the CLIN, Sub-CLIN, IMS, and MPS Guidance.
4.3 Milestone Payment Schedule (MPS)
The Contractor shall prepare and submit an MPS monthly (along with the IMS) in hardcopy and in electronic format (Microsoft Excel). The MPS will be negotiated during development of the PMP and approved by the COR.
The following are minimum AF requirements for the MPS:
• Presents appropriate milestone payments considered integral and necessary to the achievement of the POs.
• Includes a reasonable number of milestone payments per CLIN/Sub-CLIN based on the scope and anticipated duration to achieve CLIN/Sub-CLIN objective and/or PO.
• Organized in a WBS aligned with the CLINs/Sub-CLINs in Section B and includes the following columns:
o Installation Name: Identify EESOH-MIS Installation Name per Table 1.
o Site Number: Identify EESOH-MIS Site Number per Table 1 and Site Alias, if applicable.
o CLIN/Sub-CLIN: Identify CLIN and/or Sub-CLIN per Section B of the contract.
Note Sub-CLINs for compliance activities (routine regulatory requirements to comply with binding agreements) are denoted as ####CX and Sub-CLINs for performance activities (remedial advancement or progress towards the PO) are denoted as ####AX.
o Milestone Payment Identification Number: Include unique number assigned to each milestone payment for tracking purposes.
o Milestone Payment Description: Include detailed description of definable and measurable step considered integral and necessary to the achievement of the CLIN/Sub-CLIN objective and/or PO.
o Milestone Payment Amount: Include negotiated amount ensuring the sum of all milestone payments equals the value of the CLIN/Sub-CLIN per Section B of the contract.
o Milestone Payment Percentage: Include percentage of the milestone payment in relation to the total CLIN/Sub-CLIN value. The final payment milestone(s) within a CLIN/Sub-CLIN demonstrating achievement of the CLIN/Sub-CLIN objective must be a minimum of 20% of the total CLIN/Sub-CLIN value. This may include both the AF and USACE approved and regulator approved versions.
o Completion Date: Document completion date for each milestone payment consistent with the Finish date presented in the IMS.
o Percent Complete: Identify completion status (0% or 100%) of all milestone payments as approved by the COR.
o Invoice Number: Clearly indicate the invoice number associated with the milestone payment as approved by the COR for the purposes of tracking payment.
This information can be completed as invoices are prepared.
• Excludes unacceptable milestone payments representing a “progress” payment or a monthly payment for level of effort expended including:
o Submittal of documents o Site mobilization/demobilization (unless exempted by KO) o Accomplishment of field activities o Submittal of a monthly status o Management and overhead type costs (e.g., program/project management, monthly reporting, etc.)
o Allocation of PMP, Basewide QPP, or other basewide costs to specific sites
The Contractor shall maintain and submit an MPS monthly (and with PMP updates, as needed), in electronic format in accordance with the requirements above and include updates to progress (e.g., Percent Complete, Invoice Number). The MPSs shall be submitted electronically to the Contractor’s ORC document repository and in accordance with instructions from the COR. The Contractor shall prepare and maintain the MPS in accordance with the CLIN, Sub-CLIN, IMS, and MPS Guidance.
Milestone payments within a CLIN/Sub-CLIN may be revised in response to changes in the approach for achievement of the CLIN/Sub-CLIN objective without a contract modification so long as the changes do not impact the total value or objective of the CLIN/Sub-CLIN. All changes to the MPS, with the exception of tracking invoicing of completed milestone payments, must be approved by the COR. Milestone payments will not be renegotiated if the Contractor is unable to achieve the milestones, CLIN/Sub-CLIN objectives, and/or POs.
Completion of milestones shall demonstrate payment is appropriate and warranted. COR approval of the documentation supporting the completion of the milestone is required for payment. Where regulatory acceptance/concurrence is required for this documentation, AF and USACE acceptance will occur following regulatory acceptance/concurrence of the documentation. Acceptance/concurrence occurs upon final signature of documents requiring signature by the AF and/or regulators. Final decisions regarding the adequacy of milestone completion resides with the AF and USACE. The COR will take into consideration the appropriate acceptance and/or concurrence of necessary documentation by regulators consistent with the applicable regulatory drivers of this PWS.
For milestones where regulatory acceptance/concurrence is required and regulatory acceptance/concurrence cannot be obtained, the AF and USACE will evaluate the Contractor’s documents to determine if they are legally and technically acceptable to warrant payment for achieving that milestone.
The Contractor is limited to one invoice submitted to USACE per month. The invoice must itemize the milestone payments for each CLIN/Sub-CLIN associated with the invoice. The Contractor will not receive payment until milestones are achieved in accordance with the MPS.
The AF and USACE will not approve partial payments.
4.4 ORC Document Repository
The Contractor shall maintain a document repository for all ORC documents. The repository is intended to be a single access point repository for all ORC documentation. It shall be accessible to stakeholders during the life of the ORC. The Contractor shall provide notifications to AFCEC, USACE COR, and Installation POC(s) at the time data is included in the repository. At close-out, all repository documents will be transferred to DVD media and delivered to AFCEC and USACE.
The Contractor shall create and maintain a Master Document List (MDL) that includes all documents, whether the document is a deliverable or not, prepared during the course of this contract. The Contractor shall maintain the project documents for the duration of this contract and transfer custody to the AF within 90 calendar days prior to POP expiration.
4.5 Cost and Status Reporting
The Contractor shall prepare and submit a monthly Contractor’s Progress, Status, and Management Report (CPSMR). The CPSMR shall be used to review and evaluate the overall progress of the project, along with any existing or potential problem areas. The report shall be prepared and submitted in an electronic format to the Contractor’s ORC document repository and/or in accordance with instructions from COR. The CPSMR shall also be used to indicate whether efforts for each site are on target for meeting the PO. The Contractor shall submit an updated IMS each month with the CPSMR.
The Contractor shall document all optimization actions implemented on an annual basis as required in the AFCEC CPSMR Template. The AF defines optimization, under the ORC, as the reduction of contaminant mass and concentrations, reduction in LCC, or any combination of activities prompting acceleration to RC, as a result of remedial implementation the Contractor undertakes, above and beyond what is required to maintain compliance in accordance with an approved decision document. The Contractor is encouraged and required to implement potential optimization opportunities at all sites with POs of OES, RA-O & Reduce LCC, LTM & Reduce LCC, and all other sites where ORC contractor can successfully accelerate the achievement of the PO. This requirement will allow the AF to fulfill DoD requirement to accurately account for accelerated contaminant removal and cost savings (i.e., reduction in liability) as a result of optimization activities.
4.6 Meeting and Conference Requirements
4.6.1 Meeting/Teleconference Support
The Contractor shall participate in post-award meetings and Project Management Review (PMR) meetings and teleconferences with the AF and USACE as necessary to achieve the POs in this PWS. The Contractor shall coordinate meetings, provide logistical support (e.g., facilities, audio/visual), create and present materials, and lead technical discussions.
The Contractor also shall prepare and submit for AF review and concurrence any presentation materials and agendas for meetings no less than two working days prior to the event. The Contractor shall prepare minutes for all meetings attended within 14 calendar days following the event.
The Contractor also shall attend and/or support meetings and teleconferences to discuss technical or regulatory issues and project progress and status with the AF and regulatory agency representatives. Specifically, the Contractor shall host an internal kick-off meeting with the AF and USACE within 15 calendar days from contract award. In keeping with the AF’s commitment to the regulators, the Contractor shall host a kick-off meeting with the AF and regulators within 30 calendar days from contract award. At a minimum, the following topics will be discussed at the regulatory kick-off meeting: review PO and PP for each site; review project schedule for field work and deliverables; confirm agreement on site or document prioritization;
confirm mutual understanding of document review times; and confirm any document requirements, templates, or expectations to facilitate the review process.
The Contractor shall also attend and provide both technical and logistical support for Restoration Advisory Board (RAB) meetings (if needed), Tier 1/Tier II partnering meetings and teleconferences. Bi-weekly teleconferences with COR and AF POCs shall also be required to discuss in detail progress and any technical or management issues. Also, other periodic meetings/teleconferences shall be required, as necessary (e.g., weekly calls with COR, AF POCs, and regulatory agencies). However, the frequency of meetings may change based on the status of the environmental restoration program.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .