Hill_AFB_PWS_Enclosure_4_OPSEC_Addendum.pdf

PDF 112 KB Posted

Attached to
Optimized Remediation Contract for Hill AFB, UT Federal contract opportunity
Solicitation number
W91238-19-R-0050
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This document includes a draft performance work statement and sources sought synopsis for an optimized remediation contract at Hill Air Force Base in Utah. The contract will require environmental remediation services including site remediation, minor construction, and architectural and engineering services at 23 installation restoration program sites and 2 military munitions response program sites over a ten year period. Interested firms should respond with their capability statements, experience on similar projects including project descriptions and customers, business size, and joint venture information by 8:00 AM on March 29, 2019. Responses should be no more than ten pages. The resulting contract is expected to be a firm fixed price contract awarded using best value tradeoff procedures by the Army Corps of Engineers Sacramento District.

Hill AFB_PWS Enclosure 4 OPSEC Addendum

View the file

Other files for this federal contract opportunity

Other files attached to Optimized Remediation Contract for Hill AFB, UT, newest first.
File Type Posted
SF33 Attachment C-1 Hill AFB_PWS Enclosure 2B GFI List Hill AFB_20200113.xlsx XLSX spreadsheet
W923819R0050 Am 0005.pdf PDF
EPA Comments OU 15 2016-2017 letter work plan.pdf PDF
EPA Comments OU6memotofile.pdf PDF
SF33 Attachment B-1 Hill AFB_Sub-CLIN Structure_20191213.xlsx XLSX spreadsheet
Hill AFB_PWS_REV_20191213.pdf PDF
SF33 Attachment L-1 Labor Category Qualifications REV 16 Dec 2019.pdf PDF
SF33 Attachment C-1 Hill AFB_PWS Enclosure 2B GFI List Hill AFB_20191219.xlsx XLSX spreadsheet
W9123819R0050 Amendment 0003.pdf PDF
Am02 REV SF33 Attachment L-2 Past Performance Quality Questionaire.docx DOCX document
Am02 REV SF33 Attachment C-1 Hill AFB_PWS Enclosure 2B GFI List Hill AFB_20191031.xlsx XLSX spreadsheet
Solicitation_Phase_Site_Visit_Attendees_16-17_Oct_2019.pdf PDF
Hill_AFB_ORC_Existing_QandA_(PreRFP)_20191101.pdf PDF
SF33_Attachment_B-1_Hill_AFB_Sub-CLIN_Structure_REV1_20191101.xlsx XLSX spreadsheet
W9123819R0050_Hill_ORC_Sol_Amendment_0001.pdf PDF
Hill_AFB_Optimized_Remediation_Site_Visit_Attendees_16-17_October_2019.pdf PDF
Hill_AFB_ORC_Solicitation_Package_W9123819R0050.zip ZIP file
Hill_AFB_Sub-CLIN_Structure_20191016.xlsx XLSX spreadsheet
Hill_AFB_PWS_V9_20191016.pdf PDF
SF33_Attachment_L-2_Past_Performance_Quality_Questionaire.docx DOCX document
SF33_Attachment_L-1_Labor_Category_Qualifications_16_Oct_2019.docx DOCX document
1._ORC_PMP_Guidance_v1.0_20190920.docx DOCX document
3._Optimization_Benefit_Template_190520_MD_190710.docx DOCX document
5._Ensuring_Chemistry_Data_Fact_Sheet_April_2013.pdf PDF
2._CPSMR_template-_25Aug2019.docx DOCX document
7._QASP_Template_v1_20190913_FINAL.DOCX DOCX document
4._AFGM2019-32-01,_AFFF_Related_Waste_Mgmt_Implementation_Guidance.pdf PDF
6._Interim_Guidance_on_1-4_Dioxane,_Environmental_Restoration_Program.pdf PDF
W9123819R0050_Hill_AFB_ORC_DRAFT_Solicitation_SF33.pdf PDF
Hill_AFB_PWS_V8_Updated_20191009.pdf PDF
Itinerary_HAFB_ORC_Pre-Solicitation_Tour_16-17_Oct.pdf PDF
A01.12_Hill_AFB_PWS_V8_20190918.pdf PDF
Hill_ORC_RFIs_w_Responses_20190919.pdf PDF
8560-0006_HillAFB_OU_9_GCA_Bioreactor_OM_Manual_Final_6SEP19.pdf PDF
8560-0006_HillAFB_OU_10_SS109_PMR4_Draft_9MAY19.pdf PDF
Hill_ORC_Docs_10_Sep_2019.zip ZIP file
HillAFB_OU_15_ZZ113_ROD_Draft_2NOV17.pdf PDF
Hill_AFB_ORC_QandA_19_Aug_2019.pdf PDF
Hill_AFB_PWS_20190726.pdf PDF
Sampling_Transition_Table_HillAFB_20190701.docx DOCX document
Hill_AFB_PWS_Enclosure_2.1_List_of_Available_GFI.xlsx XLSX spreadsheet
Hill_AFB__PWS_Enclosure_2.2_List_of_Available_GFI_in_HAFB_Administrative_Record.xlsx XLSX spreadsheet
Hill_AFB_PWS_20190603.pdf PDF
Hill_AFB_PWS_Enclosure_1_Acronyms_and_Definitions.pdf PDF
Hill_AFB_PWS_Enclosure_3_List_of_Available_GFP.PDF PDF
Hill_AFB_CLIN-SubCLIN_Structure.xlsx XLSX spreadsheet
Itinerary_HAFB_ORC_Pre-Solicitation_Tour_26-27June.pdf PDF
Bldg383_Directions2019-06-14.pdf PDF
Draft_PWS_Hill_AFB_ORC__26Feb2019_(Amendment_1).pdf PDF
Draft_PWS_for_Hill_AFB_6Mar2019.pdf PDF
Show all 50

Optimized Remediation Contract for Hill AFB, UT has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Enclosure 4: Operations Security Addendum

Operations Security (OPSEC)

References:

National Security Decision Directive (NSDD) 298

DOD 5205.02

DODD 5205.02E

AFI10-701AFGM_2018-01

All contractors, subcontractors, their employees, associates, and consultants who have access to critical information must comply with the DOD and Air Force-sponsored Operations Security (OPSEC) program. The OPSEC Program is directed by NSDD298, DOD Publications, and applicable Air Force guidance.

OPSEC is a systematic means of identifying and protecting information which an adversary could use to their advantage or to our disadvantage. Critical Information (CI) is generally unclassified but can become classified through compilation. This sensitive information has been identified by the organization’s OPSEC program as requiring protection. OPSEC Measures (OM) are control standards with which all personnel must comply in order to protect CI against adversaries.

RESPONSIBILITIES:

The OPSEC Program Coordinators will provide OPSEC training curriculum for use by the contractor. Critical Information and Indicator Listings (CIILs) must be protected by all contract personnel. Approved organizational OPSEC measures must be used by all contract personnel to protect critical information in their possession and protect against current foreign intelligence and industrial espionage threats. The OPSEC PM/Coordinator and the Lead contractor must ensure all contract personnel working on the contract or having access to CI attend initial and annually recurring refresher training and that the approved curriculum is presented. Training must be provided before contract personnel are allowed access to or handling of critical information. All contract personnel will comply with the organizations OPSEC standards and practices as trained. Additional training may be required based on updates to critical information, OPSEC measures, intelligence threat/vulnerability, or other fundamental changes to the OPSEC program. The OPSEC Coordinator is responsible for contacting the OPSEC Program Manager if OPSEC isn’t written into the contract.

The OPSEC PM/Coordinator for the organizations will track OPSEC training statistics for all personnel working on the contract, when each individual has received the required OPSEC training, and when refresher training is due. Training statistics must be forwarded to the installation OPSEC PM at the end of each calendar quarter and/or upon request.

Contactors with OPSEC requirements within a contract must ensure employees receive OPSEC training as specified within the contract. Accomplishment of training must not exceed 90 days from initial assignment to a contract with OPSEC requirements. Annual training will be accomplished

NLT 30 September of each year. The contractor personnel will not be given access to an organizations CIIL until after training has been completed and documented by the organization OPSEC Coordinator.

Prior to seeking approval through Hill AFB Public Affairs, any information to be released outside of official U.S. Government channels, via any media, must be approved through an OPSEC review by the organization PM/Coordinator. All personnel must promptly report OPSEC related incidents, issues, and concerns to the organization PM/Coordinator, phone number (to be provided) who will then report it to the installation PM, 801-586-8008.

DODD 5205.02E

File details come from the government source that posted it. Updated .