Am #0009 - 1 (Continuation SF 30)
Solicitation No. W91238-18-R-0020
Amendment No. 0009
SUBJECT: Amendment No. 0009 to Request for Proposal specifications and drawings for Construction of REPLACE POL FACILITIES, DESC1802, HILL AFB, UTAH.
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications (New and/or Revised and Reissued). The entire set of Appendix 2 – Specifications for Construction are reissued under this amendment, however only the following specification sections are revised as noted below. For convenience, on the revised specification pages, changes have been identified by “[*Am-9]”
Pages or Sections Deleted Pages or Sections Substituted or Added
01 45 00.00 10* 01 45 00.00 10 01 50 00 01 50 00 02 82 13.00 10* 02 82 13.00 10 --- 02 82 13.00 10AT-9 to 02 82 13.00 10AT-18 02 83 13.00 20 02 83 13.00 20 21 13 17.00 10 21 13 17.00 10 28 31 76 28 31 76 33 56 13.13 33 56 13.13
*- Excluding attachments
b. Drawings (Reissued). The following sheets to Appendix 1 drawings are included with AMDT 0009 with a date of OCT 2018.
CIVL/SITE
(1) CS501 REMOTE CONTAINMENT BASIN DETAILS
STRUCTURAL SITE
(2) X-001 EXISTING FUEL STORAGE TANKS NOTES AND DETAILS
ELECTRICAL SITE
(3) ES102 ELECTRICAL SITE PLAN SHEET 2 OF 7
(4) ES103 ELECTRICAL SITE PLAN SHEET 3 OF 7
PUMPHOUSE
ELECTRICAL
(5) EI101 PUMPHOUSE CONTROL PLAN
(6) EI502 GRAPHICS DISPLAY (SHEET 1 OF 2)
(7) EI506 TERMINAL BLOCK CONNECTIONS SHEET 3
(8) EI605 CONTROL SYSTEM I/O
(9) EI620 CONDUIT AND CABLE SCHEDULES
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal specification and drawings remain unchanged.