W912838-18-R-0020-Am_00001_Narrative.docx
DOCX document 21 KB Posted
- Attached to
- DESC1802 Replace POL Facilities Hill AFB, UT
- Solicitation number
- W91238-18-R-0020
About this file
Amendment Narrative
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. W912838-18-R-0020Footer Defining Amendment Number Needs to be Modified to Reflect Actual Amendment Number.
Amendment No. 0002 24 August 2018
SUBJECT: Amendment No. 0002 to Request for Proposal specifications and drawings for Construction of REPLACE POL FACILITIES, DESC1802, HILL AFB, UTAH.
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified by “[*Am-2]”
Pages or Sections Deleted Pages or Sections Substituted or Added
| 33 52 43.11 | 33 52 43.11 | |
| 33 52 43.12 | 33 52 43.12 | |
| 33 52 43.13 | 33 52 43.13 | |
| 33 52 43.14 | 33 52 43.14 | |
| 33 52 43.23 | 33 52 43.23 | |
| 33 52 43.28 | 33 52 43.28 | |
| 33 56 10 | 33 56 10 |
b. Drawings (Reissued). The following sheets of the drawings are revised with latest revision date of AUG 2018, and reissued with this amendment.
GENERAL
(1) G-002 INDEX
CIVIL/SITE
| (2) | CD100 | CIVIL DEMOLITION PLAN - OVERALL |
| (3) | CU100 | CIVIL UTILITY PLAN |
| (4) | CU203 | SANITARY SEWER PROFILE STA 0+00 TO 4+55 |
ELECTRICAL SITE
| (5) | E-001 | FUEL SYSTEM NOTES | |
| (6) | ES102 | ELECTRICAL SITE PLAN SHEET 2 OF 7 | |
| (7) | ES104 | ELECTRICAL SITE PLAN SHEET 4 OF 7 | |
| (8) | ES205 | ENLARGED ELECTRICAL SITE PLAN | |
| (9) | ES509 | PRODUCT RECOVERY DETAILS | |
| (10) ES510 | LIGHTING DETAILS | ||
| (11) ES515 | TYPICAL TANK DETAIL | ||
| (12) EC104 | CATHODIC PROTECTION SITE PLAN (SHEET 4 OF 7) |
PUMPHOUSE
MECHANICAL
| (13) M-101 | PUMPHOUSE PIPING PLAN |
| (14) M-201 | FLOW DIAGRAM |
| (15) M-202 | FLOW DIAGRAM |
| (16) M-203B | ISOMETRIC DIAGRAM |
| (17) M-301 | PIPING SECTION |
| (18) M-302 | PIPING SECTION |
| (19) M-502 | DETAILS SHEET 2 OF 9 |
| (20) M-505 | DETAILS SHEET 5 OF 9 |
| (21) M-507 | DETAILS SHEET 7 OF 9 |
ELECTRICAL
| (22) EI101 | PUMPHOUSE CONTROL PLAN |
| (23) EI502 | GRAPHICS DISPLAY (SHEET 1 OF 2) |
| (24) EI504 | TERMINAL BLOCK CONNECTIONS SHEET 1 |
| (25) EI601 | CONTROL SYSTEM DIAGRAMS |
| (26) EI606 | CONTROL SYSTEM I/O |
| (27) EI607 | CONTROL SYSTEM I/O |
| (28) EP101 | PUMPHOUSE POWER PLAN |
| (29) EP501 | PUMPHOUSE HAZARDOUS AREA PLAN |
| (30) EP601 | PRIMARY ONE-LINE |
| (31) EP602 | ELECTRICAL ONE-LINE |
| (32) EP604 | SCHEDULES |
| (33) EP606 | PANEL SCHEDULES |
| (34) EP609 | EMERGENCY CONTROLS |
| (35) EP610 | EMERGENCY CONTROLS |
c. Drawings (New). The following new drawings dated AUG 2018 are hereby added to the contract drawings and are issued with this amendment.
PUMPHOUSE
ELECTRICAL
| (1) EP502 | HAZARDOUS AREA PLAN |
| (2) EP503 | HAZARDOUS AREA PLAN |
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal specification and drawings remain unchanged.
Am #0002 - 2 (Continuation SF 30)