Revised_Specifications_2.pdf

PDF 1 MB Posted

Attached to
DESC1802 Replace POL Facilities Hill AFB, UT
Solicitation number
W91238-18-R-0020
Issued by

About this file

Attachment 24 - Revised Specifications 2

View the file

Other files

File Type Posted
Appendix_1-Revised-Drawings-Am-0009.PDF PDF
W912838-18-R-0020-Am_0009_Narrative.pdf PDF
W91238-18-R-0020-0009.pdf PDF
Appendix_2-Revised-Specifications-Am-0009.pdf PDF
W91238-18-R-0020-0008.pdf PDF
Attachment_26_-_Price_Breakout_Schedule.xlsx XLSX spreadsheet
Amendment_0007_Narrative.pdf PDF
W91238-18-R-0020-0007.pdf PDF
Revised_Drawings_5.PDF PDF
Appendix_1b_-_Drawings-Am-6-2.docx DOCX document
W91238-18-R-0020-0006.pdf PDF
Appendix_1c_-_Drawings-Am-6-3.docx DOCX document
Appendix_1a_-_Drawings-Am-6-1rev.docx DOCX document
Appendix_2-Specifications-Am-6.pdf PDF
W912838-18-R-0020-Am_0006_Narrative.pdf PDF
Attachment_2_-_Revised_Supplemental_Contract_Requirements.pdf PDF
Appendix_1d_-_Drawings-Am-6-4.docx DOCX document
W91238-18-R-0020-0005.pdf PDF
POL_Pumphouse_Site_Walk_Photos_28_Aug.pdf PDF
Pre-Proposals_Site_Visit_Sign-In.pdf PDF
W912838-18-R-0020-Am-0002-Drawings.pdf PDF
33_52_43.11.pdf PDF
33_52_43.12.pdf PDF
33_52_43.23.pdf PDF
33_52_43.28.pdf PDF
33_52_43.14.pdf PDF
33_52_43.13.pdf PDF
33_56_10.pdf PDF
W91238-18-R-0020-0004_-_SF30.pdf PDF
W912838-18-R-0020-Am_00001_Narrative.docx DOCX document
W91238-18-R-0020-0003_-_Change_Project_Title.pdf PDF
W91238-18-R-0020-0001_-_Correct_Proposals_Due_Date.pdf PDF
Appendix_1e_-_Drawings_5.pdf PDF
Attachment_5_-_Cover_Letter.DOCX DOCX document
Appendix_1b_-_Drawings_2.pdf PDF
Attachment_7_-_Truck_Offload_FONSI.pdf PDF
Appendix_2_-_Specifications_for_Construction.pdf PDF
Attachment_1_-_SOW_Replace_POL_Facilities.DOCX DOCX document
Attachment_3_-_Wage_Determinations.docx DOCX document
Attachment_2_-_Supplemental_Contract_Requirements.docx DOCX document
Attachment_6_-_Truck_Offload_Environmental_Assessment.pdf PDF
Attachment_4_-_Acknowledgement_Statement.DOCX DOCX document
Appendix_1a_-_Drawings_1.pdf PDF
W91238-18-R-0020_-_SF1442.pdf PDF
Attachment_8_-_Site_Walk_Instructions.docx DOCX document
Appendix_1d_-_Drawings_4.pdf PDF
Appendix_1c_-_Drawings_3.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

00 01 10 - 1

SPECIFICATIONS FOR CONSTRUCTION OF

REPLACE POL FACILITIES

PROJECT NO. DESC1802

HILL AFB, UTAH

PROJECT TABLE OF CONTENTS

VOLUME 2 OF 3 – DIVISIONS 00-21

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS*

00 01 10 PROJECT TABLE OF CONTENTS

* - SEE VOLUME 1 OF 3 FOR DIVISION 00 REQUIREMENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

REGISTER SUBMITTAL REGISTER

01 33 23.33 AVIATION FUEL SYSTEM SPECIFIC SUBMITTAL REQUIREMENTS

01 33 29 SUSTAINABILITY REPORTING

01 33 29AT HPSB SUSTAINABILITY CHECKLIST

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.00 10AT SAMPLE SECTION ATTACHMENTS

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 ENVIRONMENTAL PROTECTION

01 57 19AT HILL AFB SECTION 01 57 20 ENVIRONMENTAL PROTECTION

01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 00AT CONTRACTOR INVENTORY TEMPLATE

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 23.33 OPERATION AND MAINTENANCE MANUALS FOR AVIATION FUEL

SYSTEMS

01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT

INFORMATION (eOMSI)

DIVISION 02 - EXISTING CONDITIONS

[*Am-6]

02 41 00 DEMOLITION

02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 82 13.00 10 ASBESTOS ABATEMENT

02 82 13.00 10AT ASBESTOS INPECTION REPORTS

02 83 13.00 20 LEAD IN CONSTRUCTION

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

Revised in Accordance with ADMT 0007

00 01 10 - 2

03 39 00.00 10 CONCRETE CURING

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

[*Am-7]

08 11 13 STEEL DOORS AND FRAMES

Not Used

08 51 23 STEEL WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 90 00 PAINTS AND COATINGS

09 97 13.17 THREE COAT EPOXY INTERIOR COATING OF WELDED STEEL

PETROLEUM FUEL TANKS

09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES

DIVISION 10 - SPECIALTIES

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

00 01 10 - 3

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 METAL BUILDING SYSTEMS (PUMP SHELTER)

13 34 20 METAL BUILDING SYSTEMS (CANOPIES)

13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT

13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

DIVISION 21 - FIRE SUPPRESSION

21 13 17.00 10 DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

VOLUME 3 OF 3 – DIVISIONS 23-41

00 01 10 PROJECT TABLE OF CONTENTS

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST

SYSTEMS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT

23 82 43.00 40 ELECTRIC DUCT HEATERS

23 82 46.00 40 ELECTRIC UNIT HEATERS

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END

AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 13 01 PAD-MOUNTED DEAD-FRONT AIR INSULATED SWITCHGEAR

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 27 13.10 30 ELECTRIC METERS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 32 15.00 10 DIESEL-GENERATOR SET STATIONARY 100-2500 KW, WITH

AUXILIARIES

26 41 00 LIGHTNING PROTECTION SYSTEM

26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)

26 42 17.00 10 CATHODIC PROTECTION SYSTEM (IMPRESSED CURRENT)

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

00 01 10 - 4

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 11 23 AGGREGATE BASE COURSE

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 23.00 20 PAVEMENT MARKINGS

DIVISION 33 - UTILITIES

[*Am-6]

33 01 50.01 CLEANING FUEL STORAGE TANKS

33 08 53 AVIATION FUEL DISTRIBUTION SYSTEM START-UP

33 08 53AT1 EQUIPMENT TESTS

33 00 53AT2 PERFORMANCE TESTING

33 09 53 AVIATION FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM

33 11 00 WATER UTILITY DISTRIBUTION SYSTEM

33 30 00 SANITARY SEWER SYSTEM

33 34 00 INDUSTRIAL WASTE FORCE MAIN

33 40 00 STORM DRAINAGE UTILITIES

33 52 43.11 AVIATION FUEL MECHANICAL EQUIPMENT

33 52 43.12 AVIATION FUEL PANTOGRAPHS

33 52 43.13 AVIATION FUEL PIPING

33 52 43.14 AVIATION FUEL CONTROL VALVES

33 52 43.23 AVIATION FUEL PUMPS

33 52 43.28 FILTER SEPARATOR, AVIATION FUELING SYSTEM

33 52 80 LIQUID FUELS PIPELINE COATING SYSTEMS

33 52 90.00 20 WELDING FOR POL SERVICE PIPING

33 56 13.13 STEEL TANKS WITH FIXED ROOFS

33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.17 CRANES, SINGLE-GIRDER BRIDGE, MONORAIL AND JIB

-- End of Project Table of Contents --

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 84 PAGES

Replace POL Facilities, Hill AFB, Utah

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.5.1 G ROPreliminary Project Schedule

3.5.2 G ROInitial Project Schedule

3.7.2 G ROPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.4.1 G ROSustainability Action Plan

1.5.2.1 G ROPreliminary Sustainability

eNotebook SD-11 Closeout Submittals

1.5.2.1 G ROFinal Sustainability eNotebook

1.5.2.1 G ROAmended Final Sustainability

eNotebook 01 35 26 SD-01 Preconstruction Submittals

1.7 G DOAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports 1.12.3Monthly Exposure Reports 1.12Notifications and Reports

1.12.2 G DOAccident Reports

1.12.4LHE Inspection Reports

1.7.2.15 G ROHealth Hazard Control Plan

1.7.2.16 G ROEmergency Action Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 84 PAGES

01 35 26 1.12.6Regulatory Citations And Violations

SD-07 Certificates 1.6.1.4Crane Operators/Riggers

1.7.2.2 G ROStandard Lift Plan

1.7.2.3 G DOCritical Lift Plan

1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.5Certificate of Compliance 1.15License Certificates 1.6.1.4Proof Of Current Qualification

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G ROContractor Quality Control (CQC)

Plan

3.7.2.1 G ROMTC validation

SD-06 Test Reports 3.9.2Verification Statement

01 45 35 SD-01 Preconstruction Submittals

3.1.1 G ROSIOR Letter of Acceptance

3.1.1 G ROProject Manual

3.1.1 G ROProject Manual

3.1.1Written Practices 3.1.3Written Practices 3.1.1NDT Procedures and Equipment

Calibration Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 84 PAGES

01 45 35 3.1.3NDT Procedures and Equipment Calibration Records

SD-06 Test Reports 3.1.1Daily Reports 3.1.3Daily Reports 3.1.3Daily Reports 3.1.1Biweekly Reports 3.1.2Biweekly Reports

SD-07 Certificates 2.1Fabrication Plant 2.1Steel Truss Plant 2.1AC472 Accreditation 2.1Steel Joist Institute Membership 2.1Certificate of Compliance

1.5.10 G OMASpecial Inspector of Record

1.5 G OMASpecial Inspector

3.1.1Qualification Records 3.1.3Qualification Records

SD-11 Closeout Submittals 3.1.1Interim Final Report 3.1.3Interim Final Report

3.1.1 G OMAComprehensive Final Report

3.1.3 G OMAComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 G ROConstruction Site Plan

3.3.1 G ROTraffic Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 84 PAGES

01 50 00 SD-06 Test Reports 2.4Backflow Preventer Tests

SD-07 Certificates 1.4Backflow Preventers

01 57 19 SD-01 Preconstruction Submittals

1.7 GEnvironmental Protection Plan

01 57 23 SD-01 Preconstruction Submittals

1.5.1 G DOSWPPP

1.5.1 G DOSWPPP

1.5.2 G DOPRDs

1.5.2 G DOPRDs

SD-03 Product Data 1.5.1.1BMP Product Data 3.1.1BMP Product Data 3.1.1BMP Product Data 3.1.1BMP Product Data

SD-06 Test Reports 3.1.1SWPPP Amendment 3.1.1Inspection Reports

SD-11 Closeout Submittals

3.1.2 G DOFinal SWPPP

3.1.2 G DONOT Application

01 74 19 SD-01 Preconstruction Submittals

1.6 G - ROWaste Management Plan

SD-11 Closeout Submittals 1.7Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 84 PAGES

01 78 00 SD-03 Product Data 1.7.1Warranty Management Plan 1.7.5Warranty Tags 1.5Spare Parts Data

SD-08 Manufacturer’s Instructions 1.7.1Instructions

SD-10 Operation and Maintenance Data

3.6 G ROOperation and Maintenance

Manuals

SD-11 Closeout Submittals 3.4Final Approved Shop Drawings 3.5Construction Contract

Specifications

2.3 G ROCertification of EPA Designated

Items

3.8 G ROInterim DD FORM 1354

3.8 G ROChecklist for DD FORM 1354

3.2.1 G DORecord Drawings

2.4 G DOContractor Inventory

01 78 23 SD-10 Operation and Maintenance Data

3.1.1 G ROTraining Plan

3.1.3 G ROTraining Outline

3.1.2 G ROTraining Content

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 84 PAGES

01 78 23 3.1.4 G ROTraining Video Recording

3.1.6 G ROValidation of Training Completion

01 78 23.33 SD-10 Operation and Maintenance Data

2.1.1 GSystem Instructions

01 78 24.00 20 SD-10 Operation and Maintenance

Data

3.2.1 G ROTraining Plan

3.2.3 G ROTraining Outline

3.2.2 G ROTraining Content

SD-11 Closeout Submittals

1.3.1 G ROeOMSI, Progress Submittal

1.3.2 G ROeOMSI, Prefinal Submittal

1.3.3 G ROeOMSI, Final Submittal

3.2.4 G ROTraining Video Recording

3.2.6 G ROValidation of Training Completion

02 41 00 SD-01 Preconstruction Submittals

1.2.1 G RODemolition Plan

1.9Existing Conditions

SD-07 Certificates

1.6 G RONotification

SD-11 Closeout Submittals 3.3.4Receipts

02 61 13 SD-03 Product Data

1.3 G ROWork Plan

3.7 G ROClosure Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 84 PAGES

02 61 13 SD-06 Test Reports 2.2Backfill

3.4.1 G ROSampling of Stored Material

3.4.2 G ROSampling Liquid

02 81 00 SD-03 Product Data

3.1 G ROOnsite Hazardous Waste

Management 3.2Notices of Non-Compliance and

Notices of Violation 2.1.1Packaging Notifications

SD-06 Test Reports

3.7 G RORecordkeeping

3.8Spill Response

3.7 G ROException Report

SD-07 Certificates 1.4.3Certification 3.2.4Security Plan

1.4.1 G ROTransportation and Disposal

Coordinator

1.4.2 G ROTraining

3.2.2EPA Offsite Policy 3.2.5Certificates of Disposal

3.2.3 G ROShipping Documents and

Packagings Certification 3.6Waste Minimization

02 82 13.00 10 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 84 PAGES

02 82 13.00 10 3.9.3.1 G ROAsbestos Waste Shipment Records

1.1Weight Bills and Delivery Tickets

2.1 G ROEncapsulants

1.9.1 G RORespiratory Protection Program

3.9 G ROCleanup and Disposal

1.6.1 G ROQualifications

1.11Training Program 1.8.1Licenses, Permits and

Notifications SD-06 Test Reports

3.7Exposure Assessment and Air Monitoring

1.7.3Local Exhaust System SD-07 Certificates

1.7.3Local Exhaust System 1.9Medical Surveillance

Requirements 02 83 13.00 20 SD-01 Preconstruction Submittals

1.5.2.2 G ROLead Compliance Plan

1.5.1.1 G ROCompetent Person

1.5.1.2 G ROTraining Certification

1.5.2.8 G ROLead Waste Management Plan

1.5.2.4 G ROMedical Examinations

SD-06 Test Reports

1.5.2.3 G ROSampling Results

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 84 PAGES

02 83 13.00 20 1.5.2.3 G ROOccupational and Environmental Assessment Data Report

SD-07 Certificates

1.5.1.3 G ROTesting Laboratory

SD-11 Closeout Submittals

3.5.2.1 G ROturn-in documents or weight

tickets 03 11 13.00 10 SD-02 Shop Drawings

2.2.1 GFormwork

3.1.1 GFormwork

2.2.1 GForm Removal Schedule

SD-03 Product Data 2.2Form Materials

SD-05 Design Data 2.1Calculations

SD-06 Test Reports 3.2Inspection

03 15 00.00 10 SD-02 Shop Drawings

2.4 G OMAWaterstops

SD-03 Product Data 2.2Preformed Expansion Joint Filler 2.3Sealant 2.4Waterstops

SD-04 Samples 2.3.2Lubricant for Preformed

Compression Seals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 84 PAGES

03 15 00.00 10 2.3.3Field-Molded Type 2.4Waterstops

SD-07 Certificates 2.2Preformed Expansion Joint Filler 2.3Sealant 2.4Waterstops

03 20 00.00 10 SD-01 Preconstruction Submittals

2.3.1 G OMAMechanical Butt-Splices

SD-02 Shop Drawings

3.1 G OMAReinforcement

SD-07 Certificates 2.3Reinforcing Steel 1.3.1Qualified Welders 1.3.2Qualification of Steel Bar

Butt-Splicers 03 30 00.00 10 SD-01 Preconstruction Submittals

1.5.2 G OMAQuality Control Plan

1.5.1Laboratory Accreditation

3.9.5.4 G OMASampling Plan

SD-03 Product Data 2.2Cementitious Materials 2.11Vapor Barrier 2.1.5Floor Finish 2.9Floor Hardener 2.4Chemical Admixtures

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 84 PAGES

03 30 00.00 10 2.4.4Surface Retarder SD-05 Design Data

2.1.1 G OMAMixture Proportions

SD-06 Test Reports

2.1.1 G OMAMixture Proportions

3.9 G OMATesting and Inspection for CQC

2.2.3Fly Ash 2.2.6Ground Granulated

Blast-Furnace (GGBF) Slag 2.3Aggregates 3.9.5.1Air Content 3.9.5.2Slump 3.9.5.4Compressive Strength 2.5Water

SD-07 Certificates 1.5Contractor Quality Control

Personnel 3.2.1Ready-Mix Plant

03 35 00.00 10 SD-03 Product Data Part 2Recycled Content Products

SD-04 Samples 1.3.1Field Test Panels 1.3.1.1Sample Wall Panels

03 39 00.00 10 SD-03 Product Data 2.1Curing Materials

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 84 PAGES

03 39 00.00 10 3.2Testing and Inspection for CQC SD-08 Manufacturer’s Instructions

2.1Curing Compound 04 20 00 SD-02 Shop Drawings

3.3.3.1 G OMACut CMU

3.4.1.1 G OMADetail Drawings

SD-03 Product Data

1.5.1 G OMAHot Weather Procedures

1.5.2 G OMACold Weather Procedures

2.2.2.2.1 G OMACement

2.4.1.1 G OMACementitious Materials

2.6.7 G OMAInsulation

SD-04 Samples

1.3.1.1 G ROMock-Up Panel

2.2.2.2 G ROConcrete Masonry Units (CMU)

2.2.2.5 G ROConcrete Brick

2.4.1.4 G ROAdmixtures for Masonry Mortar

2.6.2 G ROAnchors, Ties, and Bar

Positioners

2.6.3 G ROJoint Reinforcement

2.6.7 G ROInsulation

SD-05 Design Data

2.1.2 G OMAMasonry Compressive Strength

2.2.2.4Fire-Rated Concrete Masonry

Units

3.2.5 G OMABracing Calculations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 84 PAGES

04 20 00 SD-06 Test Reports 2.2.2.4Fire-Rated Concrete Masonry

Units 3.6.1.1Field Testing of Mortar 3.6.1.2Field Testing of Grout 3.6.1.3Prism Tests

SD-07 Certificates 1.3.2Special Masonry Inspector

Qualifications 2.2.2.2Concrete Masonry Units (CMU) 2.2.2.5Concrete Brick 3.3.5.2Precast Concrete 2.4.1.1Cementitious Materials 2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout 2.6.2Anchors, Ties, and Bar

Positioners 2.6.3Joint Reinforcement 2.6.7Insulation

SD-08 Manufacturer’s Instructions 2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance Data

3.8Take-Back Program SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 84 PAGES

04 20 00 2.2.2.2.2 G RORecycled Content 05 12 00 SD-01 Preconstruction Submittals

1.5.1.1 G OMAErection Drawings

SD-02 Shop Drawings

1.5.2 G OMAFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer 2.4.1Welding Electrodes and Rods 2.4.2Non-Shrink Grout 2.3.3Tension Control Bolts

SD-06 Test Reports 2.6.2Class B Coating 2.3Bolts, Nuts, and Washers 3.7.1.2Weld Inspection Reports 3.7.2.1Bolt Testing Reports

SD-07 Certificates 2.2Steel 2.3Bolts, Nuts, and Washers 2.5Galvanizing 1.3AISC Fabrication Plant Quality

Certification 1.3AISC Erector Quality Certification 1.5.3.1Welding Procedures and

Qualifications 2.4.1Welding Electrodes and Rods

05 21 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 84 PAGES

05 21 00 1.3.2Welder Qualification SD-02 Shop Drawings

1.3.1 GSteel Joist Framing

SD-05 Design Data

2.2 GDesign Calculations

SD-06 Test Reports

3.3Erection Inspection 3.3Welding Inspections

SD-07 Certificates 1.3.2Certification of Compliance

05 30 00 SD-02 Shop Drawings

1.3.5 G OMAFabrication Drawings

SD-03 Product Data 2.2Accessories 2.1Deck Units 2.1.5Galvanizing Repair Paint 2.2.15Mechanical Fasteners 2.1.5Touch-Up Paint 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories

SD-04 Samples 2.1.1Metal Roof Deck Units 2.2.4Flexible Closure Strips

SD-05 Design Data

2.1 G OMADeck Units

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 84 PAGES

05 30 00 1.3.2Powder-Actuated Tool Operator 1.3.3Welder Qualifications 1.3.3Welding Procedures 1.3.4.1Fire Safety 1.3.4.2Wind Storm Resistance 1.3.1Manufacturer's Certificate 2.2.10Stud Manufacture's Certification 2.2.10Stud Manufacture's Test Reports

SD-11 Closeout Submittals

2.1 G RORecycled Content of Steel

Products 05 40 00 SD-02 Shop Drawings

1.6.1 G OMAFraming Components

SD-03 Product Data

2.1Studs, Joists SD-05 Design Data

1.6.2 G OMAMetal Framing Calculations

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal Framing

3.2.1Welds SD-11 Closeout Submittals

2.1 SRecycled Content of Steel

Products

05 50 13 SD-02 Shop Drawings

2.5 G OMAangles and plates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 84 PAGES

05 50 13 2.3 G ROFloor Gratings And Walkways

1.3.2 G OMAShop Drawings

SD-03 Product Data

2.3 G ROFloor Gratings And Walkways

06 10 00 SD-02 Shop Drawings

3.2.1 G RONailers

3.2.1.1 G ROStrips

SD-03 Product Data 1.8Fire-retardant treatment

SD-06 Test Reports 1.4.3Preservative-treated

SD-07 Certificates 1.9.1Certificates of grade 1.7Preservative treatment

SD-11 Closeout Submittals 2.3.2Adhesives

06 41 16.00 10 SD-02 Shop Drawings

2.6 G OMAShop Drawings

3.1 G OMAInstallation

SD-03 Product Data

2.1 G OMAWood Materials

1.5.2Certification

SD-04 Samples

2.2 G OMAPlastic Laminates

SD-07 Certificates 1.5Quality Assurance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 84 PAGES

06 41 16.00 10 3.1Laminate Clad Casework 07 05 23 SD-01 Preconstruction Submittals

1.4 G ROWork Plan

SD-03 Product Data

2.1 G ROThermal Imaging Camera

SD-07 Certificates

1.6.2.1Air Barrier Inspection Agency 1.6.2.2Thermographer Qualifications 1.6.3Test Instruments 1.6.3Date Of Last Calibration

SD-06 Test Reports

3.4.4 G RODiagnostic Test Report

07 21 13 SD-03 Product Data

2.1 G OMABlock or board insulation

2.2Vapor retarder 2.3Pressure sensitive tape 2.4Protection board or coating 2.5Accessories

SD-08 Manufacturer’s Instructions 2.1Block or Board Insulation 2.5.1Adhesive

07 21 16 SD-03 Product Data 2.2Blanket Insulation 2.3Sill Sealer Insulation 2.5Vapor Retarder 2.6Pressure Sensitive Tape

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 84 PAGES

07 21 16 2.7Accessories SD-08 Manufacturer’s Instructions

3.3.1Insulation SD-11 Closeout Submittals

2.1.1 SRecycled Content for Insulation

Materials

2.1.2 SReduce Volatile Organic

Compounds (VOC)

07 22 00 SD-02 Shop Drawings 2.5Wood nailers

SD-03 Product Data

2.4 G ROFasteners

2.1 G ROInsulation

1.4.2Certification 2.1.3Recycled materials 1.4.3Local/Regional Materials

SD-06 Test Reports 1.4.1Flame spread and smoke developed ratings SD-07 Certificates

1.3qualifications SD-08 Manufacturer’s Instructions

2.4fasteners 2.1insulation

07 27 26 SD-01 Preconstruction Submittals

1.8.1 G ROQualifications of Manufacturer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 84 PAGES

07 27 26 1.8.2 G ROQualifications of Installer SD-02 Shop Drawings

1.4 G ROFluid-Applied Membrane Air

Barrier

SD-03 Product Data

1.4 G ROFluid-Applied Membrane Air

Barrier

2.4 G ROTransition Membrane

2.3 G ROPrimers, Adhesives, and Mastics

2.7 G ROReinforcement

1.4.2 G ROSafety Data Sheets

SD-06 Test Reports

1.6 G ROCapillary Moisture Test

1.4.3 G ROField Peel Adhesion Test

1.4.3 G ROFlame Propagation of Wall

Assemblies

1.4.3 G ROFlame Spread and Smoke

Developed Index Ratings

3.4.1 G ROSite Inspections

SD-07 Certificates

1.4 G ROFluid-Applied Membrane Air

Barrier

2.4 G ROTransition Membrane

1.8.1 G ROQualifications of Manufacturer

1.8.2 G ROQualifications of Installer

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 84 PAGES

07 27 26 1.4 G ROFluid-Applied Membrane Air Barrier

2.4 G ROTransition Membrane

2.3 G ROPrimers, Adhesives, and Mastics

SD-11 Closeout Submittals

2.1 G ROVolatile Organic Compound

(VOC) Content 07 52 00 SD-02 Shop Drawings

1.4.7 G OMARoof plan

SD-03 Product Data

2.1 G OMAModified Bitumen Sheets

3.3.3.1 G OMACold Adhesive Applied Modified

Bitumen Membrane

2.3 G ROCold-Applied Membrane

Adhesive

2.1 G ROFiberglass Felt

2.5 G ROPrimer

2.6 G ROModified Bitumen Roof Cement

2.8Pre-Manufactured Accessories

2.7 G OMAFasteners And Plates

1.8 G ROWarranty

SD-05 Design Data

1.4.6 G OMAWind Uplift Calculations

SD-07 Certificates 1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 84 PAGES

07 52 00 1.4.4Qualification of Engineer of Record

1.4.6 G OMAWind Uplift Resistance

1.4.5 G ROFire Resistance

SD-08 Manufacturer’s Instructions

3.3.6 G OMAModified Bitumen Membrane

Application

3.3.7 G OMAFlashing

2.5Primer 2.7.1Fasteners 3.3.4Ventilating Base Sheets

3.3.8.1 G ROCoating Application

1.6 G ROCold Weather Installation

SD-11 Closeout Submittals 1.8Warranty 3.8Information Card 3.7Instructions To Government

Personnel 07 60 00 SD-02 Shop Drawings

2.2.1 G ROExposed Sheet Metal

3.1.15 G ROGutters

3.1.16 G RODownspouts

2.2.1 G ROGravel Stops and Fasciae

3.1.10 G ROBase Flashing

3.1.11 G ROCounterflashing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 84 PAGES

07 60 00 3.1.19 G ROFlashing at Roof Penetrations and Equipment Supports

2.2.9 G ROReglets

3.1.14 G RODrip Edges

3.1.17 G ROEave Flashing

3.1.18 G ROExpansion Joints

SD-04 Samples

1.4.2 G ROFinish Samples

SD-07 Certificates

2.1 G ROCertificates of Compliance

2.1 G RORecycled Content

SD-08 Manufacturer’s Instructions

1.4.3 G ROInstructions for Installation

3.5 G ROQuality Control Plan

SD-10 Operation and Maintenance Data

1.4.3 G ROCleaning and Maintenance

07 61 14.00 20 SD-02 Shop Drawings

1.2.4 G OMARoofing

SD-03 Product Data

2.1 G OMARoofing panels

2.3Attachment clips 2.4.1Closures 2.4Accessories 2.4.2Fasteners 2.4.3Sealants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 84 PAGES

07 61 14.00 20 2.6 G OMASnow Guards

1.7 G OMAwarranty

SD-04 Samples

2.1 G OMApanel

2.1 G OMApanel

2.4Accessories 2.4.3Sealants 2.2Intermediate Support

SD-05 Design Data 1.5Design calculations

SD-06 Test Reports

3.6 G ROField Inspection

1.3.3Structural performance 1.6.6Finish

SD-07 Certificates 1.6.3Manufacturer's Technical

Representative 1.6.4Installer's Qualifications

2.1 G ROCoil stock

SD-08 Manufacturer’s Instructions

3.3 G ROInstallation

07 84 00 SD-02 Shop Drawings 2.1Firestopping Materials

SD-07 Certificates 2.1Firestopping Materials 1.4Installer Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 84 PAGES

07 84 00 3.3Inspection 07 92 00 SD-03 Product Data

2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops

SD-07 Certificates 3.3.6Sealant

08 11 13 SD-02 Shop Drawings

2.1 G RODoors

2.1 G RODoors

2.5 G ROFrames

2.5 G ROFrames

2.3Accessories 2.6Weatherstripping

SD-03 Product Data

2.1 G RODoors

2.5 G ROFrames

2.3Accessories 2.6Weatherstripping

08 51 23 SD-02 Shop Drawings 2.2Windows

SD-03 Product Data 2.6.4Hardware 2.6.5Fasteners 1.5.1Local/Regional Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 84 PAGES

08 51 23 2.1Materials 2.6Accessories

SD-04 Samples

2.7.2 G ROColor coating

2.2Windows

SD-06 Test Reports 1.3.1Air infiltration 1.3.1Water infiltration

SD-10 Operation and Maintenance Data

2.2 G ROWindows

08 71 00 SD-02 Shop Drawings

1.3 G ROHardware schedule

2.3.5Keying system

SD-03 Product Data

2.3 G OMAHardware items

SD-08 Manufacturer’s Instructions 3.1Installation

SD-10 Operation and Maintenance Data

1.3 G ROHardware Schedule

SD-11 Closeout Submittals

1.4Key Bitting 08 81 00 SD-02 Shop Drawings

Installation SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 84 PAGES

08 81 00 2.1.5Fire/Safety Rated Glass 1.3Glazing Accessories

SD-04 Samples 2.1.5Fire/Safety Rated Glass 2.3.5Tape 2.3.2.1Sealant

SD-08 Manufacturer’s Instructions 2.3Setting and Sealing Materials 3.2Glass Setting

08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers

SD-03 Product Data 2.2Metal Wall Louvers

SD-04 Samples

1.4 G ROWall louvers

1.5 G ROWall louvers

09 22 00 SD-02 Shop Drawings

2.1 G ROMetal support systems

09 29 00 SD-03 Product Data 2.1.6Accessories 2.1.2Water-Resistant Gypsum

Backing Board 2.1.3Joint Treatment Materials

SD-07 Certificates

2.1 G ROAsbestos Free Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 84 PAGES

09 29 00 SD-08 Manufacturer’s Instructions 2.1Material Safety Data Sheets

SD-10 Operation and Maintenance Data

2.1Manufacturer maintenance instructions

3.7Waste Management SD-11 Closeout Submittals

2.1.1Gypsum Board 2.1.5Adhesives

09 51 00 SD-02 Shop Drawings

1.2 G ROApproved Detail Drawings

SD-03 Product Data

1.2 G ROAcoustical Ceiling Systems

1.4Certification

SD-04 Samples

2.1 G ROAcoustical Units

2.1.1 G ROAcoustic Ceiling Tiles

SD-06 Test Reports

1.2.1 G ROCeiling Attenuation Class and

Test SD-07 Certificates

2.1 G ROAcoustical Units

2.1.1 G ROAcoustic Ceiling Tiles

09 65 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 84 PAGES

09 65 00 2.10 G ROResilient Flooring and Accessories

SD-03 Product Data

2.10 G OMAResilient Flooring and

Accessories 2.6Adhesives 2.1Vinyl Composition Tile 2.3Sheet Vinyl Flooring 2.2Wall Base

SD-04 Samples

2.10 G OMAResilient Flooring and

Accessories SD-06 Test Reports

3.3 G ROMoisture, Alkalinity and Bond

Tests

SD-08 Manufacturer’s Instructions 3.2Surface Preparation 3.1Installation

SD-10 Operation and Maintenance Data

2.10Resilient Flooring and Accessories

SD-11 Closeout Submittals 1.3LEED Documentation

09 90 00 SD-02 Shop Drawings

3.8 G ROPiping identification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 84 PAGES

09 90 00 3.8stencil SD-03 Product Data

2.1Materials 1.4.2Certification

2.1 G ROCoating

2.1Manufacturer's Technical Data

Sheets SD-04 Samples

1.9 G OMAColor

1.9 G OMAColor

SD-07 Certificates 1.3Applicator's qualifications

1.4.1.2 G ROQualification Testing

SD-08 Manufacturer’s Instructions 3.5.1Application instructions 3.5.2Mixing 1.7.2Manufacturer's Material Safety

Data Sheets SD-10 Operation and Maintenance Data

2.1 G ROCoatings

09 97 13.17 SD-05 Design Data

1.4.4.1Environmental Control System SD-06 Test Reports

1.4.5.1Metallic Abrasive Qualification Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 84 PAGES

09 97 13.17 3.1.3Coating Sample Test Reports 3.1.4Abrasive Sample Test Reports 3.10.2.2Inspection Report Forms 3.10.2.3Daily Inspection Reports 1.4.5.2Recycled Metallic Abrasive Field

Test Reports (Daily and Weekly) SD-07 Certificates

1.4.1Contract Errors, Omissions, and Other Discrepancies

1.4.2.1Corrective Action Procedures 1.4.3Coating Work Plan 1.4.6.1Qualifications of Certified

Industrial Hygienist (CIH) 1.4.6.5Qualifications Of Individuals

Performing Abrasive Blasting 1.4.6.2Qualifications of Certified

Protective Coatings Specialist

(PCS)

1.4.6.3Qualifications of Coating Inspection Company

1.4.6.4Qualifications of QC Specialist Coating Inspector

1.4.6.6Qualifications of Testing Laboratory for Coatings

1.4.6.7Qualifications of Testing Laboratory for Abrasive

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 84 PAGES

09 97 13.17 1.4.6.8Qualifications of Coating Contractors

1.4.6.9Epoxy Coating Materials 1.4.6.10Non-metallic Abrasive 1.4.6.11Metallic Abrasive

SD-08 Manufacturer’s Instructions 1.5.1Coating System Instructions

SD-11 Closeout Submittals

3.7.6 GDisposal of Used Abrasive

3.10.2.4 GInspection Logbook

09 97 13.27 SD-05 Design Data 1.4.4.1Containment System

SD-06 Test Reports 1.4.5.1Joint Sealant Qualification Test

Reports 1.4.5.2Coatings Qualification Test

Reports 1.4.5.3Metallic Abrasive Qualification

Test Reports 3.2.3Coating Sample Test Reports 3.2.4Abrasive Sample Test Reports 3.9.2.2Inspection Report Forms 3.9.2.3Daily Inspection Reports 1.4.5.4Recycled Metallic Abrasive Field

Test Reports (Daily and Weekly) SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 84 PAGES

09 97 13.27 1.4.1Contract Errors, Omissions, and Other Discrepancies

1.4.2.1Corrective Action Procedures 1.4.3Coating Work Plan 1.4.6.1Qualifications of Certified

Industrial Hygienist (CIH) 1.4.6.5Qualifications Of Individuals

Performing Abrasive Blasting 1.4.6.2Qualifications of Certified

Protective Coatings Specialist

(PCS)

1.4.6.3Qualifications of Coating Inspection Company

1.4.6.4Qualifications of QC Specialist Coating Inspector

1.4.6.6Qualifications of Testing Laboratory for Coatings

1.4.6.7Qualifications of Testing Laboratory for Abrasive

1.4.6.8Qualifications of Coating Contractors

1.4.6.9Joint Sealant Materials 1.4.6.10Coating Materials 1.4.6.11Coating System Component

Compatibility 1.4.6.12Non-metallic Abrasive

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 84 PAGES

09 97 13.27 1.4.6.13Metallic Abrasive SD-08 Manufacturer’s Instructions

1.5.1Joint Sealant Instructions 1.5.2Coating System Instructions

SD-11 Closeout Submittals 3.6.6Disposal of Used Abrasive

3.9.2.4 G ROInspection Logbook

10 28 13 SD-03 Product Data

2.1.2 G ROFinishes

2.2 G ROAccessory Items

SD-04 Samples

2.1.2 G ROFinishes

2.2Accessory Items

SD-07 Certificates 2.2Accessory Items

SD-11 Closeout Submittals 1.2Sustainability Documentation

10 44 16 SD-01 Preconstruction Submittals

2.1 G ROManufacturer's Data

SD-02 Shop Drawings

2.1 G ROFire Extinguishers

1.3.1Accessories Part 2 G ROCabinets

SD-03 Product Data 2.1Fire Extinguishers 1.3.1Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 84 PAGES

10 44 16 Part 2Cabinets 3.2.1Replacement Parts

SD-04 Samples 1.3.1Fire Extinguisher 1.3.1Cabinet 1.3.1Accessories

SD-07 Certificates 2.1Fire Extinguishers 2.1Manufacturer's Warranty with

Inspection Tag 13 34 19 SD-01 Preconstruction Submittals

1.6.4 G OMAManufacturer's Qualifications

SD-02 Shop Drawings

1.6.1 G OMADetail Drawings

SD-03 Product Data

1.6.1 G OMAManufacturer's catalog data

SD-04 Samples

1.6.1 G ROCoil Stock

2.1.8 G ROCoil Stock

1.2.1.9 G RORoof Panels

1.2.1.9 G ROWall Panels

2.5.2 G OMAFasteners

2.7.1 G ROMetal Closure Strips

2.4.2 G OMAManufacturer's color charts and

chips SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 84 PAGES

13 34 19 1.6.1 G OMAdescriptive and technical literature

1.6.3 G OMACalculations

1.6.1Building Design Analysis 1.6.3Building Design Analysis

SD-06 Test Reports

1.6.1 G OMAtest reports

1.6.1 G OMACoatings and base metals

1.6.1 G OMAFactory Color Finish Performance

Requirements SD-07 Certificates

1.6.1 G ROsystem components

1.6.1 G ROCoil Stock

2.1.8 G ROCoil Stock

1.6.1 G ROAluminized Steel Repair Paint

1.6.1 G ROGalvanizing Repair Paint

1.6.1 G ROEnamel Repair Paint

1.6.1 G OMAQualification of Manufacturer

1.6.1 G OMAQualification of Erector

SD-08 Manufacturer’s Instructions

1.6.2 G ROInstallation of Roof and Wall

panels

1.7 G ROshipping, handling, and storage

SD-11 Closeout Submittals

3.11.1 G ROManufacturer's Warranty

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 84 PAGES

13 34 19 3.11.2 G ROContractor's Warranty for Installation

13 34 20 SD-01 Preconstruction Submittals

1.6.4 G OMAManufacturer's Qualifications

SD-02 Shop Drawings

1.6.1 G…

This is the start of the file's text. The full file is on GovTribe.