Attachment_2_-_Revised_Supplemental_Contract_Requirements.pdf

PDF 18 KB Posted

Attached to
DESC1802 Replace POL Facilities Hill AFB, UT
Solicitation number
W91238-18-R-0020
Issued by

About this file

Attachment 2 - Supplemental Contract Requirements

View the file

Other files

File Type Posted
Appendix_1-Revised-Drawings-Am-0009.PDF PDF
W912838-18-R-0020-Am_0009_Narrative.pdf PDF
W91238-18-R-0020-0009.pdf PDF
Appendix_2-Revised-Specifications-Am-0009.pdf PDF
W91238-18-R-0020-0008.pdf PDF
Attachment_26_-_Price_Breakout_Schedule.xlsx XLSX spreadsheet
Amendment_0007_Narrative.pdf PDF
W91238-18-R-0020-0007.pdf PDF
Revised_Specifications_2.pdf PDF
Revised_Drawings_5.PDF PDF
Appendix_1b_-_Drawings-Am-6-2.docx DOCX document
W91238-18-R-0020-0006.pdf PDF
Appendix_1c_-_Drawings-Am-6-3.docx DOCX document
Appendix_1a_-_Drawings-Am-6-1rev.docx DOCX document
Appendix_2-Specifications-Am-6.pdf PDF
W912838-18-R-0020-Am_0006_Narrative.pdf PDF
Appendix_1d_-_Drawings-Am-6-4.docx DOCX document
W91238-18-R-0020-0005.pdf PDF
POL_Pumphouse_Site_Walk_Photos_28_Aug.pdf PDF
Pre-Proposals_Site_Visit_Sign-In.pdf PDF
W912838-18-R-0020-Am-0002-Drawings.pdf PDF
33_52_43.11.pdf PDF
33_52_43.12.pdf PDF
33_52_43.23.pdf PDF
33_52_43.28.pdf PDF
33_52_43.14.pdf PDF
33_52_43.13.pdf PDF
33_56_10.pdf PDF
W91238-18-R-0020-0004_-_SF30.pdf PDF
W912838-18-R-0020-Am_00001_Narrative.docx DOCX document
W91238-18-R-0020-0003_-_Change_Project_Title.pdf PDF
W91238-18-R-0020-0001_-_Correct_Proposals_Due_Date.pdf PDF
Appendix_1e_-_Drawings_5.pdf PDF
Attachment_5_-_Cover_Letter.DOCX DOCX document
Appendix_1b_-_Drawings_2.pdf PDF
Attachment_7_-_Truck_Offload_FONSI.pdf PDF
Appendix_2_-_Specifications_for_Construction.pdf PDF
Attachment_1_-_SOW_Replace_POL_Facilities.DOCX DOCX document
Attachment_3_-_Wage_Determinations.docx DOCX document
Attachment_2_-_Supplemental_Contract_Requirements.docx DOCX document
Attachment_6_-_Truck_Offload_Environmental_Assessment.pdf PDF
Attachment_4_-_Acknowledgement_Statement.DOCX DOCX document
Appendix_1a_-_Drawings_1.pdf PDF
W91238-18-R-0020_-_SF1442.pdf PDF
Attachment_8_-_Site_Walk_Instructions.docx DOCX document
Appendix_1d_-_Drawings_4.pdf PDF
Appendix_1c_-_Drawings_3.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2 Replace POL Facilities Hill AFB, UT July 30, 2018

SUPPLEMENTAL CONTRACT REQUIREMENTS

1. Performance Period. Refer to FAR 52.211-10, Commencement, Prosecution, And Completion of Work. The time duration of performance period is 730 calendar days after Notice to Proceed date.

2. Liquidated Damages. Refer to FAR 52.211-12, Liquidated Damages-Construction.

3. Authorities. Only a warranted Contracting Officer acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract.

If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer. The Government Contracting Officer has the authority to make any changes to this contract action that impact cost or schedule. Authority from the Contracting Officer to the Contractor to make changes that impact cost or schedule will be in the form of an official, signed modification.

4. Wage Determination. General Decision Numbers UT180104, 02/09/2018, Building; and UT180028, 04/06/2018, Heavy, Davis County, Utah, or their most current modifications at the time of award are hereby applicable to work performed under this contract. The most current decision or its modification can be found by clicking on hyperlink http://www.wdol.gov/dba.aspx for such information.

5. Subcontractors and Outside Associates and Consultants. Any subcontractors and outside associates or consultants required by the Contractor in connection with the services covered by the contract will be limited to individuals or firms that were specifically identified and agreed to during negotiations. The Contractor shall obtain the Contracting Officer’s written consent before making any substitution for these subcontractors, associates, or consultants.

5. Time Extensions For Unusually Severe Weather. Refer to FAR 52.249-10, Default (Fixed- Priced Construction). All weather delays will need to be submitted and approved by the Contracting Officer Representative.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY

WORK DAYS BASED ON (5) DAY WORK WEEK

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

(22) (17) (13) (08) (05) (03) (01) (02) (03) (05) (12) (22) http://www.wdol.gov/dba.aspx

SUPPLEMENTAL CONTRACT REQUIREMENTS