W91238-18-R-0020-0004_-_SF30.pdf

PDF 70 KB Posted

Attached to
DESC1802 Replace POL Facilities Hill AFB, UT
Solicitation number
W91238-18-R-0020
Issued by

About this file

W91238-18-R-0020-0004 - SF30

View the file

Other files

File Type Posted
Appendix_1-Revised-Drawings-Am-0009.PDF PDF
W912838-18-R-0020-Am_0009_Narrative.pdf PDF
W91238-18-R-0020-0009.pdf PDF
Appendix_2-Revised-Specifications-Am-0009.pdf PDF
W91238-18-R-0020-0008.pdf PDF
Attachment_26_-_Price_Breakout_Schedule.xlsx XLSX spreadsheet
Amendment_0007_Narrative.pdf PDF
W91238-18-R-0020-0007.pdf PDF
Revised_Specifications_2.pdf PDF
Revised_Drawings_5.PDF PDF
Appendix_1b_-_Drawings-Am-6-2.docx DOCX document
W91238-18-R-0020-0006.pdf PDF
Appendix_1c_-_Drawings-Am-6-3.docx DOCX document
Appendix_1a_-_Drawings-Am-6-1rev.docx DOCX document
Appendix_2-Specifications-Am-6.pdf PDF
W912838-18-R-0020-Am_0006_Narrative.pdf PDF
Attachment_2_-_Revised_Supplemental_Contract_Requirements.pdf PDF
Appendix_1d_-_Drawings-Am-6-4.docx DOCX document
W91238-18-R-0020-0005.pdf PDF
POL_Pumphouse_Site_Walk_Photos_28_Aug.pdf PDF
Pre-Proposals_Site_Visit_Sign-In.pdf PDF
W912838-18-R-0020-Am-0002-Drawings.pdf PDF
33_52_43.11.pdf PDF
33_52_43.12.pdf PDF
33_52_43.23.pdf PDF
33_52_43.28.pdf PDF
33_52_43.14.pdf PDF
33_52_43.13.pdf PDF
33_56_10.pdf PDF
W912838-18-R-0020-Am_00001_Narrative.docx DOCX document
W91238-18-R-0020-0003_-_Change_Project_Title.pdf PDF
W91238-18-R-0020-0001_-_Correct_Proposals_Due_Date.pdf PDF
Appendix_1e_-_Drawings_5.pdf PDF
Attachment_5_-_Cover_Letter.DOCX DOCX document
Appendix_1b_-_Drawings_2.pdf PDF
Attachment_7_-_Truck_Offload_FONSI.pdf PDF
Appendix_2_-_Specifications_for_Construction.pdf PDF
Attachment_1_-_SOW_Replace_POL_Facilities.DOCX DOCX document
Attachment_3_-_Wage_Determinations.docx DOCX document
Attachment_2_-_Supplemental_Contract_Requirements.docx DOCX document
Attachment_6_-_Truck_Offload_Environmental_Assessment.pdf PDF
Attachment_4_-_Acknowledgement_Statement.DOCX DOCX document
Appendix_1a_-_Drawings_1.pdf PDF
W91238-18-R-0020_-_SF1442.pdf PDF
Attachment_8_-_Site_Walk_Instructions.docx DOCX document
Appendix_1d_-_Drawings_4.pdf PDF
Appendix_1c_-_Drawings_3.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorporate revised specif ications and draw ings.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123818R0020

X 9B. DATED (SEE ITEM 11)

06-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Aug-2018

CODE

USACE SACRAMENTO DISTRICT

ATTN: CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123818R0020

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 01 Attachment 1 - SOW

Replace POL Facilities

2 30-JUL-2018

Attachment 02 Attachment 2 - Supplemental Contract Requirements

1 30-JUL-2018

Attachment 03 Attachment 3 - Wage Determinations

12 09-FEB-2018

Attachment 04 Attachment 4 - Acknowledgement Statement

4 30-JUL-2018

Attachment 05 Attachment 5 - Cover Letter

3 30-JUL-2018

Attachment 06 Attachment 6 - Truck Offload Environmental Assessment

49 09-NOV-2012

Attachment 07 Attachment 7 - Finding of Significant Impact

2 09-NOV-2012

Attachment 08 Attachment 8 - Site Walk Instructions

1 09-AUG-2018

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 01 Attachment 1 - SOW

Replace POL Facilities

2 30-JUL-2018

Attachment 02 Attachment 2 - Supplemental Contract Requirements

1 30-JUL-2018

Attachment 03 Attachment 3 - Wage Determinations

12 09-FEB-2018

Attachment 04 Attachment 4 - Acknowledgement Statement

4 30-JUL-2018

Attachment 05 Attachment 5 - Cover Letter

3 30-JUL-2018

Attachment 06 Attachment 6 - Truck Offload Environmental Assessment

49 09-NOV-2012

W9123818R0020

Attachment 07 Attachment 7 - Finding of Significant Impact

2 09-NOV-2012

Attachment 08 Attachment 8 - Site Walk Instructions

1 09-AUG-2018

Attachment 09 Amendment Narrative 2 24-AUG-2018 Attachment 10 Revised Drawings 37 24-AUG-2018 Attachment 11 Revised Spec - 33 52

43.11

18 24-AUG-2018

Attachment 12 Revised Spec - 33 52 43.12

6 24-AUG-2018

Attachment 13 Revised Spec - 33 52 43.13

30 24-AUG-2018

Attachment 14 Revised Spec - 33 52 43.14

17 24-AUG-2018

Attachment 15 Revised Spec - 33 52 43.23

25 24-AUG-2018

Attachment 16 Revised Spec - 33 52 10 24-AUG-2018

Attachment 17 43.28 Revised Spec – 33 56 10 14 24-AUG-2018

(End of Summary of Changes)