AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate revised specif ications and draw ings.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Aug-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123818R0020
X 9B. DATED (SEE ITEM 11)
06-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Aug-2018
CODE
USACE SACRAMENTO DISTRICT
ATTN: CONTRACTING DIVISION
1325 J STREET
SACRAMENTO CA 95814-2922
W91238 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123818R0020
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 01 10 - TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 01 Attachment 1 - SOW
Replace POL Facilities
2 30-JUL-2018
Attachment 02 Attachment 2 - Supplemental Contract Requirements
1 30-JUL-2018
Attachment 03 Attachment 3 - Wage Determinations
12 09-FEB-2018
Attachment 04 Attachment 4 - Acknowledgement Statement
4 30-JUL-2018
Attachment 05 Attachment 5 - Cover Letter
3 30-JUL-2018
Attachment 06 Attachment 6 - Truck Offload Environmental Assessment
49 09-NOV-2012
Attachment 07 Attachment 7 - Finding of Significant Impact
2 09-NOV-2012
Attachment 08 Attachment 8 - Site Walk Instructions
1 09-AUG-2018
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 01 Attachment 1 - SOW
Replace POL Facilities
2 30-JUL-2018
Attachment 02 Attachment 2 - Supplemental Contract Requirements
1 30-JUL-2018
Attachment 03 Attachment 3 - Wage Determinations
12 09-FEB-2018
Attachment 04 Attachment 4 - Acknowledgement Statement
4 30-JUL-2018
Attachment 05 Attachment 5 - Cover Letter
3 30-JUL-2018
Attachment 06 Attachment 6 - Truck Offload Environmental Assessment
49 09-NOV-2012
W9123818R0020
Attachment 07 Attachment 7 - Finding of Significant Impact
2 09-NOV-2012
Attachment 08 Attachment 8 - Site Walk Instructions
1 09-AUG-2018
Attachment 09 Amendment Narrative 2 24-AUG-2018 Attachment 10 Revised Drawings 37 24-AUG-2018 Attachment 11 Revised Spec - 33 52
43.11
18 24-AUG-2018
Attachment 12 Revised Spec - 33 52 43.12
6 24-AUG-2018
Attachment 13 Revised Spec - 33 52 43.13
30 24-AUG-2018
Attachment 14 Revised Spec - 33 52 43.14
17 24-AUG-2018
Attachment 15 Revised Spec - 33 52 43.23
25 24-AUG-2018
Attachment 16 Revised Spec - 33 52 10 24-AUG-2018
Attachment 17 43.28 Revised Spec – 33 56 10 14 24-AUG-2018
(End of Summary of Changes)