Attachment_26_-_Price_Breakout_Schedule.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
DESC1802 Replace POL Facilities Hill AFB, UT
Solicitation number
W91238-18-R-0020
Issued by

About this file

Attachment 26 - Price Breakout Schedule

View the file

Other files

File Type Posted
Appendix_1-Revised-Drawings-Am-0009.PDF PDF
W912838-18-R-0020-Am_0009_Narrative.pdf PDF
W91238-18-R-0020-0009.pdf PDF
Appendix_2-Revised-Specifications-Am-0009.pdf PDF
W91238-18-R-0020-0008.pdf PDF
Amendment_0007_Narrative.pdf PDF
W91238-18-R-0020-0007.pdf PDF
Revised_Specifications_2.pdf PDF
Revised_Drawings_5.PDF PDF
Appendix_1b_-_Drawings-Am-6-2.docx DOCX document
W91238-18-R-0020-0006.pdf PDF
Appendix_1c_-_Drawings-Am-6-3.docx DOCX document
Appendix_1a_-_Drawings-Am-6-1rev.docx DOCX document
Appendix_2-Specifications-Am-6.pdf PDF
W912838-18-R-0020-Am_0006_Narrative.pdf PDF
Attachment_2_-_Revised_Supplemental_Contract_Requirements.pdf PDF
Appendix_1d_-_Drawings-Am-6-4.docx DOCX document
W91238-18-R-0020-0005.pdf PDF
POL_Pumphouse_Site_Walk_Photos_28_Aug.pdf PDF
Pre-Proposals_Site_Visit_Sign-In.pdf PDF
W912838-18-R-0020-Am-0002-Drawings.pdf PDF
33_52_43.11.pdf PDF
33_52_43.12.pdf PDF
33_52_43.23.pdf PDF
33_52_43.28.pdf PDF
33_52_43.14.pdf PDF
33_52_43.13.pdf PDF
33_56_10.pdf PDF
W91238-18-R-0020-0004_-_SF30.pdf PDF
W912838-18-R-0020-Am_00001_Narrative.docx DOCX document
W91238-18-R-0020-0003_-_Change_Project_Title.pdf PDF
W91238-18-R-0020-0001_-_Correct_Proposals_Due_Date.pdf PDF
Appendix_1e_-_Drawings_5.pdf PDF
Attachment_5_-_Cover_Letter.DOCX DOCX document
Appendix_1b_-_Drawings_2.pdf PDF
Attachment_7_-_Truck_Offload_FONSI.pdf PDF
Appendix_2_-_Specifications_for_Construction.pdf PDF
Attachment_1_-_SOW_Replace_POL_Facilities.DOCX DOCX document
Attachment_3_-_Wage_Determinations.docx DOCX document
Attachment_2_-_Supplemental_Contract_Requirements.docx DOCX document
Attachment_6_-_Truck_Offload_Environmental_Assessment.pdf PDF
Attachment_4_-_Acknowledgement_Statement.DOCX DOCX document
Appendix_1a_-_Drawings_1.pdf PDF
W91238-18-R-0020_-_SF1442.pdf PDF
Attachment_8_-_Site_Walk_Instructions.docx DOCX document
Appendix_1d_-_Drawings_4.pdf PDF
Appendix_1c_-_Drawings_3.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Proposal Breakout Schedule
Instructions: Please fill out only cells in green.
CLIN 0001 - Fuel PipingCLIN 0002 - Pumphouse
WBSDescriptionTotalWBSDescriptionTotal
01Substructure01Substructure
02Superstructure02Superstructure
03Exterior Closure03Exterior Closure
04Roofing04Roofing
05Interior Construction05Interior Construction
06Interior Finishes06Interior Finishes
07Conveying System07Conveying System
08Plumbing08Plumbing
09HVAC M209HVAC M2
10Fire Protection System10Fire Protection System
11Electric Power11Electric Power
12Electrical Systems12Electrical Systems
13Equipment13Equipment
14Furnishing14Furnishing
15Special Construction15Special Construction
16Selective Building Demolition16Selective Building Demolition
17Site Preparation17Site Preparation
18Site Improvements18Site Improvements
19Site Civil Utilities19Site Civil Utilities
20Site Electrical Utilities20Site Electrical Utilities
21Design21Design
CLIN 0001 Total$ - 0CLIN 0002 Total$ - 0
CLIN 0003 - FillstandsCLIN 0004 - Offload Points
WBSDescriptionTotalWBSDescriptionTotal
01Substructure01Substructure
02Superstructure02Superstructure
03Exterior Closure03Exterior Closure
04Roofing04Roofing
05Interior Construction05Interior Construction
06Interior Finishes06Interior Finishes
07Conveying System07Conveying System
08Plumbing08Plumbing
09HVAC M209HVAC M2
10Fire Protection System10Fire Protection System
11Electric Power11Electric Power
12Electrical Systems12Electrical Systems
13Equipment13Equipment
14Furnishing14Furnishing
15Special Construction15Special Construction
16Selective Building Demolition16Selective Building Demolition
17Site Preparation17Site Preparation
18Site Improvements18Site Improvements
19Site Civil Utilities19Site Civil Utilities
20Site Electrical Utilities20Site Electrical Utilities
21Design21Design
CLIN 0003 Total$ - 0CLIN 0004 Total$ - 0
CLIN 0005 - DemolitionCLIN 0006 - Site Preparation
WBSDescriptionTotalWBSDescriptionTotal
01Substructure01Substructure
02Superstructure02Superstructure
03Exterior Closure03Exterior Closure
04Roofing04Roofing
05Interior Construction05Interior Construction
06Interior Finishes06Interior Finishes
07Conveying System07Conveying System
08Plumbing08Plumbing
09HVAC M209HVAC M2
10Fire Protection System10Fire Protection System
11Electric Power11Electric Power
12Electrical Systems12Electrical Systems
13Equipment13Equipment
14Furnishing14Furnishing
15Special Construction15Special Construction
16Selective Building Demolition16Selective Building Demolition
17Site Preparation17Site Preparation
18Site Improvements18Site Improvements
19Site Civil Utilities19Site Civil Utilities
20Site Electrical Utilities20Site Electrical Utilities
21Design21Design
CLIN 0005 Total$ - 0CLIN 0006 Total$ - 0
CLIN 1001 - Fillstand CanopiesCLIN 1002 - Offload Point Canopies
WBSDescriptionTotalWBSDescriptionTotal
01Substructure01Substructure
02Superstructure02Superstructure
03Exterior Closure03Exterior Closure
04Roofing04Roofing
05Interior Construction05Interior Construction
06Interior Finishes06Interior Finishes
07Conveying System07Conveying System
08Plumbing08Plumbing
09HVAC M209HVAC M2
10Fire Protection System10Fire Protection System
11Electric Power11Electric Power
12Electrical Systems12Electrical Systems
13Equipment13Equipment
14Furnishing14Furnishing
15Special Construction15Special Construction
16Selective Building Demolition16Selective Building Demolition
17Site Preparation17Site Preparation
18Site Improvements18Site Improvements
19Site Civil Utilities19Site Civil Utilities
20Site Electrical Utilities20Site Electrical Utilities
21Design21Design
CLIN 1001 Total$ - 0CLIN 1002 Total$ - 0
CLIN 1003 - Contaminated Soil DisposalCLIN 1004 - Automatic Tank Gauging System
WBSDescriptionTotalWBSDescriptionTotal
01Substructure01Substructure
02Superstructure02Superstructure
03Exterior Closure03Exterior Closure
04Roofing04Roofing
05Interior Construction05Interior Construction
06Interior Finishes06Interior Finishes
07Conveying System07Conveying System
08Plumbing08Plumbing
09HVAC M209HVAC M2
10Fire Protection System10Fire Protection System
11Electric Power11Electric Power
12Electrical Systems12Electrical Systems
13Equipment13Equipment
14Furnishing14Furnishing
15Special Construction15Special Construction
16Selective Building Demolition16Selective Building Demolition
17Site Preparation17Site Preparation
18Site Improvements18Site Improvements
19Site Civil Utilities19Site Civil Utilities
20Site Electrical Utilities20Site Electrical Utilities
21Design21Design
CLIN 1003 Total$ - 0CLIN 1004 Total$ - 0
Base CLINs Subotal$ - 0
Option CLINs Subtotal$ - 0
Total Including all Options$ - 0

File details come from the government source that posted it.