W91236-16-R-0010-0008.pdf

PDF 33 KB Posted

Attached to
AIT Barracks- Phase III, Ft. Lee, Virginia Federal contract opportunity
Solicitation number
W91236-16-R-0010
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

W91236-16-R-0010-0008 Amendment

View the file

Other files for this federal contract opportunity

Other files attached to AIT Barracks- Phase III, Ft. Lee, Virginia, newest first.
File Type Posted
W91236-16-R-0010-0007.pdf PDF
VOL_2_A-601_3JUN2016.pdf PDF
VOL_2_EP104_3JUN2016.pdf PDF
VOL_2_EP601_3JUN2016.pdf PDF
VOL_2_EP703_3JUN2016.pdf PDF
VOL_3_EP701_3JUN2016.pdf PDF
VOL_2_M-001_3JUN2016.pdf PDF
VOL_3_EL502_3JUN2016.pdf PDF
VOL_3_EP601_3JUN2016.pdf PDF
VOL_2_E-001_3JUN2016.pdf PDF
VOL_3_EL701_3JUN216.pdf PDF
BARRACKS_SPECIFICATION_14_21_23_-_ELECTRIC_TRACTION_PASSENGER_ELEVATORS_3JUN2016.pdf PDF
VOL_2_M-601_3JUN2016.pdf PDF
VOL_2_EP701_3JUN2016.pdf PDF
VOL_3_E-001_3JUN2016.pdf PDF
VOL_2_EL701_3JUN2016.pdf PDF
Am_4_-_Attach_17_VOL_3_S-102_26MAY2016.pdf PDF
Am_4_-_Attach_12_VOL_3_A-318_26MAY2016.pdf PDF
W91236-16-R-0010-0004.pdf PDF
25May2016_Site_Visit_Roster.pdf PDF
Am_4_-_Attach_01_VOL_1__CS101-103_26MAY2016.pdf PDF
Am_4_-_Attach_02_VOL_2_A-002_26MAY2016.pdf PDF
Am_4_-_Attach_22_VOL_3_S-501_26MAY2016.pdf PDF
synthetic_turf_spec.pdf PDF
Am_4_-_Attach_18_VOL_3_S-105_26MAY2016.pdf PDF
Am_4_-_Attach_13_VOL_3_A-504_26MAY2016.pdf PDF
Am_4_-_Attach_05_VOL_2_A-507_26MAY2016.pdf PDF
Am_4_-_Attach_21_VOL_3_S-108_26MAY2016.pdf PDF
Am_4_-_Attach_10_VOL_3_A-101_26MAY2016.pdf PDF
Am_4_-_Attach_08_VOL_2_S-003_26MAY2016.pdf PDF
Am_4_-_Attach_23_VOL_4_A-101_26MAY2016.pdf PDF
Am_4_-_Attach_07_VOL_2_G-002_26MAY2016.pdf PDF
VOL_3_P-001_20May2016.pdf PDF
W91236-16-R-0010-0003.pdf PDF
VOL_2_EP601_20May2016.pdf PDF
BARRACKS_SPECS_VOL2_16May2016.pdf PDF
DFAC_SPECS_VOL1_16May2016.zip ZIP file
DFAC FFE Package_16May2016.pdf PDF
VOL 2_LEE_BCOF_600_16May2016.pdf PDF
VOL 4_LEE_DFAC_16May2016.pdf PDF
VOL 1_LEE_SITE_16May2016.pdf PDF
W91236-16-R-0010-00001.pdf PDF
H.01.04__Drainage_Report_21April2016.zip ZIP file
H.01.04_Volume2600PersonBarracks_21April2016.zip ZIP file
H.01.04_Volume4DFACPlans_21April2016.zip ZIP file
H.01.01_LEEAITBARRACKSCOMPLEXPH3VOL3300PN_21April2016.zip ZIP file
A.07.23_solicitation_9May2016.pdf PDF
H.01.04_LEE_VOLUME_1_SITE(Progress_Submission).zip ZIP file
H.01.04_BARRACKS_Specifications21April2016.zip ZIP file
H.01.04_LEE_VOLUME_4_DFAC_(ProgressSubmission).zip ZIP file
Show all 50

AIT Barracks- Phase III, Ft. Lee, Virginia has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W91236-16-R-0010 AIT Barracks, Phase III, Fort Lee, Virginia

This Amendment is issued to update the Davis Bacon Wage Determination from WD VA 160111 07/15/2016 to WD VA 160111 08/12/2016.

All Contractors that have submitted a price proposal are to provide a revised price proposal, or confirm current pricing, NLT 15 August 2016 at 10:00 AM (EST) via Email to Stormie.B.Wicks@usace.army.mil , CC'd Paula.M.Beck@usace.army.mil . ALL Contractors are to acknow ledge receipt of all Amendments (0001-0008) NLT 15 August 2016 at 10:00 AM (EST) via submission of a completed SF1442 via Email to Stormie.B.Wicks@usace.army.mil , CC'd Paula.M.Beck@usace.army.mil.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91236-16-R-0010

X 9B. DATED (SEE ITEM 11)

09-May-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Aug-2016

CODE

USA ENGINEER DISTRICT, NORFOLK

803 FRONT STREET

NORFOLK VA 23510-1096

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91236-16-R-0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

General Decision Number: VA160111 08/12/2016 VA111

Superseded General Decision Number: VA20150111

State: Virginia

Construction Type: Building

Counties: Hopewell* and Prince George Counties in Virginia.

*INDEPENDENT CITY

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 01/15/2016 2 03/25/2016 3 07/15/2016 4 08/12/2016

BOIL0045-004 01/01/2016

Rates Fringes

BOILERMAKER......................$ 31.92 25.21

ELEC0666-012 03/01/2016

Rates Fringes

ELECTRICIAN......................$ 29.53 43%

ELEV0051-005 01/01/2016

Rates Fringes

ELEVATOR MECHANIC................$ 37.61 29.985+a+b

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving and Christmas Day.

b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.

ENGI0147-023 11/01/2013

Rates Fringes

Power equipment operators:

Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100

ft. above ground............$ 28.30 8.69%+8.15 Cranes under 90 tons........$ 27.38 8.69%+8.15

IRON0028-011 06/01/2015

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 26.00 14.85

* PAIN0051-031 06/01/2016

Rates Fringes

PAINTER (Brush & Roller).........$ 18.00 9.15

PLUM0010-014 09/01/2014

Rates Fringes

PIPEFITTER (Including HVAC Pipe & System Installation)......$ 28.00 16.02

PLUMBER..........................$ 28.00 16.02

SHEE0100-035 07/01/2016

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 26.42 16.41

SUVA2010-117 09/20/2010

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 23.29 10.09

BRICKLAYER.......................$ 22.88 5.81

CARPENTER........................$ 16.11 2.39

CEMENT MASON/CONCRETE FINISHER...$ 13.29 0.62

IRONWORKER, ORNAMENTAL...........$ 16.45 2.28

LABORER: Common or General......$ 8.90 2.21

LABORER: Landscape..............$ 10.64 0.00

LABORER: Mason Tender - Brick...$ 10.90 2.35

LABORER: Mason Tender - Cement/Concrete..................$ 12.96 3.12

LABORER: Pipelayer..............$ 14.44 2.35

OPERATOR: Backhoe...............$ 17.67 3.16

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 15.62 2.40

OPERATOR: Bulldozer.............$ 21.50 4.80

OPERATOR: Excavator.............$ 18.38 4.17

OPERATOR: Forklift..............$ 17.93 7.28

OPERATOR: Loader................$ 20.63 4.80

OPERATOR: Mechanic..............$ 18.23 1.59

OPERATOR: Roller................$ 21.50 4.80

PAINTER: Spray..................$ 21.01 6.91

ROOFER...........................$ 21.55 7.01

SPRINKLER FITTER (Fire Sprinklers)......................$ 16.25 4.37

TILE FINISHER....................$ 17.32 6.72

TILE SETTER......................$ 21.12 7.68

TRUCK DRIVER: Dump Truck........$ 13.25 1.80

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Summary of Changes)

File details come from the government source that posted it. Updated .