W91236-16-R-0010-0005.pdf
PDF 219 KB Posted
- Attached to
- AIT Barracks- Phase III, Ft. Lee, Virginia Federal contract opportunity
- Solicitation number
- W91236-16-R-0010
About this file
W91236-16-R-0010-0005
View the file
Other files for this federal contract opportunity
Show all 50
AIT Barracks- Phase III, Ft. Lee, Virginia has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W91236-16-R-0010 AIT Barracks, Phase III, Fort Lee, Virginia Please see continuation page for Amendment details. Please note that the proposal due date remains the same at 12:00 NOON, EST, 13 June 216.
If the offeror is a large business and the offer amount exceeds $1,000,000, he shall submit a subcontracting plan w ith initial proposals. The subcontracting plan shall be review ed and approved by the Contracting Officer prior to aw ard.
Contracting POC: Stormie Wicks, Stormie.B.Wicks@usace.army.mil, (757) 201.7215
1. CONTRACT ID CODE PAGE OF PAGES
J 1 48
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Jun-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91236-16-R-0010
X 9B. DATED (SEE ITEM 11)
09-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Jun-2016
CODE
USA ENGINEER DISTRICT, NORFOLK
803 FRONT STREET
NORFOLK VA 23510-1096
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91236-16-R-0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 11 00 - SOLICITATION, OFFER & AWARD
SUMMARY OF CHANGES
SECTION 00 11 00 - SOLICITATION, OFFER & AWARD
The following have been added by full text:
AMENDMENT #5:
The solicitation is amended as follows:
The following items represent changes to the contract scope. These changes apply across the entire solicitation.
REQUEST FOR PROPOSAL IS AMENDED AS FOLLOWS:
1. SPECIFICATION 23 07 00, DFAC SPECIFICATIONS:
Delete item d. “Condenser Water” from paragraph 3.2.5
2. SPECIFICATION 23 64 26, BARRACKS SPECIFICATIONS:
Delete paragraph 2.4.2
3. SPECIFICATION 23 64 26, DFAC SPECIFICATIONS:
Delete paragraph 2.5.2
4. SPECIFICATION 23 00 00, DFAC SPECIFICATIONS:
Delete equipment tags (SF-1,2) from the title of paragraph 2.9.1.2
5. SPECIFICATION 23 00 00, DFAC SPECIFICATIONS:
Delete equipment tags (EF-10,11,12) from the title of paragraph 2.9.1.3
6. SPECIFICATION 23 00 00, DFAC SPECIFICATIONS:
Delete equipment tags (EF-1,2,3,4,5,6,7,8,9) from the title of paragraph 2.9.1.4
7. SPECIFICATION 23 00 00, DFAC SPECIFICATIONS:
Delete equipment tags (EF-13,14,17,19,20) from the title of paragraph 2.9.1.5
8. SPECIFICATION 23 00 00, DFAC SPECIFICATIONS:
Delete equipment tags (EF-15,18) from the title of paragraph 2.9.1.6
9. SPECIFICATION 23 00 00, DFAC SPECIFICATIONS:
Delete equipment tag (EF-16) from the title of paragraph 2.9.1.7
10. SPECIFICATION 23 00 00, DFAC SPECIFICATIONS:
Delete equipment tags (MAU-1.2.3.4.5.6.7) from the title of paragraph 2.10
11. DRAWING M-601, VOLUME 2:
Changed closed circuit cooler design wet bulb to 78 degrees. (Refer to included VOL 2_M-601_3JUN2016.pdf)
12. DRAWING M-601, VOLUME 3:
Changed closed circuit cooler design wet bulb to 78 degrees. (Refer to included VOL 3_M-601_3JUN2016.pdf)
13. DRAWING M-601, VOLUME 4:
Changed closed circuit cooler design wet bulb to 78 degrees. (Refer to included VOL 4_M-601_3JUN2016.pdf)
14. DRAWING P-502, VOLUME 4:
Provided gas piping sizes. (Refer to included VOL 4_P-502_3JUN2016.pdf)
15. DRAWING QF512, VOLUME 4:
Removed makeup air from hood details. (Refer to included VOL 4_QF512_3JUN2016.pdf)
16. DRAWING QF603, VOLUME 4:
In the Ventilation Schedule, Removed supply air information from item 71. (Refer to included VOL 4_QF603_3JUN2016.pdf)
17. DRAWING M-001, VOLUME 2:
Updated Fire Damper Symbol on the legend. (Refer to included VOL 2_M-001_3JUN2016.pdf)
18. SPECIFICATION 14 21 23, BARRACKS SPECIFICATIONS:
Delete outdated specification (02/09) in its’ entirety and replace with updated specification (05/16). (Refer to included BARRACKS SPECIFICATION 14 21 23 - ELECTRIC TRACTION PASSENGER ELEVATORS_3JUN2016.pdf)
19. SPECIFICATION 08 14 00, BARRACKS SPECIFICATIONS:
Revise paragraph 2.1.3 to read, "...Sound Transmission Rating as indicated on drawings when tested... ". Revise the second sentence to read, "Provide faces to match flush doors.”
20. SPECIFICATION 08 71 00, BARRACKS SPECIFICATIONS:
Delete “NOT USED” under paragraph 3.6.3 and replace with:
3 Hinges - BB1191 4.5" x 4.5" NRP - 652 - Hager 1 Battery Lock - 45HG-7-DV-15-MS - 626 - Best 1 Kickplate - 190S 8" x 34" - 630 - Hager 1 Stop - 236W - 626 - Hager 3 Silencers - 307D - GRY - Hager 1 acoustical door seal kit, threshold, and door bottom.
Personnel who work in room can enter using key card and convert to and from passage function (not locked) by double swiping card. Key override provided.
21. SPECIFICATION 08 71 00, BARRACKS SPECIFICATIONS:
Delete “NOT USED” under paragraph 3.6.28 and replace with:
6 Hinges - BB1191 4.5" x 4.5" NRP - 652 - Hager 1 Battery Lock - EXG-7-EV-15-MS-PH2-RM - 626 - Best 2 Exit Device - FL2103 - 630 - Precision 2 Cylinder - 1E72 - 626 - Best 2 Closer - D-4550 EDA - 689 - Stanley 2 Kickplate - 190S 8" x 34" - 630 - Hager 2 Stop - 236W - 630 - Hager 6 Silencers - 307D - GRY - Hager 2 acoustical door seal kits 2 Flush Bolts (inactive leaf) - 281D - 26D - Hager
Personnel with special clearance may enter using card. Convert door to and from passage function (not locked) by double swiping card. Key override provided. No access to general card holders at other times.
22. SPECIFICATION 10 22 39, BARRACKS SPECIFICATIONS:
Add item "f. Partitions shall have a minimum STC rating of 45." to paragraph 2.2.
Add paragraph 2.3.1 to read, " DOORS - Provide non-fire rated, manually operated doors with vinyl sweep top seals which compress against the bottom of the top track."
23. DRAWING A-601, VOLUME 2:
STC RATING column is integrated and updating under the Door Schedule. The HARDWARE column has been also updated. (Refer to included VOL 2_A-601_3JUN2016.pdf)
24. DRAWING A-601, VOLUME 3:
STC RATING column is integrated and updating under the Door Schedule. The HARDWARE column has been also updated. (Refer to included VOL 3_A-601_3JUN2016.pdf)
25. DRAWING M-602, VOLUME 2:
Added Note 4 to schedule (Refer to included VOL 2_M-602_3JUN2016.pdf)
26. DRAWING M-602, VOLUME 3:
Added Note 4 to schedule (Refer to included VOL 3_M-602_3JUN2016.pdf)
27. DRAWINGS EP104, EP601, EP701, EP702, EP703, VOLUME 2:
Added circuits for WSHP-#### (Refer to included VOL 2_EP104_3JUN2016.pdf, VOL 2_EP601_3JUN2016.pdf, VOL 2_EP701_3JUN2016.pdf, VOL 2_EP702_3JUN2016.pdf, VOL 2_EP703_3JUN2016.pdf)
28. DRAWINGS EP104, EP601, EP701, EP702, EP703, VOLUME 3:
Added circuits for WSHP-#### (Refer to included VOL 3_EP104_3JUN2016.pdf, VOL 3_EP601_3JUN2016.pdf, VOL 3_EP701_3JUN2016.pdf, VOL 3_EP702_3JUN2016.pdf, VOL 3_EP703_3JUN2016.pdf)
29. SPECIFICATION 26 51 00 BARRACKS SPECIFICATION:
Paragraph 2.7 LIGHTING CONTROL SYSTEMS This sentenced has changed from:
“Low voltage control wiring, Class 2, sized as per manufacturer recommendations, shall be used to communicate between light fixtures, dimmers, switches, wall stations, and lighting control system.”
To:
“Wireless RF signals shall be used to communicate between light fixtures, dimmers, switches, wall stations, and lighting control system.”
Remove sentences:
“Connection to any point along the communication wiring shall connect the device to the lighting control system.”
And “The system shall access points throughout the building to allow the use of a handheld device.”
30. SPECIFICATION 26 51 00 BARRACKS SPECIFICATION:
Paragraph 2.7.1 OPERATION Remove sentence:
“Change in sensor and fixture control shall be done by software and not require hardware changes or additions.”
31. DRAWINGS E-001, EL502, EL701, VOLUME 2:
Clarified the lighting control system. (Refer to included VOL 2_E-001_3JUN2016.pdf, VOL 2_EL502_3JUN2016.pdf, VOL 2_EL701_3JUN2016.pdf)
32. DRAWINGS E-001, EL502, EL701, VOLUME 3:
Clarified the lighting control system. (Refer to included VOL 3_E-001_3JUN2016.pdf, VOL 3_EL502_3JUN2016.pdf, VOL 3_EL701_3JUN2016.pdf)
BIDDER INQUIRIES & ANSWERS SUBMITTED VIA ProjNet
6514791 Regarding Factor 2 – Past Performance. Would the Corps consider accepting a CCASS/CPARS evaluation in lieu of a PPQ? Many of our clients are not responsive to a request for a PPQ, if an evaluation has been made available.
Government Response. . Yes.
6514792 Regarding Factor 2 – Past Performance. Would the Corps consider accepting a recently completed PPQ for a prior solicitation in lieu of requesting the client to complete a new PPQ as provided in this RFP?
Government Response. . Yes.
6514793 Regarding Volume 2 Price & Pro Forma. Are Representations and Certifications required to be included in the price and pro forma volume?
Government Response. . Provision 52.204-7 applies to this solicitation. Accordingly, paragraph (d) of 52.204-8 applies which requires offerors to complete corresponding individual representations and certifications electronically through the System for Award Management (SAM). The Government will access the online representations and certifications of a prospective Offeror through SAM. Other representations included in Section 00 45 00 shall be completed and be include with the price and pro forma volume.
6520673 There are two (2) sets of drawings for each building posted on the Government website. For instance, for the 600 Person Barracks, there are files noted "Progress Submission", [ie: H.01.04_LEE_VOLUME 2_600 MAN BARRACKS (Progress Submission)], and very similar drawing sets noted with "21April2016", [ie:
H.01.04_Volume2600PersonBarracks_21April2016], both for the same building. The date in the title blocks for both sets is 30 March 2016. Some examples of the differences discovered are as follows:
1.) The "Progress Submission" set has civil drawings, the 21 April 2016 set does not have civil drawings.
2.) Drawing S-303 is not the same in each set of drawings, less details in the "Progress Submission" set. 3.)
Drawings A-202 through A-209 are not the same.
4.) Drawings A-321 and A-322, sections and details are not the same.
5.) There is a drawing A-323 in the "Progress Submission" set that is not in the 21 April 2016 set. 6.)
Drawing A-606 is not the same.
7.) Drawings F-102 through F-106 are not the same. 8.) Drawings I-100 and I-101 are not the same We did not go all the way through the MEP drawings in Volume 2 and there may be similar discrepancies.
This also occurs in Volumes 1, 3 and 4 of the drawings which may have similar discrepancies since there are duplicate sets of drawings for each of these. Please clarify which set of drawings the bidding contractors are to use and remove the duplicate sets from the Government website to prevent confusion and error in bidding.
Government Response. . Please see Amendment 0003 document "Amendment Details 3_20May2016". This document details what changes have been made to drawings/plans/specs. Amendment 0004, FAR clause 252.236-7001 details what contract drawings and specifications are applicable to this Solicitation.
6520679 The submission instructions state that both the Price and Technical proposals are to be submitted on a CD- ROM; given that we will not be getting pricing from the subs and vendors until closer to the bid date and time please advise if it will be acceptable to submit the CD for the Price Proposal with a blank Price Schedule and blank Subcontracting Plan, and that we be allowed to e-mail you the completed Price Schedule and Subcontracting Plan prior to the bid closing time or provide the CD in its entirety the following business day Government Response. . See Amendment 0004 for clarification
6520680 The submission instructions state that both the Price and Technical proposals are to be submitted in one (1) original and four (4) copies; please confirm that one (1) original and four (4) copies is required for the Price proposal as typically the requirement is just one (1) original and one (1) copy.
Government Response. . Only one copy of the Price and Pro Forma volume is required. See amendment 0004 for clarification
6523954
Regarding the Proposal Submission Requirement – 4.6.2: In addition to the hardcopy proposals, submit one (1), non- editable, searchable copy on CD-ROM". Given the nature of the bidding process, the minutes leading up to the deadline for the price proposal can be very hectic. The focus for the Offeror is on compiling a complete, accurate and competitive bid finalized and submitted. Submitting the Price CD at this point adds a level of complication that hinders the bid process. Would the Corps consider allowing the Price CD to be submitted within the next 24 hours, so that the CD contains complete and accurate information and doesn't detract from focus on the bid?
Government Response. . See amendment 0004 for clarification.
6524993 Please provide a list of the sections and drawings that changed with Amendments 1 & 2.
Government Response. . Amendment 0004, FAR clause 252.236-7001 details what contract drawings and specifications are applicable to this Solicitation.
6525063 Since the plans and specifications have been completely reissued and replaced in full, we respectfully request the proposal due date be extended as if this were the issued date of the RFP. We request a proposal due date not less than 16 May 2016.
Government Response. . Proposal due date has been extended to 12:00 Noon EST, 13June2016
6525066 Due to the complexity and size of this project and the reissuance of the plans and specifications, please consider extending the proposal due date to 6/30/2016.
Government Response. . Proposal due date has been extended to 12:00 Noon EST, 13June2016
6525326 Sheet A-002 of the 600 Man Barracks includes a detail for wall type S6A. This detail indicates batt insulation, but the notation does not state that it requires batt insulation as noted on other similar details.
Please clarify whether or not this wall type requires batt insulation - thermal, acoustical, etc.
Government Response. . On sheet A-002, wall type S6A shall read as follows:
6" Metal studs 16" o.c. with acoustic batt insulation and one layer of 5/8" GWB each side. The drawing will be updated as part of Amendment 4.
6525330 Sheet A-002 of the 600 Man Barracks includes details for wall types S6B1/2 S6G1/2. These details indicate drywall applied to both sides, but the notation states "5/8" Type X GWB Room Side". Please clarify whether or not this wall type requires 5/8" Type X GWB on one side, two sides, or perhaps Type X GWB on the Room Side and regular 5/8" GWB on the other.
Government Response. . Wall type S6 shall have 5/8" GWB each side. Wall type S6A shall have 5/8" GWB each side.
Wall type S6B1/2 shall have 5/8" Type GWB each side. Wall type S6G1/2 shall have 5/8" Type GWB each side.
A drawing will be provided in Amendment 4 showing these changes.
6525355 On S-105, please reference the Northern (First Floor Roof) portion of Area B. Although Details 7A/A-318 and 5A/A-315 depict a portion of the exterior walls for this area, the structural information is not clearly identified. Please provide or identify roof joist bearing details at the exterior load bearing walls of Area B First Floor Roof.
Government Response. . For joist bearing sections in the low roof area to the north of the multistory portions see sections 4, 4A/S305
6525372 In Detail 7A/A-318 there appears to be a horizontal tube steel member supporting a brick ledger angle. We have been unable to locate this tube steel in the structural framing plans. Please provide or identify the tube steel and brick ledger detail, as well as the tube steel bearing and connection details.
Government Response. . Brick ledger and box beam are not needed for single story.
Amendment 4 will be issued to include these changes.
6526633 Due to the misdirection and confusion with having two sets of drawings issued with the original solicitation, which have now been replaced by drawings issued in Amendment No. 1, and with the issuance of replacement specifications in Amendment No. 2, we respectfully request that the bid date be extended by at least two weeks since contractors and subcontractors are essentially starting all over from the beginning. We also request that the pre-bid site visit be extended two weeks in anticipation of the building demolition drawings being issued on or about 20 May 2016 in order to allow time for review before the site visit, especially considering this is a tentative date which could slip. Your favorable considerations will be greatly appreciated and will most assuredly aid in better pricing for this logistically challenging project.
Government Response. . Proposal due date has been extended to 12:00 Noon EST, 13June2016. On
6527274 Paragraph 1.3.2 of this Section entitled LEED says ..."The Contractor is required to provide documentation that meets the LEED Energy & Atmosphere (EA) Prerequisite 1, Fundamental Commissioning and EA Credit 3, Enhanced Commissioning. The Contractor's Commissioning Firm/Specialist shall prepare the documents required for EA credit 3."
Since this project is already designed, and since project was not design-build, Contractors' cannot provide Enhanced Commissioning. Contractors' can only provide Fundamental Commissioning at this point in project development. If Enhanced Commissioning is needed, is the Owner providing the Commissioning Agent directly? Please clarify what is required for Commissioning for this project.
Government Response. . The government performed the required Cx reviews during design for this credit and will continue to be part of the Cx efforts through construction. This credit is obtainable.
6527276 Paragraph 1.1 of this section in both the Barracks and DEFAC specifications says ..."Compensation for removal of contaminated soil and pumpable liquids will be paid as a unit cost." We see no provision for unit prices on the Bid Form. Please clarify this requirement or issue a revised Bid Form incorporating an item for this work.
Government Response. . Amendment will be provided to address. Text will be changed similar to the following. Refer to Amendment 3 for actual language.
Change: "Compensation for removal of contaminated soil and pumpable liquids will be paid as a unit cost."
To: "Compensation for removal of contaminated soil and pumpable liquids will be determined by modification to the contract in accordance with the Changes clause in the contract."
6527279 Paragraph 1.1.2.1 of this section in both the Barracks and DEFAC specifications says ..."Compensation for excavation and onsite transportation of contaminated material will be paid as a unit cost." We see no provision for unit prices on the Bid Form. Please clarify this requirement or issue a revised Bid Form incorporating an item for this work.
Government Response. . Amendment will be provided to address. Text will be changed similar to the following. Refer to Amendment 3 for actual language.
Change: "Compensation for excavation and onsite transportation of contaminated material will be paid as a unit cost."
To: "Compensation for excavation and onsite transportation of contaminated material will be determined by modification to the contract in accordance with the Changes clause in the contract."
6527281 Paragraph 1.2 of this section in the Barracks specifications says ..."Geotextile installed and accepted will be paid for at the respective contract unit price in the bidding schedule." We see no provision for unit prices on the Bid Form. Please clarify this requirement or issue a revised Bid Form incorporating an item for this work.
Government Response. . Amendment will be provided to address. Text will be changed similar to the following. Refer to Amendment 3 for actual language.
Change: "Geotextile installed and accepted will be paid for at the respective contract unit price in the bidding schedule."
To: "Geotextile installed and accepted will be compensated as determined by modification to the contract in accordance with the Changes clause in the contract."
6527283 The General Notes on the "F" series of drawings showing the FF&E package says ..."Furniture is not in Contract. Furniture is shown for information only. Furniture will be procured in the FF&E package under separate cover." Please confirm that "under separate cover" should be "under separate contract" and is not the responsibility of the Contractor. Also, please confirm that the Contractor is not to provide an alternate price for the Barracks FF&E similarly as for the DEFAC since no specifications or cut-sheet information was provided, and no item was included on the Bid Form.
Government Response. . Change "under separate cover" to "under separate contract". This work is not a part of this contract. It is confirmed that a separate price is not required for the Barracks FF&E package.
Amendment 5 will be provided to show this change.
6527287 We understand the project is to attain LEED Silver per Section 01 11 00, Part 3 Execution, but we are unable to locate a LEED Checklist anywhere in the RFP documents. Please provide the LEED Checklist for this project.
Government Response. . This was provided as part of Amendment 3.
6527289 Paragraph 1.4.3 (a) indicates a Third Party Certification (TPC) Checklist is to be included at the end of Section 01 33 29 as Attachment 2. We are unable to find Attachment 2 or a TPC Checklist. Is the TPC Checklist the same thing as the LEED Checklist requested in part A) above? Please clarify and provide the appropriate Checklists.
Government Response. . This has now been included and clarified in amendment 3
6528470 Barracks Spec section 013329 1.4 a. refers to Attachment 1, HPSB checklist. Please provide this attachment.
Government Response. . This has now been included in amendment 3.
6528471 Specification 26 51 00 2.7 states that "the lighting control system shall be based on a digital addressable ballast system." The spec goes on to describe a computer software based lighting control system with class 2 wiring used "to communicate between fixtures, dimmers, switches, wall stations and lighting control system." The system is described as being able (in 2.7.1) to "make changes in sensor and fixture control...by software...." Section 2.7.6 includes a statement that "lighting fixtures and zones shall be done via the lighting control software."
Electrical drawings do not appear to provide design that matches this description from the specifications.
Specifically:
The lighting fixture schedule on EL501 and associated cut sheets on EL502 and EL503 do not indicate that the light fixtures should be provided with "digitally addressable ballasts" as would be required by the specifications.
The drawings do not include any information regarding the required computer station head end or class 2 wiring noted in the specifications.
This system would appear to be building-wide (not room specific) such that every device, sensor, or light fixture could be individually addressed and controlled via the program set in the software. Additionally, in the recent past we have installed a system as described in the specifications on a Federal facility (Marine Corps) and were unable to achieve approval for the software that the system operates on. That system was required to remain stand-alone -unconnected to the building (base) LAN.
Is the intent of this project to have a lighting control system with digital addressable ballasts and building-wide control for the barracks buildings as noted in the specifications?
Government Response. . For lighting control system, follow sheet EL701 Lighting Control Riser for both barracks. Lighting control system is stand alone; does not require building-wide control. The specs and the drawings do not indicate a computer station. A computer station is not required. Light fixtures shall utilize digital ballasts and drivers in order to be compatible with the lighting control system.
6528473
Drawing EL-701 includes a detail for "Stand Alone Wireless Digital Dimming, Sensors, and Controls Typical". This wiring diagram depicts room-specific (non-networked) lighting control arrangement utilizing a control module with RF receiver which switches lighting fixtures, HVAC loads, and plug loads based on signals received from battery powered (wireless), RF devices. This diagram depicts digital loop wiring from the controller to the fixtures and drivers (which would require digitally addressable fixtures as noted in the above) but does not depict any building-wide communication/control from a software based system.
Questions:
Is the intent to utilize RF frequency from a head-end system of software to communicate to local "stand alone" room controllers (in lieu of the class 2 wiring noted above)?
The Electrical Legend on E-001 describes the symbols for "S", "SB", "Sd", "(OS)" and [OS]" as "Low Voltage ..." but the detail on EL-701 would seem to indicate that these are wireless, battery powered switches and sensors instead of low voltage (there are no symbol on the Legend corresponding to the wireless sensors and devices). Is this correct?
The Electrical Legend indicates that the symbol "So" is a line voltage device. As such it would not be wireless or communicate with the lighting controls (either local or network). Please verify that those lighting fixtures connected to those devices would not require digital addressed ballasts (assuming they are required for the balance of the building).
What is the purpose of the "HVAC Integration Module"? No reference can be found in the HVAC controls diagrams to this integration.
What quantity of "Wireless plug in appliance modules" are required? The Legend on E-001 identifies some office receptacles as "Automatic Duplex Receptacles". Is the intent that these plug in modules be provided at those locations?
Government Response. . a. Is the intent to utilize RF frequency from a head-end system of software to communicate to local "stand alone" room controllers (in lieu of the class 2 wiring noted above)?
Answer: Yes, the intent is to utilize RF frequency for local stand alone controls. There is no building-wide control.
The Electrical Legend on E-001 describes the symbols for "S", "SB", "Sd", "(OS)" and [OS]" as "Low Voltage ..." but the detail on EL-701 would seem to indicate that these are wireless, battery powered switches and sensors instead of low voltage (there are no symbol on the Legend corresponding to the wireless sensors and devices). Is this correct?
Answer: These switches and sensors should be wireless, not low-voltage wiring. Follow sheet EL701.
The Electrical Legend indicates that the symbol "So" is a line voltage device. As such it would not be wireless or communicate with the lighting controls (either local or network). Please verify that those lighting fixtures connected to those devices would not require digital addressed ballasts (assuming they are required for the balance of the building).
Answer: This switch should be wireless, not line-voltage wiring. Follow sheet EL701. Fixtures should use digital ballast.
What is the purpose of the "HVAC Integration Module"? No reference can be found in the HVAC controls diagrams to this integration.
Answer: This control module should have a single contact closure output with normally open and normally closed dry maintained contacts suitable for connection to third party equipment (e.g. building management system, HVAC system, etc.)
e. What quantity of "Wireless plug in appliance modules" are required? The Legend on E-001 identifies some office receptacles as "Automatic Duplex Receptacles". Is the intent that these plug in modules be provided at those locations?
Answer: The quantity is zero. Please ignore the wireless plug in appliance module on sheet EL701. The wireless plug in appliance module is separate and unrelated to the automatic duplex receptacles
6528474 Barracks Spec section 013329 1.4.3 a. refers to a TPC (LEED) checklist to have been included as an appendix to that spec section. Please provide this checklist.
Government Response. . This has been provided as part of amendment 3.
6528636
See sheets S-501 for both the 300 person barracks and the 600 person barracks:
1. The shear wall components do not match:
300 barracks shear wall A studs are 600S200-97 on 1st floor 600 barracks shear wall A studs are 600S250-97 on 1st floor
2. Also the gusset plates are different as well 300 barracks 1st floor are .1017 thick 600 barracks all floors are .0713 thick.
3. Also the strapping 300 barracks is 10" x .1017 on floors 1 – 3 and changes to 8" x .0713 on floors 3 -5 600 barracks is 10" x .1017 on all floors Please confirm the respective differences are correct and that we are to follow the current drawings for pricing.
Government Response. . Studs shall be revised as 600S250-97 (1st flr to underside of 3rd flr). This change will be reflected in Amendment 4.
6529010
In the documents provided for download, there are multiple sets of the same drawings that have different features of work shown. For example, the filename: H.01.04_LEE-VOLUME 1_SITE(Progress Submission) calls for light duty concrete pavement for the entire 600PN parking lot. However, filename:
H.01.04_Volume1SITEPlans_21April2016 indicates a combination of concrete pavement and pervious pavement at the parking stalls. Please advise which set we are to bid from and provide the associated CAD files if available.
Government Response. . Please see Amendment 0003 document "Amendment Details 3_20May2016".
This document details what changes have been made to drawings/plans/specs. Amendment 0004, FAR clause 252.236-7001 details what contract drawings and specifications are applicable to this Solicitation
6529013
Architectural – Ref: 600 Man Barracks drawing A-507: This sheet indicates an add-on to an existing cooling tower slab and screen wall. However, the site drawings seem to show this belongs with the 300 Man Barracks, especially since it includes a cage for ATFP and the existing cooling tower slab is within the 75 ft setback. Please clarify.
Government Response. . The site plan is correct, the add-on is intended for the 300 man barrack and not the 600 man barrack. Both the 600 and 300 man barrack construction documents will be altered to reflect the change. This will be reflected in Amendment 4.
6529016
Please confirm that pricing for all 3 parking lots belongs with CLIN 0004.
Government Response. . Confirmed. All 3 parking lots belong with CLIN 0004.
6529018
Architectural – Ref: DFAC drawing A-101: There is no concrete pad shown at the front entrance canopy, nor is there one indicated on the structural drawings.
Government Response. . Locate the slab underneath the canopy per Amendment 4. The edge of slab will offset the column line similar to the slab underneath the Covered Assembly Areas, at 4'-9".
6529020
Architectural – Ref: 300 Man Barracks drawing A-101: There is no concrete pad shown at the front entrance canopy, nor is there one indicated on the structural drawings.
Government Response. . Located the slab underneath the canopy per Amendment 4. The edge of slab will offset the column line similar to the slab underneath the Covered Assembly Areas, at 4'-9"
6529021
Architectural – Ref: 600 Man Barracks drawing A-112: There appears to be a concrete pad shown at the front entrance canopy, but no other information. Also, if you cross reference the site drawings, there appears to be other pads indicated at the back of Area "D" which are not shown or detailed anywhere.
Government Response. . The information regarding the concrete pad will be on the Overall Floor Plan on Sheet A- 101 and provided in Amendment 4. The pad will offset 4'-9" away from the column lines of the canopy, so leading away from the building and to the left and right side of the columns.
6529023
Structural – Ref: 600 Man Barracks drawing S-103: Is the intent of the mechanical support frame shown to be used on the Closed Circuit Cooler listed on the mechanical drawings? If so, then are we to assume it is typical for the Man barracks and the DFAC?
Government Response. . Yes, and the detail is intended to be typical.
6529343
On drawings CP-102 and CP-103 in Volume 1, the L.E.B pads are denoted as being concrete paving, but per drawings A-551 in Volumes 2 and 3, they are masonry buildings with concrete footing and slabs-on-grade. Please confirm concrete paving is not the correct support/foundation for these L.E.B.'s. Also, please note the reinforcing steel is not sized in the footings except for the vertical rebar dowels into the CMU. Please provide this information.
Government Response. . Concrete paving is not the correct support/foundation for these L.E.B.'s.
Although the floor finish within the L.E.B.'s and the concrete pavement that is butted up against the building, are both made up of the same material, concrete. In Volume 1, we are showing only an outline of the supporting building, so it can be located on the site. The details on Sheet A-551 provided in Amendment 4 will provide the correct foundation for this supporting building. The horizontal rebar in the footing will be #5 Reinforcement @ 16" OC and the longitudinal bars should be "#5 CONT".
6529344
Details in the upper left hand corner of drawing A-507, Volume 2, 600 PN Barracks, Cooling Tower Screen Wall Plan, refer to "existing screen wall." Where is this existing Cooling Tower Screen Wall that the Contractor is to tie into?
Government Response. . The existing Cooling Tower Screen Wall is not associated with the 600 man barrack. It is associated with the 300 man barrack. Both the 600 and 300 man barrack, set of construction documents will be updated with Amendment 4.
6529345 Drawing A-504, Volume 2, 600 PN Barracks; Drawing A-502, Volume 3, 300 PN Barracks; Drawing A-511, Volume 4, DEFAC; all these drawings show a Monument Sign. We are unable to find where these monument signs are located.
Please clarify whether or not they are required at each building and where they are to be physically located on the site drawings.
Government Response. . Refer to Amendment 4 for the locations.
6529346 Drawing C-507, Volume 1, Site Drawings, no specification is given for the synthetic turf for the PT Pit. Please provide a section for this work.
Government Response. . See Amendment 0004, attachment "Synthetic Turf Spec"
6529348 Drawings CU101, CU102 and CU103 show domestic cold water to Cooling Towers (Chillers). Please confirm the Contractor is to install these domestic water lines to the chillers and not Virginia American Water with the rest of the site water system.
Government Response. . Confirmed.
6529350 Please confirm that the new parking lot on drawings CS101, CG101 and CU101 at the corner of Byrd Ave and 16th St. (south of DEFAC) is in the Base Bid and not the DEFAC Option.
Government Response. . Confirmed
6529351 The keynotes on Drawings CS101 and CS102 refer to chiller pad as being on A-503. The reference to drawing A- 503 is incorrect as we cannot find any such details on any A-503 drawings in any volume set. We are unable to find details of the chiller pads on any drawings. Please provide details of the chiller pads.
Government Response. . A-507 is the correct sheet location for the Cooling Tower, instead of A-503.
Although the plan, sections and elevations that are currently shown on A-507 are intended for the 300 man barrack, Section 2/A-507 shows how each Cooling Tower Screen wall will look like. The plan be updated in Amendment 4.
6530265 The solicitation states;
"Acceptable past performance is demonstrated by: (1) an overall rating of at least Satisfactory or better on the Past Performance Questionnaires, Attachment 3 of Section 00 22 11and Appendix D of this Source selection Plan,"
Please advise as to the location of Appendix D.
Government Response. . Specification will be edited to remove the reference to Appendix D.
6530273
Attachment 2 states;
Project "Magnitude", i.e.; Construction Cost, of the Project with Respect to Paragraph 6.2.2.6.a:
Project "Magnitude", i.e.; Construction Cost, of the Project with Respect tp Paragraph 6.2.2.6.b:
There is only a 6.2.2.6. Please clarify.
Government Response. . Reference will be changed to the following:
....of the Project with respect to Paragraph 6.2.2.3a:
and ....of the Project with respect to Paragraph 6.2.2.3b
6530281
4.6.5 b. Content Requirement states;
"Each file of the proposal shall consist of a Table of Contents, Summary Section, and the Narrative discussion. The Summary Section shall contain a brief abstract of the file." Please advise as to the contents of the Narrative discussion.
Government Response. . Narrative discussion should give a brief summary of contents of the file being discussed
6530285 Should Volume I and Volume II be submitted on the same CD or on separate CDs
Government Response. . Volume II need not be submitted on CD. See amendment 0004.
6530286 Is the price required to be on the CD when submitted?
Government Response. . Volume II need not be submitted on CD. See amendment 0004.
6532343 STC ratings for module wood doors are not indicated on plans or in specifications. Please provide.
Government Response. . The entry doors to the module rooms has a STC rating of 33. The CO Office entry door has a STC rating of 50. The Classroom/Multi-purpose Room doors has a rating of 45. An Amendment will be provided to address the STC rating of all doors.
6532345 300 PN Barracks & 600 PN Barracks Electrical power plans do not indicate any power source for Water Source Heat Pumps associated with the bedroom units. The connections do not appear on plan; there is no indication of connection on the Equipment Connection Schedule; and there are no panels/breakers assigned to power these units.
Reference drawings M-401, EP-701, and others.
Government Response. . Power will be provided. Please see narrative describing the details of the required work included in Amendment 5.
6532346 300PN and 600PN Specifications – 26 20 00 Section 26 20 00 3.1.3.2 provides direction on how MC cable installation should be executed; however, there is no section 2 Product Requirements provided for MC Cable. Is only MC Cable allowed, or is MC-A also allowed on this project?
Government Response. . MC-A cable is not allowed on this project.
6533565 Solicitation documents Page 55 "CLAUSES INCORPORATED BY FULL TEXT 52.211-10
COMMENCEMENT,
PROSECUTION, AND COMPLETION OF WORK" states " (c) complete the entire work ready for use not later than 8760* The time stated for completion shall include final cleanup of the premises..." Elsewhere in the solicitation it offers 720 CD as the duration- please advise.
Government Response. . 52.211-10 corrected to read 720 calendar days.
6533570
Solicitation Under "Delivery Information" for CLINS 6-11 the Delivery Dates are noted to be"24 months ADC" for each of these options. Please confirm that awardee will be given 24 months from award of the individual options in order to complete those options?
Government Response. . Yes.
6533572 Amendments # 1-3 involved substantial sections of contract drawings which have been modified. We would suggest that additional time may be required to review amendments of that magnitude. We would respectfully recommend an extension of the contract submission date by a week to 6/16 in order to allow subcontractors adequate time to review these documents and prepare proposals.
Government Response. . Proposal due date has been extended to 12:00 Noon EST, 13June2016.
6533574 SECTION 01 35 26.00 50 para 1.5.1.1 states "Site Safety and Health Officer (SSHO) The contractor shall provide a Safety oversight team that includes a minimum of one (1) Competent Person at each project site to function as the Safety and Health Officer (SSHO). Please confirm the meaning of the word project site as it pertains to this section. Will the Government expect additional/ separate SSHOs at the dining facility and the 300 person barracks facility if those options are awarded?
Government Response. . The Project site is the scope of all work awarded under this solicitation. If the Government awards one or more buildings under this contract, at a minimum, one SSHO is required on site at all times while work is being performed.
6533575 SECTION 01 35 26.00 50 para 1.5.1.1 state "Site Safety and Health Officer (SSHO) The Contractor Quality Control (QC) person cannot be the SSHO on this project, even though the QC has safety inspection responsibilities as part of the QC duties." This clause does not preclude the SSHO from having other duties – only precludes them serving as the QC. Please confirm if these individuals can perform the role of a SSHO in addition to other duties or if they are required to have no other duties assigned than site safety and health.
Government Response. . The designated SSHO (and Alternate SSHO) shall have no other duties assigned other than that of site safety and health.
6533581 SECTION 01 35 26.00 50 1.5.2.2 requires that a Certified Industrial Hygienist be assigned to "a. Perform occupational\ health management, surveillance, inspections, and enforcement for the demolition phase of the project.... c. Be onsite daily whenever demolition work or hazardous " please confirm this individual is required for the entire demo phase or only during the period of time when the demolition contractor is removing hazardous material.
Government Response. . Individual is required for the entire demolition phase of the project, and is to be present on-site daily whenever demolition or hazardous materials work is occurring.
6533583
SECTION 01 35 26.00 50 1.5.2.2 requires that Certified Industrial Hygienist (CIH) "shall have no other duties other than occupational health management, inspections, and enforcement on this contract" but also states they will "b.
Perform as the occupational health "competent person" as defined by USACE EM 385-1-1". It is understood that this individual is required full time during the demo phase when demo work is being performed- could this individual also then serve as the SSHO during the demo phase? Or are both individuals required during this phase?
Government Response. . A CIH could serve to fulfill both designated roles (safety and occupational health management) during the demolition phase of the project, however, to serve in the designated role of project SSHO, the individual would need to demonstrate that he meets all of the specific qualifications, training, and experience requirements established for a project SSHO as indicated in Section 01.A.17 (a-i).
6533585 SECTION 01 50 02.00 50 para 1.4.1 Payment for Utility Services states "The Government will make all reasonably required utilities available to the Contractor from existing outlets and supplies, as specified in the contract." Please confirm who is to pay for the utility usage.
Government Response. . The Contractor is responsible for paying for utility usage during construction.
6533587 Specification section 088100, 2.2.1, a calls for the exterior light of the IGU to be laminated along with the interior light of glass to be laminated. The typical make up for an IGU that meets ATFP criteria is a 1/4" non-laminated exterior light - 1/2" air - 1/4" laminated interior light with the appropriate PVB to meet the blast load. Having the exterior and interior lights both laminated adds more load to the frame and fasteners as well as cost to the project.
Is it acceptable to use a non-laminated exterior light and laminated interior light to make up the IGU for this project?
Government Response. . Please follow what is stated within the spec.
6533995
Please confirm that all building level DDC control systems shall be fully integrated to the existing Fort Lee base wide Utility Monitoring Control System. The current UMCS is provided by Johnson Controls. Specification
230923.1.3.2 states "if there is not an existing UMCS that meet the following requirements, provide one." Please clarify that this contract shall include integration to the existing UMCS and not to provide a new or separate UMCS. Typically a specification section 251010 is issued for UMCS integration. This requirement was omitted in the Ft Lee AIT Complex Phase 2 bid package and was later added by a Contract Change.
Government Response. . This contract shall include integration to the existing UMCS and this information is addressed in specification 23 09 23. An amendment will be issued to clarify this requirement.
6536088 Natural Gas Schematic on P-502 does not indicate pipe sizes for gas lines. This is typical of all three volumes of drawings. Please provide gas pipe sizing.
Government Response. . The DFAC drawings will be revised by amendment to indicate sizes. For the barracks buildings, use the sizing information provided on the Gas Meter Detail and the equipment run-out sizing information
6536091 Please provide specification for pre-insulated chilled water underground piping (building to chiller).
Government Response. . The exterior condenser water piping does not require insulation.
6537974 Does the government there have an existing UMCS for us to tie onto?
Government Response. . This contract shall include integration to the existing UMCS and this information is addressed in specification 23 09 23. An amendment will be issued to clarify this requirement.
6537975 What type of BPOC's are currently being used in other facilities on that post?
Government Response. . The base UMCS is provided by Johnson Controls. The contractor is responsible for the coordination and interface of the building into this system.
6537976 Will the controls contractor be required to use a government issued laptop before the buildings are tied to the government LAN?
Government Response. . No.
6537977 Will the controls contractor be required to have a government issued CAC Card to access the base?
Government Response. . See division 01 for base access requirements, specifically section 01 30 00.10 50.
6537979 Will a CAC Card issued by another military base allow the contractor to log on to the government computers at Ft.
Lee?
Government Response. . No this will require coordination with Ft. Lee.
6538443 Spec section 04 20 00/3.2.4.5 calls out leaving brick out and washing out the cavity twice a day. Can this requirement be waived for this project? We will be installing a cavity drainage system, including mortar net and weeps at the base of the wall, which will ensure to keep the cavity clean.
Government Response. . Concur.
6538444 Will Type N masonry cement be acceptable to use for the masonry veneer on this project?
Government Response. . No use Type S mortar.
6538705 RFP 7.3.1.1, item (f) requests "A list of present commitments, including the dollar value thereof, and name of the organization under which the work is being performed. Include names and telephone numbers of personnel within each organization who are familiar with the prospective contractor's performance."
Discussion: For larger firms the requested list can be several hundred items. Please confirm that it is acceptable for firms to provide a list of the top 20 present commitments and associated data to satisfy the requirement
Government Response. . The Government is using this information to determine Contractor responsibility; please use your best business judgment in presenting a listing of present commitments, as there is no minimum/maximum set.
6538712 Sheet A-502 on Building 600 and Building 300 show the typical living unit closets in detail 4. Please specify finish of the plywood closet shelves with solid wood edges.
Government Response. . The plywood shelves are to be painted to match the color specified for the door frames of the Module rooms.
6538715 Please confirm if SS-1 or SS-2 will be used on Solid Surface window sills. Interior finishes schedule sheet I-100 and typical window sill details located on sheet A-611 do not indicate which one to use.
Government Response. . See General Notes #14 on Sheet I-100.
6538716 Please confirm if…