Am_4_-_Attach_09_VOL_2_S-108_26MAY2016.pdf
PDF 72 KB Posted
- Attached to
- AIT Barracks- Phase III, Ft. Lee, Virginia Federal contract opportunity
- Solicitation number
- W91236-16-R-0010
About this file
AM 4 - ATTACH 09 VOL 2_S-108_26MAY2016
View the file
Other files for this federal contract opportunity
Show all 50
AIT Barracks- Phase III, Ft. Lee, Virginia has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z4 Z4 Z4 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1
Z2 Z2
Z3
Z3 Z3
WALL
TYP
BM BM BM L
SP
LI
C E
.6 L
.2 L
.2 L
TR
AN
SV
ER
SE
S
PL
IC
E
ZO
N
ES
N O
TE
B
TY
P
L
L
.2L.2L
SPLICE
.6L
LONGITUDINAL SPLICE ZONES NOTE 5A TYP
SPLICE
.6L.2L .2L
L
LONGITUDINAL SPLICE ZONES NOTE 5A TYP
S-108
S-108
STAIR SEE
NOTES S-105
LONGITUDINAL TRANSVERSE
REINFORCEMENT DIRECTION
Z1
Z1
Z3
Z3
Z3
Z3
Z3
Z3
INTERIOR
SIDE
66" MIN
INTERRUPT 5/16" POUR STOP
LANDING VARIES
POUR STOP, COPE, AND
INSIDE CORNER BAR SEE
INSIDE CORNER DETAIL
#8 CONT ACROSS OPENING,
SEE INSIDE CORNER DETAIL
FOR WELDS TO POUR STOP
END TRANSVERSE TIES
AT #8 CONT BAR WITH SEISMIC
HOOKS, 1/2" COVER BETWEEN
HOOK AND DECK ACCEPTABLE
LAP LENGTHBAR SIZE
CLASS B BAR LAP LENGTH
#6
#5
38"
32"
#4 26"
#8 66"
5/16" POUR STOP
(PERIPHERAL TIE)
T/SLAB
SEE PLAN
CFMF BEARING WALL
SEE SCHEDULE
TRANSVERSE REINFORCING SEE PLAN
LONGITUDINAL REINFORCING WITH CLASS B LAP
- SEE PLAN
WELDABLE REBAR; SIZE AND SPACING TO
MATCH LONGITUDINAL REINFORCEMENT.
WELD ALL AROUND TO POUR STOP.
NOTE:
1. MAINTAIN SPECIFIED BAR PLACEMENT AND CLEAR COVER.
1/
2"
2"
C
LR1"
CONT #5
1/4
TRANSVERSE REINFORCING
WITH CLASS B LAP - SEE PLAN
WELDABLE REBAR;
SIZE AND SPACING TO
MATCH TRANSVERSE
REINF. WELDED ALL
AROUND TO POUR
STOP.
L6X"X5/16 LLV
CONT POUR STOP UNO
PERIPHERAL TIE
T/SLAB
SEE PLAN
LONGITUDINAL
REINFORCING
- SEE PLAN
SE
E
S-
NOTE:
1. COMPOSITE DECK SPANS OPPOSITE DIRECTION AND SLAB EDGE VARIES AT "SIM" CONDITION.
2"
CFMF BEARING WALL
SEE SCHEDULE
CONT #5 BARS)
1/4
LENGTH VARIES SEE PLAN
1T/SLAB
SEE PLAN
1/2"x4" BENT PLATE
CONT TOP TO BOTTOM
2ND TO 5TH STORY
5/8" ROD
STUD SEE SCHEDULE
(SECOND AND
THIRD FLOOR)
STUD SEE SCHEDULE
HSS TUBE
(SEE PLAN)
FINISH FLOOR
SEE PLAN
(3) 3/8" A-325 BOLTS TYP
5/8" ROD
TRACK, TYP
1/2" THICK PL WASHER TYP
1/2"x4" BENT PLATE 8"
ZONE WIDTH MEMBER & SPACING SPLICE DIRECTION
Z1 8' * 8-#6 EQUAL SPACING TYPE 1 MECHANICAL TRANSVERSE
Z2 4' * 4-#6 EQUAL SPACING TYPE 1 MECHANICAL LONGITUDINAL
Z3 3.3' 4-#6 EQUAL SPACING WELDED LONGITUDINAL
Z4 8' 4-#6 EITHER SIDE OF BM LAP TRANSVERSE
Z5 VARIES #6 @ 1'-0" LAP EACH WAY, ALL
AREAS NOT MARKED
* HALF WIDTH AT ENDS, BEJ AND OPENINGS
WIDTHS SHALL BE CENTERED OVER WALL OR BEAM,
EXCEPT AT ENDS AND OPENINGS.
5/16" POUR
STOP (TIE)
5/16" POUR STOP
(TIE), COPE AT
CORNERINTERIOR
SIDE
5/16
5/16
5/16" POUR
STOP (TIE)
5/16" POUR STOP
(TIE), COPE AT
CORNER
INTERIOR
SIDE
5/16
5/16
TYP
66" MIN
TYP
0' - 8"
1/4 8 MIN
TYP
#8 X 6'-2" MIN
#8 X 6'-2" MIN LAP ABOVE
OTHER BAR
SEE TABLE
LAP SPLICE
SEE TABLE
LAP SPLICE STAGGER
US Army Corps of Engineers ®
SHEET OF
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
A W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B M
IT
TE
D B
Y:
SI
ZE
C H
E C
KE
D B
Y:
AN
S I
'D
FI
LE
N
AM
E:
IS
SU
E D
AT
E :
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
37621
S-108
VOLUME 2
S E C
O N
D -F
IF
TH
F L O
O R
T
IE
F O
R C
E P L
AN
AR
EA
A
C
A
IT
B A
R
RA
CK
S
CO
M
PL
EX
PH
A
SE
6 0
M
A N
N O
R
FO
LK
D
I S
TR
IC
T
N O
R
FO
LK
, V
A
JP
J
C
ES
LW
M
LW
M
A
PR
PR
O
JE
C T
N U
M
BE
R
C O
N
TR
AC
T
N O
S- 1 0
8-
F T . L
E E , V
IR
G
IN
IA
1" = 10'-0"
TIE FORCE PLAN - AREA A (AREA C OPPOSITE HAND)
NOT TO SCALEC PERIPHERAL IRREGULARITIES
1 1/2" = 1'-0"S-108
2 TYPICAL SECTION AT DECK BEARING
1 1/2" = 1'-0"S-108
1 TYPICAL SECTION AT WELDABLE REBAR
NOT TO SCALE
TYPICAL VERTICAL TIE
NOTES:
1. SEE FLOOR FRAMING PLANS FOR FINISH FLOOR ELEVATIONS.
2. VERTICAL TIES SHALL BE LOCATED AT EITHER SIDE OF ALL OPENINGS GREATER THAN 32", AND SPACED 32" OC MAX BETWEEN OPENINGS.
3. VERTICAL TIES ATTACH TO CONTINUOUS HSS 6x6x3/16 UON AT ROOF AT TOP OF EXTERIOR, CORRIDOR, AND TRANSVERSE BEARING WALLS.
4. ALL REINFORCEMENT SPLICES SHALL BE CLASS B CONTACT, WELDED, OR TYPE 2 MECHANICAL SPLICES PER TABLE.
5. ALL REINFORCEMENT SPLICES EXCEPT TYPE 2 MECHANICAL SHALL OCCUR WITHIN THE FOLLOWING LIMITS:
5A: LONGITUDINAL BARS: INNER 60% OF THE SPAN BETWEEN BEARING WALLS. SEE EXAMPLE LONGITUDINAL SPLICE PATTERN ABOVE FOR TYPICAL LONGITUDINAL SPLICE ZONES.
PLAN ALSO SHOWS ONE EXAMPLE PERMISSIBLE CONFIGURATION OF LONGITUDINAL SPLICES.
5B: TRANSVERSE BARS: INNER 60% OF THE SPAN BETWEEN CORRIDOR AND EXTERIOR WALLS. SPLICES SHALL OCCUR WITHIN AREAS NOTED "SPLICE ZONE" ON PLAN.
SEE UFC 4-023-03 PARAGRAPH 3-1.5.1.
6. TYPE 2 MECHANICAL SPLICES MAY OCCUR ANYWHERE IN THE SLAB.
7. ALL REINFORCEMENT SPLICES SHALL BE STAGGERED SO THAT NO TWO ADJACENT BARS ARE SPLICED AT THE SAME LOCATION.
8. WELDED SPLICES IN 5/16" POUR STOP SHALL OCCUR WITHIN THE LIMITS OF TRANSVERSE AND LONGITUDINAL SPLICE ZONES, SEE NOTE 4.
NOT TO SCALEA OUTSIDE CORNER DETAIL
NOT TO SCALEB INSIDE CORNER DETAIL
SEE NOTE 8
NOT TO SCALE
LAP SPLICE TYP LONGITUDINAL
AND TRANSVERSE
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
R
EV
IS
ED
B
Y
AM
EN
D
M
EN
T
M
AY
| Sheets |
| S-108 - SECOND-FIFTH FLOOR TIE FORCE PLAN - AREA A & C |
File details come from the government source that posted it. Updated .