VOL_2_M-601_3JUN2016.pdf
PDF 20 KB Posted
- Attached to
- AIT Barracks- Phase III, Ft. Lee, Virginia Federal contract opportunity
- Solicitation number
- W91236-16-R-0010
About this file
VOL 2_M-601_3JUNE2016
View the file
Other files for this federal contract opportunity
Show all 50
AIT Barracks- Phase III, Ft. Lee, Virginia has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET OF
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
A W N
B Y:
D
ES
IG
N
ED
B
Y:
SU
B M
IT
TE
D B
Y:
SI
ZE
C H
E C
KE
D B
Y:
AN
S I
'D
FI
LE
N
AM
E:
IS
SU
E D
AT
E :
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
376266
M-601
VOLUME 2
SC
H
ED
U
L E S
A
IT
B A
R
RA
CK
S
CO
M
PL
EX
PH
A
SE
6 0
M
A N
N O
R
FO
LK
D
I S
TR
IC
T
N O
R
FO
LK
, V
A
SA
G
EA
M
D
AG
M
LM
A
PR
PR
O
JE
C T
N U
M
BE
R
C O
N
TR
AC
T
N O
M -6
F O R
T L E
E, V
I R G
IN
I A
DEDICATED OUTSIDE AIR HANDLING UNIT
UNIT LOCATION
SUPPLY FAN DATA EXHAUST FAN DATA DX COOLING MODE HOT GAS REHEAT COIL DX HEATING MODE WATER DATA
OA CFM ESP (IN WG) ELECTRICAL HP CFM ESP (IN WG) ELECTRICAL HP
DB EAT
(F)
WB EAT
(F)
TOTAL
(MBH)
SENSIBLE
(MBH)
EAT
(F)
CAPACITY
(MBH)
EAT
(F)
CAPACITY
(MBH)
COOLING
EWT (F)
HEATING
EWT (F)
FLOW
(GPM)
MAX PD
(FT)
DOAU-1 MEZZANINE 10185 1.5 460/3/60 15 6525 1.5 460/3/60 7.5 87 70.5 672 419 49 232 38 352 85 65 150 22 DOAU-2 MEZZANINE 10185 1.5 460/3/60 15 6805 1.5 460/3/60 7.5 87 70.5 672 419 49 232 46 341 85 65 150 22 DOAU-3 MECHANICAL 1089 6790 1.25 460/3/60 7.5 4815 1.25 460/3/60 2 86.5 70 431 268 50 147 40 220 85 65 95 22
BOILER SCHEDULE
UNIT LOCATION MIN EFFICIENCY (%) GROSS INPUT (MBH) NET OUTPUT (MBH) WATER TEMP (F) ENT GPM WATER PD (FT)
B-1 MECHANICAL 1089 94 5000 4650 54 220 4.5
B-2 MECHANICAL 1089 94 5000 4650 54 220 4.5
NOTES:
1. LOW NOx TYPE (<30PPM @ 3% O2)
CLOSED CIRCUIT COOLER
UNIT GPM
MAX PD
(FT)
WATER TEMP (F)
ENT AIR
(F) WB
SPRAY
PUMP HP FAN HP
BASIN
HEATER
KW V/P/HZENT LVG
CCC-1 1220 10 100 85 78 2 @ 10 50 2 @ 9 460/3/60
FAN SCHEDULE
UNIT LOCATION CFM ESP (IN WG) SONES MOTOR HP V/P/HZ
EF-1 SCRUB ROOM 1098 330 0.5 7.4 0.1 115/1/60
EF-2 SCRUB ROOM 1099 330 0.5 7.4 0.1 115/1/60
PUMP SCHEDULE
UNIT SERVICE TYPE GPM FT HD HP V/P/HZ VFD NOTES
P-1 BOILER 1 INLINE 220 30 3 460/3/60 NO
P-2 BOILER 2 INLINE 220 30 3 460/3/60 NO
P-3 CONDENSER LOOP BASE MOUNTED 610 100 25 460/3/60 YES 1
P-4 CONDENSER LOOP BASE MOUNTED 610 100 25 460/3/60 YES 1
P-5 CONDENSER LOOP INLINE 37 15 1/3 115/1/60 NO
WATER TO WATER HEAT PUMP
UNIT LOCATION SERVICE
DOMESTIC LOOP CONDENSER LOOP
V/P/HZGPM EWT (F) LWT (F) PD FT HD GPM EWT (F) LWT (F) PD FT HD
WWHP-1 MECHANICAL 1089 DOMESTIC WATER 30 114 130 8 37 54 44 7 460/3/60
DEHUMIDIFIER
UNIT LOCATION 24 HR CAPACITY @ 80F 60% RH ELECTRICAL
DH-1 ARMS VAULT 1095 60 PINTS 115/1/60
DH-2 ARMS VAULT 1102 60 PINTS 115/1/60
UNIT HEATER
UNIT LOCATION TYPE CFM KW V/P/HZ
CUH-1 STAIRS 101 CABINET 250 1.5 208/1/60
CUH-2 STAIRS 102 CABINET 250 1.5 208/1/60
CUH-3 STAIRS 103 CABINET 250 1.5 208/1/60
CUH-4 STAIRS 104 CABINET 250 1.5 208/1/60
CUH-5 VESTIBULE 1097 CABINET 250 0.75 208/1/60
CUH-6 VESTIBULE 1101 CABINET 250 0.75 208/1/60
CUH-7 VESTIBULE 1000 CABINET 250 0.75 208/1/60
UH-1 ELECTRICAL 1090 HORIZONTAL WALL MOUNT 400 2.5 208/1/60
UH-2 MECHANICAL 1089 HORIZONTAL WALL MOUNT 400 2.5 208/1/60
UH-3 MECHANICAL 1089 HORIZONTAL WALL MOUNT 400 2.5 208/1/60
UH-4 SCRUB ROOM 1098 CEILING MOUNTED 400 2.5 208/1/60
UH-5 SCRUB ROOM 1099 CEILING MOUNTED 400 2.5 208/1/60
UH-6 MEZZANINE HORIZONTAL WALL MOUNT 400 2.5 208/1/60
UH-7 MEZZANINE HORIZONTAL WALL MOUNT 400 2.5 208/1/60
NOTES:
1. ENERGY STAR RATED.
2. CONTINUOUS DRAINING OPTION.
NOTES:
1. FAN SHALL BE DIRECT DRIVE AND EQUIPPED WITH MANUFACTURERS SPEED CONTROLLER.
ENERGY RECOVERY UNIT
SERVING
UNIT SA CFM RA CFM ELECTRICAL MOTOR HP
WINTER SUMMER
OAT (F) MIN SAT (F) RAT (F) OAT DB (F) OAT WB (F) MAX DB SAT (F) MAX WB SAT (F) RAT DB (F) RA RH%
DOAU-1 10185 6525 460/3/60 0.5 14.7 38 68 92.1 75.5 87 70.5 78 50
DOAU-2 10185 6805 460/3/60 0.5 14.7 39 68 92.1 75.5 87 70.5 78 50
DOAU-3 6790 4815 460/3/60 0.5 14.7 40 68 92.1 75.5 86.5 70 78 50
NOTES:
1. PROVIDE EACH FAN WITH A VFD.
NOTES:
1. INCLUDE BLOWDOWN PUMP ASSEMBLY WITH PARTICULATE SEPARATOR AND TIMED BLOWDOWN VALVE.
2. PROVIDE EACH FAN WITH A VFD.
NOTES:
1. PROVIDE DOMESTIC WATER GRADE, DOUBLE WALL HEAT EXCHANGER WITH LEAK DETECTION.
AIR CONTROL SCHEDULE
SERVICE LOCATION
AIR SEPERATOR EXPANSION TANK
UNIT
FLOW
(GPM) PD (PSI) UNIT
ACCEPTANCE VOL
(GAL) TYPE
CONDENSER LOOP MECHANICAL ROOM 1089 AS-1 1230 2 ET-1 40 DIAPHRAGM
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
R
EV
IS
ED
P
ER
A
M
EN
D M
EN
T
J
U N
NOTES:
1. SELECT FOR PARALLEL LEAD / LAG OPERATION.
| Sheets |
| M-601 - SCHEDULES |
File details come from the government source that posted it. Updated .