VOL_2_M-601_3JUN2016.pdf

PDF 20 KB Posted

Attached to
AIT Barracks- Phase III, Ft. Lee, Virginia Federal contract opportunity
Solicitation number
W91236-16-R-0010
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

VOL 2_M-601_3JUNE2016

View the file

Other files for this federal contract opportunity

Other files attached to AIT Barracks- Phase III, Ft. Lee, Virginia, newest first.
File Type Posted
W91236-16-R-0010-0007.pdf PDF
VOL_2_A-601_3JUN2016.pdf PDF
VOL_2_EP104_3JUN2016.pdf PDF
VOL_2_EP601_3JUN2016.pdf PDF
VOL_2_EP703_3JUN2016.pdf PDF
VOL_3_EP701_3JUN2016.pdf PDF
VOL_2_M-001_3JUN2016.pdf PDF
VOL_3_EL502_3JUN2016.pdf PDF
VOL_3_EP601_3JUN2016.pdf PDF
VOL_2_E-001_3JUN2016.pdf PDF
VOL_3_EL701_3JUN216.pdf PDF
BARRACKS_SPECIFICATION_14_21_23_-_ELECTRIC_TRACTION_PASSENGER_ELEVATORS_3JUN2016.pdf PDF
VOL_2_EP701_3JUN2016.pdf PDF
VOL_3_E-001_3JUN2016.pdf PDF
VOL_2_EL701_3JUN2016.pdf PDF
Am_4_-_Attach_17_VOL_3_S-102_26MAY2016.pdf PDF
Am_4_-_Attach_12_VOL_3_A-318_26MAY2016.pdf PDF
W91236-16-R-0010-0004.pdf PDF
25May2016_Site_Visit_Roster.pdf PDF
Am_4_-_Attach_01_VOL_1__CS101-103_26MAY2016.pdf PDF
Am_4_-_Attach_02_VOL_2_A-002_26MAY2016.pdf PDF
Am_4_-_Attach_22_VOL_3_S-501_26MAY2016.pdf PDF
synthetic_turf_spec.pdf PDF
Am_4_-_Attach_18_VOL_3_S-105_26MAY2016.pdf PDF
Am_4_-_Attach_13_VOL_3_A-504_26MAY2016.pdf PDF
Am_4_-_Attach_05_VOL_2_A-507_26MAY2016.pdf PDF
Am_4_-_Attach_21_VOL_3_S-108_26MAY2016.pdf PDF
Am_4_-_Attach_10_VOL_3_A-101_26MAY2016.pdf PDF
Am_4_-_Attach_08_VOL_2_S-003_26MAY2016.pdf PDF
Am_4_-_Attach_23_VOL_4_A-101_26MAY2016.pdf PDF
Am_4_-_Attach_07_VOL_2_G-002_26MAY2016.pdf PDF
Am_4_-_Attach_03_VOL_2_A-101_26MAY2016.pdf PDF
VOL_3_P-001_20May2016.pdf PDF
W91236-16-R-0010-0003.pdf PDF
VOL_2_EP601_20May2016.pdf PDF
BARRACKS_SPECS_VOL2_16May2016.pdf PDF
DFAC_SPECS_VOL1_16May2016.zip ZIP file
DFAC FFE Package_16May2016.pdf PDF
VOL 2_LEE_BCOF_600_16May2016.pdf PDF
VOL 4_LEE_DFAC_16May2016.pdf PDF
VOL 1_LEE_SITE_16May2016.pdf PDF
W91236-16-R-0010-00001.pdf PDF
H.01.04__Drainage_Report_21April2016.zip ZIP file
H.01.04_Volume2600PersonBarracks_21April2016.zip ZIP file
H.01.04_Volume4DFACPlans_21April2016.zip ZIP file
H.01.01_LEEAITBARRACKSCOMPLEXPH3VOL3300PN_21April2016.zip ZIP file
A.07.23_solicitation_9May2016.pdf PDF
H.01.04_LEE_VOLUME_1_SITE(Progress_Submission).zip ZIP file
H.01.04_BARRACKS_Specifications21April2016.zip ZIP file
H.01.04_LEE_VOLUME_4_DFAC_(ProgressSubmission).zip ZIP file
Show all 50

AIT Barracks- Phase III, Ft. Lee, Virginia has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers ®

SHEET OF

SHEET ID

U S

A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

D R

A W N

B Y:

D

ES

IG

N

ED

B

Y:

SU

B M

IT

TE

D B

Y:

SI

ZE

C H

E C

KE

D B

Y:

AN

S I

'D

FI

LE

N

AM

E:

IS

SU

E D

AT

E :

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

376266

M-601

VOLUME 2

SC

H

ED

U

L E S

A

IT

B A

R

RA

CK

S

CO

M

PL

EX

PH

A

SE

6 0

M

A N

N O

R

FO

LK

D

I S

TR

IC

T

N O

R

FO

LK

, V

A

SA

G

EA

M

D

AG

M

LM

A

PR

PR

O

JE

C T

N U

M

BE

R

C O

N

TR

AC

T

N O

M -6

F O R

T L E

E, V

I R G

IN

I A

DEDICATED OUTSIDE AIR HANDLING UNIT

UNIT LOCATION

SUPPLY FAN DATA EXHAUST FAN DATA DX COOLING MODE HOT GAS REHEAT COIL DX HEATING MODE WATER DATA

OA CFM ESP (IN WG) ELECTRICAL HP CFM ESP (IN WG) ELECTRICAL HP

DB EAT

(F)

WB EAT

(F)

TOTAL

(MBH)

SENSIBLE

(MBH)

EAT

(F)

CAPACITY

(MBH)

EAT

(F)

CAPACITY

(MBH)

COOLING

EWT (F)

HEATING

EWT (F)

FLOW

(GPM)

MAX PD

(FT)

DOAU-1 MEZZANINE 10185 1.5 460/3/60 15 6525 1.5 460/3/60 7.5 87 70.5 672 419 49 232 38 352 85 65 150 22 DOAU-2 MEZZANINE 10185 1.5 460/3/60 15 6805 1.5 460/3/60 7.5 87 70.5 672 419 49 232 46 341 85 65 150 22 DOAU-3 MECHANICAL 1089 6790 1.25 460/3/60 7.5 4815 1.25 460/3/60 2 86.5 70 431 268 50 147 40 220 85 65 95 22

BOILER SCHEDULE

UNIT LOCATION MIN EFFICIENCY (%) GROSS INPUT (MBH) NET OUTPUT (MBH) WATER TEMP (F) ENT GPM WATER PD (FT)

B-1 MECHANICAL 1089 94 5000 4650 54 220 4.5

B-2 MECHANICAL 1089 94 5000 4650 54 220 4.5

NOTES:

1. LOW NOx TYPE (<30PPM @ 3% O2)

CLOSED CIRCUIT COOLER

UNIT GPM

MAX PD

(FT)

WATER TEMP (F)

ENT AIR

(F) WB

SPRAY

PUMP HP FAN HP

BASIN

HEATER

KW V/P/HZENT LVG

CCC-1 1220 10 100 85 78 2 @ 10 50 2 @ 9 460/3/60

FAN SCHEDULE

UNIT LOCATION CFM ESP (IN WG) SONES MOTOR HP V/P/HZ

EF-1 SCRUB ROOM 1098 330 0.5 7.4 0.1 115/1/60

EF-2 SCRUB ROOM 1099 330 0.5 7.4 0.1 115/1/60

PUMP SCHEDULE

UNIT SERVICE TYPE GPM FT HD HP V/P/HZ VFD NOTES

P-1 BOILER 1 INLINE 220 30 3 460/3/60 NO

P-2 BOILER 2 INLINE 220 30 3 460/3/60 NO

P-3 CONDENSER LOOP BASE MOUNTED 610 100 25 460/3/60 YES 1

P-4 CONDENSER LOOP BASE MOUNTED 610 100 25 460/3/60 YES 1

P-5 CONDENSER LOOP INLINE 37 15 1/3 115/1/60 NO

WATER TO WATER HEAT PUMP

UNIT LOCATION SERVICE

DOMESTIC LOOP CONDENSER LOOP

V/P/HZGPM EWT (F) LWT (F) PD FT HD GPM EWT (F) LWT (F) PD FT HD

WWHP-1 MECHANICAL 1089 DOMESTIC WATER 30 114 130 8 37 54 44 7 460/3/60

DEHUMIDIFIER

UNIT LOCATION 24 HR CAPACITY @ 80F 60% RH ELECTRICAL

DH-1 ARMS VAULT 1095 60 PINTS 115/1/60

DH-2 ARMS VAULT 1102 60 PINTS 115/1/60

UNIT HEATER

UNIT LOCATION TYPE CFM KW V/P/HZ

CUH-1 STAIRS 101 CABINET 250 1.5 208/1/60

CUH-2 STAIRS 102 CABINET 250 1.5 208/1/60

CUH-3 STAIRS 103 CABINET 250 1.5 208/1/60

CUH-4 STAIRS 104 CABINET 250 1.5 208/1/60

CUH-5 VESTIBULE 1097 CABINET 250 0.75 208/1/60

CUH-6 VESTIBULE 1101 CABINET 250 0.75 208/1/60

CUH-7 VESTIBULE 1000 CABINET 250 0.75 208/1/60

UH-1 ELECTRICAL 1090 HORIZONTAL WALL MOUNT 400 2.5 208/1/60

UH-2 MECHANICAL 1089 HORIZONTAL WALL MOUNT 400 2.5 208/1/60

UH-3 MECHANICAL 1089 HORIZONTAL WALL MOUNT 400 2.5 208/1/60

UH-4 SCRUB ROOM 1098 CEILING MOUNTED 400 2.5 208/1/60

UH-5 SCRUB ROOM 1099 CEILING MOUNTED 400 2.5 208/1/60

UH-6 MEZZANINE HORIZONTAL WALL MOUNT 400 2.5 208/1/60

UH-7 MEZZANINE HORIZONTAL WALL MOUNT 400 2.5 208/1/60

NOTES:

1. ENERGY STAR RATED.

2. CONTINUOUS DRAINING OPTION.

NOTES:

1. FAN SHALL BE DIRECT DRIVE AND EQUIPPED WITH MANUFACTURERS SPEED CONTROLLER.

ENERGY RECOVERY UNIT

SERVING

UNIT SA CFM RA CFM ELECTRICAL MOTOR HP

WINTER SUMMER

OAT (F) MIN SAT (F) RAT (F) OAT DB (F) OAT WB (F) MAX DB SAT (F) MAX WB SAT (F) RAT DB (F) RA RH%

DOAU-1 10185 6525 460/3/60 0.5 14.7 38 68 92.1 75.5 87 70.5 78 50

DOAU-2 10185 6805 460/3/60 0.5 14.7 39 68 92.1 75.5 87 70.5 78 50

DOAU-3 6790 4815 460/3/60 0.5 14.7 40 68 92.1 75.5 86.5 70 78 50

NOTES:

1. PROVIDE EACH FAN WITH A VFD.

NOTES:

1. INCLUDE BLOWDOWN PUMP ASSEMBLY WITH PARTICULATE SEPARATOR AND TIMED BLOWDOWN VALVE.

2. PROVIDE EACH FAN WITH A VFD.

NOTES:

1. PROVIDE DOMESTIC WATER GRADE, DOUBLE WALL HEAT EXCHANGER WITH LEAK DETECTION.

AIR CONTROL SCHEDULE

SERVICE LOCATION

AIR SEPERATOR EXPANSION TANK

UNIT

FLOW

(GPM) PD (PSI) UNIT

ACCEPTANCE VOL

(GAL) TYPE

CONDENSER LOOP MECHANICAL ROOM 1089 AS-1 1230 2 ET-1 40 DIAPHRAGM

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

R

EV

IS

ED

P

ER

A

M

EN

D M

EN

T

J

U N

NOTES:

1. SELECT FOR PARALLEL LEAD / LAG OPERATION.

Sheets
M-601 - SCHEDULES

File details come from the government source that posted it. Updated .