W911YP-09-B-0002-0004.doc

DOC document 37 KB Posted

Attached to
Construction of an Ammunitions Supply Point Facility Federal contract opportunity
Solicitation number
W911YP-09-B-0002
Issued by
Department of the Army Utah Army National Guard

About this file

Addendum 0004. Notice from A-E is attached to this solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Construction of an Ammunitions Supply Point Facility, newest first.
File Type Posted
ASP Addendum 0010.doc DOC document
ASP Davis Bacon UT080039.pdf PDF
ASP Davis Bacon UT080060.pdf PDF
ASP RFIs Addendum 0009.doc DOC document
ASP 08315 Sliding Blast Resistant Door Addendum 0009.doc DOC document
ASP Addendum 0009 Utah National Guard Seed Mix.doc DOC document
ASP 01360 —
ASP Addendum 0009.doc DOC document
ASP Addendum No 0009 - Notice to Bidders.doc DOC document
Davis Bacon UT080038 —
ASP Addendum 0008.doc DOC document
ASP Addendum 0008 RFIs.doc DOC document
Davis Bacon UT080059 —
ASP Addendum 0007.doc DOC document
ASP Addendum 0007 Drawings Specifications.pdf PDF
ASP geotechnical report.pdf PDF
BID SCHEDULE ASP CW.Revised Add 0006.doc DOC document
ASP A-E's Addendum 3 Notice to Bidders.pdf PDF
ASP Addendum 0006.doc DOC document
ASP A-E's TOC-ADM3.pdf PDF
ASP Addendum 0006.doc DOC document
W911YP-09-B-0002-0005.doc DOC document
BID SCHEDULE ASP CW.Revised.doc DOC document
W911YP-09-B-0002-0002 ASP addendum.doc DOC document
ASP Site Visits Contractors.pdf PDF
UT Ammo Dwg 8-21-09 pgs 29-39.pdf PDF
UT Ammo Dwg 8-21-09 pgs 1-28.pdf PDF
UT Ammo Dwg 8-21-09 pgs 40-181.pdf PDF
J A Sole Source Telecommunications ASP.doc DOC document
W911YP-09-B-0002-0001 ASP Addendum 001.doc DOC document
Utah Ammo Specs 8-21-09.pdf PDF
Utah ARNG Camp Williams Ammo Storage Point - 95 Design Submittal PDF BINDER - 7-28-09.pdf PDF
W911YP-09-B-0002 Ammunitions Suppy Point —
20090729_UTAH_ASP_95 Plans.pdf PDF
Utah ARNG Camp Williams Ammo Storage Point - 95 Design Submittal PDF PKG - 7-28-09.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

ADDENDUM 0004

Addendum 4

UTARNG Ammunitions Supply Point

Camp Williams, Utah

NOTICE TO BIDDERS:

This document shall serve as an addendum for the above mentioned project. The items listed below are intended to modify all previously issued construction documents as indicated below and shall become part of the Construction Documents.

ITEM 1: BID OPTION 1: Fire Loop at ECM’s

Description of work: For base bid work, at the 8” tee located at station 66+00 on Sheet 00C125, install a blind flange downstream of the 8” valve. For Bid Option 1, provide all required labor and materials to install the 8” fire loop shown downstream of the 8” valve at Station 66+00 on 00C125 continuing through sheet 00C129. Work includes but is not limited to all required trenching and pipe bedding, piping materials and connections, required fire hydrants, pipe trace and cover and required flushing and leak testing. The drawings below indicate which current drawings encompass the scope of BID Option 1.

Drawings: Fire Loop Water Main Plan and Profile, 00C126-8” Fire Loop Water Main Plan and Profile, 00C127-8” Fire Loop Water Main Plan and Profile, 00C128-8” Fire Loop Water Main Plan and Profile, 00C129-8” Fire Loop Water Main Plan and Profile

Specifications: No Changes

ITEM 2: BID OPTION 2: Vehicle Holding Area

Description of work: As described in the attached drawings and specifications, provide a new vehicle holding pad for the temporary parking of vehicles laden with explosives. The pad construction work includes, but is not limited to all required grading and drainage, installation of a crushed rock pad, installation of area lighting and an aerial lightning protection system. The cover sheet shall change to refer to 00C105 as Bid Option 2 and delete the words, “Not in this Contract”.

Drawings: 00G00, Cover Sheet, 00C105 – Site Layout Plan; 00E105, Electrical Site Plan, Area E, 00E503, Electrical Site Details

Specifications: No Changes

(End of Summary of Changes)

File details come from the government source that posted it. Updated .