W911YP-09-B-0002-0001 ASP Addendum 001.doc
DOC document 38 KB Posted
- Attached to
- Construction of an Ammunitions Supply Point Facility Federal contract opportunity
- Solicitation number
- W911YP-09-B-0002
About this file
Addendum 001
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
ADDENDUM 0001
Addendum 1
UTARNG Ammunition Supply Point
Camp Williams, UT
NOTICE TO BIDDERS:
The attached documents represent the final for construction drawings and specifications for the subject project. This set of documents is intended to replace fully and in kind the previous “95% RTA” set of documents. For the convenience of the Contractors, some of the major changes are listed below; but by no means is the list intended to be complete or exhaustive. The Contractors shall be responsible for all changes that have occurred in the documents, whether listed below, or not.
ITEM 1: Telecommunications System and Service
Description of work: Minor modifications have occurred within the telecom. specification section to include contact information and other miscellaneous items. The scope of telecom. service work has changed to include a 7 mile length of service duct, which is only partially reflected on these documents. The full scope of the telecom service change shall be indicated in Addendum 2 to follow.
Drawings: 00E101, Electrical Site Plan – Area A
Specifications: 16742, Wired Telecommunications System
ITEM 2: Water Distribution Storage Tanks and Booster Pumping Station
Description of work: In order to provide water flow for domestic needs and to charge fire systems, the contractor shall provide all required labor and materials to construct new water storage tanks and a booster pumping station at the location shown on sheet 00C130. The system shall provide a flow range of 20 gpm to 1,222 gpm at a discharge pressure range of 154 psi to 172 psi. The water booster pumping station shall include but is not limited to all required site work, concrete foundations, piping, controls, electrical power and communications required to support the station. Further, construction of a weathertight shelter around the station shall be provided to include lighting, power, heat and ventilation as required.
Drawings: 00C130 – Water Tanks and Pumping Station, Site Plan; 00C131 – Water Tanks and Pumping Station, Piping Schematics; 00C132 – Water Tanks and Pumping Station, Facility Layouts
Specifications: 11304 – Pre-Engineered Booster Pumping Station; 13213 – Water Storage Tanks: Welded Steel; 16230 – Pump Station Engine Generator: Diesel
ITEM 3: Added Insulation (Admin. And SIRE)
Description of work: Changed insulation values to R-26 for Walls and R-42 for Roof.
Drawings: 01A series drawings & 02A series drawings
Specifications: Updated 13121 – Metal Building Systems
(End of Summary of Changes)