W911YP-09-B-0002-0002 ASP addendum.doc
DOC document 43 KB Posted
- Attached to
- Construction of an Ammunitions Supply Point Facility Federal contract opportunity
- Solicitation number
- W911YP-09-B-0002
About this file
Addendum 002 is attached.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
ADDENDUM 0002
3. Bid Opening date remains as September 10, 2009 @ 2:00 p.m. MST.
4. Location of Bid Opening is changed to Camp Williams Training Site
Headquarters Building 800
17800 South Redwood Road
Riverton, Utah 84065
5. If mailing bids or hand carrying before bid opening date, address is:
Utah Army National Guard Headquarters
Attn: Diane Johnson – UT-DPFO-P
12953 South Minuteman Drive
Draper, Utah 84020
Email Contracting Officer if mailing to ensure bid is received.
6. Personnel at the Utah Army National Guard work Monday-Thursday (10-hour days). If submitting RFIs on Friday, they will be answered on Monday.
7. No other changes are to be made at this time.
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been modified:
BID SHEET
BID SCHEDULE
CONSTRUCTION OF AN AMMUNITIONS SUPPLY POINT (ASP) FACILITY
CAMP W.G. WILLIAMS, UTAH
PROJECT NUMBER 490101
UNIT (EACH) TOTAL
BID ITEM
DESCRIPTION
AMOUNT AMOUNT
Administration Building
Pre-engineered
Surveillance, Inspection, Repair and Equipment
(SIRE) – Pre-engineered
Inert Devices (Storage) Building
Breakdown Building
Concrete Earth Covered Magazines
(ECM)
(11 each)
Loading Dock Structure
Site Improvements (See Tab B)
Total Bid Amount*
(Line items 0001-0007)
*Line Items 0001 through 0007 are identified as unit priced bid items. Failure to complete all bid items shall render the bid non-responsive.
Bid may be rejected if the individual total line item prices are unreasonable and/or unbalanced.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .