ASP RFIs Addendum 0009.doc

DOC document 33 KB Posted

Attached to
Construction of an Ammunitions Supply Point Facility Federal contract opportunity
Solicitation number
W911YP-09-B-0002
Issued by
Department of the Army Utah Army National Guard

About this file

Addendum 0009 Final RFIs

View the file

Other files for this federal contract opportunity

Other files attached to Construction of an Ammunitions Supply Point Facility, newest first.
File Type Posted
ASP Addendum 0010.doc DOC document
ASP Davis Bacon UT080039.pdf PDF
ASP Davis Bacon UT080060.pdf PDF
ASP 01360 —
ASP 08315 Sliding Blast Resistant Door Addendum 0009.doc DOC document
ASP Addendum 0009 Utah National Guard Seed Mix.doc DOC document
ASP Addendum 0009.doc DOC document
ASP Addendum No 0009 - Notice to Bidders.doc DOC document
Davis Bacon UT080038 —
ASP Addendum 0008.doc DOC document
ASP Addendum 0008 RFIs.doc DOC document
Davis Bacon UT080059 —
ASP Addendum 0007.doc DOC document
ASP Addendum 0007 Drawings Specifications.pdf PDF
ASP A-E's Addendum 3 Notice to Bidders.pdf PDF
ASP Addendum 0006.doc DOC document
ASP A-E's TOC-ADM3.pdf PDF
ASP geotechnical report.pdf PDF
BID SCHEDULE ASP CW.Revised Add 0006.doc DOC document
ASP Addendum 0006.doc DOC document
W911YP-09-B-0002-0005.doc DOC document
W911YP-09-B-0002-0004.doc DOC document
BID SCHEDULE ASP CW.Revised.doc DOC document
W911YP-09-B-0002-0002 ASP addendum.doc DOC document
UT Ammo Dwg 8-21-09 pgs 1-28.pdf PDF
UT Ammo Dwg 8-21-09 pgs 40-181.pdf PDF
ASP Site Visits Contractors.pdf PDF
UT Ammo Dwg 8-21-09 pgs 29-39.pdf PDF
J A Sole Source Telecommunications ASP.doc DOC document
Utah Ammo Specs 8-21-09.pdf PDF
W911YP-09-B-0002-0001 ASP Addendum 001.doc DOC document
Utah ARNG Camp Williams Ammo Storage Point - 95 Design Submittal PDF BINDER - 7-28-09.pdf PDF
W911YP-09-B-0002 Ammunitions Suppy Point —
20090729_UTAH_ASP_95 Plans.pdf PDF
Utah ARNG Camp Williams Ammo Storage Point - 95 Design Submittal PDF PKG - 7-28-09.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 0009

Ammunitions Supply Point (ASP) Facility

Camp Williams, Utah

RFIs

1. Is the "Mass PA System" part of the electrical scope of work. If so, do you know who is in charge of that or can you give us contact information of someone we can talk to regarding that?

Answer: Yes, please see specification section 16770 for the information on the Mass notification and PA Systems.

2. In reference to proposed suppliers offering proposals for the Booster Pump Stations:

Answer: Suppliers capable of meeting or exceeding the requirements of the specification will be evaluated equally.

3. Propex was the manufacturer of the LANDLOK-TRM-1060 turf reinforcement mat specified in section 02270-4, Soil erosion and sediment control. Manufacturing of LANDLOK-TRM-1060 turf reinforcement mat was discontinued approximately four years ago. We would like to submit a functional equivalent to replace it. The replacement product meets/exceeds hydraulic performance values (shear stress and velocity) but not necessarily the physical properties (the mass and thickness of the mat). Since turf reinforcement mats are specified according to hydraulic requirements of the channel or slope, will this suffice or should we submit to the civil engineer before the bid date?

Answer: We suspect this will suffice, but please submit a request for variance after award and it will be evaluated at that time.

4.

Wanted to confirm Fence Specifications measurements:

Line Posts – 2-7/8

Terminal Posts – 4-1/2

Brace & Rails – 1-5/8

And is it all supposed to be schedule 80 pipe?

Answer: All dimensions referenced are correct measured as “out-Side Diameter (in.)”. All pipe “Schedule 80”.

5.

We have assumed there is no rebar reinforcement in concrete encased ductbanks. Is this correct?

Answer: Please refer to detail 3/00E501 for ductbank construction requirements 6.

We have assumed there is no ground wire run within the concrete encased ductbanks. Is this correct?

Answer: Please refer to detail 3/00E501 for ductbank construction requirements 7.

There is a conflict with the roof collateral loading on the “Structural Notes” plan page 00S001, under “Pre-engineered Metal Buildings”, item #6 (“Design Loads”) verses the revised structural foundation plans for each building. Also a question concerning the “FM I Global” requirement

Answer: Roof collateral loads shown on the foundation plans sheets should be followed. The note on the general note sheet should be changed to see the plan sheets for the collateral load to design to.

The site structure resonance factor is the “R” value or Response Modification coefficient as noted in Table 12.2-1 in ASCE 7-05.

As this is a federal project, please remove any reference to FM Global from this specification.

8.

On page 01A4-1 detail 1, note #1 & #2 say Lockers & Benches to be Option #1. I do not see this on the Bid Schedule. Is this an option or a Base bid item?

Answer: These should be Base bid items.

9.

Please confirm the style of paper towel dispenser required for section 10802 Toilet and Bath accessories. The American Specialties P/N 0469 is a single unit containing a towel dispenser and a trash disposal.

Answer: The spec. sheet lists TA-6 semi-recessed combo paper towel dispenser/disposal showing American Specialties P/N 0469 as well as a TA-7 surface mounted combo paper towel dispense/disposal. The drawings also show TA-6 & TA-7 are required.

There should only be one unit in each toilet. The Admin Building should have the recessed unit (TA-6) and the SIRE Building should have the surface mounted unit

(TA-7).

10.

How high is the chain link fence supposed to be and how many gates are required.

Answer: The drawings (00C503) indicate the height of the fence (original set of drawings) and the site plans indicate the location of gates.

Added information:

Security

Security at the ASP is provided by several different methods. The entire ASP is enclosed within an 8-foot high, chain link fence with a 1-foot anti-climb top. A Chain link sliding gate will provide access to the ASP. Fire barrier strips will be required for 50 foot inside and outside the fence. The gate will be a remotely operated electrically from inside the Administration Building.