Emergency_Power_ACI_Pre-Proposal_Breifing_25_Apr_2013.pdf
PDF 565 KB Posted
- Attached to
- Advanced Contract Initiative for Emergency Power Federal contract opportunity
- Solicitation number
- W911WN-13-R-0003
About this file
Pre-Proposal Powerpoint
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers
BUILDING STRONG®
Emergency Power Advanced Contracting Initiative (ACI)
W911WN-13-R-0003
Pre-proposal Conference 1100 25 April 2013
Pittsburgh District
Emergency Power ACI
DISCLAIMER
Nothing discussed during this pre-proposal conference shall be construed as changing any terms and conditions of the solicitation.
Any change(s) to the solicitation will be made only by an amendment to the solicitation
Solicitation, Performance Work Statement, Instructions
On the Web www.fbo.gov Solicitation No. W911WN-13-R-0003 Request for Proposal with Attachments
• Section A – Solicitation/Contract Form
• Section B – Supplies or Services Price
• Section C – Performance Work Statement
• Section E – Inspection and Acceptance
• Section F – Deliveries or Performance
• Section G – Contract Administration Data
• Section I – Contract Clauses
• Section J – List of Attachments
• Section K – Representations, Certs & other Statements of Offerors
• Section L – Instructions, Conditions and Notices to Offerors
• Section M – Evaluation Factors for Awards http://www.fbo.gov/
Contract Structure
Regions Specific Coverage Contract Value
I/II/III CT, ME, MA, NH, RI, VT, NJ, NY, DE, DC,
MD, PA, VA, WV
$ 50,000,000
IV/V AL, FL, GA, KY, MS, NC, SC, TN, IL, IN, MI,
MN, OH, WI
$ 50,000,000
VI/VII/VIII AR, LA, NM, OK, TX, IA, KS, MO, NE, CO,
MT, ND, SD, UT, WY
$ 50,000,000
IX/X AR, CA, NV, ID, OR, WA $ 50,000,000
PR/VI Puerto Rico (PR) and Virgin Island (VI) $ 15,000,000 Alaska Alaska only $ 15,000,000 Hawaii Hawaii, Guam, and America Samoa (AS)
(AS not shown on the map) $ 15,000,000
Total Program Value $245,000,000
Offerors may submit proposals for all or any number of Regions.
Contract Period
Base Contract:
►Date of Award – One year Period
Four One-Year Option Periods ►Decision to exercise any Option Period is solely at the discretion of the Government
How can you be awarded the ACI Emergency Power Contract??
Submit the Information Required in the RFP Follow the directions provided in Section L Evaluation Factors are shown in Section M The award will be made based on a best value, trade-off methodology. The proposal that is determined to be the most beneficial to the Government, with appropriate consideration given to the evaluation factors identified in the solicitation. The evaluation factors, other than cost or price, when combined, are approximately equal to cost or price. The relative importance of the factors, Technical Approach, are significantly more important than the Past Performance factor, which is slightly more important than the Small Business Participation Plan factor. The relative importance of the non-Cost sub factors are listed in Section C. To receive consideration for award, a rating of no less than “Acceptable” must be achieved for each of the non- Cost factors/sub-factors. Offerors will be cautioned that the award may not necessarily be made to the lowest cost offered.
What you need to submit.
Section L – Instructions, Conditions and
Notices to Offerors 3 Volumes
• Volume 1 – Technical Proposal & Past Performance (1 Original and 4 Copies)
• Volume 2 – Small Business Participation (1 Original and 1 Copy)
• Volume 3 – Price Proposal (1 Original and 2 copies)
Two CDs of the entire proposal also required
Volume I
Tab I: Factor I -Technical Approach Deployment Package Operations and Execution Plan Readiness Activation and Mobilization Plan Command, Control and Communications Plan Quality Control, Environmental and Safety
Compliance Plan
Volume I
Tab II: Factor II – Past Performance Experience and Sustainability with the
Company of Key Personnel Hauling and Installation of diesel generator sets and related equipment within the Last Five Years
Operating, Servicing and Maintaining generator sets and related equipment
Assessing power needs in last five years
Volume II
Tab I: Factor III – Small Business Participation Plan Small Business Participation Plan Past Utilization of Small Business Concerns
Volume III Tab I - Price Proposal Rate Schedule Type III Deployment Package Daily Expense
Report for four days Type II Deployment Package Daily Expense
Report for four days Tab II - Certifications and Representations Section A – SF 33 Solicitation, Offer and
Award Section K - Representations, Certs & other
Statements of Offerors
Proposal Due Date/Time
Offerors must submit complete proposal, Volumes I, II and III by date/time required:
29 May 2013 2:00 pm (EST) U.S. Army Corps of Engineers
Pittsburgh District 1000 Liberty Avenue
22nd Floor, Room 2203 Pittsburgh, PA 15222
Offers submitted by Facsimile or Electronic methods will NOT be accepted
How will the proposal be evaluated?
Evaluation criteria is detailed in Section M of the RFP Carefully review Section L and M of the
RFP when preparing proposal Failure to furnish a complete proposal may result in elimination from consideration
Relative Importance of Factors Factor Relative Importance to
Other Factors Sub-Factor Relative Importance
I. Technical Approach
This Factor is significantly more important than Factor II. Past Performance and Factor III., Small Business Participation Plan.
Sub-Factor A Deployment Packages is significantly more important than Sub- Factor B Operations and Execution Plan.
Sub-factors B, C, D & E are equally important.
II. Past
Performance
This Factor is slightly more important than Factor III, Small Business Participation Plan.
Sub-factors A – D are in descending order of importance.
III. Small Business
Participation Plan
This Factor is less important than Factor I. Technical Approach and II. Past Performance.
Sub-Factor A Small Business Participation Plan is equally important as Sub-Factor B Past Utilization of Small Business Concerns.
IV. Price
This Factor is of equal to the combination of Factor I, Technical Approach, Factor I, Past Performance, and Factor III, Small Business Participation.
What if I have a question?
Questions must be submitted in writing via email to:
Emergencypoweraci@usace.army.mil Submit questions NLT COB 03 May 2013 Addressing questions received after 03
May 2013 is at the discretion of the Contracting Officer mailto:Emergencypoweraci@usace.army.mil
| Emergency Power Advanced Contracting Initiative (ACI) |
| Emergency Power ACI |
| Solicitation, Performance Work Statement, Instructions |
| Contract Structure |
| Contract Period |
| How can you be awarded the ACI Emergency Power Contract?? |
| What you need to submit. |
| Volume I |
| Volume I |
| Volume II |
| Volume III |
| Proposal Due Date/Time |
| How will the proposal be evaluated? |
| Relative Importance of Factors |
| What if I have a question? |
File details come from the government source that posted it. Updated .