Attachment_8-Daily_Expenditure_Report.xlsx

XLSX spreadsheet 48 KB Posted

Attached to
Advanced Contract Initiative for Emergency Power Federal contract opportunity
Solicitation number
W911WN-13-R-0003
Issued by
Department of the Army Corps of Engineers Engineering District Pittsburgh

About this file

Attachment 8 - Daily Expenditure Report

View the file

Other files for this federal contract opportunity

Other files attached to Advanced Contract Initiative for Emergency Power, newest first.
File Type Posted
W911WN-13-R-0003-0004.pdf PDF
Revised_2_W911WN-13-R-0003.pdf PDF
W911WN-13-R-0003-0003.pdf PDF
Attachment_12-Wage_Determination_Rates.doc DOC document
W911WN-13-R-0003-0002.pdf PDF
Revised_W911WN-13-R-0003.pdf PDF
http //www.youtube.com/user/RSCUSACE —
Questions_and_Answers.pdf PDF
Pre-Proposal_Conference_Sign-In_Sheet.pdf PDF
Attachment_17-FEMA_Generator_Inventory.xls XLS spreadsheet
Attachment_11-Quality_Assurance_Surveillance_Plan.pdf PDF
W911WN-13-R-0003-0001.pdf PDF
Attachment_13-Deployment_Package_Descriptions.pdf PDF
Emergency_Power_ACI_Pre-Proposal_Breifing_25_Apr_2013.pdf PDF
Attachment_6-Installation_Work_Order.pdf PDF
Attachment_11-Quality_Area_Surveillance_Plan.pdf PDF
Attachment_13-Type_III_and_II_Deployment_Packages.pdf PDF
Attachment_4-Generator_Maintenance_Profile.pdf PDF
Attachment_12-Wage_Determination_Rates.pdf PDF
Attachment_16-Past_Utilization_of_Small_Business_Participation_Information_Collection_Sheet.pdf PDF
Attachment_15-Small_Business_Participation_Plan.pdf PDF
Emergency_Power_Solicitation_W911WN-13-R-0003.pdf PDF
Attachment_2-FEMA_BOM_Kits.pdf PDF
Attachment_9-DER_Acceptance_Memo.pdf PDF
Attachment_1-Rate_Schedule.xlsx XLSX spreadsheet
Attachment_5-Assessment_Input_Template.pdf PDF
Attachment_14-NAVFACUSACE_Past_Performance_Questionnaire.pdf PDF
Attachment_3-Generator_Power_Pack.pdf PDF
Attachment_7-De-Installation_Work_Order.pdf PDF
Attachment_10-Emergency_Power_USACE_Deployment_Packages.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DER Summary

Task Order Number
Cost
Labor Rates$0
Date:xx Mon year
Equipment Rates$0
ISB:
Mob/Demob$0

Servicing Gens $0

Reimbursables$0
Total Cost:
$0.00

ATTACHMENT 8 - Daily Expenditure Report

DER Day 1

Task Order NumberDay 1
RegularStandbyCost
Labor Rates00$0
Date:Day 1RegularStandbyCost
Equipment Rates00$0
ISB:Mob MilesDemob MilesCost
Mob/Demob00$0.00
QuantityCost
Servicing Gens0$0
Cost
Reimbursables$0.00

Day 1 Expenditure: $0.00

Task Order #:Day 1
ISB: DEP: (date)Base YearQuantityDaily
Line ItemLabor RatesRegularStandbyRegularStandbyCost
L01Operations Manager$0
L02Site Manager$0
L03Admin Support$0
L04Yard Superintendent$0
L05Fuel Manager$0
L06Quality Control Manager$0
L07Safety Officer$0
L08Equipment Operator$0
L09Mechanical Team Leader$0
L10Electrical Team Leader$0
L11Mechanic$0
L12Electrician$0
L13Laborer$0
L14Truck Driver$0
L15"contractor labor"$0
L16"contractor labor"$0
L17"contractor labor"$0
L18"contractor labor"$0
Lxx"contractor labor"$0
Labor RatesDay 1
RegularStandbyCost
Totals:00$0
Base YearDay 1
Rate (Day)QuantityDaily
Line ItemEquipment RatesRegularStandbyRegularStandbyCost
E01Crane, Hyd, Self-Propelled (capacity)$0
E02Fork Lift, Rough Terrain,(capacity)$0
E03Lighting Sets, Trailer Mounted 1500 W$0
E04Truck, Pick-up, (capacity)$0
E05Truck, Highway,(capacity)$0
E06Truck, Semi Tractor$0
E07Truck Trailer, Flatbed, <= 15 ton$0
E08Truck Trailer, Flatbed, > 15 ton$0
E09Truck Trailer, Lowboy, <= 50 ton$0
E10Truck Trailer, Lowboy, > 50 ton$0
E11Truck Trailer, Fuel Tanker$0
E12Truck, Fuel, <1000 gal$0
E13Truck, Fuel, 1000 to 4,000 gal$0
E14Truck, Fuel, > 4000 gal$0
E15Tank, Fuel Storage$0
E16Fuel Caddy$0
E17Pump, Fuel, Portable (flow rate)$0
E18Pressure Washer, Low$0
E19Pressure Washer, High$0
E20Office Trailer$0
E21Trailer Euipment stoage$0
E22Conex Container Storage$0
E23Load Bank, < 500 kW$0
E24"contractor equipment"$0
Exx"contractor equipment"$0
Equipment RatesDay 1
RegularStandbyCost
Totals:00$0
Base YearDay 1
Rate per MileActualDaily
Line ItemMobilization/DemobilizatonNTE 200 MilesMob MilesDemob MilesCost
ME02Fork Lift, Rough Terrain,(capacity)$0.00
ME03Lighting Sets, Trailer Mounted 1500 W$0.00
ME15Tank, Fuel Storage$0.00
ME16Fuel Caddy$0.00
ME17Pump, Fuel, Portable$0.00
ME18Pressure Washer, Low, < 5000 psi$0.00
ME19Pressure Washer, High >= 5000 psi$0.00
ME20Office Trailer$0.00
ME21Trailer Euipment storage$0.00
ME22Conex Container Storage$0.00
ME23Load Bank, < 500 kW$0.00
ME24"contractor equipment"$0.00
MEXX"contractor equipment"$0.00
Mob/DemobDay 1
Mob MilesDemob MilesCost
Totals:00$0.00
Base YearDay 1
Rate perDaily
Line ItemParts for Servicing GeneratorsServiceQuantityCost
P010 to 29 kW$0.00
P0230 to 59 kW$0.00
P0360 to 99 kW$0.00
P04100 to 199 kW$0.00
P05200 to 299 kW$0.00
P06300 to 399 kW$0.00
P07400 to 499 kW$0.00
P08500 to 699 kW$0.00
P09700 to 900 kW$0.00
P10901 kW to 1.9MW$0.00
P112 - 3 MW$0.00
Servicing GensDay 1
QuantityCost
Totals:0$0.00
Base YearDay 1
Actual CostsDaily
Line ItemReimbursable ItemsUnitPriceQuantityCost
R1Diesel Fuel - GeneratorsGallons$0.00
R2Fuel for Government Vehicles - GasGallons$0.00
R3Fuel for Government Vehicles - DieselGallons$0.00
R4Travel CostsLSna1
R5Materials and SuppliesLSna1
R6Credit for Recycling BOMLSna1
R7Other Negotiated ItemsLSna1
ReimbursablesDay 1
Cost
Totals:$0.00

ATTACHMENT 8 - Daily Expenditure Report

DER Day 2

Task Order NumberDay 2
RegularStandbyCost
Labor Rates00$0
Date:DayRegularStandbyCost
Equipment Rates00$0
ISB:Mob MilesDemob MilesCost
Mob/Demob00$0.00
QuantityCost
Servicing Gens0$0
Cost
Reimbursables$0.00

Day 1 Expenditure: $0.00

Task Order #:Day 2
ISB: DEP: (date)Base YearQuantityDaily
Line ItemLabor RatesRegularStandbyRegularStandbyCost
L01Operations Manager$0
L02Site Manager$0
L03Admin Support$0
L04Yard Superintendent$0
L05Fuel Manager$0
L06Quality Control Manager$0
L07Safety Officer$0
L08Equipment Operator$0
L09Mechanical Team Leader$0
L10Electrical Team Leader$0
L11Mechanic$0
L12Electrician$0
L13Laborer$0
L14Truck Driver$0
L15"contractor labor"$0
L16"contractor labor"$0
L17"contractor labor"$0
L18"contractor labor"$0
Lxx"contractor labor"$0
Labor RatesDay 2
RegularStandbyCost
Totals:00$0
Base YearDay 2
Rate (Day)QuantityDaily
Line ItemEquipment RatesRegularStandbyRegularStandbyCost
E01Crane, Hyd, Self-Propelled (capacity)$0
E02Fork Lift, Rough Terrain,(capacity)$0
E03Lighting Sets, Trailer Mounted 1500 W$0
E04Truck, Pick-up, (capacity)$0
E05Truck, Highway,(capacity)$0
E06Truck, Semi Tractor$0
E07Truck Trailer, Flatbed, <= 15 ton$0
E08Truck Trailer, Flatbed, > 15 ton$0
E09Truck Trailer, Lowboy, <= 50 ton$0
E10Truck Trailer, Lowboy, > 50 ton$0
E11Truck Trailer, Fuel Tanker$0
E12Truck, Fuel, <1000 gal$0
E13Truck, Fuel, 1000 to 4,000 gal$0
E14Truck, Fuel, > 4000 gal$0
E15Tank, Fuel Storage$0
E16Fuel Caddy$0
E17Pump, Fuel, Portable (flow rate)$0
E18Pressure Washer, Low$0
E19Pressure Washer, High$0
E20Office Trailer$0
E21Trailer Euipment stoage$0
E22Conex Container Storage$0
E23Load Bank, < 500 kW$0
E24"contractor equipment"$0
Exx"contractor equipment"$0
Equipment RatesDay 2
RegularStandbyCost
Totals:00$0
Base YearDay 2
Rate per MileActualDaily
Line ItemMobilization/DemobilizatonNTE 200 MilesMob MilesDemob MilesCost
ME02Fork Lift, Rough Terrain,(capacity)$0.00
ME03Lighting Sets, Trailer Mounted 1500 W$0.00
ME15Tank, Fuel Storage$0.00
ME16Fuel Caddy$0.00
ME17Pump, Fuel, Portable$0.00
ME18Pressure Washer, Low, < 5000 psi$0.00
ME19Pressure Washer, High >= 5000 psi$0.00
ME20Office Trailer$0.00
ME21Trailer Euipment storage$0.00
ME22Conex Container Storage$0.00
ME23Load Bank, < 500 kW$0.00
ME24"contractor equipment"$0.00
MEXX"contractor equipment"$0.00
Mob/DemobDay 2
Mob MilesDemob MilesCost
Totals:00$0.00
Base YearDay 2
Rate perDaily
Line ItemParts for Servicing GeneratorsServiceQuantityCost
P010 to 29 kW$0.00
P0230 to 59 kW$0.00
P0360 to 99 kW$0.00
P04100 to 199 kW$0.00
P05200 to 299 kW$0.00
P06300 to 399 kW$0.00
P07400 to 499 kW$0.00
P08500 to 699 kW$0.00
P09700 to 900 kW$0.00
P10901 kW to 1.9MW$0.00
P112 - 3 MW$0.00
Servicing GensDay 2
QuantityCost
Totals:0$0.00
Base YearDay 2
Actual CostsDaily
Line ItemReimbursable ItemsUnitPriceQuantityCost
R1Diesel Fuel - GeneratorsGallons$0.00
R2Fuel for Government Vehicles - GasGallons$0.00
R3Fuel for Government Vehicles - DieselGallons$0.00
R4Travel CostsLSna1
R5Materials and SuppliesLSna1
R6Credit for Recycling BOMLSna1
R7Other Negotiated ItemsLSna1
ReimbursablesDay 2
Cost
Totals:$0.00

ATTACHMENT 8 - Daily Expenditure Report

DER Day 3

Task Order NumberDay 3
RegularStandbyCost
Labor Rates00$0
Date:DayRegularStandbyCost
Equipment Rates00$0
ISB:Mob MilesDemob MilesCost
Mob/Demob00$0.00
QuantityCost
Servicing Gens0$0
Cost
Reimbursables$0.00

Day 1 Expenditure: $0.00

Task Order #:Day 3
ISB: DEP: (date)Base YearQuantityDaily
Line ItemLabor RatesRegularStandbyRegularStandbyCost
L01Operations Manager$0
L02Site Manager$0
L03Admin Support$0
L04Yard Superintendent$0
L05Fuel Manager$0
L06Quality Control Manager$0
L07Safety Officer$0
L08Equipment Operator$0
L09Mechanical Team Leader$0
L10Electrical Team Leader$0
L11Mechanic$0
L12Electrician$0
L13Laborer$0
L14Truck Driver$0
L15"contractor labor"$0
L16"contractor labor"$0
L17"contractor labor"$0
L18"contractor labor"$0
Lxx"contractor labor"$0
Labor RatesDay 3
RegularStandbyCost
Totals:00$0
Base YearDay 3
Rate (Day)QuantityDaily
Line ItemEquipment RatesRegularStandbyRegularStandbyCost
E01Crane, Hyd, Self-Propelled (capacity)$0
E02Fork Lift, Rough Terrain,(capacity)$0
E03Lighting Sets, Trailer Mounted 1500 W$0
E04Truck, Pick-up, (capacity)$0
E05Truck, Highway,(capacity)$0
E06Truck, Semi Tractor$0
E07Truck Trailer, Flatbed, <= 15 ton$0
E08Truck Trailer, Flatbed, > 15 ton$0
E09Truck Trailer, Lowboy, <= 50 ton$0
E10Truck Trailer, Lowboy, > 50 ton$0
E11Truck Trailer, Fuel Tanker$0
E12Truck, Fuel, <1000 gal$0
E13Truck, Fuel, 1000 to 4,000 gal$0
E14Truck, Fuel, > 4000 gal$0
E15Tank, Fuel Storage$0
E16Fuel Caddy$0
E17Pump, Fuel, Portable (flow rate)$0
E18Pressure Washer, Low$0
E19Pressure Washer, High$0
E20Office Trailer$0
E21Trailer Euipment stoage$0
E22Conex Container Storage$0
E23Load Bank, < 500 kW$0
E24"contractor equipment"$0
Exx"contractor equipment"$0
Equipment RatesDay 3
RegularStandbyCost
Totals:00$0
Base YearDay 3
Rate per MileActualDaily
Line ItemMobilization/DemobilizatonNTE 200 MilesMob MilesDemob MilesCost
ME02Fork Lift, Rough Terrain,(capacity)$0.00
ME03Lighting Sets, Trailer Mounted 1500 W$0.00
ME15Tank, Fuel Storage$0.00
ME16Fuel Caddy$0.00
ME17Pump, Fuel, Portable$0.00
ME18Pressure Washer, Low, < 5000 psi$0.00
ME19Pressure Washer, High >= 5000 psi$0.00
ME20Office Trailer$0.00
ME21Trailer Euipment storage$0.00
ME22Conex Container Storage$0.00
ME23Load Bank, < 500 kW$0.00
ME24"contractor equipment"$0.00
MEXX"contractor equipment"$0.00
Mob/DemobDay 3
Mob MilesDemob MilesCost
Totals:00$0.00
Base YearDay 3
Rate perDaily
Line ItemParts for Servicing GeneratorsServiceQuantityCost
P010 to 29 kW$0.00
P0230 to 59 kW$0.00
P0360 to 99 kW$0.00
P04100 to 199 kW$0.00
P05200 to 299 kW$0.00
P06300 to 399 kW$0.00
P07400 to 499 kW$0.00
P08500 to 699 kW$0.00
P09700 to 900 kW$0.00
P10901 kW to 1.9MW$0.00
P112 - 3 MW$0.00
Servicing GensDay 3
QuantityCost
Totals:0$0.00
Base YearDay 3
Actual CostsDaily
Line ItemReimbursable ItemsUnitPriceQuantityCost
R1Diesel Fuel - GeneratorsGallons$0.00
R2Fuel for Government Vehicles - GasGallons$0.00
R3Fuel for Government Vehicles - DieselGallons$0.00
R4Travel CostsLSna1
R5Materials and SuppliesLSna1
R6Credit for Recycling BOMLSna1
R7Other Negotiated ItemsLSna1
ReimbursablesDay 3
Cost
Totals:$0.00

ATTACHMENT 8 - Daily Expenditure Report

DER Day 4

Task Order NumberDay 4
RegularStandbyCost
Labor Rates00$0
Date:DayRegularStandbyCost
Equipment Rates00$0
ISB:Mob MilesDemob MilesCost
Mob/Demob00$0.00
QuantityCost
Servicing Gens0$0
Cost
Reimbursables$0.00

Day 1 Expenditure: $0.00

Task Order #:Day 4
ISB: DEP: (date)Base YearQuantityDaily
Line ItemLabor RatesRegularStandbyRegularStandbyCost
L01Operations Manager$0
L02Site Manager$0
L03Admin Support$0
L04Yard Superintendent$0
L05Fuel Manager$0
L06Quality Control Manager$0
L07Safety Officer$0
L08Equipment Operator$0
L09Mechanical Team Leader$0
L10Electrical Team Leader$0
L11Mechanic$0
L12Electrician$0
L13Laborer$0
L14Truck Driver$0
L15"contractor labor"$0
L16"contractor labor"$0
L17"contractor labor"$0
L18"contractor labor"$0
Lxx"contractor labor"$0
Labor RatesDay 4
RegularStandbyCost
Totals:00$0
Base YearDay 4
Rate (Day)QuantityDaily
Line ItemEquipment RatesRegularStandbyRegularStandbyCost
E01Crane, Hyd, Self-Propelled (capacity)$0
E02Fork Lift, Rough Terrain,(capacity)$0
E03Lighting Sets, Trailer Mounted 1500 W$0
E04Truck, Pick-up, (capacity)$0
E05Truck, Highway,(capacity)$0
E06Truck, Semi Tractor$0
E07Truck Trailer, Flatbed, <= 15 ton$0
E08Truck Trailer, Flatbed, > 15 ton$0
E09Truck Trailer, Lowboy, <= 50 ton$0
E10Truck Trailer, Lowboy, > 50 ton$0
E11Truck Trailer, Fuel Tanker$0
E12Truck, Fuel, <1000 gal$0
E13Truck, Fuel, 1000 to 4,000 gal$0
E14Truck, Fuel, > 4000 gal$0
E15Tank, Fuel Storage$0
E16Fuel Caddy$0
E17Pump, Fuel, Portable (flow rate)$0
E18Pressure Washer, Low$0
E19Pressure Washer, High$0
E20Office Trailer$0
E21Trailer Euipment stoage$0
E22Conex Container Storage$0
E23Load Bank, < 500 kW$0
E24"contractor equipment"$0
Exx"contractor equipment"$0
Equipment RatesDay 4
RegularStandbyCost
Totals:00$0
Base YearDay 4
Rate per MileActualDaily
Line ItemMobilization/DemobilizatonNTE 200 MilesMob MilesDemob MilesCost
ME02Fork Lift, Rough Terrain,(capacity)$0.00
ME03Lighting Sets, Trailer Mounted 1500 W$0.00
ME15Tank, Fuel Storage$0.00
ME16Fuel Caddy$0.00
ME17Pump, Fuel, Portable$0.00
ME18Pressure Washer, Low, < 5000 psi$0.00
ME19Pressure Washer, High >= 5000 psi$0.00
ME20Office Trailer$0.00
ME21Trailer Euipment storage$0.00
ME22Conex Container Storage$0.00
ME23Load Bank, < 500 kW$0.00
ME24"contractor equipment"$0.00
MEXX"contractor equipment"$0.00
Mob/DemobDay 4
Mob MilesDemob MilesCost
Totals:00$0.00
Base YearDay 4
Rate perDaily
Line ItemParts for Servicing GeneratorsServiceQuantityCost
P010 to 29 kW$0.00
P0230 to 59 kW$0.00
P0360 to 99 kW$0.00
P04100 to 199 kW$0.00
P05200 to 299 kW$0.00
P06300 to 399 kW$0.00
P07400 to 499 kW$0.00
P08500 to 699 kW$0.00
P09700 to 900 kW$0.00
P10901 kW to 1.9MW$0.00
P112 - 3 MW$0.00
Servicing GensDay 4
QuantityCost
Totals:0$0.00
Base YearDay 4
Actual CostsDaily
Line ItemReimbursable ItemsUnitPriceQuantityCost
R1Diesel Fuel - GeneratorsGallons$0.00
R2Fuel for Government Vehicles - GasGallons$0.00
R3Fuel for Government Vehicles - DieselGallons$0.00
R4Travel CostsLSna1
R5Materials and SuppliesLSna1
R6Credit for Recycling BOMLSna1
R7Other Negotiated ItemsLSna1
ReimbursablesDay 4
Cost
Totals:$0.00