Attachment_1-Rate_Schedule.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Advanced Contract Initiative for Emergency Power Federal contract opportunity
Solicitation number
W911WN-13-R-0003
Issued by
Department of the Army Corps of Engineers Engineering District Pittsburgh

About this file

Attachment 1 - Rate Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Advanced Contract Initiative for Emergency Power, newest first.
File Type Posted
W911WN-13-R-0003-0004.pdf PDF
Revised_2_W911WN-13-R-0003.pdf PDF
Attachment_12-Wage_Determination_Rates.doc DOC document
W911WN-13-R-0003-0003.pdf PDF
W911WN-13-R-0003-0002.pdf PDF
Revised_W911WN-13-R-0003.pdf PDF
Emergency_Power_ACI_Pre-Proposal_Breifing_25_Apr_2013.pdf PDF
Attachment_17-FEMA_Generator_Inventory.xls XLS spreadsheet
Attachment_11-Quality_Assurance_Surveillance_Plan.pdf PDF
W911WN-13-R-0003-0001.pdf PDF
Attachment_13-Deployment_Package_Descriptions.pdf PDF
http //www.youtube.com/user/RSCUSACE —
Questions_and_Answers.pdf PDF
Pre-Proposal_Conference_Sign-In_Sheet.pdf PDF
Attachment_12-Wage_Determination_Rates.pdf PDF
Attachment_16-Past_Utilization_of_Small_Business_Participation_Information_Collection_Sheet.pdf PDF
Attachment_15-Small_Business_Participation_Plan.pdf PDF
Emergency_Power_Solicitation_W911WN-13-R-0003.pdf PDF
Attachment_2-FEMA_BOM_Kits.pdf PDF
Attachment_9-DER_Acceptance_Memo.pdf PDF
Attachment_5-Assessment_Input_Template.pdf PDF
Attachment_14-NAVFACUSACE_Past_Performance_Questionnaire.pdf PDF
Attachment_3-Generator_Power_Pack.pdf PDF
Attachment_7-De-Installation_Work_Order.pdf PDF
Attachment_10-Emergency_Power_USACE_Deployment_Packages.pdf PDF
Attachment_13-Type_III_and_II_Deployment_Packages.pdf PDF
Attachment_4-Generator_Maintenance_Profile.pdf PDF
Attachment_6-Installation_Work_Order.pdf PDF
Attachment_8-Daily_Expenditure_Report.xlsx XLSX spreadsheet
Attachment_11-Quality_Area_Surveillance_Plan.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rate Schedule

Contract Regions:
Rate ScheduleBase Year1st Option Year2nd Option Year3rd Option Year4th Option Year
Line ItemLabor RatesRegularStandbyRegularStandbyRegularStandbyRegularStandbyRegularStandby
L01Operations Manager
L02Site Manager
L03Admin Support
L04Yard Superintendent
L05Fuel Manager
L06Quality Control Manager
L07Safety Officer
L08Equipment Operator
L09Mechanical Team Leader
L10Electrical Team Leader
L11Mechanic
L12Electrician
L13Laborer
L14Truck Driver
L15"contractor labor"
L16"contractor labor"
L17"contractor labor"
L18"contractor labor"
Lxx"contractor labor"
Base Year1st Option Year2nd Option Year3rd Option Year4th Option Year
Rate (Day)Rate (Day)Rate (Day)Rate (Day)Rate (Day)
Line ItemEquipment RatesRegularStandbyRegularStandbyRegularStandbyRegularStandbyRegularStandby
E01Crane, Hyd, Self-Propelled (capacity)
E02Fork Lift, Rough Terrain,(capacity)
E03Lighting Sets, Trailer Mounted 1500 W
E04Truck, Pick-up, (capacity)
E05Truck, Highway,(capacity)
E06Truck, Semi Tractor
E07Truck Trailer, Flatbed, <= 15 ton
E08Truck Trailer, Flatbed, > 15 ton
E09Truck Trailer, Lowboy, <= 50 ton
E10Truck Trailer, Lowboy, > 50 ton
E11Truck Trailer, Fuel Tanker
E12Truck, Fuel, <1000 gal
E13Truck, Fuel, 1000 to 4,000 gal
E14Truck, Fuel, > 4000 gal
E15Tank, Fuel Storage
E16Fuel Caddy
E17Pump, Fuel, Portable (flow rate)
E18Pressure Washer, Low
E19Pressure Washer, High
E20Office Trailer
E21Trailer Euipment stoage
E22Conex Container Storage
E23Load Bank, < 500 kW
E24"contractor equipment"
Exx"contractor equipment"
Base Year1st Option Year2nd Option Year3rd Option Year4th Option Year
Rate per MileRate per MileRate per MileRate per MileRate per Mile
Line ItemMobilization/DemobilizatonNTE 200 MilesNTE 200 MilesNTE 200 MilesNTE 200 MilesNTE 200 Miles
ME02Fork Lift, Rough Terrain,(capacity)
ME03Lighting Sets, Trailer Mounted 1500 W
ME15Tank, Fuel Storage
ME16Fuel Caddy
ME17Pump, Fuel, Portable
ME18Pressure Washer, Low, < 5000 psi
ME19Pressure Washer, High >= 5000 psi
ME20Office Trailer
ME21Trailer Euipment storage
ME22Conex Container Storage
ME23Load Bank, < 500 kW
ME24"contractor equipment"
MEXX"contractor equipment"
Base Year1st Option Year2nd Option Year3rd Option Year4th Option Year
Rate perRate perRate perRate perRate per
Line ItemParts for Servicing GeneratorsServiceServiceServiceServiceService
P010 to 29 kW
P0230 to 59 kW
P0360 to 99 kW
P04100 to 199 kW
P05200 to 299 kW
P06300 to 399 kW
P07400 to 499 kW
P08500 to 699 kW
P09700 to 900 kW
P10901 kW to 1.9MW
P112 - 3 MW
Line ItemReimbursable Items
R1Diesel Fuel - Generators
R2Fuel for Government Vehicles - Gas
R3Fuel for Government Vehicles - Diesel
R4Travel Costs
R5Materials and Supplies
R6Credit for Recycling BOM
R7Other Negotiated Items

ATTACHMENT 1 - Rate Schedule

File details come from the government source that posted it. Updated .