Attachment 5 - Assessment Input Template
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Assessment Input US Army Corps of Engineers
Power Response Team Facility Information
1. Mission Number:
2. Facility and building use:
3. Address:
4. City:
5. State: 6. County:
7a. Latitude: 7b. Longitude:
8. Site Amperage (Amp): 9. Site Power (kW):
10. Site Voltage (V): 11. Site Phase:
12. Site POC:
13. Office Phone: 14. Cell Phone:
15. Fax:
Assessment - Assessor Information
16. Assessor Name:
17. Assessor Qualification:
18. Assessor State Qualification:
19. Assessor Qualification Date:
20. Assessment Completed Date Time:
Assessment - Facility Power Information
21. Calculated Load: 22. Voltage:
23. Output Phase: 24. Configuration:
25. Amperage (Amp):
Load Cable Information
26. Cable Size: 27. Cable runs per phase:
28. Neutral Runs: 29. Neutral Runs:
30. Total Cable Length (ft):
Ground Cable Information
31. Ground Cable Size: 32. Ground Cable Runs:
33. Bare Copper Length (ft): 34. Total Ground Rods:
ATTACHMENT 5 - Assessment Input Template
Assessment Input US Army Corps of Engineers
Power Response Team
On-Site Generator
Does this facility have an existing on-site backup generator?
Can an alternate generator be connected via this hookup?
Critical Load Data
37a. Latitude: 37b. Longitude:
38. Output Phase: 39. Configuration:
40. Calculated Load: 41. Voltage:
42. Amperage (Amp):
Assessment - Onsite Generator
43a. Latitude: 43b. Longitude:
44. Output Phase: 45. Configuration:
46. Calculated Load: 47. Voltage:
48. Fuel Type: 49. Fuel Capacity:
50. Amperage (Amp): 51. Meter Reading (hrs):
Remarks
52. Generator Remarks:
53. Directions/Remarks:
Assigned Date
Tasking Received by Action Officer Date Time:
Date and Time tasking received by Mission Manager:
Date and Time tasking passed to the 249th:
Inspection Team: