Attachment_10-Emergency_Power_USACE_Deployment_Packages.pdf

PDF 61 KB Posted

Attached to
Advanced Contract Initiative for Emergency Power
Solicitation number
W911WN-13-R-0003
Issued by

About this file

Attachment 10 - Emergency Power USACE Deployment Packages

View the file

Other files

File Type Posted
W911WN-13-R-0003-0004.pdf PDF
Revised_2_W911WN-13-R-0003.pdf PDF
Attachment_12-Wage_Determination_Rates.doc DOC document
W911WN-13-R-0003-0003.pdf PDF
W911WN-13-R-0003-0002.pdf PDF
Revised_W911WN-13-R-0003.pdf PDF
http //www.youtube.com/user/RSCUSACE —
Attachment_17-FEMA_Generator_Inventory.xls XLS spreadsheet
Questions_and_Answers.pdf PDF
Pre-Proposal_Conference_Sign-In_Sheet.pdf PDF
Attachment_11-Quality_Assurance_Surveillance_Plan.pdf PDF
Emergency_Power_ACI_Pre-Proposal_Breifing_25_Apr_2013.pdf PDF
W911WN-13-R-0003-0001.pdf PDF
Attachment_13-Deployment_Package_Descriptions.pdf PDF
Attachment_3-Generator_Power_Pack.pdf PDF
Attachment_11-Quality_Area_Surveillance_Plan.pdf PDF
Emergency_Power_Solicitation_W911WN-13-R-0003.pdf PDF
Attachment_7-De-Installation_Work_Order.pdf PDF
Attachment_13-Type_III_and_II_Deployment_Packages.pdf PDF
Attachment_12-Wage_Determination_Rates.pdf PDF
Attachment_16-Past_Utilization_of_Small_Business_Participation_Information_Collection_Sheet.pdf PDF
Attachment_15-Small_Business_Participation_Plan.pdf PDF
Attachment_6-Installation_Work_Order.pdf PDF
Attachment_8-Daily_Expenditure_Report.xlsx XLSX spreadsheet
Attachment_4-Generator_Maintenance_Profile.pdf PDF
Attachment_5-Assessment_Input_Template.pdf PDF
Attachment_2-FEMA_BOM_Kits.pdf PDF
Attachment_9-DER_Acceptance_Memo.pdf PDF
Attachment_14-NAVFACUSACE_Past_Performance_Questionnaire.pdf PDF
Attachment_1-Rate_Schedule.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING STRONG®

Emergency Power USACE Deployment Packages

Type IV Type III Type II Type I

Power

PRT

1 SME

(Total Pax: 1)

JFO – 1 AO, 1 MS (2 Pax) RFO – 1 ML (1 Pax)

ISB – 2 MM, 2 MS, 2 LS, 1

CS, 2 QA (9 Pax)

1 SME

(Total Pax: 13)

JFO – 2 AO, 1 MS (3 Pax) RFO – 2 ML, (2 Pax)

ISB – 2 MM, 2 MS, 2 LS, 2 CS,

6 QA (13 Pax)

1 SME

(Total Pax: 20)

Multiple deployments of Type I and/or Type II configurations to one event

(Total Pax: Varies)

249th

-C2 Node (1 Pax) -Yard Dog/PITT Boss (1 Pax) (DUAL HAT) -2 PIIT’s (4 Pax)

(Total Pax: = 6)

-C2 Node (2 Pax) -Yard Dog/PITT Boss (1 Pax) (DUAL HAT) -3 PIIT’s (6 Pax)

(Total Pax: 9 = 1 X Section)

-C2 Node (2 Pax) -Yard Dog (I Pax) -PIIT Boss (1 Pax) -6 ea. PIIT’s (12 Pax)

(Total Pax: 16 = 1 X Platoon)

-(CO) C2 Node (1-2 Pax) -2 + PP C2 Nodes -2 + Yard Dog / PIIT Boss (2-4 Pax) -7 + PIIT’s (14 PAX) (Total Pax: 20+ = Platoon +)

DTOS

Not Applicable ISB – 2 Pax ISB – 4 Pax ISB – 4 Pax

Event Type

Ice Storm Severe Weather Flooding Tropical Storm

-Tropical Event of CAT I or II -Any Tropical Event in the Islands (known trans issues) -Any event in which FEMA Generators are deployed (1 Power Pack) -Expect to perform 24 Hour operations at the JFO

-Catastrophic Event with the deployment of FEMA generators (i.e., CAT IV + Hurricane, major earthquake, etc) -Expect to perform 24 hours OPS at the JFO

-Confirmed Catastrophic Event covering multiple locations -Expect to perform 24 hours OPS at the JFO

ATTACHMENT 10 - Emergency Power USACE Deployment Packages

Emergency Power USACE Deployment Packages

File details come from the government source that posted it. Updated .