Attachment_6-Installation_Work_Order.pdf
PDF 491 KB Posted
- Attached to
- Advanced Contract Initiative for Emergency Power Federal contract opportunity
- Solicitation number
- W911WN-13-R-0003
About this file
Attachment 6 - Installation Work Order
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Installation Work Order
US Army Corps of Engineers Power Response Team
COR or Contract Specialist (Print)
Signature Date/Time
Mission Number
Barcode
Assessed Team
Assessed Gen Required Size (kW)
Assessed Gen Required Voltage (V)
Assessed Gen Required Phase
Assessed Gen Required Amperage (amp)
Load Wire #awg: ott: kCMil: Qty/UI:
Ground Wire #awg: ott: kCMil: Qty/UI:
Facility
Address
City County
Latitude Longitude
Site Amperage (amp) Site Power (kW) Site Voltage (V) Site Phase
Site POC Phone Alt Phone
Priority Install Assignment Installed By
Gen. Installed Size (kW) Gen Hrs Meter Reading Gen Voltage(V)
Generator Amperage (amp) Generator Phase
Generator Latitude Generator Longitude
Remarks/Directions
Power PRT LTM (Print)
ACI Contractor (Print)
Drivers Name (Print)
Drivers Lic#:
State:
Facility Owner (Print)
Installer (Print)
ACI Signature Transfers ownership of equipment from the Government to ACI Contractor. Give copy to ACI. Gov. keeps original.
Loggy Initial by Drivers name indicates that gen has left the yard. Loggy brings back copy to CS-one copy to Driver for Install Signature.
ATTACHMENT 6 - Installation Work Order
| COR or Contract Specialist Print: |
| DateTime: |
| Power PRT LTM Print: |
| Drivers Name Print: |
| Facility Owner Print: |
| DateTime_2: |
| DateTime_3: |
| DateTime_4: |
| ACI Contractor Print: |
| Installer Print: |
| DateTime_5: |
| DateTime_6: |
| Mission Number: |
| Barcode: |
| Facility Name: |
| Facility Address: |
| City: |
| County: |
| Latitude: |
| Longitude: |
| Site amp: |
| Site kW: |
| Site V: |
| Site Phase: |
| Site POC: |
| Site Phone: |
| Alt Phone: |
| Priority: |
| Install Assignment: |
| Installed By: |
| Gen Size: |
| Gen Hrs Meter: |
| Gen Voltage: |
| Gen amp: |
| Gen Phase: |
| Gen Latitude: |
| Gen Longitude: |
| remarks: |
| Assessed Team: |
| Assessed Gen Req Size: |
| Assessed Gen Re Voltage: |
| Assessed Gen Req Phase: |
| Assessed Gen Req amp: |
| Load Wire: |
| ott: |
| kCMil: |
| Qty/UI: |
| Ground awg: |
| Ground ott: |
| Ground kCMil: |
| Ground Qty/UI: |
| Drivers Lic#: |
| State: |
File details come from the government source that posted it. Updated .