W911SR-17-R-0005_RFP_NGCD1_AVCAD_21_Sep_2017.pdf
PDF 1 MB Posted
- Solicitation number
- W911SR-17-R-0005
About this file
RFP NGCD1 AVCAD
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
X
A X B X C X D
EX
X
G F 187 - 195
196 - 216 X H 217 - 230
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO-C9 1 230
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W911SR 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 3 4 - 74
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
75 - 127
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
129 - 131 132 - 137
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 138 - 141 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 142 - 144 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
145 - 185
PART II - CONTRACT CLAUSES
USA CONTRACTING CMD-APG. - W911SR
EDGEWOOD CONTRACTING DIVISION
E4215 AUSTIN ROAD
ABERDEEN PROVING GROUND MD 21010-5401
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
21 Sep 2017
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W911SR-17-R-0005
Section A - Solicitation/Contract Form
EXECUTIVE SUMMARY
The Army Contracting Command Aberdeen Proving Ground (ACC-APG) Contracting Center, Edgewood Contracting Division, APG, MD, APG-EA Branch, on behalf of the Joint Project Manager, Nuclear Biological Chemical Contamination Avoidance (JPM NBC CA) is in support of the Next Generation Chemical Detector 1 (NGCD1) program. The JPM NBC CA is conducting the NGCD1 program to fill known operational gaps in chemical detection. NGCD1, now named XM12 Aerosol & Vapor Chemical Agent Detector (AVCAD), shall detect traditional and advanced threat vapors and liquid and solid aerosols. The AVCAD shall detect, identify, alarm, and report the presence of foreign variants of aerosol and vapor chemical hazards. The AVCAD shall also include a wireless remote alarm capability.
The AVCAD shall operate in both dismounted and mounted configurations (a portable system capable of detecting and identifying vapor and aerosol chemical hazards to meet AVCAD requirements). The U.S. Army, Air Force, Navy, and Marine Corps will use the AVCAD to conduct or support their missions. These missions include monitoring, collective protection, base defense, decontamination, unmasking, dismounted reconnaissance, mounted reconnaissance (on the Stryker Nuclear Biological Chemical Reconnaissance Vehicle (NBCRV)), shipboard (replacing the current shipboard chemical detection system), and aviation (CH-47 Chinook, OH-60 Blackhawk, and CH-72 platforms for surveillance and survey of cargo and personnel).
The objective of this effort is to procure AVCADs for Engineering and Manufacturing Development (EMD), with the capability using options, to satisfy Low Rate Initial Production (LRIP) and Full Rate Production (FRP) requirements. Additionally, the contract requirements for the AVCADs include Government testing, program and logistic support, and delivery of technical data (end-item products, software, and logistics). The anticipated contract(s), when including all options, will be for ten years, consisting of twenty seven (27) months EMD, twenty one (21) months LRIP, and six (6) years FRP. The Government may award approximately 2 contract. However, the Government reserves the right to award one contract. If the Government elects award more than one contract, the individual contracts may be for the same technology solution, or for different technology variants and/or solutions in order to support differing mission sets and constraints of various DoD activities.
There will be no "down-select" or future competition between contractors if more than one contractor is selected for award. The Government's intent is to award the EMD options for approximately two contracts. After that point, if successful EMD test results are obtained under multiple contracts, the LRIP and FRP options may be exercised under more than one contract. In this scenario (for example, two contract awards and successful EMD tests for both contractors), the Government reserves the right to either obtain all LRIP and FRP production items from a single contractor or to divide production options between contractors based on (i) price, (ii) sustainment cost, (iii) performance against the PSPEC and any mission requirements to maintain multiple sources of supply.
Engineering and Manufacturing Development (EMD)
The EMD phase covers development and delivery of six (6) prototypes, program management, System Engineering, and support of a limited customer test, along with preliminary and critical design reviews (PDR and CDR). Prototype delivery will be scheduled six (6) months after contract award in order to allow sufficient time to conduct chamber testing and analyze test results prior to the CDR. If more than one EMD Base contract is awarded, the intent is to award the EMD option to all contractors upon successful completion of prototype delivery, customer testing and the CDR.
The EMD Option includes system design and delivery (seventy-five (75) units), system support packages for Preventive Maintenance Checks and Services (PMCS) and testing, packaging and Item Unique Identification Data (IUID), training, consumables and spare parts, repair and maintenance for detectors during test, technical manuals, logistics support, information assurance support and calibration. The anticipated EMD option award is approximately eight (8) months after contract award. The first scheduled hardware delivery of twenty-four (24) systems is four (4) months after option award to support Production Qualification Testing (PQT) chamber testing, with a second delivery of thirty-six (36) systems six (6) months after option award to support remaining PQT. The third scheduled hardware delivery of fifteen (15) systems is eight (8) months after option award to support the Log Demo and the Operational Assessment (OA).
Low-Rate Initial Production (LRIP)
LRIP is Option 4, which if exercised will cover hardware delivery of one hundred and twenty-eight (128) units. The LRIP option will include support to Production Verification Test (PVT), Item Unique Identification (IUID), packaging, and consumables and spare parts.
Full-Rate Production (FRP)
Full Rate Production (FRP) is covered under Options 5 through 10, and if exercised will have deliveries for over a six (6) year period at the discretion of the Government based on need and results achieved in LRIP. It is anticipated that there will be a maximum production of units per year up to 3200 for first (1st) year; 11,635 for years two (2), three (3), four (4), five (5); and 7,472 for year six (6). Additionally, the FRP options will cover consumables and spare parts, and packaging. The prerequisite for exercising the first FRP option is the FRP decision. Follow-on option awards will occur annually thereafter to meet the Government’s requirements.
Contract Type
The EMD phase (EMD Base and EMD Options 1 and 2) will be Cost-Plus-Incentive-Fee (CPIF). LRIP and FRP options will be priced on a Fixed-Price-Incentive (Successive Target) (FPI(S)) basis. Prior to completion of the LRIP option, a decision will be made to restructure to either a Fixed-Price-Incentive (Firm Target) or a Firm-Fixed- Price for each FRP option. A separate decision will occur prior to exercise of the FRP options. Should the alternative aerosol approach be the final AVCAD technical solution, the Government will restructure an adjustment to the LRIP and FRP pricing based on information the contractor provides in the EMD proposal. The acquisition will be negotiated for best-value procurement using the Contracting by Negotiation process prescribed in Federal Acquisition Regulation (FAR) Part 15. The source selection process to be utilized for this acquisition is best value/trade-off method. Information about source selection is listed under Section L and Section M.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 3 Each AVCAD Base
CPIF
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, as detailed in the PWS Section C.
EMD BASE CONTRACT/SUPPLIES AND SERVICES
FOB: Destination
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
0002 3 Each AVCAD with Alternate Design Base
CPIF
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, as detailed in the PWS Section C.
0003 1 Job System Support Package (SSP) Base
CPIF
The contractor, as an independent contractor and not as an agent of the Government, shall deliver SSP for CLIN 0001 and CLIN 0002, 180 calenders days after contract award and furnish the necessary resources to perform the work, as detailed in the PWS Section C.
0004 1 Job IPS EMD, Base
CPIF
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, as detailed in the PWS Section C.
EMD INTEGRATED PRODUCT SUPPORT (IPS)
Accounting for Contract Service
FFP
The Accounting for Contract Services/Contractor Manpower Reporting requirement has been added to the statement of work, and contractor is required to provide data on contractor manpower (including subcontractor manpower) for performance of this contract. The cost, if any, for providing this data shall be entered into the space provided at this CLIN. If no direct cost is associated with providing the data, enter No Cost.
b. Suggested rates for determining the proposed price of the Contractor Manpower Reporting as fair and reasonable are:
i. Simplified Acquisition Procedures (SAP) action with one performance location – $200 or less/year;
ii. Purchase Order or Contract with numerous performance locations – $500 or less/year.
NET AMT
Contract Data Requirement List (CDRLs)
The contractor shall deliver data A001 - F006 in accordance with DD Form 1423 Contract Data Requirements List in Section J.
**** NOT SEPARATELY PRICED****
OPTION AVCAD, EMD, OPTION 1
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, as detailed in the PWS Section C.
EMD AVCAD PQT HARDWARE
*****NOT SEPARATELY PRICED--INFORMATIONAL CLIN*****
0007AA 24 Each OPTION AVCAD First Delivery
CPIF
The contractor, as an independent contractor and not as an agent of the
EMD AVCAD HARDWARE
0007AB 36 Each OPTION AVCAD Second Delivery
CPIF
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, as detailed in the PWS Section C.
0007AC 15 Each OPTION AVCAD Third Delivery
CPIF
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, as detailed in the PWS Section C.
OPTION System Support Package
CPIF
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, as
0008AA 1 Job OPTION SSP For 24 AVCAD
CPIF
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, as detailed in the PWS Section C.
0008AB 1 Job OPTION SSP For 36 AVCAD
CPIF
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, as detailed in the PWS Section C.
0008AC 1 Job OPTION SSP For 15 AVCAD
CPIF
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, as detailed in the PWS Section C.
OPTION PLATFORM INTEGRATION, EMD, OPTION 2
CPIF
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, as
EMD PLATFORM INTEGRATION
0009AA 2 Each OPTION Shipboard Platform
CPIF
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, as detailed in the PWS Section C.
0009AB 2 Each
OPTION NBCRV
CPIF
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, as detailed in the PWS Section C.
0009AC 2 Each OPTION Unmanned Ground Vehicle
CPIF
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, as detailed in the PWS Section C.
0009AD 2 Each OPTION Joint Assault Bridge
CPIF
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, as detailed in the PWS Section C.
0009AE 2 Each OPTION ABRAMS Tank
CPIF
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, as detailed in the PWS Section C.
0009AF 2 Each
OPTION AMPV
CPIF
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, as detailed in the PWS Section C.
0009AG 2 Each OPTION Fixed-wing aircraft
CPIF
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, as detailed in the PWS Section C.
0009AH 2 Each OPTION Rotary-wing aircraft
CPIF
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, as detailed in the PWS Section C.
0010 1 Job
OPTION DEPOT MAINTENANCE MANUAL, OPTION 3
CPIF
The contractor, as an independent contractor and not as an agent of the Government, shall deliver one (1) electronic Technical Manual (TM) 180 days after option award and furnish the necessary resources to perform the work, as detailed in the PWS Section C.
EMD TECHNICAL MANUAL (TM): DEPOT MAINTENANCE MANUAL
OPTION AVCAD Hardware, LRIP OPTION 4
LOW RATE INITIAL PRODUCTION (LRIP) HARDWARE
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
0011AA 68 Each OPTION AVCAD LRIP First Delivery
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0011AB 60 Each OPTION AVCAD Second Delivery
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0012 Job
OPTION SSP
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0012AA 1 Job OPTION SSP for PVT Testing (41,472 hours)
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0012AB 1 Job OPTION SSP for MOT Testing (32,400 hours)
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
OPTION LRIP IPS
FPI
The contractor, as an independent contractor and not as an agent of the
LOW RATE INITIAL PRODUCTION (LRIP) INTEGRATED PRODUCT
SUPPORT (IPS)
TOTAL TARGET PRICE
CEILING PRICE
0013AA 100 Each OPTION TM Update
FPI
The contractor, as an independent contractor and not as an agent of the Government, shall deliver one (1) electronics TM and 100 hard copies of TM 90 days after option award and furnish the necessary resources to perform the work, as detailed in the PWS Section C.
LOW RATE INITIAL PRODUCTION (LRIP) IPS
TOTAL TARGET PRICE
CEILING PRICE
0013AB 1 Job OPTION Logistics/Maintenance Demonstration(s)
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0013AC 50 Each OPTION Training Course Update Deliverables
FPI
The contractor, as an independent contractor and not as an agent of the Government, shall deliver one (1) electronics Training Material (TM) and 50 hard copies of TM 90 days after option award and furnish the necessary resources to perform the work, as detailed in the PWS Section C.
TOTAL TARGET PRICE
CEILING PRICE
0014 1 Job OPTION Consumable and Spare Parts
FPI
The contractor, as an independent contractor and not as an agent of the
LOW RATE INITIAL PRODUCTION (LRIP)
TOTAL TARGET PRICE
CEILING PRICE
0015 Job OPTION Technical Support
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0016 Job
OPTION PLATFORM INTEGRATION, LRIP
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0016AA 2 Each OPTION Shipboard Platform
FPI
The contractor, as an independent contractor and not as an agent of the
LOW RATE INITIAL PRODUCTION (LRIP) PLATFORM INTEGRATION
TOTAL TARGET PRICE
CEILING PRICE
0016AB 2 Each
OPTION NBCRV
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0016AC 2 Each OPTION Unmanned Ground Vehicle
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0016AD 2 Each OPTION Joint Assault Bridge
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0016AE 2 Each OPTION ABRAMS Tank
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0016AF 2 Each
OPTION AMPV
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0016AG 2 Each OPTION Fixed -wing aircraft
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0016AH 2 Each OPTION Rotary-wing aircraft
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0017 168 Each
OPTION AVCAD WARRANTY
FFP
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work and provide warranties, as detailed in the PWS Section C, FAR 52.246-19 and DFARS 252.246-7001.
OPTION AVCAD, FRP, 1st YEAR, OPTION 5 detailed in the PWS Section C and as set forth in Section B Range Pricing Schedule.
FULL RATE PRODUCTION (FRP)
TOTAL TARGET PRICE
CEILING PRICE
0018AA 3,200 Each OPTION AVCAD Hardware FRP
FPI
The contractor, as an independent contractor and not as an agent of the Government, shall provide up to 3200 AVCADs and furnish the necessary resources to perform the work, as detailed in the PWS Section C and as set forth in Section B Range Pricing Schedule.
TOTAL TARGET PRICE
CEILING PRICE
0018AB 1 Job
OPTION AVCAD WARRANTY FRP
FFP
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, and provide warranties, as detailed in the PWS Section C, FAR 52.246-19 and DFARS
0018AC 1 Job OPTION Consumables and Spares Parts
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0018AD 30 Each OPTION Shipboard FRP Platform Integration Kits
FPI
The contractor, as an independent contractor and not as an agent of the
FULL RATE PRODUCTION (FRP) PLATFORM INTEGRATION KITS
TOTAL TARGET PRICE
CEILING PRICE
0018AE 675 Each
OPTION NBCRV
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0018AF 300 Each OPTION Unmanned Ground Vehicle
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0018AG 30 Each OPTION Joint Assault Bridge
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0018AH 225 Each OPTION ABRAMS Tank
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0018AJ 30 Each
OPTION AMPV
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0018AK 30 Each OPTION Fixed-wing aircraft
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0018AL 30 Each OPTION Rotary-wing aircraft
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0019 1 Job OPTION Technical Support
FPI
The contractor, as an independent contractor and not as an agent of the
Full Rate Production (FRP)
TOTAL TARGET PRICE
CEILING PRICE
OPTION AVCAD, FRP, 2nd YEAR, OPTION 6
TOTAL TARGET PRICE
CEILING PRICE
0020AA 11,635 Each OPTION AVCAD Hardware 2nd YEAR, OPTION 6
FPI
The contractor, as an independent contractor and not as an agent of the Government, shall provide up to 11,635 AVCAD and furnish the necessary
TOTAL TARGET PRICE
CEILING PRICE
0020AB 1 Job OPTION AVCAD Warranty FRP 2nd Year, Option 6
FFP
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work and provide warranties, as detailed in the PWS Section C, FAR 52.246-19 and DFARS 252.246-7001.
0020AC 1 Job OPTION Consumables and Spare Parts
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0020AD 30 Each OPTION Shipboard Platform Integration Kits
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0020AE 675 Each
OPTION NBCRV
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0020AF 300 Each OPTION Unmanned Ground Vehicle
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0020AG 30 Each OPTION Joint Assault Bridge
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0020AH 225 Each OPTION ABRAMS Tank
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0020AJ 30 Each
OPTION AMPV
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0020AK 30 Each OPTION Fixed-wing aircraft
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0020AL 30 Each OPTION Rotary-wing aircraft
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0021 1 Job OPTION Technical Support
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
AVCAD FRP, 3rd YEAR, OPTION 7
FPI
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, as
TOTAL TARGET PRICE
CEILING PRICE
0022AA 11,635 Each OPTION AVCAD Hardware
FPI
The contractor, as an independent contractor and not as an agent of the Government, shall provide up to 11,635 AVCAD and furnish the necessary
TOTAL TARGET PRICE
CEILING PRICE
0022AB 1 Job OPTION AVCAD Warranty, FRP 3rd Year, Option 7
FFP
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work and provide warranties, as detailed in the PWS Section C, FAR 52.246-19 and DFARS 252.246-7001.
0022AC 1 Job OPTION Consumables and Spare Parts
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0022AD 30 Each OPTION Shipboard Platform Integration Kits
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0022AE 675 Each
OPTION NBCRV
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0022AF 300 Each OPTION Unmanned Ground Vehicle
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0022AG 30 Each OPTION Joint Assault Bridge
FPI
The contractor, as an independent contractor and not as an agent of the
FULL RATE PRODUCTION (FRP) PLATFORM INTEGRATION
KITS
TOTAL TARGET PRICE
CEILING PRICE
0022AH 225 Each OPTION ABRAMS Tank
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0022AJ 30 Each
OPTION AMPV
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0022AK 30 Each OPTION Fixed-wing aircraft
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0022AL 30 Each OPTION Rotary-wing aircraft
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0023 1 Job OPTION Technical Support
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
OPTION AVCAD FRP, 4th YEAR, OPTION 8
TOTAL TARGET PRICE
CEILING PRICE
0024AA 11,635 Each OPTION AVCAD Hardware
FPI
The contractor, as an independent contractor and not as an agent of the Government, shall provide up to 11,635 AVCAD and furnish the necessary
TOTAL TARGET PRICE
CEILING PRICE
0024AB 1 Job OPTION AVCAD Warranty
FFP
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work and provide warranties, as detailed in the PWS Section C, FAR 52.246-19 and DFARS 252.246-7001.
0024AC 1 Job OPTION Consumables and Spare Parts
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0024AD 30 Each OPTION Shipboard Platform Integration Kits
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0024AE 675 Each
OPTION NBCRV
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0024AF 300 Each OPTION Unmanned Ground Vehicle
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0024AG 30 Each OPTION Joint Assault Bridge
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0024AH 225 Each OPTION ABRAM Tank
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0024AJ 30 Each
OPTION AMPV
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0024AK 30 Each OPTION Fixed-wing aircraft
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0024AL 30 Each OPTION Rotary-wing aircraft
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0025 1 Job OPTION Technical Support
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
OPTION AVCAD, FRP, 5th YEAR, OPTION 9
TOTAL TARGET PRICE
CEILING PRICE
0026AA 11,635 Each OPTION AVCAD Hardware
FPI
The contractor, as an independent contractor and not as an agent of the Government, shall provide up to 11,635 AVCAD and furnish the necessary
TOTAL TARGET PRICE
CEILING PRICE
0026AB 1 Job OPTION AVCAD Warranty
FFP
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work and provide warranties, as detailed in the PWS Section C, FAR 52.246-19 and DFARS 252.246-7001.
0026AC 1 Job OPTION Consumables and Spare Parts
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0026AD 30 Each OPTION Shipboard Platform Integration Kits
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0026AE 675 Each
OPTION NBCRV
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0026AF 300 Each OPTION Unmanned Ground Vehicle
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0026AG 30 Each OPTION Joint Assault Bridge
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0026AH 225 Each OPTION ABRAMS Tank
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0026AJ 30 Each
OPTION AMPV
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0026AK 30 Each OPTION Fixed-wing aircraft
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0026AL 30 Each OPTION Rotary-wing aircraft
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0027 1 Job OPTION Technical Support
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
OPTION AVCAD, FRP, 6th YEAR, OPTION 10
TOTAL TARGET PRICE
CEILING PRICE
0028AA 7,472 Each OPTION AVCAD Hardware
FPI
The contractor, as an independent contractor and not as an agent of the Government, shall provide up to 7,472 AVCAD and furnish the necessary
TOTAL TARGET PRICE
CEILING PRICE
0028AB 1 Job OPTION AVCAD Warranty
FFP
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work and provide warranties, as detailed in the PWS Section C, FAR 52.246-19 and DFARS
0028AC 1 Job OPTION Consumables and Spare Parts
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0028AD 30 Each OPTION Shipboard Platform Integration Kits
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0028AE 675 Each
OPTION NBCRV
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0028AF 300 Each OPTION Unmanned Ground Vehicle
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0028AG 30 Each OPTION Joint Assault Bridge
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0028AH 225 Each OPTION ABRAMS Tank
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0028AJ 30 Each
OPTION AMPV
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0028AK 30 Each OPTION Fixed-wing aircraft
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0028AL 30 Each OPTION Rotary-wing aircraft
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0029 1 Job OPTION Technical Support
FPI
The contractor, as an independent contractor and not as an agent of the
TOTAL TARGET PRICE
CEILING PRICE
0030 1 Job OPTION Spare and Consumable TDP, OPTION 11
FFP
The contractor, as an independent contractor and not as an agent of the Government, shall furnish the necessary resources to perform the work, as detailed in the PWS Section C.
AVCAD SPARE AND CONSUMABLE PARTS TECHNICAL DATA
PACKAGE (TDP)
PRICING SCHEDULE
FPIS INCENTIVE STRUCTURE
Common FPI(S) Parameters: All FPI(S) CLINs have the following structure: 1) A ceiling price that equates to 130% of the Initial Target Cost (not the initial target price), 2) No effective use of a Firm Target Profit Floor/Ceiling, 3) An 85% Government over/under share, and 4) A 15% Contractor over/under share.
CONSUMABLE AND SPARE PARTS
Escalation: Proposed initial target costs will be multiplied by an escalation factor appropriate for the production year as follows to arrive at the full Consumables and Spares schedule.
Escalation Factor Calculation
Escalation Percentage
Proposed by Offeror (Esc)
FY 2018 (1+Esc)0 = 1
LRIP (1+Esc)1
FRP Year 1 (1+Esc)2
FRP Year 2 (1+Esc)3
FRP Year 3 (1+Esc)4
FRP Year 4 (1+Esc)5
FRP Year 5 (1+Esc)6
FRP Year 6 (1+Esc)7
Range Pricing:
Part Name & Description Per Unit Initial Target Cost (LRIP)
1 - 100 101 - 500 501 - 1,000 > 1,000
<Consumables & Spares FRP schedules to be added prior to award>
Initial Target Profit <Percent> * Initial Target Cost
FULL RATE PRODUCTION
Section B: Total Initial Target Cost Calculation Range Total Initial Target Cost
F R
P Y ea r
1 - 49 $ + [$ * Quantity] 50 - 199 $ + [$ * Quantity]
200 - 799 $ + [$ * Quantity] 800 - 1,599 $ + [$ * Quantity]
1,600 - 3,199 $ + [$ * Quantity] 3,200 - 6,399 $ + [$ * Quantity]
6,400 - 11,635 $ + [$ * Quantity]
F R
P Y ea r
1 - 49 $ + [$ * Quantity] 50 - 199 $ + [$ * Quantity]
200 - 799 $ + [$ * Quantity] 800 - 1,599 $ + [$ * Quantity]
1,600 - 3,199 $ + [$ * Quantity] 3,200 - 6,399 $ + [$ * Quantity]
6,400 - 11,635 $ + [$ * Quantity]
F R
P Y ea r
1 - 49 $ + [$ * Quantity] 50 - 199 $ + [$ * Quantity]
200 - 799 $ + [$ * Quantity] 800 - 1,599 $ + [$ * Quantity]
1,600 - 3,199 $ + [$ * Quantity] 3,200 - 6,399 $ + [$ * Quantity]
6,400 - 11,635 $ + [$ * Quantity]
F R
P Y ea r
1 - 49 $ + [$ * Quantity] 50 - 199 $ + [$ * Quantity]
200 - 799 $ + [$ * Quantity] 800 - 1,599 $ + [$ * Quantity]
1,600 - 3,199 $ + [$ * Quantity] 3,200 - 6,399 $ + [$ * Quantity]
6,400 - 11,635 $ + [$ * Quantity]
F R
P Y ea r
1 - 49 $ + [$ * Quantity] 50 - 199 $ + [$ * Quantity]
200 - 799 $ + [$ * Quantity] 800 - 1,599 $ + [$ * Quantity]
1,600 - 3,199 $ + [$ * Quantity] 3,200 - 6,399 $ + [$ * Quantity]
6,400 - 11,635 $ + [$ * Quantity]
F R
P Y ea r
1 - 49 $ + [$ * Quantity] 50 - 199 $ + [$ * Quantity]
200 - 799 $ + [$ * Quantity] 800 - 1,599 $ + [$ * Quantity]
1,600 - 3,199 $ + [$ * Quantity] 3,200 - 6,399 $ + [$ * Quantity]
6,400 - 11,635 $ + [$ * Quantity]
Initial Target Profit <Percent> * Initial Target Cost
WARRANTY
Warranty Firm Fixed Prices are determined by multiplying <INSERT: the proposed warranty percentage> by the initial target cost for the AVCAD production lot to arrive at the FFP dollar amount.
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
SECTION C: PERFORMANCE WORK STATEMENT (PWS)
TITLE: XM12 AEROSOL AND VAPOR CHEMICAL AGENT DETECTOR (AVCAD)
C.1 SCOPE.
The Joint Project Manager for Nuclear, Biological and Chemical Contamination Avoidance (JPM NBC CA) is responsible for development, production and fielding of Chemical, Biological, Radiological and Nuclear (CBRN) detection systems. The JPM NBC CA is conducting the Next Generation Chemical Detector 1 (NGCD 1) program to fill known operational gaps in chemical detection. The NGCD 1 also known as XM12 Aerosol and Vapor Chemical Agent Detector (AVCAD), will detect traditional and advanced threat vapors and liquid and solid aerosols.
C.1.1 Background.
The NGCD program received a Milestone A decision in March 2014 to enter the Technology Maturation and Risk Reduction (TMRR) Phase. The JPM NBC CA awarded three (3) contracts to develop and conduct CWA chamber testing with prototypes and the results are promising for the continuation of the program into the Engineering and Manufacturing Development (EMD) phase.
C.1.2 Objective.
The objective of this contract is to procure NGCD 1 XM12 AVCAD, hereafter referred to as AVCAD, for EMD. Requirements include EMD Government testing, program and logistic support, and delivery of technical data (end-item products, software, and logistics). It also includes options for Low Rate Initial Production (LRIP) and Full Rate Production (FRP), and subsequent documentation updates, test and fielding support.
C.2 APPLICABLE DOCUMENTS
For purposes of this Performance Work Statement (PWS), “Required” means that the requirements contained in the directly cited document are contractually applicable to the extent specified. The term “For guidance only” means the document is not contractually applicable and is provided for guidance and information only. The documents cited below are “required” unless specifically identified as “For guidance only”. In the event of a conflict between the documents referenced herein and the contents of this PWS, the PWS shall take precedence.
C.2.1 Military Standards (MIL-STD) and Performance Specifications (MIL-PRF).
C.2.1.1 MIL-STD-882E, System Safety, 11 May 12.
C.2.1.2 MIL-STD-1472G, Human Engineering, 11 Jan 12.
C.2.1.3 MIL-STD-1839D (For guidance only), Calibration and Measurement Requirements, 12 May 10.
C.2.1.4 MIL-STD 40051-2C, Preparation of Digital Technical Information for Page-based
Technical Manuals (TMs), 15 Dec 15.
C.2.1.5 MIL STD-2073-1E Standard Practice for Military Packaging, 07 Jan 11.
C.2.1.6 MIL-STD-129R, Military Marking for Shipment and Storage, 18 Feb 14.
C.2.1.7 MIL-STD-147E, Palletized Unit Loads, 23 Dec 13.
C.2.1.8 MIL-STD-40051-2C Preparation of Digital Technical Information for Page-Based Technical Manuals, 15 Dec 15.
C.2.1.9 MIL-PRF-29612B, Training Data Products, 31 Mar 16.
C.2.1.10 MIL-STD-810G Environmental Engineering Considerations and Laboratory Tests, 15 Apr 14.
(The above Instructions are available at: http://quicksearch.dla.mil/)
C.2.2 Military Handbooks (MIL-HDBK).
C.2.2.1 MIL-HDBK-470 (For guidance only), Designing and Developing Maintainable Products and Systems, Volume 1, 31 May 12.
C.2.2.2 MIL-HDBK-61A (For guidance only), Configuration Management Guidance, 7 Feb 01.
C.2.2.3 MIL-HDBK-502A (For guidance only), Product Support Analysis, 08 Mar 13.
C.2.2.4 MIL-HDBK-2155 (For guidance only), Failure Reporting, Analysis and Corrective Action Taken, 10 Sep 14
(The above Instructions are available at: http://quicksearch.dla.mil/)
C.2.3 Department of Defense Instructions
C.2.3.1 DoD 5220.22-M, National Industrial Security Program (NISP) Operating Manual, 28 Feb 06 through changes dated 18 May 16.
C.2.3.2 DoD Instruction 8510.01, Risk Management Framework (RMF) for DoD Information Technology (IT), 12 Mar 14 through changes dated 24 May 16.
C.2.3.3 DoD Instruction 5200.39 Critcal Program Information (CPI) Identification and Protection within Research, Development, Test, and Evaluation (RDT&E), 28 May 15.
C.2.3.4 DODM 4140.27 DoD Shelf-Life Management Program, 06 Jul 16.
(The above Instructions are available from: http://www.dtic.mil/whs/directives/corres/ins1.html)
C.2.4 Department of Defense Documents
C.2.4.1 Defense Acquisition Guidebook (DAG), 15 May 13 or later.
(This document is available at: https://dag.dau.mil/Pages/Default.aspx)
C.2.4.2 Department of Defense Manufacturing Readiness Level (MRL) Deskbook, Version 2.4, Aug 15.
(This document is available at:
http://www.dodmrl.com/MRL_Deskbook_V2.4%20August_2015.pdf)
C.2.4.3 Department of Defense Security Classification Guide for Non-Traditional Agent Defense Incorporating Change 2, 16 Aug 16.
(This document is available by request to the Contracting Officer)
C.2.4.4 Risk Management Guide for DoD Acquisition, Sixth Edition, Aug 06.
(This document is available at:
http://www.dau.mil/publications/publicationsDocs/RMG%206Ed%20Aug06.pdf)
C.2.4.5 DA PAM 738-751, Functional Users Manual for the Army Maintenance Management System – Aviation, 28 Feb 14.
(This document is available at:
https://armypubs.army.mil/Search/ePubsSearch/ePubsSearchDownloadPage.aspx?docID=0902c 8518001097e)
C.2.5 Army Regulations
C.2.5.1 AR 530-1, Operations Security, 26 Sep 14.
(This document is available at:
http://www.apd.army.mil/Search/ePubsSearch/ePubsSearchDownloadPage.aspx?docID=0902c8 5180010d7a)
C.2.5.2 AR 350-1, Army Training and Leader Development, 19 Aug 14.
(This document is available at:
http://www.apd.army.mil/Search/ePubsSearch/ePubsSearchDownloadPage.aspx?docID=0902c8 51800103c5)
C.2.5.3 AR 350-38, Policies and Management for Training Aids, Devices, Simulators, and Simulations, 28 Mar 13.
(This document is available at:
http://www.apd.army.mil/Search/ePubsSearch/ePubsSearchDownloadPage.aspx?docID=0902c8 5180010483)
C.2.5.4 TRADOC Regulation 350-70, Army Learning Policy and Systems, 6 Dec 11 (This document is available at: http://tradoc.army.mil/tpubs/regs/TR350-70.pdf)
C.2.5.6 AR 70-77 Program Protection, 7 Apr 14
(This document is available at:
http://www.apd.army.mil/Search/ePubsSearch/ePubsSea
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .