Attachment_3_-_40051-2C_TABLE_A-II_TM_3-6665-441-10.xlsx
Army Technical Manual XLSX spreadsheet 30 KB Posted
- Solicitation number
- W911SR-17-R-0005
About this file
Attachment 3 Table A-II TM
View the file
Who attaches TM 3-6665-441-10
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
-10
| https://www.logsa.army.mil/mil40051/matrix2_chg4.cfm |
| TABLE A-II. |
Operators and combined operator/maintenance requirements matrix for
TM 3-6665-441-10
| TM Content | ‑10 | MIL‑STD‑40051-2C | Element Name |
| Reference | |||
| FRONT MATTER | R | 5.2.1 | <paper.frnt> |
| Front cover | R | 5.2.1.1 | <frntcover> |
| (MC) Promulgation letter | TBD | 5.2.1.3 | <promulgation> |
| Warning summary | TBD | 5.2.1.4 | <warnsum> |
| Change transmittal page | TBD | 5.2.1.5 | <chgsheet> |
| List of effective pages/work packages | R | 5.2.1.6 | <loepwp> |
| Title page | R | 5.2.1.7 | <titleblk> |
| Table of contents | R | 5.2.1.9 | <contents> |
| How to use this manual | R | 5.2.1.10 | <howtouse> |
| CHAPTER 1. | R | APPENDIX B | <gim> |
| GENERAL INFORMATION, Equipment DESCRIPTION, AND THEORY OF OPERATION | |||
| GENERAL INFORMATION WORK PACKAGE | R | B.5.2 | <ginfowp> |
| Scope | R | B.5.2.3 | <scope> |
| Maintenance forms, records, and reports | R | B.5.2.4 | <mfrr> |
| Reporting Equipment Improvement Recommendations (EIR) | R | B.5.2.5 | <eir> |
| Hand Receipt (HR) manuals | TBD | B.5.2.6 | <handreceipt> |
| Corrosion Prevention and Control (CPC) | R | B.5.2.7 | <cpcdata> |
| Ozone Depleting Substances (ODS) | TBD | B.5.2.8 | <odsdata> |
| Destruction of Army materiel to prevent enemy use | R | B.5.2.9 | <destructmat> |
| Preparation for storage or shipment | R | B.5.2.10 | <pssref> |
| Transportability guidance | R | B.5.2.11 | <transportability> |
| Warranty information | TBD | B.5.2.12 | <wrntyref> |
| Nomenclature cross‑reference list | R | B.5.2.13 | <nomenreflist> |
| List of abbreviations/acronyms | R | B.5.2.14 | <loa> |
| Quality of material | P | B.5.2.16 | <qual.mat.info> |
| Safety, care, and handling | TBD | B.5.2.17 | <sftyinfo> |
| Nuclear hardness | TBD | B.5.2.18 | <hcp> |
| Calibration | TBD | B.5.2.19 | <calref> |
| Item unique identification (IUID) | TBD | B.5.2.20 | <iuid> |
| Supporting information for repair parts, special tools, TMDE, and support equipment | P | B.5.2.27 | <supdata> |
| Copyright credit line | TBD | B.5.2.28 | <copyrt> |
| EQUIPMENT DESCRIPTION AND DATA WORK PACKAGE | R | B.5.3 | <descwp> |
| Equipment characteristics, capabilities, and features | R | B.5.3.3 | <eqpinfo> |
| Location and description of major components | R | B.5.3.4 | <locdesc> |
| Equipment differences | R | B.5.3.5 | <eqpdiff> |
| Equipment data | R | B.5.3.6 | <eqpdata> |
| THEORY OF OPERATION WORK PACKAGE | R | B.5.4 | <thrywp> |
| CHAPTER X. | R | APPENDIX C | <opim> |
| OPERATOR INSTRUCTIONS | |||
| DESCRIPTION AND USE OF OPERATOR CONTROLS AND INDICATORS WORK PACKAGE | R | C.5.2.2.1 | <ctrlindwp> |
| OPERATION UNDER USUAL CONDITIONS WORK PACKAGE | R | C.5.2.2.2 | <opusualwp> |
| Operation under usual conditions task | R | C.5.2.2.2.3 | <opertsk> |
| Security measures for electronic data | TBD | C.5.2.2.2.3.1 | <secref> |
| Siting requirements | TBD | C.5.2.2.2.3.2 | <site> |
| Shelter requirements | TBD | C.5.2.2.2.3.3 | <shelter> |
| Assembly and preparation for use | TBD | C.5.2.2.2.3.4 | <prepforuse> |
| Initial adjustments, before use and self‑test | TBD | C.5.2.2.2.3.5 | <initial> |
| Operating procedures | R | C.5.2.2.2.3.6 | <oper> |
| Operating auxiliary equipment | TBD | C.5.2.2.2.3.8 | <operaux> |
| Preparation for movement | TBD | C.5.2.2.2.3.9 | <prepmove> |
| Decals and instruction plates | TBD | C.5.2.2.2.3.10 | <instructplt> |
| OPERATION UNDER UNUSUAL CONDITIONS WORK PACKAGE | R | C.5.2.2.3 | <opunuwp> |
| Security measures for electronic data | TBD | C.5.2.2.3.3.1 | <secref> |
| Unusual environment/weather | R | C.5.2.2.3.3.2 | <unusualenv> |
| Fording and swimming | TBD | C.5.2.2.3.3.3 | <fording> |
| Interim Chemical, Biological, Radiological, Nuclear and Explosives (CBRNE) decontamination procedures | TBD | C.5.2.2.3.3.4 | <decon> |
| Jamming and Electronic Countermeasures (ECM) procedures | TBD | C.5.2.2.3.3.5 | <ecm> |
| Degraded operation procedures | TBD | C.5.2.2.3.3.6 | <degraded> |
| Decals and instruction plates | TBD | C.5.2.2.3.3.7 | <instructplt> |
| Emergency WORK PACKAGE | TBD | C.5.2.2.4 | <emergencywp> |
| STOWAGE AND DECAL/DATA PLATE GUIDE WORK PACKAGE | TBD | C.5.2.2.5 | <stowagewp> |
| ON‑VEHICLE EQUIPMENT LOADING PLAN WORK PACKAGE | TBD | C.5.2.2.6 | <eqploadwp> |
| CHAPTER X. | TBD | APPENDIX D | <tim> |
| TROUBLESHOOTING | TBD | D.5.4.4 | <masterindexcategory> |
| MASTER INDEX | TBD | ||
| TROUBLESHOOTING INDEX WORK PACKAGE | TBD | D.5.5.5 | <tsindxwp> |
| CHAPTER X. | APPENDIX D | <tim> | |
| TROUBLESHOOTING PROCEDURES | D.5.4.2 | <troublecategory> | |
| NOTE | TBD | ||
| The notation (*) indicates that at least one of the these content items shall be included | |||
| INTRODUCTION WORK PACKAGE | TBD | D.5.5.3 | <tsintrowp> |
| TROUBLESHOOTING INDEX WORK PACKAGE | TBD | D.5.5.5 | <tsindxwp> |
| *OPERATIONAL CHECKOUT WORK PACKAGES | TBD | D.5.5.8.3 | <opcheckwp> |
| *TROUBLESHOOTING WORK PACKAGES | TBD | D.5.5.8.4 | <tswp> |
| *COMBINED OPERATIONAL CHECKOUT AND TROUBLESHOOTING WORK PACKAGES | TBD | D.5.5.8.5 | <opcheck‑tswp> |
| CHAPTER X. | APPENDIX E | <mim> | |
| PMCS | E.5.2.1 | <pmcscategory> | |
| MAINTENANCE INSTRUCTIONS | |||
| NOTE | TBD | ||
| PMCS may be in its own chapter or may be combned with other maintenance work packages in a maintenance chapter but not both places. | TBD | ||
| PMCS INTRODUCTION WORK PACKAGE | R | E.5.3.4.1 | <pmcsintrowp> |
| PMCS, INCLUDING LUBRICATION | R | E.5.3.4.2 | <pmcswp> |
| INSTRUCTIONS, WORK PACKAGE | |||
| CHAPTER X. | R | APPENDIX E | <mim> |
| MAINTENANCE INSTRUCTIONS | E.5.2.2 | <maintenancepmcscategory> | |
| NOTE | E.5.2.3 | <maintenancecategory> | |
| PMCS is required as a minimum in one maintenance chapter. PMCS may be in its own chapter or may be combined with other maintenance work packages in a maintenance chapter but not both places. | |||
| SERVICE UPON RECEIPT WORK PACKAGE (maintainer level only) | TBD | E.5.3.2 | <surwp> |
| Service upon receipt tasks | TBD | E.5.3.2.3 | <surtsk> |
| Siting | TBD | E.5.3.2.3.1 | <siting> |
| Shelter requirements | TBD | E.5.3.2.3.2 | <shltr> |
| Service upon receipt of materiel | TBD | E.5.3.2.3.3 | <surmat> |
| Installation instructions | TBD | E.5.3.2.3.4 | <install> |
| Preliminary servicing of equipment | TBD | E.5.3.2.3.5 | <preserv> |
| Preliminary checks and adjustment of equipment | TBD | E.5.3.2.3.6 | <prechkadj> |
| Preliminary calibration of equipment | TBD | E.5.3.2.3.7 | <precal> |
| Circuit alignment | TBD | E.5.3.2.3.8 | <calign> |
| Ammunition markings | TBD | E.5.3.2.3.9.1 | <mark> |
| Classification of defects | TBD | E.5.3.2.3.9.2 | <ammo.defect> |
| Ammunition handling | TBD | E.5.3.2.3.9.3 | <ammo.handling> |
| Procedures to activate ammunition | TBD | E.5.3.2.3.9.4 | <arm> |
| Additional maintenance task | TBD | E.5.3.2.3.10 | <other.surtsk> |
| Follow-on maintenance | TBD | E.5.3.2.3.11 | <followon.maintsk> |
| EQUIPMENT/USER FITTING INSTRUCTIONS WORK PACKAGE | TBD | E.5.3.3 | <perseqpwp> |
| PMCS INTRODUCTION WORK PACKAGE | R | E.5.3.4.1 | <pmcsintrowp> |
| PMCS WORK PACKAGE | R | E.5.3.4.2 | <pmcswp> |
| MAINTENANCE WORK PACKAGES | TBD | E.5.3.5 | <maintwp> |
| Maintenance tasks | TBD | E.5.3.5.3 | <maintsk> |
| Inspect | TBD | E.5.3.5.3.2 | <inspect> |
| Test | TBD | E.5.3.5.3.3 | <test> |
| Service | TBD | E.5.3.5.3.4 | <service> |
| Adjust | TBD | E.5.3.5.3.5 | <adjust> |
| Align | TBD | E.5.3.5.3.6 | <align> |
| Calibrate | TBD | E.5.3.5.3.7 | <calibration> |
| Remove | TBD | E.5.3.5.3.8 | <remove> |
| Install | TBD | E.5.3.5.3.9 | <install> |
| Replace | TBD | E.5.3.5.3.10 | <replace> |
| Repair | TBD | E.5.3.5.3.11 | <repair> |
| Paint | TBD | E.5.3.5.3.12 | <paint> |
| Overhaul | P | E.5.3.5.3.13 | <overhaul> |
| Rebuild | P | E.5.3.5.3.14 | <rebuild> |
| Lubricate | TBD | E.5.3.5.3.15 | <lube> |
| Mark | TBD | E.5.3.5.3.16 | <mark> |
| Pack | TBD | E.5.3.5.3.17 | <pack> |
| Unpack | TBD | E.5.3.5.3.18 | <unpack> |
| Preserve | TBD | E.5.3.5.3.19 | <preservation> |
| Prepare for use | TBD | E.5.3.5.3.20 | <prepforuse> |
| Assemble | TBD | E.5.3.5.3.21 | <assem> |
| Disassemble | TBD | E.5.3.5.3.22 | <disassem> |
| Clean | TBD | E.5.3.5.3.23 | <clean> |
| Nondestructive inspection | TBD | E.5.3.5.3.24 | <ndi> |
| Radio interference suppression | TBD | E.5.3.5.3.25 | <ris> |
| Place in service | TBD | E.5.3.5.3.26 | <pis> |
| Towing | TBD | E.5.3.5.3.27 | <tow> |
| Jacking | TBD | E.5.3.5.3.28 | <jack> |
| Parking | TBD | E.5.3.5.3.29 | <park> |
| Mooring | TBD | E.5.3.5.3.30 | <moor> |
| Covering | TBD | E.5.3.5.3.31 | <cover> |
| Hoisting | TBD | E.5.3.5.3.32 | <hoist> |
| Sling loading | TBD | E.5.3.5.3.33 | <sling> |
| External power | TBD | E.5.3.5.3.34 | <extpwr> |
| Preparation for storage | R | E.5.3.5.3.35 | <prepstore> |
| Preparation for shipment | R | E.5.3.5.3.36 | <prepship> |
| Transport | R | E.5.3.5.3.37 | <transport> |
| Arm | TBD | E.5.3.5.3.38 | <arm> |
| Load | TBD | E.5.3.5.3.39 | <load> |
| Unload | TBD | E.5.3.5.3.40 | <unload> |
| Install peripheral device | TBD | E.5.3.5.3.41 | <installperdev> |
| Uninstall peripheral device | TBD | E.5.3.5.3.42 | <uninstallperdev> |
| Upgrade/patch software | TBD | E.5.3.5.3.43 | <upgrade> |
| Configure software | TBD | E.5.3.5.3.44 | <configure> |
| Debug software | TBD | E.5.3.5.3.45 | <debug> |
| Additional maintenance task | TBD | E.5.3.5.3.46 | <other.maintsk> |
| Follow-on maintenance | TBD | E.5.3.5.3.47 | <followon.maintsk> |
| GENERAL MAINTENANCE WORK PACKAGE | TBD | E.5.3.7 | <gen.maintwp> |
| LUBRICATION INSTRUCTIONS WORK PACKAGE | TBD | E.5.3.8 | <lubewp> |
| ILLUSTRATED LIST OF MANUFACTURED ITEMS WORK PACKAGE (maintainer level and above) | P | E.5.3.10 |
| Illustrated list of manufactured items introduction work package | P | E.5.3.10.1 | <manu_items_introwp> |
| Manufacturing procedures work package | P | E.5.3.10.2 | <manuwp> |
| TORQUE LIMITS WORK PACKAGE (MAINTAINER level and above) | P | E.5.3.11 | <torquewp> |
| WIRING DIAGRAMS WORK PACKAGE (MAINTAINER level and above) | P | E.5.3.12 | <wiringwp> |
| CHAPTER X. | TBD | APPENDIX E | <mim> |
| AUXILIARY EQUIPMENT | TBD | E.5.2.6 | <auxiliarycategory> |
| MAINTENANCE INSTRUCTIONS | TBD | ||
| AUXILIARY EQUIPMENT MAINTENANCE WORK PACKAGE | TBD | E.5.3.14 | <auxeqpwp> |
| ILLUSTRATED LIST OF MANUFACTURED ITEMS WORK PACKAGE (maintainer level and above) | P | E.5.3.10 | |
| Illustrated list of manufactured items introduction work package | P | E.5.3.10.1 | <manu_items_introwp> |
| Manufacturing procedures work package | P | E.5.3.10.2 | <manuwp> |
| TORQUE LIMITS WORK PACKAGE (maintainer level and above) | P | E.5.3.11 | <torquewp> |
| WIRING DIAGRAMS WORK PACKAGE (maintainer level and above) | P | E.5.3.12 | <wiringwp> |
| CHAPTER X. | TBD | APPENDIX E | <mim> |
| AMMUNITION | TBD | E.5.2.7 | <ammunitioncategory> |
| MAINTENANCE INSTRUCTIONS | TBD | ||
| AMMUNITION MAINTENANCE WORK PACKAGE | TBD | E.5.3.15.1 | <ammowp> |
| AMMUNITION MARKING INFORMATION WORK PACKAGE | TBD | E.5.3.15.2 | <ammo.markingwp> |
| FOREIGN AMMUNITION (NATO) WORK PACKAGE | TBD | E.5.3.15.3 | <natowp> |
| CHAPTER X. | TBD | APPENDIX H | <dim> |
| DESTRUCTION OF EQUIPMENT TO PREVENT ENEMY USE | |||
| NOTE | |||
| If a separate destruction of material manual is not developed for this equipment, then the destruction chapter must be included. | |||
| Destruction PROCEDURES introduction work package | R | H.5.3 | <destruct-introwp> |
| Authority to destroy | R | H.5.3.3 | <authorize_to_destroy> |
| Reporting destruction | R | H.5.3.4 | <report_destruct> |
| General destruction information | R | H.5.3.5 | <general_destruct_info> |
| Degree of destruction | R | H.5.3.6 | <degree_of_destruct> |
| Essential components and spare parts | TBD | H.5.3.7 | <component_spares> |
| DESTRUCTION PROCEDURES WORK PACKAGE | R | H.5.4 | <destruct-materialwp> |
| Parts list | TBD | H.5.4.3 | <essential_spares> |
| Specific destruction procedures | R | H.5.4.4 | <proc> |
| SOFTWARE INFORMATION | TBD | Appendix M | <soim> |
| <softwarecategory> | |||
| SOFTWARE GENERAL INFORMAtiON WORK PACKAGE | R | M.5.3.1 | <softginfowp> |
| System Overview | R | M.5.3.1.6 | <softsysover> |
| Document Overview | R | M.5.3.1.7 | <softdocover> |
| software summary work package | R | M.5.3.2 | <softsumwp> |
| software effectivity work package | TBD | M.5.3.3 | <softeffectwp> |
| differences between software versions work package | TBD | M.5.3.4 | <softdiffversionwp> |
| features and capaiblities work package | R | M.5.4.1 | <softfeaturescapwp> |
| screen displays work package | R | M.5.4.2 | <softscreendisplaywp> |
| menus/directories work package | R | M.5.4.3 | <softmenuwp> |
| tools and buttons work packages | R | M.5.4.4 | <softtoolswp> |
| security and privacy procedures work package | R | M.5.5.1 | <softsecprivwp> |
| supervisory controls work package | TBD | M.5.5.2 | <softsuperctrlswp> |
| powerup/startup and powerdown/shutdown procedures work package | R | M.5.5.3 | <softpowerupwp> |
| accessing/exiting software work package | R | M.5.5.4 | <softaccesswp> |
| key commands work package | TBD | M.5.5.5 | <softkeycmdswp> |
| processes and commands work package | TBD | M.5.5.6 | <softproccmdwp> |
| user interface work package | TBD | M.5.5.7 | <softguiwp> |
| Software OPERATING conventions work package | TBD | M.5.5.8 | <softopconventionswp> |
| Additional software operation wp | TBD | M.5.5.9 | <softgenwp> |
| messages work package | TBD | M.5.6.3 | <softmessageswp> |
| recovery from errors, malfunctions, and emergencies work package | TBD | M.5.6.4 | <softerrorswp> |
| CHAPTER X. | APPENDIX F | <pim> | |
| RPSTL | |||
| (-10, -13, -14) | P | ||
| (-13&P, -14&p) | P | ||
| Introduction work package | P | F.5.3.5 | <introwp> |
| Repair parts list work package | P | F.5.3.6 | <plwp> |
| Repair parts for special tools work package | P | F.5.3.7 | <stl_partswp> |
| Kit parts list work package | P | F.5.3.8 | <kitswp> |
| bulk Item Work Package | P | F.5.3.9 | <bulk_itemswp> |
| Special tools list work package | P | F.5.3.10 | <stlwp> |
| NSN index work package | P | F.5.3.11.1 | <nsnindxwp> |
| P/N index work package | P | F.5.3.11.2 | <pnindxwp> |
| Reference designator index work package | P | F.5.3.11.3 | <refdesindxwp> |
| CHAPTER X. | R | APPENDIX G | <sim> |
| SUPPORTING INFORMATION | |||
| NOTE | |||
| Applicable supporting information work packages shall be arranged in the order in which they are presented here and numbered accordingly. | |||
| REFERENCES WORK PACKAGE | R | G.5.2 | <refwp> |
| INTRODUCTION FOR non-aviation TWO-LEVEL maintenance mac WORK PACKAGE | P | G.5.3.1 | <macintrowp> |
| MAC WORK PACKAGE (non-aviation TWO-LEVEL) | P | G.5.3.3 | <macwp> |
| COMPONENTS OF END ITEM (COEI) AND BASIC ISSUE ITEMS (BII) LISTS WORK PACKAGE | R | G.5.4 | <coeibiiwp> |
| ADDITIONAL AUTHORIZATION LIST (AAL) WORK PACKAGE | TBD | G.5.5 | <aalwp> |
| EXPENDABLE AND DURABLE ITEMS LIST WORK PACKAGE | R | G.5.7 | <explistwp> |
| TOOL IDENTIFICATION LIST WORK PACKAGE | P | G.5.8 | <toolidwp> |
| MANDATORY REPLACEMENT PARTS WORK PACKAGE | R | G.5.9 | <mrplwp> |
| CRITICAL SAFETY ITEMS WORK PACKAGE | R | G.5.10 | <csi.wp> |
| SUPPORT ITEMS WORK PACKAGE | TBD | G.5.11 | <supitemwp> |
| ADDITIONAL SUPPORTING WORK PACKAGES | TBD | G.5.12 | <genwp> |
| REAR MATTER | R | 5.2.2 | <rear> |
| Glossary | TBD | 5.2.2.1 | <glossary> |
| Alphabetical index | TBD | 5.2.2.2 | <aindx> |
| DA Form 2028 | R | 5.2.2.3 | <da2028> |
| Authentication page | R | 5.2.2.4 | <authent> |
| Foldout pages | TBD | 5.2.2.5 | <foldsect> |
| Back cover | R | 5.2.2.6 | <back> |
| Legend |
| TBD - To Be Determined |
| R - Required |
| P - Prohibited |
| blue - location in MIL-STD |
| green - XML tag |
File details come from the government source that posted it. Updated .