SECTION C: PERFORMANCE WORK STATEMENT (PWS)
TITLE: XM12 AEROSOL AND VAPOR CHEMICAL AGENT DETECTOR (AVCAD)
C.1 SCOPE.
The Joint Project Manager for Nuclear, Biological and Chemical Contamination Avoidance (JPM NBC CA) is responsible for development, production and fielding of Chemical, Biological, Radiological and Nuclear (CBRN) detection systems. The JPM NBC CA is conducting the Next Generation Chemical Detector (NGCD) program to fill known operational gaps in chemical detection. The NGCD 1 also known as XM12 Aerosol and Vapor Chemical Agent Detector (AVCAD), will detect traditional and advanced threat vapors and liquid and solid aerosols.
C.1.1 Background.
The NGCD program received a Milestone A decision in March 2014 to enter the Technology Maturation and Risk Reduction (TMRR) Phase. The JPM NBC CA awarded three (3) contracts to develop and conduct CWA chamber testing with prototypes and the results are promising for the continuation of the program into the Engineering and Manufacturing Development (EMD) phase.
C.1.2 Objective.
The objective of this contract is to procure XM12 AVCADs for EMD. Requirements include EMD Government testing, program and logistic support, and delivery of technical data (end-item products, software, and logistics). It also includes options for Low Rate Initial Production (LRIP), and Full Rate Production (FRP) – and subsequent documentation updates, test and fielding support.
C.2 APPLICABLE DOCUMENTS
For purposes of this Performance Work Statement (PWS), “Required” means that the requirements contained in the directly cited document are contractually applicable to the extent specified. The term “For guidance only” means the document is not contractually applicable and is provided for guidance and information only. The documents cited below are “required” unless specifically identified as “For guidance only”. In the event of a conflict between the documents referenced herein and the contents of this PWS, the PWS shall take precedence.
C.2.1 Military Standards (MIL-STD) and Performance Specifications (MIL-PRF).
C.2.1.1 MIL-STD-882E, System Safety, 11 May 12.
C.2.1.2 MIL-STD-1472G, Human Engineering, 11 Jan 12.
C.2.1.3 MIL-STD-1839D (For guidance only), Calibration and Measurement Requirements, 12 May 10.
C.2.1.4 MIL-STD 40051-2C, Preparation of Digital Technical Information for Page-based Technical
Manuals (TMs), 15 Dec 15.
C.2.1.5 MIL STD-2073-1E Standard Practice for Military Packaging, 07 Jan 11.
C.2.1.6 MIL-STD-129R, Military Marking for Shipment and Storage, 18 Feb 14.
C.2.1.7 MIL-STD-147E, Palletized Unit Loads, 23 Dec 13.
C.2.1.8 MIL-STD-40051-2C Preparation of Digital Technical Information for Page-Based Technical Manuals, 15 Dec 15.
C.2.1.9 MIL-PRF-29612B, Training Data Products, 31 Mar 16.
C.2.1.10 MIL-STD-810G Environmental Engineering Considerations and Laboratory Tests, 15 Apr 14.
(The above Instructions are available at: http://quicksearch.dla.mil/)
C.2.2 Military Handbooks (MIL-HDBK).
C.2.2.1 MIL-HDBK-470 (For guidance only), Designing and Developing Maintainable Products and
Systems, Volume 1, 31 May 12.
C.2.2.2 MIL-HDBK-61A (For guidance only), Configuration Management Guidance, 7 Feb 01.
C.2.2.3 MIL-HDBK-502A (For guidance only), Product Support Analysis, 08 Mar 13.
C.2.2.4 MIL-HDBK-2155 (For guidance only), Failure Reporting, Analysis and Corrective Action Taken, 10 Sep 14
(The above Instructions are available at: http://quicksearch.dla.mil/)
C.2.3 Department of Defense Instructions
C.2.3.1 DoD 5220.22-M, National Industrial Security Program (NISP) Operating Manual, 28 Feb 06 through changes dated 18 May 16.
C.2.3.2 DoD Instruction 8510.01, Risk Management Framework (RMF) for DoD Information Technology (IT), 12 Mar 14 through changes dated 24 May 16.
C.2.3.3 DoD Instruction 5200.39 Critcal Program Information (CPI) Identification and Protection within Research, Development, Test, and Evaluation (RDT&E), 28 May 15.
C.2.3.4 DODM 4140.27 DoD Shelf-Life Management Program, 06 Jul 16.
http://quicksearch.dla.mil/ http://quicksearch.dla.mil/
(The above Instructions are available from: http://www.dtic.mil/whs/directives/corres/ins1.html)
C.2.4 Department of Defense Documents
C.2.4.1 Defense Acquisition Guidebook (DAG), 15 May 13 or later.
(This document is available at: https://dag.dau.mil/Pages/Default.aspx)
C.2.4.2 Department of Defense Manufacturing Readiness Level (MRL) Deskbook, Version 2.4, Aug 15.
(This document is available at:
http://www.dodmrl.com/MRL_Deskbook_V2.4%20August_2015.pdf)
C.2.4.3 Department of Defense Security Classification Guide for Non-Traditional Agent Defense Incorporating Change 2, 16 Aug 16.
(This document is available for request to the Contracting Officer)
C.2.4.4 Risk Management Guide for DoD Acquisition, Sixth Edition, Aug 06.
(This document is available at:
http://www.dau.mil/publications/publicationsDocs/RMG%206Ed%20Aug06.pdf)
C.2.4.5 DA PAM 738-751, Functional Users Manual for the Army Maintenance Management System – Aviation, 28 Feb 14.
(This document is available at:
https://armypubs.army.mil/Search/ePubsSearch/ePubsSearchDownloadPage.aspx?docID=0902c851 8001097e)
C.2.5 Army Regulations
C.2.5.1 AR 530-1, Operations Security, 26 Sep 14.
(This document is available at:
http://www.apd.army.mil/Search/ePubsSearch/ePubsSearchDownloadPage.aspx?docID=0902c8518 0010d7a)
C.2.5.2 AR 350-1, Army Training and Leader Development, 19 Aug 14.
(This document is available at:
http://www.apd.army.mil/Search/ePubsSearch/ePubsSearchDownloadPage.aspx?docID=0902c8518 00103c5)
C.2.5.3 AR 350-38, Policies and Management for Training Aids, Devices, Simulators, and Simulations, 28 Mar 13.
http://www.dtic.mil/whs/directives/corres/ins1.html https://dag.dau.mil/Pages/Default.aspx https://armypubs.army.mil/Search/ePubsSearch/ePubsSearchDownloadPage.aspx?docID=0902c8518001097e https://armypubs.army.mil/Search/ePubsSearch/ePubsSearchDownloadPage.aspx?docID=0902c8518001097e http://www.apd.army.mil/Search/ePubsSearch/ePubsSearchDownloadPage.aspx?docID=0902c85180010d7a http://www.apd.army.mil/Search/ePubsSearch/ePubsSearchDownloadPage.aspx?docID=0902c85180010d7a http://www.apd.army.mil/Search/ePubsSearch/ePubsSearchDownloadPage.aspx?docID=0902c851800103c5 http://www.apd.army.mil/Search/ePubsSearch/ePubsSearchDownloadPage.aspx?docID=0902c851800103c5
(This document is available at:
http://www.apd.army.mil/Search/ePubsSearch/ePubsSearchDownloadPage.aspx?docID=0902c8518 0010483)
C.2.5.4 TRADOC Regulation 350-70, Army Learning Policy and Systems, 6 Dec 11 (This document is available at: http://tradoc.army.mil/tpubs/regs/TR350-70.pdf)
C.2.5.6 AR 70-77 Program Protection, 7 Apr 14 (This document is available at:
http://www.apd.army.mil/Search/ePubsSearch/ePubsSearchDownloadPage.aspx?docID=0902c8518 00106e6)
C.2.6 NGCD Program Documents
C.2.6.1 NGCD Program Protection Plan (PPP). (Attachment 6)
C.2.6.2 Security Classification Guide for NGCD. (Attachment 7)
C.2.6.3 NGCD Systems Engineering Plan (SEP). (Attachment 8)
C.2.6.4 AVCAD Performance Specification (PSpec). (Attachment 1)
(The above documents are found as attachments in Section J )
C.2.7 Other Government Documents
C.2.7.1 Modular Open Systems Architecture in DoD Acquisition, (For guidance only), 29 Oct 14.
(This document is available at: http://www.acq.osd.mil/se/briefs/16943-2014_10_29_NDIA-SEC- Welby-MOSA-vF.pdf)
C.2.7.2 National Aerospace Standard (NAS) 411: Hazardous Materials Management Program, 3rd Edition, (For guidance only), 30 Sept 13.
(This document is available at:
https://global.ihs.com/doc_detail.cfm?&rid=AIA&item_s_key=00156371&item_key_date=860301 &input_doc_number=411&input_doc_title=&org_code=AIA%2FNAS)
C.2.7.3 AF 24-204/TM 38-250/NAVSUP PUB 505/MCO P4030.19J/DLAI 4145.3: Preparing Hazardous Materials for Military Air Shipments, 12 Oct 04 https://dap.dau.mil/policy/Documents/Policy/AFMAN24_204_I%5B1%5D.pdf)
C.2.7.4 Title 49 Code of Federal Regulations https://www.gpo.gov/fdsys/browse/collectionCfr.action?selectedYearFrom=2015&go=Go) http://www.apd.army.mil/Search/ePubsSearch/ePubsSearchDownloadPage.aspx?docID=0902c85180010483 http://www.apd.army.mil/Search/ePubsSearch/ePubsSearchDownloadPage.aspx?docID=0902c85180010483 http://tradoc.army.mil/tpubs/regs/TR350-70.pdf http://www.apd.army.mil/Search/ePubsSearch/ePubsSearchDownloadPage.aspx?docID=0902c851800106e6 http://www.apd.army.mil/Search/ePubsSearch/ePubsSearchDownloadPage.aspx?docID=0902c851800106e6 https://www.gpo.gov/fdsys/browse/collectionCfr.action?selectedYearFrom=2015&go=Go
C.2.7.5 National Institute of Standards and Technology (NIST) Interagency Report 7622, Notional Supply Chain Risk Management Practices for Federal Information Systems, (For guidance only), Oct 12.
(This document is available at: http://nvlpubs.nist.gov/nistpubs/ir/2012/NIST.IR.7622.pdf)
C.2.7.6 Common Chemical Biological Radiological Nuclear Sensor Interface (CCSI) Standard 1.1.2 (For proposals, Offerors may submit request to the Contracting Officer)
C.2.8 Commercial Documents.
C.2.8.1 SAE EIA 649B (For guidance only), Configuration Management Standard, 2011.
(This document is available at: http://www.ansi.org)
C.2.8.2 National Defense Industrial Association (2008) guidebook, Engineering for System Assurance, (For guidance only), (This document is available at: http://www.acq.osd.mil/se/docs/SA- Guidebook-v1-Oct2008.pdf)
C.2.8.3 ISO 9001, Quality Management Systems, 5th edition:15 Sept 15, (This document is available at: http://www.iso.org/iso/home/store/catalogue_ics/catalogue_detail_ics.htm?csnumber=62085)
C.2.8.4 ASTM D3951, Standard Practice for Commercial Packaging, (This document is available at:
http://www.astm.org/Standards/D3951.htm)
C.2.8.5 ASTM D4169 Standard Practice for Performance Testing of Shipping Containers and Systems, (This document is available at: http://www.astm.org/Standards/D4169.htm)
C.2.8.6 ISPM 15, International Standards for Phytosanitary Measures, 2009, (This document is available at: www.ispm15.com/ISPM15_Revised_2009.pdf)
C.2.8.7 ANSI-MH1, Pallets, Slip Sheets, and Other Bases for Unit Loads, 08 Jan 16 (This document is available at: http://www.mhi.org/free/8956)
C.2.8.8 International Air Transportation Association (IATA) Dangerous Goods Regulation (This document is available at: https://www.iata.org/publications/dgr/pages/index.aspx)
C.2.8.9 TA-STD-0017, Product Support Analysis (This document is available at:
http://www.sae.org)
C.2.8.10 GEIA-STD-0007C, Logistics Product Data, 21 Oct 15, (This document is available at:
http://standards.sae.org/wip/geiastd0007c/) http://nvlpubs.nist.gov/nistpubs/ir/2012/NIST.IR.7622.pdf http://www.ansi.org/ http://www.acq.osd.mil/se/docs/SA-Guidebook-v1-Oct2008.pdf http://www.acq.osd.mil/se/docs/SA-Guidebook-v1-Oct2008.pdf http://standards.sae.org/wip/geiastd0007c/
C.2.8.11 GEIA-HB-0007B (For guidance only), Logistics Product Data Handbook,10 Feb 14, (This document is available at: http://standards.sae.org/geiahb0007/)
C.3 REQUIREMENTS.
The Contractor, as an independent Contractor and not as an agent of the Government, shall provide the necessary services, personnel, labor, facilities, materials, supplies, and equipment to perform the following work.
C.3.1 Program Management.
The Contractor shall establish a program management organization responsible for the execution of this PWS with the appropriate management controls and processes to ensure that the contract requirements are met. The Contractor shall manage the contract activities by providing integrated program management, program control, contract and subcontracts management, data management, and operations management. The Contractor shall use a well-defined and efficient organizational, management, and development methodology consistent with an Integrated Process and Product Development approach as the primary method of organizing and managing this PWS and ensure that all teams have the expertise and disciplines integrated throughout the process.
C.3.1.1 Meetings/Reviews/Teleconferences (Telecons)
The Contractor shall participate in the required meetings, reviews, and telecons as listed in this contract. Whenever possible and appropriate, meetings and reviews shall be conducted virtually using the most appropriate technology. Physical meetings and reviews shall be scheduled in tandem, or groups, to minimize personnel resources and travel expenses, when appropriate. All meetings, reviews, and telecons shall be hosted by the Contractor. The Government may request that an individual meeting or review be held at a Government facility on a case-by-case basis, and such a request must be made thirty (30) days prior to the meeting or review.
C.3.1.2 Start of Work Meeting.
The Contractor shall hold a Start-of-Work (SOW) meeting at the Contractor’s facility not later than thirty (30) calendar days after award. Briefing agenda shall include, as a minimum, introduction of key personnel, schedule, review of key design features, and information distribution. The meeting shall have a break out session for Integrated Product Support to include Technical Manual(s) (TM).
The Contractor shall prepare an agenda and read-ahead package/briefing charts for Government approval in accordance with (IAW) Exhibit Line Item Numbers (ELIN) B001. The Contractor shall record and deliver Meeting Minutes IAW ELIN B002.
C.3.1.3 Action Items.
The Contractor shall create and implement a system for tracking, following-up on, and resolving open items (“Action Items”) including the review of the status of open items during subsequent meetings. The Contractor shall immediately inform the Contracting Officer (KO) and Contracting Officer Representative (COR) if there are open actions preventing or delaying the completion of program or contract data delivery schedules.
C.3.1.4 Integrated Master Schedule (IMS).
The Contractor shall maintain, update and execute to an Integrated Master Schedule (IMS) IAW ELIN B003. The Contractor shall manage their program IAW the IMS. The Contractor shall update the IMS provided in their proposal for use during the SOW. The IMS presented at the SOW meeting shall reflect detailed planning for the EMD contract performance. The Contractor shall establish, maintain and provide the Government direct access to the Contractor’s working IMS on a continuous basis. The Contractor, in conjunction with the Government, shall update the IMS on an as needed basis. The Contractor shall ensure that the IMS aligns with the Government schedule throughout the contract.
C.3.1.5 Monthly Reports.
C.3.1.5.1 The Contractor shall deliver a monthly status report IAW ELIN B004.
C.3.1.5.2 The Contractor shall collect, monitor and report the data associated with labor, material, subcontracting, and overhead costs and include a monthly spend plan.
C.3.1.5.3 The Contractor shall report the status and progress on the development and delivery of technical manuals to include schedule.
C.3.1.6 Bi-Weekly Telecons.
The Contractor shall hold bi-weekly telecons with the Government for ongoing activities. The purpose of these meetings is for the Contractor and Government representatives to openly discuss technical progress, issues, and risks. The first bi-weekly telecon shall be held the first month following the SOW meeting. Agenda topics, meeting minutes, read ahead items, if any, and action items shall be provided IAW ELINs B001 and B002. The Contractor and Government may mutually agree to cancel a bi-weekly telecon during a particular month due to lack of discussion topics or a review or meeting being held the same month.
C.3.1.7 Program Reviews.
The Contractor shall conduct semi-annual Program Reviews (PRs) that include program management participation, technical management and Subject Matter Expert (SME) participation, as appropriate. The Contractor shall present cost, schedule, performance, and risk status at each PR and be prepared for detailed discussion with the Government. PRs may be held in conjunction with Design Reviews (DRs) and Technical Interchange Meetings (TIMs) to limit meeting proliferation.
The Contractor shall prepare an agenda and read-ahead package/briefing charts for Government approval IAW ELIN B001. The Contractor shall record and deliver Meeting Minutes IAW ELIN B002.
C.3.1.8 Design Reviews.
C.3.1.8.1 Preliminary Design Review (PDR)
The Contractor shall host a Preliminary Design Review (PDR) at the Contractor’s facility using the Defense Acquisition Guidebook, Paragraph 4.2.12 as guidance not later than seventy-five (75) calendar days after contract award. The Contractor shall submit a PDR Data Package IAW ELIN A001. The Contractor shall, as a minimum, address requirements; key system features; future material availability; long lead items; estimated life cycle costs for final design and design alternatives; projected cost of the detector system in production; manufacturing risks; estimated failure modes and rates; Logistics Product Data (LPD) considerations; and the draft Technical Data Package (TDP) in this review. The review shall include recommended requirements trade-offs based upon an assessment of cost, schedule, and performance risk. The Contractor shall prepare an agenda and read-ahead package/briefing charts for Government approval IAW ELIN B001. The Contractor shall record and deliver Meeting Minutes IAW ELIN B002.
C.3.1.8.2 Critical Design Review (CDR) The Contractor shall host a Critical Design Review (CDR) at the Contractor’s facility using the Defense Acquisition Guidebook, Paragraph 4.2.13 as guidance. The Contractor shall submit a CDR package IAW ELIN A002. The Contractor shall address requirements specified in the Performance Specification and include updated performance; Size, Weight and Power (SWaP); key system features; future Material Availability (Am); long lead items; estimated life cycle costs for final design and design alternatives; projected cost of the components and systems in production; manufacturing risks; estimated failure modes and rates; logistics management considerations; and the TDP in this review. The review shall include recommended requirements trade-offs based upon an assessment of cost, schedule, and performance risk. The CDR will be 30 days after after the Customer Test data delivery. The Contractor shall prepare an agenda and read-ahead package/briefing charts for Government approval IAW ELIN B001. The Contractor shall record and deliver Meeting Minutes
IAW ELIN B002.
C.3.1.9 Technical Interchange Meetings (TIM).
The Contractor shall conduct quarterly TIMs to facilitate technical discussions at a working level.
The TIMs may cover test results, logistic planning, design challenges, etc. The first TIM will be three (3) months after the first set of hardware delivery. The Contractor shall prepare an agenda and read-ahead package/briefing charts for Government approval IAW ELIN B001. The Contractor shall record and deliver Meeting Minutes IAW ELIN B002.
C.3.1.10 Security.
The contactor shall follow security requirements outlined in the DD254 (Section J), NGCD Program Protection Plan (PPP) (C.2.6.1, Section J), the NGCD Security Classification Guide (C.2.6.2, Section J), and the Department of Defense Security Classification Guide for Non-Traditional Agent Defense (C.2.4.3).
C.3.1.10.1 Program Protection Implementation Plan (PPIP) The Contractor and all subcontractors shall develop, provide, implement and maintain a Program Protection Implementation Plan (PPIP) IAW ELIN B005. The Contractor shall align their PPIP with the NGCD PPP, and revise their PPIP accordingly if updates to the NGCD PPP occur. If Critical
Program Information (CPI) or Critical Components (CC) exists per updates to the PPP IAW DoDI 5200.39, the PPIP shall cover the protection of CPI/CC, compliant with the security requirements imparted by the DD254 and the National Industrial Security Program (NISP) (C.2.3.2). The PPIP should provide sufficient safeguards to ensure that all sensitive information, technical controlled unclassified information (CUI) and/or (CPI) in the possession of the Contractor is protected from unauthorized access and release.
C.3.1.10.2 Cybersecurity Management The Contractor shall include a Cybersecurity Management Strategy in the PPIP (ELIN B005) that aligns with the Cybersecurity Strategy of the PPP. The Contractor shall provide assistance in security control selection and implementation, security control assessment and security control monitoring as outlined in “NIST Special Publication 800-37, Revision 1, Guide for Applying the Risk Management Framework to Federal Information Systems”. The Contractor's Cybersecurity Management Strategy shall protect information using the DoDI 8510.01 confidentiality, integrity and availability levels described in the Cybersecurity Strategy of the PPP. The Contractor’s Cybersecurity Management Program Plans and related information shall be available to the Government.
C.3.1.10.3 Program Protection Working Group (PPWG)/Critical Program Information Assessment
(CPIA).
The Contractor shall host a PPWG within four (4) months after contract award and a second PPWG within twelve (12) months after contract award. Subsequent PPWGs shall be held as needed. Each PPWG will be chaired by the Government security manager and co-chaired by the Contractor security manager. The co-chair shall develop the agenda. The agenda shall include a CPIA that will identify potential Critical Program Information or Critical Technology (defined by Army Regulation 70-77 Program Protection, 7 April 2014). Each PPWG will be a one (1) day event. After each event, the Government will provide the results of the meeting via the COR to include but not limited to validating any CPI/Critical Technology for the program, and/or Critical Functional Analysis
(CFA).
C.3.1.10.4 Anti-Tamper (AT) Planning and Solutions.
If the PPWG identifies Critical Program Information or Critical Technology, the Contractor shall design, develop and integrate Anti-Tamper (AT) solutions for hardware and software containing Critical Program Information and Critical Components to deter, prevent, and detect the compromise and reverse engineering of the AVCAD. The Contractor shall conduct verification and testing of AT solutions and shall provide necessary hardware, consumables, and support equipment necessary to execute testing. The Contractor shall utilize reverse engineering countermeasures that are commensurate with the exposure levels and consequence of Critical Program Information loss using the analysis process identified in the DoD Anti-Tamper (AT) Guidelines (https://at.dod.mil/). An Account is required for login. The Government will provide the Contractor with sponsorship and access to the DoD AT Guidelines if the PPWG identifies this need. The Contractor shall document and deliver the detailed Anti-Tamper solutions as an Anti-Tamper Plan Annex to the PPIP IAW
ELIN B0005. Incorporation of validated AT solutions into contractual deliverable hardware shall be in accordance with the IMS.
C.3.1.10.5 Contractor Employees who require access to Government Information Systems.
All Contractor and subcontract employees with access to a Government information system must be registered in the Army Training Certification Tracking System (ATCTS) at the commencement of services and must successfully complete the DoD Informational Assurance Awareness Training prior to receiving access to the information system(s) and then annually thereafter.
C.3.1.10.6 Operations Security (OPSEC) Standing Operating Procedure/Plan The Contractor shall develop an OPSEC Standing Operating Procedure (SOP)/Plan within 90 calendar days of contract award, IAW ELIN B006, to be reviewed and approved by the responsible Government OPSEC officer, per AR 530-1. This SOP/Plan shall include the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. In addition, the Contractor shall identify an individual who shall be an OPSEC Coordinator and ensure this individual becomes OPSEC Level II certified per AR 530-1.
C.3.1.10.7 Handling or Access to Classified Information.
The Contractor and subcontractor personnel shall comply with FAR 52.204-2, Security Requirements. This clause involves access to information classified “Confidential,” “Secret,” or “Top Secret” and requires Contractors to comply with the Security Agreement (DD Form 441) and the most recent version of the National Industrial Security Program Operating Manual (DoD 5220.22-M).
C.3.2 Systems Engineering.
C.3.2.1 Systems Engineering Management Plan.
The Contractor shall provide a Systems Engineering Management Plan (SEMP) that describes the Contractor's system engineering process to guide all technical aspects of the development through the AVCAD EMD phase IAW the Contractors IMS. The Contractor’s SEMP shall align with the NGCD 1 SEP (C.2.6.3, Section J). The Contractor shall prepare the SEMP IAW ELIN B007.
C.3.2.2 Requirements Analysis The Contractor shall develop, deliver and update the Requirements Compliance Matrix (RCM) that tracks achievement of all AVCAD requirements as the development and tests progress (ELIN B008).
The RCM shall be logically organized and clearly depict the level of fidelity for each requirement assessment and trace or link to the supporting basis for the assessment. The RCM shall trace directly to the AVCAD Performance Specification (PSPEC) (C.2.6.4). The Contractor shall brief the overall progress in terms of the RCM at PRs, DRs, and TIMs.
C.3.2.3 Reliability, Availability, and Maintainability Program.
The Contractor shall establish, maintain, and operate a Reliability, Availability and Maintainability (RAM) program. The Contractor shall provide the Government an overview of their reliability program at the SOW meeting. The RAM program shall be updated and addressed by the Contractor at each PR, DR, and TIM. The Contractor shall include RAM Rationale in the SEMP as a comprehensive compendium of the Contractor’s reliability activities, functions, processes, test strategies, measurements, data collections, resources, and timelines required to ensure that the specified reliability of the system in the AVCAD PSpec will be achieved before fielding.
C.3.2.4 Failure Reporting, Analysis, and Corrective Action System (FRACAS)
C.3.2.4.1 The Contractor shall implement and maintain a Failure Reporting, Analysis and Corrective Action System (FRACAS) for collecting, recording and analyzing hardware, packaging and software failures or nonconformities during conformance and lot acceptance inspections and tests, Production Qualification Test (PQT), Production Verification Test (PVT), and First Article Testing (FAT), Government conducted testing, and from any field reports supplied by the Government. The Contractor shall track these occurrences in a standard format which provides adequate information to conduct failure analysis.
C.3.2.4.2 The Contractor shall establish a system that provides a process for reporting, classifying and analyzing Failure Mode, Effects and Criticality Analysis (FMECA) and planning corrective actions in response to those failures. The Contractor shall analyze failure and nonconformance data to identify the frequency and severity of these problems and to assess the need for corrective actions and to prioritize the implementation of corrective actions to prevent recurrence. (MIL-HDBK-2155 may be used for guidance).
C.3.2.4.3 The Contractor shall include a summary of the open FRACAS items in the Monthly Reports and provide a summary at PRs, DRs, and TIMs.
C.3.2.5 Interfaces.
The Contractor shall prepare, deliver and update Interface Control Documentation (ICD) that identify the interface requirements between: Hardware Configuration Items (HWCI) and hardware devices (HWCI to HWCI); Software Configuration Items (SCI) and hardware devices (SCI to HWCI); and HWCI and SCI to systems external to AVCAD IAW ELIN A003. The Contractor shall define and brief the configuration items at PRs, DRs, and TIMs.
C.3.2.6 Computer Resources/Software (SW) IPT.
The Contractor shall establish a bi-weekly joint Government and Contractor Software IPT telecon.
The purpose of these telecons will be to conduct coordinated discussions to include the following topics (at a minimum); Cybersecurity, Program Protection and Common CBRN Sensor Interface (CCSI). The SW IPT will be responsible for maintaining and updating the Software Development Plan (SDP) as process changes and improvements are identified. The SW IPT may be combined with other meetings or reviews as appropriate. The Contractor and Government may mutually agree to cancel a SW IPT due to lack of discussion topics or a review or meeting being held the same month. Agenda topics, meeting minutes, read ahead items, if any, and action items shall be provided IAW ELINs B001 and B002.
C.3.2.6.1 Cybersecurity Support The Contractor shall implement cybersecurity into the design and development of their system. The SW IPT shall function as the single point of contact for interaction between the Government Cybersecurity team and the Contractor. Cybersecurity support will consist of Contractor cybersecurity management IAW C.3.1.10.2, electronic exchange of Risk Management Framework (RMF) technical implementation documentation and discussions to be held at the SW IPT IAW C.3.2.6, where the Contractor will discuss their implementation of RMF security controls and the Government will provide any updates to regulations and policies. The Contractor shall ensure that all system deliverables meet the requirements of DoD Cybersecurity policy and guidance. Security validation shall be accomplished throughout the system life cycle. The Vulnerability Scan Compliance (VSC) Report shall be submitted IAW ELIN A005.
C.3.2.6.2 CCSI Support The Contractor shall incorporate the CCSI standard into their system. The SW IPT (C.3.2.6) shall function as the single point of contact for interaction between the Government CCSI Subject Matter Expert and the Contractor. Support will include electronic exchange of CCSI technical implementation documentation through the SW IPT (C.3.2.6) for discussion of implementation of the CCSI standard with the Government. The latest version of the CCSI standard will be provided after contract award.
C.3.2.7 Modular Open System Approach (MOSA)
C.3.2.7.1 The Contractor shall use a Modular Open Systems Approach (MOSA) to implement a modular design strategy for building the AVCAD. The Contractor shall apply MOSA considerations in the selection of components and subsystems to meet the AVCAD design functionality. A MOSA and analysis of long term supportability (including obsolescence management), interoperability, and growth for future modifications shall be major factors in the Contractor’s final design decisions and integration approach and presented at DRs. All the AVCAD system components and subsystems shall facilitate future upgrades and permit incremental technology insertion to allow for incorporation of additional or substitution of higher performance elements with minimal impact on the existing systems. The “Modular Open Systems Architecture in DoD Acquisition, October 29, 2014” may be used as a reference.
C.3.2.7.2 The Contractor shall ensure that AVCAD modular design and integration preclude dependence on closed or proprietary interface standards, technologies, products or architectures.
The Contractor shall design the AVCAD to provide sufficient growth and open interfaces to allow future reconfiguration and addition of new capabilities without large-scale redesign of the system.
C.3.2.8 Program Risk Management The Contractor shall develop, implement, and deliver, as part of the SEMP (ELIN B007) a Risk Management Plan (RMP) following the concepts in the Risk Management Guide for DoD Acquisition. The Contractor’s RMP shall include all program and system level plans to identify and mitigate program risks in the areas of cost, schedule, and performance.
C.3.2.8.1 The Contractor’s RMP shall address
• Risk Management Strategy and Process
• Responsible/Executing Organization
• Risk Management Process and Procedures
• Risk Identification
• Risk Analysis
• Risk Mitigation Planning
• Risk Mitigation Plan Implementation
• Risk Tracking and Reporting
C.3.2.8.2 Risk management shall be an integral part of all PRs, DRs, TIMs, and bi-weekly telecons.
The Contractor shall systematically identify, analyze, and report risk mitigation activities for all risk areas.
C.3.2.8.3 Uncertainty evaluations shall consider overall program objectives, IMS and operational requirements baseline. The Contractor shall develop mitigation plans to identify the recommended critical path for contract completion and the appropriate risk handling approach to lower the level of uncertainty identified. The Contractor shall recommend decision points in terms of performance, cost, and schedule objectives to facilitate management and technical control. The Contractor shall maintain a database of all risks and their status. Risk reporting shall present standard probability and consequence-screening criteria.
C.3.2.8.4 The Contractor shall establish mechanisms to effectively monitor the introduction of supply chain risk associated with critical components, and implement countermeasures to mitigate such risks, including the application of supply chain risk management best practices, applied as appropriate to the development of the system, and the enumeration of potential suppliers of critical components, as they are identified, including cost, schedule, and performance information and proposed selection decisions for the purposes of obtaining approval from the Government and engaging in the development of mutually agreeable risk management plans for the selected suppliers of critical components. Supply chain risk management key practices may be found in the National Institute of Standards and Technology (NIST) Interagency Report 7622, Notional Supply Chain Risk Management for Federal Information Systems, and the National Defense Industrial Association (2008) guidebook, Engineering for System Assurance.
C.3.2.9 Manufacturing
C.3.2.9.1 Manufacturing Readiness Assessment The Contractor shall conduct assessments of manufacturing risk and readiness and determine Manufacturing Readiness Levels throughout the life of the contract (ELIN B015) using the Manufacturing Readiness Level Deskbook as a guide. The Contractor shall identify high manufacturing risk technologies or components and present appropriate risk analysis and associated maturation plans within the IMS (ELIN B003).
C.3.2.9.2 Manufacturing Plan The Contractor shall prepare and submit a Manufacturing Plan, IAW to ELIN B016.
C.3.2.9.3 The Contractor shall manufacture, package, and deliver hardware as specified. All manufacturing shall be IAW the Contractor’s Manufacturing Plan, Quality Assurance Program Plan, and Configuration Management Plan.
C.3.2.9.4 The Contractor shall address manufacturing at the PDR and CDR.
C.3.2.10 Quality Assurance Program Requirements (All Delivered Hardware and Software).
C.3.2.10.1 The Contractor’s Quality Assurance Program (QAP) shall be certified to the current revision of ISO 9001 or a path to be certified prior to any LRIP options must be provided. The Contractor’s QAP shall be designed to promptly detect, correct and prevent conditions that adversely affect the quality of contract deliverables including documents, services, products, and software.
The Government may perform audits and assessments to assure Contractor ISO 9001 compliance.
C.3.2.10.2 As part of the QAP, the Contractor shall establish, implement, and conduct a software quality program IAW software quality practices identified by the Software Development Plan (SDP). The SDP shall be included as an appendix to the Quality Assurance Program Plan (QAPP) IAW ELIN B017 (C.3.2.10.4). The Contractor shall ensure that the software quality program complies with the requirements of ISO 9001 approved by the Government.
C.3.2.10.3 The software quality program shall address the following areas, at a minimum: software quality planning including resources, software reviews, in-process software evaluations, evaluator independence, verification and validation, record keeping requirements, problem reporting and corrective action, and software quality product and process metrics.
C.3.2.10.4 Contractor Quality Assurance Program Plan (QAPP). The Contractor shall update and maintain the implementation of the QAP in a Quality Assurance Program Plan (QAPP) throughout the life of the contract. Contractor documents referenced in the QAPP shall be provided to the Government upon request. If the Contractor holds a registration certificate for ISO 9001, the Contractor shall include a copy of the registration certificate in the QAPP. If the Contractor does not hold a registration certificate for ISO 9001, the Contractor shall declare it in the QAPP and describe in the QAPP how compliance to the standard shall be demonstrated and maintained. The Contractor shall address and implement Government comments to the Contractor’s QAPP IAW ELIN B017.
C.3.2.11 Configuration Management The Contractor shall implement and maintain a Configuration Management (CM) process, which governs all aspects (hardware and software) of AVCAD development (to include Government Furnished Equipment, Information, and Material) throughout the EMD phase of the systems engineering life cycle. SAE EIA 649B and MIL-HDBK-61A provide guidance. The Contractor shall ensure that the requirements of this CM process are allocated to all levels of organizations internal to the Contractor and its subcontractors to ensure that the basic elements of CM and control are consistent across all members involved and that established baselines are maintained, communicated and understood across all organizations involved. Configuration control of the AVCAD PSpec will be retained by the Government. The Contractor shall manage all prototype design drawings/models, TDP, specification and engineering documentation. The Contractor may request a change to the PSpec through the COR.
C.3.2.11.1 Configuration Management Plan (CMP) The Contractor shall implement and maintain the CM processes and procedures submitted with its proposal. The Contractor shall designate a CM representative to serve as a primary Point of Contact (POC) to the Government for all CM matters. Prototype CM status shall be reported at all DRs. The Contractor shall notify the Government of any changes which affect the Contractor's established CM process. The Contractor shall submit a CMP for Government approval IAW ELIN B009. The approved CMP shall serve as the baseline for all CM activities.
C.3.2.11.2 Engineering Change Proposals (ECP) The Contractor shall provide ECPs IAW ELIN B010. Government approval of an ECP in no way invalidates any contractually required warranty or performance specification unless specifically stated in a contract modification.
C.3.2.11.3 Notice of Revision (NOR) The Contractor shall prepare and submit Notices of Revision (NORs), in conjunction with the ECP submission process, IAW ELIN B011.
C.3.2.11.4 Request for Deviation (RFD) The Contractor shall prepare and submit Requests for Deviation (RFDs) for all hardware changes IAW ELIN B012. Government approval of RFDs in no way invalidates any contractually required warranty or performance specification unless specifically stated in a contract modification.
C.3.2.11.5 Configuration Status Accounting Information The Contractor shall perform configuration management and status accounting of the configuration of all aspects of the AVCAD deliverable hardware IAW the Government approved CMP and the terms of this contract. The Contractor shall ensure that all engineering changes, deviations and use of non-conforming hardware are reflected in the CM documentation IAW ELIN B013. The Contractor's CM Program shall guarantee continuous form, fit, function, and interchangeability of the AVCAD system and auxiliary equipment with the spare and repair parts, and consumable supplies.
C.3.2.11.6 Configuration Control Board (CCB).
The Contractor shall establish a Configuration Control Board (CCB) to review changes and recommend appropriate action prior to approval and implementation. The Contractor shall provide the Government at least a ten (10) working day notice prior to convening the CCB so if the Government chooses a representative may attend in person or via telephone or video conference.
C.3.2.11.7 Material Review Board.
The Contractor shall establish and maintain a Material Review Board (MRB) to determine the acceptance status of nonconforming parts and material used in fabrication of the AVCAD deliverable hardware throughout the life of the contract. The Government may attend all MRBs either in person or via teleconference or video conference.
C.3.2.12 Environmental, Safety, and Occupational Health
C.3.2.12.1 Safety and Occupational Health.
C.3.2.12.1.1 System Safety Engineering Principles.
The Contractor shall follow system safety engineering best-practices and established design standards during the development of the system/subsystem and prototypes.
C.3.2.12.1.2 Safety Assessment Reports (SAR) The Contractor shall provide Safety Assessment Reports (SARs), to summarize safety and health hazard data, provide a comprehensive evaluation of the safety and health risks, and identify procedures/precautions required for safe use of the system/subsystem and prototypes. (ELIN B014).
The Contractor shall use the Hazard Severity and Probability categories and definitions along with the Hazard Risk Index Matrix in the MIL-STD-882E to assign Risk Assessment codes and categorize risk levels. The Contractor shall deliver a SAR 30 calendar days prior to each Government test event.
C.3.2.12.2 Hazardous Materials Management.
The Contractor shall evaluate, plan, and implement a program to eliminate and reduce the use of toxic and hazardous materials in processes and products IAW Executive Order No. 13148. The Contractor shall conduct efforts to minimize, eliminate, and control hazardous/toxic waste materials in AVCAD production. Guidance is available in National Aerospace Standard (NAS) 411, sections 4.2, 4.4, and 5.3.
C.3.2.12.3 Ozone Depleting Substances (ODS).
The Contractor shall avoid or minimize the use of Class II (ODS). (Reference FAR subparts 23.8 through 23.10, US EPA Class II Ozone Depleting Substances, and US EPA TRI Listed Chemicals.
C.3.2.12.4 Hazardous Materials Use.
The Contractor shall develop and implement plans and procedures for the tracking, storing, handling, packaging, transporting, and disposing of such materials and documents when the use of hazardous materials cannot be avoided. In addition, the Contractor shall ensure that the shipping configuration or container, as applicable, be packed to meet all modes of shipment as specified in the most current version of the following required documents: Title 49 Code of Federal Regulations Part 100 thru 180; the International Air Transportation Association (IATA) Dangerous Goods Regulation; the International Maritime Dangerous Good (IMDG) Code; and the AF 24-204/TM 38-250/NAVSUP PUB 505/MCO P4030.19J/DLAI 4145.3 “Preparing Hazardous Materials for Military Air Shipments.” In the event the requirements of this PWS conflict with the respective Regulation stated above for the respective mode of transportation, the Regulation listed above shall take precedence.
When an item is forbidden for shipment IAW the required document for that mode of transportation, the requirements of this PWS for that particular mode of transportation are not applicable.
C.3.2.12.5 Material Safety Data Sheets.
The Contractor shall provide material safety data sheets (OSHA Form 20) for known hazardous materials, to include ozone-depleting substances. (Reference: FAR subpart 23.3.)
C.3.2.12.6 Use of Recoverable Materials and Environmentally Preferable and Energy Efficient Products and Services.
The Contractor shall use environmentally preferable, recycled, or recovered materials that exceed or meet the operational and maintenance requirements as well as reduce life-cycle cost to the maximum extent possible. (Reference Executive Order 13101 and FAR subparts 23.4 and 23.7.)
C.3.2.13 Technical Support
C.3.2.13.1 General Technical Support. The Contractor shall provide technical support such as testing, data collection, engineering, training, and sustainment when identified.
C.3.2.13.2 Refurbishments/Upgrades. The Contractor shall perform system refurbishments or upgrades, or perform analysis to determine the scope of refurbishments or upgrades, when identified.
C.3.2.13.3 Repairs. The Contractor shall perform repairs, or perform analysis to determine the scope of repair, when identified.
C.3.2.13.4 Technical Documents. The Contractor shall prepare technical documents and update existing documents when identified. Technical documents include documents such as test plans, test reports, operating procedures, maintenance manuals, and training lesson plans.
C.3.2.13.5 Obsolescence. The Contractor shall notify the Government of any obsolescence risks pertinent to continued production and support of the AVCAD and related items as they may arise during the contract. The notification to the Government shall describe the issue in detail, including the following information:
• Full identification of the item
• A complete description of the item's role and criticality within the AVCAD program,
• Current item cost,
• Existence of substitutable items and associated costs (to include retesting),
• The expected date of the affected item's unavailability,
• The number of items known to be available in supplier stockpiles,
• The usage forecasts for the remainder of the AVCAD program (including option period),
• Suggested item stockpile management strategy
• Recommendation for path forward, to include all associated costs
C.3.2.14 Pursual of Performance Objectives During the course of the contract, the Government may request and the Contractor may submit, proposals under FAR 52.243-2, Alt IV to pursue performance specification objective requirements which may improve performance, reduce the unit price, or reduce sustainment costs of the AVCAD.
C.4 EMD AVCAD Customer Test
C.4.1 The Government will initially evaluate the AVCAD equipped with two different aerosol sampling approaches. The results of agent chamber testing will inform a decision of which aerosol approach to be incorporated into the design and delivered with EMD hardware. The Government will also evaluate AVCAD system algorithm performance.
C.4.2 The Contractor shall provide all necessary material, supplies, and manufacturing services to produce and deliver three (3) AVCAD systems meeting at least Technology Readiness Level (TRL) 6, with lab personnel training. The AVCAD systems delivered shall include all accessories required for external power and communications. (CLIN 0001)
C.4.3 The Contractor shall provide all necessary material, supplies, and manufacturing services to produce and deliver three (3) AVCAD systems that have an alternative Aerosol Approach meeting at least TRL 4, with lab personnel training. The AVCAD systems delivered shall include all accessories required for external power and communications. (CLIN 0002).
C.4.4 CLIN 0001 and CLIN 0002 shall be delivered four (4) months after contract option award.
C.4.5 The detectors delivered in CLIN 0001 and CLIN 0002 will undergo CWA chamber testing for one hundred sixty (160) hours and shipboard false alarm testing for thirty (30) hours. The government, upon completion of the customer test, may elect to require upgrades to the prototypes prior to additional customer testing.
C.4.6 System Support Package The Contractor shall identify to the Government all Preventive Maintenance Checks and Services (PMCS) and calibrations that may be required during the course of testing. The Contractor shall provide a System Support Package List (SSPL), as part of the proposal for CLIN 0003, which details all consumables and operator repair parts recommended for supporting for six (6) AVCADs for testing (see C.4.5). The Contractor shall supply the parts listed in the SSPL as a system support package. CLIN 0003 will deliver together with CLIN 0001 and CLIN 0002.
C.5 OPTION 1: EMD AVCAD HARDWARE
C.5.1 First AVCAD EMD Hardware Delivery
C.5.1.1 The Contractor shall provide all necessary material, supplies, and manufacturing services to produce and deliver sixty (60) AVCAD systems, each system in a reusable carrying case with one
(1) User Guide or Operator Manual in each case IAW the AVCAD PSPEC (Attachment 1) and this PWS. The AVCAD systems delivered shall include all accessories required for external power and communications. The delivery of sixty (60) AVCAD shall be four (4) months after contract option award. CLIN 0004AA
C.5.1.2 The following table shows the test hours associated with the Production Qualification Test (PQT) events.
PQT Events
Number of
Systems Scheduled for Test
Test Duration
Days
Hours per Test day
Maximum Test
Hours
Chemical Chamber Testing 24 120 10 28,800
Environmental False Alarm/Interoperability 6 35 24 5,040 Cybersecurity -CVPA 2 10 10 200 Coastal Operation Service Life 3 90 24 6,480 Physical Characteristics/ Signature Test 9 5 8 360
MIL-STD-810* 9 45 8 3,240
Shipboard Operations 4 10 8 320 Chemical Biological Radiological Contamination Survivability (CBRCS)* 4 30 10 1,200 Electromagnetic Survivability 6 30 8 1,440 Natural Desert Environmental Storage 3 2 8 48 Platform Integration* 6 10 8 480 Explosive Atmosphere/Battery Venting* 2 10 8 160 Rotary Wing Compatibility 3 2 8 36 Fixed Wing Compatibility* 3 2 8 36 Mil-S 901D Ship Shock Test & Mil-Std 167- 1 Vibration Test* 2 5 8 80 Logistics/Maintenance Demonstration* 6 10 8 480 Post Field Chemical Chamber Testing* 12 60 10 7,200
Total PQT Hours 55,600
* These systems are in multiple tests.
C.5.1.3 The Contractor shall identify to the Government all Preventive Maintenance Checks and Services (PMCS) and calibrations that may be required during the course of testing.