About this file

Exhibit A CDRLS

View the file

Other files

File Type Posted
Government_Response_10_May.pdf PDF
NGCD1_AVCAD_Amendment__27_April_2018.pdf PDF
A07_Attachment_9_Cost_Template_Feb_2018_.xlsx XLSX spreadsheet
Attachment_4_-_40051-2C_TABLE_A-IV_TM_3-6665-441-23_and_P.XLSX XLSX spreadsheet
Attachment_3_-_40051-2C_TABLE_A-II_TM_3-6665-441-10.xlsx XLSX spreadsheet
Attachment_11_-_DDForm254_AVCAD_17_Aug_17_Signed.pdf PDF
Attachment_9_7th_BETA_NGCD_1_Cost_Template,_.xlsx XLSX spreadsheet
Attachment_12_-_Past_Performance_Questionnaire_01_Aug_2017_.docx DOCX document
Attachment_10_-_Small_Business_Participation_Proposa_01_Aug_2017_l.docx DOCX document
Attachment_5_-_40051-2C_TABLE_A-III_TM_3-6665-441-40.xlsx XLSX spreadsheet
Attachment_1_-_AVCAD_Performance_Specification_29AUG2017.pdf PDF
W911SR-17-R-0005_RFP_NGCD1_AVCAD_21_Sep_2017.pdf PDF
Attachment_2_-_AVCAD_Logistics_Product_Data_Selection_Worksheet.pdf PDF
NGCD_1_Technical_Slides.pptx PPTX presentation
NGCD_1_FPI(S)_Basics.pdf PDF
Government_response_to_Questions_27_July_2017.pdf PDF
A02_Attachment_4_Field_Maintenance_Manual.xlsx XLSX spreadsheet
CDRLs_5_Jul_2017.pdf PDF
A02_Attachment_9_Cost_Template.xlsx XLSX spreadsheet
A02_SECTION_L_5_July.pdf PDF
Attachment_1_Pspec_29JUN2017.pdf PDF
A02_Attachment_3_Operator's_Maintenance_Manual_.xlsx XLSX spreadsheet
B02_Section_M_7_July.pdf PDF
A02_Attachment_2_-_Logistics_Product_Data_Selection_Worksheet.pdf PDF
Draft_RFP.pdf PDF
A02_Section_B_30_June_2017.xlsx XLSX spreadsheet
A02_Attachment_10_Small_Business_Participation_Proposal_(Sample_Format).pdf PDF
A02Attachment_5_Depot_Maintenance_Manual.xlsx XLSX spreadsheet
Government_Response.pdf PDF
Government_Response.pdf PDF
13-Draft_AVCAD_section_L_2017420.pdf PDF
NGCD1_AVCAD_Questions_and_Responses.xlsx XLSX spreadsheet
13-Draft_AVCAD_section_L_2017420.pdf PDF
17-Draft_AVCAD_Section_M_20170420.pdf PDF
5-Attachment_1_-_Draft_AVCAD_Performance_Specification_20_Apr_2017.pdf PDF
4-Draft_AVCAD_Section_C_-_PWS_20170420.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-2, JUN 90 Previous editions are obsolete Page 1 of 31

CONTRACT DATA REQUIREMENTS LIST

(2 Data Items)

FORM APPROVED

OMB No. 0704-0188

Public reporting burden for this collection is estimated to average 330 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to DoD, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No.

Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY TDP TM_______ OTHER __X_

D. SYSTEM/ITEM

Aerosol and Vapor Chemical Agent Detector (AVCAD)

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Design Review Information Package (DRIP)

3. SUBTITLE

Preliminary Design Review Data Package

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81757A

5. CONTRACT REFERENCE

C.3.1.8.1

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

No

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

R/ASR

12. DATE OF FIRST SUBMISSION

15 calendar days prior to PDR

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

5 calendar days after receipt of Government comments

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/. Only include sections 5 and 6.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is included in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/)

14. Submit in electronic format in Microsoft Office 2013 and PDF to Contract Specialist, Jemel Hogan, jemel.m.hogan.civ@mail.mil and COR, Mobil Kolbon, mobil.w.kolbon.civ@mail.mil .

SFAE-CBD-NBC-S

CCAP-SCE 0 1 0

15. TOTAL

17. PRICE GROUP

18. ESTIMATED TOTAL PRICE

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C. CATEGORY TDP TM_______ OTHER _x__

A002

2. TITLE OF DATA ITEM

Design Review Information Package (DRIP)

3. SUBTITLE

Critical Design Review Data Package

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81757A

5. CONTRACT REFERENCE

C.3.1.8.2

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

15 calendar days prior to CDR

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Government comments

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/. Only include sections 8 and 9.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is included in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/) 14 Submit in electronic format in Microsoft Office 2013 and PDF to Contract

G. PREPARED BY

Mobil Kolbon

H. DATE

11/7/16

I. APPROVED BY

Lou Kosydar

J. Date http://quicksearch.dla.mil/ http://www.dtic.mil/whs/directives mailto:jemel.m.hogan.civ@mail.mil mailto:mobil.w.kolbon.civ@mail.mil http://quicksearch.dla.mil/ http://www.dtic.mil/whs/directives mailto:jemel.m.hogan.civ@mail.mil mailto:mobil.w.kolbon.civ@mail.mil

DD FORM 1423-2, JUN 90 Previous editions are obsolete Page 2 of 31

(2 Data Items)

FORM APPROVED

OMB No. 0704-0188

Public reporting burden for this collection is estimated to average 330 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to DoD, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No.

Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A003

2. TITLE OF DATA ITEM

Interface Control Document (ICD)

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81248B

5. CONTRACT REFERENCE

C.3.2.5

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

R/ASR

12. DATE OF FIRST SUBMISSION

30 Calendar Days Prior to Each Hardware Delivery

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

10 calendar days after receipt of Government comments

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is included in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/)

10. Revise and re-submit for any changes to the Government approved file or as requested by the Government.

14. Submit in electronic format in Microsoft Office 2013 and PDF to Contract

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A004

2. TITLE OF DATA ITEM

Contractor’s Corrective Action Plan

DI-MGMT-80501

5. CONTRACT REFERENCE

C.10.9.3.4

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

R/ASR

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

N/A

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/.

Additionally, the report shall contain financial expenditures for the current month and cumulatively by work breakdown structure.

9. Distribution guidance is included in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/)

12. Submit 15 calendar days after Systemic Defect Coverage is invoked per PWS pagragraph C.19.3.

14. Submit in electronic format in Microsoft Office 2013 and PDF to Contract

DCMA 0 1 0

Mobil Kolbon

H. DATE

11/7/16

I. APPROVED BY

Lou Kosydar

J. DATE

mailto:jemel.m.hogan.civ@mail.mil mailto:mobil.w.kolbon.civ@mail.mil http://quicksearch.dla.mil/ http://www.dtic.mil/whs/directives

DD FORM 1423-2, JUN 90 Previous editions are obsolete Page 3 of 31

(2 Data Items)

FORM APPROVED

OMB No. 0704-0188

Public reporting burden for this collection is estimated to average 330 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to DoD, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No.

Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A005

2. TITLE OF DATA ITEM

Vulnerability Scan Compliance (VSC) Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81842

5. CONTRACT REFERENCE

C.3.2.6.1

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

No

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

R/ASR

12. DATE OF FIRST SUBMISSION

60 Calendar Days Prior to Each Hardware Delivery

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

See Block 16 Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is included in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/)

13. Final submission shall be 15 Calendar Days Prior to Each Hardware Delivery.

14. Submit in electronic format in Microsoft Office 2013 and PDF to Contract

A006

2. TITLE OF DATA ITEM

EQUIPMENT FAILURE INFORMATION

REPORT (EFIR)

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80359

5. CONTRACT REFERENCE

C.10.9.2.3

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

No

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

Refer to Block 16

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is included in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/)

12. Submit after the warranty repair finish

14. Submit in electronic format in Microsoft Office 2013 and PDF to Contract

H. DATE

11/7/16

I. APPROVED BY

Lou Kosydar

J. Date mailto:jemel.m.hogan.civ@mail.mil mailto:mobil.w.kolbon.civ@mail.mil http://quicksearch.dla.mil/ http://www.dtic.mil/whs/directives

DD FORM 1423-2, JUN 90 Previous editions are obsolete Page 4 of 31

(1 Data Item)

FORM APPROVED

OMB No. 0704-0188

Public reporting burden for this collection is estimated to average 330 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to DoD, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No.

Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

B

B001

2. TITLE OF DATA ITEM

Presentation Material

3. SUBTITLE

Agenda & Read-Ahead Information

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81373

5. CONTRACT REFERENCE

C.3.1.2, C.3.1.6, C.3.1.7, C.3.1.8.1, C.3.1.8.2, C.3.1.9,C.3.2.6, C.5.1.3, C.5.3.2, C.5.7.6, C.16.2

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

No

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

R/ASR

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Government comments

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/.

8. The Government will respond with comments or approval within 2 calendar days after receipt.

9. Distribution guidance is included in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/)

10. & 12. Meeting agendas and read-ahead information shall be submitted 7 calendar days prior to meetings or reviews. Agendas and read-ahead information for telecons shall be submitted 48 hour in advance.

14. Submit in electronic format in Microsoft Office 2013 and PDF to Contract

H. DATE

11/7/16

I. APPROVED BY

Lou Kosydar

DD FORM 1423-2, JUN 90 Previous editions are obsolete Page 5 of 31

(2 Data Items)

FORM APPROVED

OMB No. 0704-0188

Public reporting burden for this collection is estimated to average 330 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to DoD, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No.

Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

B002

2. TITLE OF DATA ITEM

Report, Record of Meeting/Minutes

3. SUBTITLE

Meeting Minutes

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81505

5. CONTRACT REFERENCE

C.3.1.2, C.3.1.6, C.3.1.7, C.3.1.8.1, C.3.1.8.2, C.3.1.9, C.3.2.6, C.5.1.3, C.5.3.2, C.5.7.6, C.16.2

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

R/ASR

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Government comments

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/)

10. & 12. Meeting minutes shall be submitted within 5 calendar days following a meeting or review. Meeting minutes for telecons shall be submitted 48 hours after.

14 Submit in electronic format in Microsoft Office 2013 and PDF to Contract

B003

2. TITLE OF DATA ITEM

Integrated Program Management Report

(IPMR)

3. SUBTITLE

Integrated Master Schedule

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81861A

5. CONTRACT REFERENCE

C.3.1.4, C.3.2.9.1

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

R/ASR

12. DATE OF FIRST SUBMISSION

Start of Work Meeting

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

See block 16 Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/.

Format 6 applies

8. The Government will review and provide comments at Integrated Baseline Reviews and monthly as to reporting level, content, and dependencies. Contractor shall address Government comments in subsequent submissions.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/)

13. Submit revised drafts 10 Calendar Days receipt of Government comments and as needed.

14 Submit in electronic format in Microsoft Office 2013 and PDF to Contract

H. DATE

11/7/16

I. APPROVED BY

Lou Kosydar mailto:mobil.w.kolbon.civ@mail.mil http://www.dtic.mil/whs/directives

DD FORM 1423-2, JUN 90 Previous editions are obsolete Page 6 of 31

(1 Data Item)

FORM APPROVED

OMB No. 0704-0188

Public reporting burden for this collection is estimated to average 330 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to DoD, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No.

Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

B004

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

Monthly Status Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A

5. CONTRACT REFERENCE

C.3.1.5.1

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

MONTHLY

12. DATE OF FIRST SUBMISSION

By the 10th of the month following contract award

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil.

Additionally, the report shall contain a monthly spend plan, and financial expenditures for the current month and cumulatively by work breakdown structure.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/)

14. Submit in electronic format in Microsoft Office 2013 and PDF to Contract

Mobil Kolbon

H. DATE

11/7/16

I. APPROVED BY

Lou Kosydar

DD FORM 1423-2, JUN 90 Previous editions are obsolete Page 7 of 31

(1 Data Item)

FORM APPROVED

OMB No. 0704-0188

Public reporting burden for this collection is estimated to average 330 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to DoD, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No.

Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

B005

2. TITLE OF DATA ITEM

Program Protection Implementation Plan (PPIP)

DI-ADMN-81306

5. CONTRACT REFERENCE

C.3.1.10.1, C3.1.10.2

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

No

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

R/ASR

12. DATE OF FIRST SUBMISSION

30 Calendar Days After Contract Award

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Government comments

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/)

10. Revise and re-submit for any changes to the Government approved report or as requested by the Government.

14 Submit in electronic format in Microsoft Office 2013 and PDF to Contract

H. DATE

11/7/16

I. APPROVED BY

Lou Kosydar

DD FORM 1423-2, JUN 90 Previous editions are obsolete Page 8 of 31

(2 Data Items)

FORM APPROVED

OMB No. 0704-0188

Public reporting burden for this collection is estimated to average 330 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to DoD, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No.

Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

1. DATA ITEM NO

B006

2. TITLE OF DATA ITEM

Operation Security (OPSEC) Plan

DI-MGMT-80934C

5. CONTRACT REFERENCE

C.3.1.10.6

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

R/ASR

12. DATE OF FIRST SUBMISSION

Refer to Block 16

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

15 days after receipt of Government comments

Draft Reg Repro

16. REMARKS.

4. The DID may be obtained at: http://quicksearch.dla.mil/.

8. The Government will respond with comments or approval within 15 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/)

12. & 13. Submit 90 calendar days after contract award.

14. Submit in electronic format in Microsoft Office 2013 and PDF to Contract

B007

2. TITLE OF DATA ITEM

Systems Engineering Management Plan (SEMP)

DI-SESS-81785A

5. CONTRACT REFERENCE

C.3.2.1, C.3.2.8, C.5.4.4, C.5.5

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

R/ASR

12. DATE OF FIRST SUBMISSION

60 calendar days after contract award

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Government comments

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/)

10. Revise and re-submit for any changes to the Government approved report or as requested by the Government.

14. Submit in electronic format in Microsoft Office 2013 and PDF to Contract

H. DATE

11/7/16

I. APPROVED BY

Lou Kosydar mailto:mobil.w.kolbon.civ@mail.mil http://www.dtic.mil/whs/directives

DD FORM 1423-2, JUN 90 Previous editions are obsolete Page 9 of 31

(2 Data Items)

FORM APPROVED

OMB No. 0704-0188

Public reporting burden for this collection is estimated to average 330 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to DoD, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No.

Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

B008

2. TITLE OF DATA ITEM

Technical Report – Study/Services

3. SUBTITLE

Requirements Compliance Matrix (RCM)

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B

5. CONTRACT REFERENCE

C.3.2.2

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

R/ASR

12. DATE OF FIRST SUBMISSION

30 calendar days after contract award

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Government comments

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.2.

(http://www.dtic.mil/whs/directives/)

10. Revise and re-submit for any changes to the Government approved matrix or as requested by the Government.

14 Submit in electronic format in Microsoft Office 2013 and PDF to Contract

B009

2. TITLE OF DATA ITEM

Configuration Management Plan

(CMP) (MIL-STD-3046)

DI-SESS-81875

5. CONTRACT REFERENCE

C.3.2.11.1

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

60 calendar days after contract award

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Government comments

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/)

10. Revise and re-submit for any changes to the Government approved report or as requested by the Government.

14. Submit in electronic format in Microsoft Office 2013 and PDF to Contract

H. DATE

11/7/16

I. APPROVED BY

Lou Kosydar mailto:jemel.m.hogan.civ@mail.mil mailto:mobil.w.kolbon.civ@mail.mil http://www.dtic.mil/whs/directives

DD FORM 1423-2, JUN 90 Previous editions are obsolete Page 10 of 31

(2 Data Items)

FORM APPROVED

OMB No. 0704-0188

Public reporting burden for this collection is estimated to average 330 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to DoD, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No.

Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C. CATEGORY TDP X TM_______ OTHER ___

B010

2. TITLE OF DATA ITEM

Engineering Change Proposal

(ECP)

DI-SESS-80639D

5. CONTRACT REFERENCE

C.3.2.11.1

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

Refer to block 16

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Resubmission is not required unless requested by the Configurarion Control Board.

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/) 10 & 12 Submit immediately when design/process changes that impact the spares and the form, fit and function of the approved AVCAD baseline configuration are proposed.

14. Submit in electronic format in Microsoft Office 2013 and PDF to Contract

H. DATE

11/7/16

I. APPROVED BY

Lou Kosydar

DD FORM 1423-2, JUN 90 Previous editions are obsolete Page 11 of 31

(2 Data Items)

FORM APPROVED

OMB No. 0704-0188

Public reporting burden for this collection is estimated to average 330 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to DoD, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No.

Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C. CATEGORY TDP x TM_______ OTHER ___

B011

2. TITLE OF DATA ITEM

Notice of Revisiion (NOR)

DI-SESS-80642D

5. CONTRACT REFERENCE

C.3.2.11.3,

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

Refer to Block 16

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Resubmission is not required unless requested by the CCB

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/) 10 & 12 Submit immediately when design/process changes that impact the spares and the form, fit and function of the approved AVCAD baseline configuration are proposed.

14 Submit in electronic format in Microsoft Office 2013 and PDF to Contract

B012

2. TITLE OF DATA ITEM

Request for Variance (RFV)

3. SUBTITLE

Request for Deviation (RFD)

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80640D

5. CONTRACT REFERENCE

C.3.2.11.4

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

Refer to block 16

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Resubmission not required unless requested by the CCB

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/) 10 & 12 Submit immediately when design/process changes that impact the spares and the form, fit and function of the approved AVCAD baseline configuration are proposed.

14. Submit in electronic format in Microsoft Office 2013 and PDF to Contract

H. DATE

11/7/16

I. APPROVED BY

Lou Kosydar mailto:mobil.w.kolbon.civ@mail.mil http://www.dtic.mil/whs/directives

DD FORM 1423-2, JUN 90 Previous editions are obsolete Page 12 of 31

(2 Data Items)

FORM APPROVED

OMB No. 0704-0188

Public reporting burden for this collection is estimated to average 330 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to DoD, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No.

Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C. CATEGORY TDP x TM_______ OTHER ___

B013

2. TITLE OF DATA ITEM

Configuration Status Accounting (CSA) Information

DI-SESS-81253C

5. CONTRACT REFERENCE

C.3.2.11.5

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

Refer to Block 16

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Government comments

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/) 10 & 12 Submit immediately when design/process changes that impact the spares and the form, fit and function of the approved AVCAD baseline configuration are proposed.

14. Submit in electronic format in Microsoft Office 2013 and PDF to Contract

H. DATE

11/7/16

I. APPROVED BY

Lou Kosydar

DD FORM 1423-2, JUN 90 Previous editions are obsolete Page 13 of 31

(2 Data Items)

FORM APPROVED

OMB No. 0704-0188

Public reporting burden for this collection is estimated to average 330 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to DoD, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No.

Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C. CATEGORY TDP TM_______ OTHER __x_

B014

2. TITLE OF DATA ITEM

Safety Assessment Report (SAR)

DI-SAFT-80102C

5. CONTRACT REFERENCE

C.3.2.12.1.2

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

30 calendar days prior to start of Government testing.

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Government comments.

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/)

14. Submit in electronic format in Microsoft Office 2013 and PDF to Contract

B015

2. TITLE OF DATA ITEM

Assessment of Manufacturing Risk and Readiness

3. SUBTITLE

Manufacturing Readiness Assessment (MRA)

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81974

5. CONTRACT REFERENCE

C.3.2.9.1

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

R/ASR

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Government comments

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/.

Contractor format.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/)

10. Revise and re-submit for any changes to the Government approved matrix or as requested by the Government.

12. Contractor shall submit incremental MRAs 15 calendar days prior to Design Reviews.

14. Submit in electronic format in Microsoft Office 2013 and PDF to Contract

H. DATE

11/7/16

I. APPROVED BY

Lou Kosydar mailto:jemel.m.hogan.civ@mail.mil mailto:mobil.w.kolbon.civ@mail.mil http://quicksearch.dla.mil/ http://www.dtic.mil/whs/directives

DD FORM 1423-2, JUN 90 Previous editions are obsolete Page 14 of 31

(2 Data Items)

FORM APPROVED

OMB No. 0704-0188

Public reporting burden for this collection is estimated to average 330 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to DoD, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No.

Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C. CATEGORY TDP TM_______ OTHER x

B016

2. TITLE OF DATA ITEM

Manufacturing Plan

DI-MGMT-81889

5. CONTRACT REFERENCE

C.3.2.892

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

Refer to Block 16

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Government comments

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/) 10 & 12 Submit immediately when design/process changes that impact the spares and the form, fit and function of the approved AVCAD baseline configuration are proposed.

14. Submit in electronic format in Microsoft Office 2013 and PDF to Contract

B017

2. TITLE OF DATA ITEM

Quality Assurance Program Plan

(QAPP)

DI-QCIC-81794 NOT 1

5. CONTRACT REFERENCE

C.3.2.10.2, C.3.2.10.4

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

30 calendar days prior to start of Government testing.

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Government comments.

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/)

14. Submit in electronic format in Microsoft Office 2013 and PDF to Contract

H. DATE

11/7/16

I. APPROVED BY

Lou Kosydar mailto:jemel.m.hogan.civ@mail.mil mailto:mobil.w.kolbon.civ@mail.mil http://quicksearch.dla.mil/ http://www.dtic.mil/whs/directives

DD FORM 1423-2, JUN 90 Previous editions are obsolete Page 15 of 31

(2 Data Items)

FORM APPROVED

OMB No. 0704-0188

Public reporting burden for this collection is estimated to average 330 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to DoD, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No.

Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

B018

2. TITLE OF DATA ITEM

Intergrated Program management Report (IPMR)

3. SUBTITLE

Work Breakdown Structure

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81861A

5. CONTRACT REFERENCE

C.3.1.4

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

Start of Work Meeting

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Government comments

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil. Format 1 applies.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/)

14. Submit in electronic format in Microsoft Office 2013 and PDF to Contract

H. DATE

4/5/17

I. APPROVED BY

Lou Kosydar

4/5/17

FORM APPROVED

OMB No. 0704-0188

Public reporting burden for this collection is estimated to average 330 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to DoD, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No.

Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

B019

2. TITLE OF DATA ITEM

Intergrated Program management Report (IPMR)

3. SUBTITLE

Integrated Master Plan (IMP)

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81861A

5. CONTRACT REFERENCE

C.3.1.4

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

60 Days After Contract Award

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Government comments

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil. Format 5 applies.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/)

14. Submit in electronic format in Microsoft Office 2013 and PDF to Contract

H. DATE

4/5/17

I. APPROVED BY

Lou Kosydar

4/5/17 mailto:jemel.m.hogan.civ@mail.mil mailto:mobil.w.kolbon.civ@mail.mil http://quicksearch.dla.mil/ http://www.dtic.mil/whs/directives

DD FORM 1423-2, JUN 90 Previous editions are obsolete Page 16 of 31

FORM APPROVED

OMB No. 0704-0188

Public reporting burden for this collection is estimated to average 330 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to DoD, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No.

Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C

C001

2. TITLE OF DATA ITEM

Technical Report – Study/Services

Interim Allowance List.

DI-MISC-80508B

5. CONTRACT REFERENCE

C.5.6.4.4

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

Refer to Block 16

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Government comments

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/) 10 & 12.The Contractor shall provide the Interim Allowance List 30 calendar days prior to the Provisioning Conference Review. Should this data deliverable require revision after initial delivery, the Contractor shall update and redeliver.

14. Submit in editable electronic format in Microsoft Office 2013 and PDF to Contract

C002

2. TITLE OF DATA ITEM

Provisioning Parts List (PPL)

DI-SESS-81715

5. CONTRACT REFERENCE

C.5.6.3.1

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

Refer to Block 16

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Government comments.

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/) 10 Submit immediately when design/process changes that impact the spares and the form, fit and function of the approved AVCAD baseline configuration are proposed.

12.The Contractor shall provide a PPL thirty (30) calendar days prior to the Provisioning Conference Review. Should this data deliverable requirerevision after initial delivery, the Contractor shall update and redeliver.

14. Submit in electronic format in Microsoft Office 2013 and PDF to Contract

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE

H. DATE

11/7/16

I. APPROVED BY

Lou Kosydar mailto:jemel.m.hogan.civ@mail.mil mailto:mobil.w.kolbon.civ@mail.mil http://www.dtic.mil/whs/directives

DD FORM 1423-2, JUN 90 Previous editions are obsolete Page 17 of 31

FORM APPROVED

OMB No. 0704-0188

Public reporting burden for this collection is estimated to average 330 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to DoD, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No.

Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C003

2. TITLE OF DATA ITEM

Logistics Product Data Summaries

LSA-004, Maintenance Allocation Chart

DI-SESS-81759A

5. CONTRACT REFERENCE

C.5.6.3.1.8

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

Refer to Block 16

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Government comments

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/) 10 Submit immediately when design/process changes affect the current baseline.

12. The Contractor shall provide Logistics Product Data Summaries 60 calendar days before Production Qualification Test (PQT)

14. Contractor format is not acceptable. Submit in electronic format in an editable electronic format, Microsoft Office 2013 and PDF to Submit in electronic format in Microsoft Office 2013 and PDF to Contract Specialist, Jemel Hogan, jemel.m.hogan.civ@mail.mil and COR, Mobil Kolbon, mobil.w.kolbon.civ@mail.mil .

in format prescribed by MIL-STD-40051-2C and supported by approved LPD.

C004

2. TITLE OF DATA ITEM

Logistics Product Data Summaries

3. SUBTITLE

Functional Group Codes (FGC)

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81759A

5. CONTRACT REFERENCE

C.5.6.3.1.9

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

Refer to Block 16

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Government comments.

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/) 10 Submit immediately when design/process changes that impact the current FGC baseline.

12.The Contractor shall provide a FGC thirty (30) calendar days prior to the Provisioning Conference Review. Should this data deliverable requirerevision after initial delivery, the Contractor shall update and redeliver.

14. Submit in electronic format in Microsoft Office 2013 and PDF to Contract

H. DATE

11/7/16

I. APPROVED BY

Lou Kosydar mailto:jemel.m.hogan.civ@mail.mil mailto:mobil.w.kolbon.civ@mail.mil http://www.dtic.mil/whs/directives

DD FORM 1423-2, JUN 90 Previous editions are obsolete Page 18 of 31

FORM APPROVED

OMB No. 0704-0188

Public reporting burden for this collection is estimated to average 330 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to DoD, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No.

Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

C005

2. TITLE OF DATA ITEM

Engineering Data for Provisioning (EDFP)

DI-SESS-81874

5. CONTRACT REFERENCE

C.5.6.3.2

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

Refer to Block 16

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Government comments

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/.

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/) 10 Submit immediately when design/process changes the current baseline for SDFP and EDFP.

12.The Contractor shall provide the SDFP and EDFP thirty (30) calendar days prior to the Provisioning Conference Review. Should this data deliverable require revision after initial delivery, the Contractor shall update and redeliver.

14. Submit in editable electronic format in Microsoft Office 2013 and PDF to Contract mobil.w.kolbon.civ@mail.mil .to the COR.

C006

2. TITLE OF DATA ITEM

Technical Report - Study/Services

3. SUBTITLE

Selected Essential Item Stockage to Availability Method (SESAME) report

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B

5. CONTRACT REFERENCE

C.5.6.4.3

6. REQUIRING OFFICE

JPM-NBC-CA (SFAE-CBD-NBC-S)

7. DD 250 REQ

NO

9. DIST

STATEMENT

REQUIRED

C

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

Refer to Block 16

14. DISTRIBUTION

a. Addressee b. COPIES

FINAL

8. APP CODE

Government comments.

Draft Reg Repro

16. REMARKS.

4. DID may be obtained from http://quicksearch.dla.mil/

8. The Government will respond with comments or approval within 10 calendar days after receipt.

9. Distribution guidance is provided in DoDI 5230.24.

(http://www.dtic.mil/whs/directives/) 10 & 12.The Contractor shall provide the SESAME report thirty (30) calendar days prior to the Provisioning Conference Review. Should this data deliverable require revision after initial delivery, the Contractor shall update and redeliver.

14. Submit in editable electronic format in Microsoft Office 2013 and PDF to Contract

H. DATE

11/7/16

I. APPROVED BY

Lou Kosydar mailto:mobil.w.kolbon.civ@mail.mil http://www.dtic.mil/whs/directives

DD FORM 1423-2, JUN 90 Previous editions are obsolete Page 19 of 31

FORM APPROVED

OMB No. 0704-0188

Public reporting burden for this collection is estimated to average 330 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .