TE 5.13-002

View the file

Other files

File Type Posted
Special_Notice___Sources_Sought___Benning_BASOPS_20_Mar_18.docx DOCX document
SOURCES_SOUGHT_15_Nov_17.pdf PDF
Amendment__0002_W911SF-16-R-0012_Benning_BASOPS_13_Oct_17.pdf PDF
Amendment__0001_W911SF-16-R-0012_Benning_BASOPS_8_Sep_17.pdf PDF
TE_5.2-026_Mas_Fire_Alarm_Schedule_as_of_01April2013.xlsx XLSX spreadsheet
TE_5.2-027_Traffic_Light_Control_List.xlsx XLSX spreadsheet
TE_1-010-_Environmental_Reports.xls XLS spreadsheet
TE_5.2-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE_1-012-_Invoice_Register.docx DOCX document
TE_5.1-003-_Labor_Hours_for_IJO's_by_Craft.xls XLS spreadsheet
TE_5.10-007-_Chiller_Building_List.xls XLS spreadsheet
Technical_Exhibit_5.13-005_Operational_Inspection_Checklist.docx DOCX document
TE_5.2-024_SUPRESSION_LIST.xlsx XLSX spreadsheet
TE_5.2-021_-_Signal_Ground_Reference_Subsystem_Crecklist_For_Existing_Facilities.docx DOCX document
Technical_Exhibit_5.13-001_Chiller_Equipment.docx DOCX document
TE_5.2-020_-_Ground_Fault_Protection_Subsystem_Checklist_For_Existing_Facilities_-.docx DOCX document
TE_1-005-_Examples_of_Training_Courses.doc DOC document
TE_5.2-002-_List_of_Memorials.doc DOC document
TE_5.2-023_Fire_Sprinkler_system.xlsx XLSX spreadsheet
TE_5.3-002-_Dining_Facility_Equip.,_PMCS,_and_Repair_rev_by_amendment.doc DOC document
TE_5.5-004-_List_of_Buildings_Requiring_Monthly_Filter_Chang.xls XLS spreadsheet
TE_5.2-005-_Bldgs._Designated_for_Roof_Truss_Inspection.xls XLS spreadsheet
Technical_Exhibit_5.13-002a_Chiller_Data.docx DOCX document
Technical_Exhibit_5.13-007_Governmnet_Furnished_Property.docx DOCX document
TE_5.4-005-_Operating_Checklist_for_Peak_Shaving_Plant_(old).doc DOC document
TE_5_12-001-Workload_Data.xls XLS spreadsheet
TE_5.4-004a-_Propane_Storage_Tanks-_Camp_Merrill.xls XLS spreadsheet
TE_5.2-022_-_Shielding_Subsystem_Checklist_For_Existing_Facilities.docx DOCX document
TE_5.12-002_Cemeteries_Locations.xls XLS spreadsheet
TE_1-006-_TNG_Density.xls XLS spreadsheet
Technical_Exhibit_5.13-008_Chiller_Annual_Maintenance_Checklist.docx DOCX document
TE_5.6-002_List_of_Memorials.xlsx XLSX spreadsheet
TE_5.7-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE5.12-006b_Columbarium_Numbering.docx DOCX document
TE_1-002-_Facility_and_Land_Summary-_Ft._Benning.xls XLS spreadsheet
TE_5.10-003-_Bidgs._Requireing__Heater_Inspections_).docx DOCX document
TE_5.4-004-_List_of_Propane_Tanks-_Ft._Benning.xls XLS spreadsheet
TE_1-015-_DPW_Mail_Courier.doc DOC document
TE_5.11-002-_Maintenance_Allocation_Chart.doc DOC document
TE_5.5-005-_Building__Heating_Plants_and_Systems.xls XLS spreadsheet
TE_5.2-011-_Welcome_Home_Ceremony_Sign_Route,_Map_1.pdf PDF
TE_5.2-019_-_Lighting_Protection_Grounding_Subsystem_Checklist_For_Existing_Facilities.docx DOCX document
TE_5.2-012-_Welcome_Home_Ceremony_Sign_Route,_Map_2.pdf PDF
TE_5.4-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE_5.5-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE_3-002_GFE_Gov't_Furnish_Equipment.xlsx XLSX spreadsheet
TE_5.11-003_Range_Roads_Grading.xls XLS spreadsheet
TE_5.10-001-_Required_Scheduled_Tasks.xlsx XLSX spreadsheet
TE_5.5-003_Changeover_Heat_to_Air.xls XLS spreadsheet
TE_5.4-002a_Monthly_emergency_Hour-meter_Reading_Report.docx DOCX document
Show 40 more

Latest 50 of 229 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chiller Annual Inspection Checklist

1. Chillers.

a. Test for refrigerant leaks including relief valve piping outlets and rupture disc. b. Check main starter and control panel.

c. Inspect and tighten electrical connections.

d.Checked relays, operating, and safety controls. e.Check flow switch operation.
f.Lubricate inlet vane linkage, if applicable. g.Check vane control setting and operation.
h.Take and record water side pressure drops across vessels. i.Perform controls check.
j.Meg compressor and oil pump motors.

k. Clean oil cooler strainer, water cooled only. l. Check oil sump heater operation.

m. Perform oil analysis for wear (metals), moisture, acid.

n. Inspect vibration eliminators and inspect water piping for leaks. o. Clean condenser water strainer(s).

p. Check head pressure control operation for tower fans or bypass valve. q. Check minimum condenser water temperature operation.

r. Clean purge / replace filters.

s. Check purge for proper operation.

t. Eddy current test shall be performed on 10 chillers (as designated by COR) per year.

u. Check all chilled water, condenser water, and steam lines for leaks at joints, packings, stems, and bonnet gaskets.

Co n tract

N o

T e c hn ical

E x h ibit

P a g e

Chiller Annual Inspection

2 Towers

a. Check sump heaters.

b.Check for scaling and corrosion. c.Check pitch of fan blades.
d.Check integrity of basin, skid and structural components. e.Check float valves.
f.Check gearboxes/transmissions. g.Check fan shafts.
3.Pumps (Condensate, Condenser and Circulating)
a.Check alignment of shaft and couplings and couplings for slippage. b.Check pump housing and impeller.
c.Perform vibration analysis and compare to previous analysis (for condenser and circulating pumps only).