TE 5.2-022
View the file
Other files for this federal contract opportunity
Show all 50
Sources Sought - Fort Benning, GA Base Operations has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract No: TECHNICAL EXHIBIT 5.1-022
SHIELDING SUBSYSTEM CHECKLIST FOR EXISTING FACILITIES
For use of this form, see TM 5-690; the proponent agency is COE.
| 1. FACILITY |
| 2. DATE (YYYYMMDD) |
3. LOCATION
4. INSPECTOR
5. VISUALLY INSPECT THE EXISTING SHIELD NETWORK FOR PROPER GROUNDING AND SIGNS OF DAMAGE, CORROSION, AND LOOSENESS
LOCATION
DEFICIENCIES
6. CHECK SHIELDING ON ALL DOORS, WINDOWS, VENTILATION PORTS, VISUAL ACCESS OPEININGS, AND WALLS FOR
PROPER INSTALLATION AND BONDING
DEFICIENCIES
7. CHECK ALL UTILITY LINES, ELECTRICAL CONDUCTORS, AND DATA CABLES FOR PROPER BONDING AND SHIELDING
a. UTILITY LINES, ELECTRICAL CONDUCTORS, AND DATA CABLES ARE PROPERLY BONDED TO THE SHIELD AT THE POINT OF ENTRANCE
b. ALL ELECTRICAL GROUNDED AND GROUNDING CONDUCTORS ARE IN THE SAME CONDUIT AS PHASE CONDUCTORS
c. ALL ELECTRICAL FILTERS AND CONDUCTORS ARE PROPERLY ENCLOSED INSIDE METAL (STEEL) CASES/CONDUITS
d. ALL METAL OBJECTS/CASES/CONDUITS ARE PROPERLY BONDED TO GROUND
e. DATA CABLES ARE PROPERLY BONDED TO THE SIGNAL GROUND FEFERENCE SYSTEM
8. MEASURE STRAY CURRENTS ON THE GROUND CIRCUITS
GROUND CIRCUITS
CURRENT MEASUREMENTS
9. MEASURE THE BOND RESISTANCES
BOND CIRCUIT
RESISTANCES