TE_5.2-022_-_Shielding_Subsystem_Checklist_For_Existing_Facilities.docx

DOCX document 21 KB Posted

Attached to
Sources Sought - Fort Benning, GA Base Operations
Solicitation number
W911SF-16-R-0012
Issued by

About this file

TE 5.2-022

View the file

Other files

File Type Posted
Special_Notice___Sources_Sought___Benning_BASOPS_20_Mar_18.docx DOCX document
SOURCES_SOUGHT_15_Nov_17.pdf PDF
Amendment__0002_W911SF-16-R-0012_Benning_BASOPS_13_Oct_17.pdf PDF
Amendment__0001_W911SF-16-R-0012_Benning_BASOPS_8_Sep_17.pdf PDF
TE_5.2-026_Mas_Fire_Alarm_Schedule_as_of_01April2013.xlsx XLSX spreadsheet
TE_5.2-027_Traffic_Light_Control_List.xlsx XLSX spreadsheet
TE_1-010-_Environmental_Reports.xls XLS spreadsheet
TE_5.2-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE_1-012-_Invoice_Register.docx DOCX document
TE_5.1-003-_Labor_Hours_for_IJO's_by_Craft.xls XLS spreadsheet
TE_5.10-007-_Chiller_Building_List.xls XLS spreadsheet
Technical_Exhibit_5.13-005_Operational_Inspection_Checklist.docx DOCX document
TE_5.2-024_SUPRESSION_LIST.xlsx XLSX spreadsheet
TE_5.2-021_-_Signal_Ground_Reference_Subsystem_Crecklist_For_Existing_Facilities.docx DOCX document
Technical_Exhibit_5.13-001_Chiller_Equipment.docx DOCX document
TE_5.2-020_-_Ground_Fault_Protection_Subsystem_Checklist_For_Existing_Facilities_-.docx DOCX document
TE_1-005-_Examples_of_Training_Courses.doc DOC document
TE_5.2-002-_List_of_Memorials.doc DOC document
TE_5.2-023_Fire_Sprinkler_system.xlsx XLSX spreadsheet
TE_5.3-002-_Dining_Facility_Equip.,_PMCS,_and_Repair_rev_by_amendment.doc DOC document
TE_5.5-004-_List_of_Buildings_Requiring_Monthly_Filter_Chang.xls XLS spreadsheet
TE_5.2-005-_Bldgs._Designated_for_Roof_Truss_Inspection.xls XLS spreadsheet
Technical_Exhibit_5.13-002a_Chiller_Data.docx DOCX document
Technical_Exhibit_5.13-007_Governmnet_Furnished_Property.docx DOCX document
TE_5.4-005-_Operating_Checklist_for_Peak_Shaving_Plant_(old).doc DOC document
TE_5_12-001-Workload_Data.xls XLS spreadsheet
TE_5.4-004a-_Propane_Storage_Tanks-_Camp_Merrill.xls XLS spreadsheet
TE_5.12-002_Cemeteries_Locations.xls XLS spreadsheet
TE_1-006-_TNG_Density.xls XLS spreadsheet
Technical_Exhibit_5.13-008_Chiller_Annual_Maintenance_Checklist.docx DOCX document
TE_5.6-002_List_of_Memorials.xlsx XLSX spreadsheet
TE_5.7-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE5.12-006b_Columbarium_Numbering.docx DOCX document
TE_1-002-_Facility_and_Land_Summary-_Ft._Benning.xls XLS spreadsheet
TE_5.10-003-_Bidgs._Requireing__Heater_Inspections_).docx DOCX document
TE_5.4-004-_List_of_Propane_Tanks-_Ft._Benning.xls XLS spreadsheet
TE_1-015-_DPW_Mail_Courier.doc DOC document
TE_5.11-002-_Maintenance_Allocation_Chart.doc DOC document
TE_5.5-005-_Building__Heating_Plants_and_Systems.xls XLS spreadsheet
TE_5.2-011-_Welcome_Home_Ceremony_Sign_Route,_Map_1.pdf PDF
TE_5.2-019_-_Lighting_Protection_Grounding_Subsystem_Checklist_For_Existing_Facilities.docx DOCX document
TE_5.2-012-_Welcome_Home_Ceremony_Sign_Route,_Map_2.pdf PDF
TE_5.4-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE_5.5-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE_3-002_GFE_Gov't_Furnish_Equipment.xlsx XLSX spreadsheet
TE_5.11-003_Range_Roads_Grading.xls XLS spreadsheet
TE_5.10-001-_Required_Scheduled_Tasks.xlsx XLSX spreadsheet
TE_5.5-003_Changeover_Heat_to_Air.xls XLS spreadsheet
TE_5.4-002a_Monthly_emergency_Hour-meter_Reading_Report.docx DOCX document
TE_1-011-_ASP_Identifications.xls XLS spreadsheet
Show 40 more

Latest 50 of 229 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract No: TECHNICAL EXHIBIT 5.1-022

SHIELDING SUBSYSTEM CHECKLIST FOR EXISTING FACILITIES

For use of this form, see TM 5-690; the proponent agency is COE.

1. FACILITY
2. DATE (YYYYMMDD)

3. LOCATION

4. INSPECTOR

5. VISUALLY INSPECT THE EXISTING SHIELD NETWORK FOR PROPER GROUNDING AND SIGNS OF DAMAGE, CORROSION, AND LOOSENESS

LOCATION

DEFICIENCIES

6. CHECK SHIELDING ON ALL DOORS, WINDOWS, VENTILATION PORTS, VISUAL ACCESS OPEININGS, AND WALLS FOR

PROPER INSTALLATION AND BONDING

DEFICIENCIES

7. CHECK ALL UTILITY LINES, ELECTRICAL CONDUCTORS, AND DATA CABLES FOR PROPER BONDING AND SHIELDING

a. UTILITY LINES, ELECTRICAL CONDUCTORS, AND DATA CABLES ARE PROPERLY BONDED TO THE SHIELD AT THE POINT OF ENTRANCE

b. ALL ELECTRICAL GROUNDED AND GROUNDING CONDUCTORS ARE IN THE SAME CONDUIT AS PHASE CONDUCTORS

c. ALL ELECTRICAL FILTERS AND CONDUCTORS ARE PROPERLY ENCLOSED INSIDE METAL (STEEL) CASES/CONDUITS

d. ALL METAL OBJECTS/CASES/CONDUITS ARE PROPERLY BONDED TO GROUND

e. DATA CABLES ARE PROPERLY BONDED TO THE SIGNAL GROUND FEFERENCE SYSTEM

8. MEASURE STRAY CURRENTS ON THE GROUND CIRCUITS

GROUND CIRCUITS

CURRENT MEASUREMENTS

9. MEASURE THE BOND RESISTANCES

BOND CIRCUIT

RESISTANCES

DA FORM 7452-9-R, FEB 2002 USAPA V1.00