Technical_Exhibit_5.13-008_Chiller_Annual_Maintenance_Checklist.docx

DOCX document 17 KB Posted

Attached to
Sources Sought - Fort Benning, GA Base Operations Federal contract opportunity
Solicitation number
W911SF-16-R-0012
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Benning

About this file

TE 5.13-008

View the file

Other files for this federal contract opportunity

Other files attached to Sources Sought - Fort Benning, GA Base Operations, newest first.
File Type Posted
TE_5.5-004-_List_of_Buildings_Requiring_Monthly_Filter_Chang.xls XLS spreadsheet
TE_5.4-005-_Operating_Checklist_for_Peak_Shaving_Plant_(old).doc DOC document
TE_5.4-004a-_Propane_Storage_Tanks-_Camp_Merrill.xls XLS spreadsheet
TE_5.2-022_-_Shielding_Subsystem_Checklist_For_Existing_Facilities.docx DOCX document
TE_5.12-002_Cemeteries_Locations.xls XLS spreadsheet
TE_5_12-001-Workload_Data.xls XLS spreadsheet
TE_5.2-011-_Welcome_Home_Ceremony_Sign_Route,_Map_1.pdf PDF
TE_5.11-002-_Maintenance_Allocation_Chart.doc DOC document
TE_5.5-005-_Building__Heating_Plants_and_Systems.xls XLS spreadsheet
TE_1-015-_DPW_Mail_Courier.doc DOC document
TE_5.4-004-_List_of_Propane_Tanks-_Ft._Benning.xls XLS spreadsheet
TE_5.4-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE_5.2-019_-_Lighting_Protection_Grounding_Subsystem_Checklist_For_Existing_Facilities.docx DOCX document
TE_5.2-012-_Welcome_Home_Ceremony_Sign_Route,_Map_2.pdf PDF
TE_5.11-003_Range_Roads_Grading.xls XLS spreadsheet
TE_5.10-001-_Required_Scheduled_Tasks.xlsx XLSX spreadsheet
TE_5.5-003_Changeover_Heat_to_Air.xls XLS spreadsheet
TE_3-002_GFE_Gov't_Furnish_Equipment.xlsx XLSX spreadsheet
TE_5.5-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE_5.7-003-Road_Inspection_Areas.doc DOC document
TE_5.12-003_Sources_of_Work.xlsx XLSX spreadsheet
TE_5.10-006-_Boiler_Building_List.xls XLS spreadsheet
Technicial_Exhibit_5.13-002_Chiller_Annual_Inspection_Checklist.docx DOCX document
Sec_C-5.4_UTILITY_OPERATIONS_&_MAINTENANCE.rtf RTF text file
Attachment_4_-_Past_Performance_Questionaire_16-R-0012_DPW_Benning_BASOPS.pdf PDF
Sec_C-5.3_DINING_FACILITY_EQUIPMENT_MAINTENANCE.docx DOCX document
Sec_C-3_Government-Furnished_Property_and_Services.doc DOC document
Sec_C-5.12_CEMETERY.pdf PDF
Sources_Sought-_Ft._Benning_BASOPS_4_May_2017.pdf PDF
DRAFT_SOLICITATION_16-R-0012_DPW_Benning_BASOPS__19_Jan_17.pdf PDF
TE_5.2-015_-_Lighting_Protection_Grounding_Subsystem_Checklist_For_New_Facilities.pdf PDF
TE_5.2-005-_Bldgs._Designated_for_Roof_Truss_Inspection.pdf PDF
TE_5.1-010_-_Variance_Report.pdf PDF
TE_5.1-006-_List_of_ISA _MOU _MOS'a.pdf PDF
TE_5.2-009-_Building_and_Traffic_Sign_Areas.pdf PDF
Sec_C-5.9_SELF-HELP_SERVICES.pdf PDF
TE_5.8-002-_Quantities_Req'd_to_be_on_hand_before_NAF_bid.pdf PDF
TE_5.4-005-_Operating_Checklist_for_Peak_Shaving_Plant_(old).pdf PDF
TE_5.1-002-_Service_Order_(SO)_Workload_Summary.pdf PDF
TE_5.10-002-_Bldgs._Requiring_Fire_Sprinkler_Inspections.pdf PDF
TE_5.4-003-_List_of_Fuel_Tanks.pdf PDF
TE_5.6-005-_Leaf_removal_Areas.pdf PDF
TE_5.8-001-_List_of_bldgs._currently_serviced_by_MRF_Personn.pdf PDF
Sec_C-5.12_CEMETERY_SERVICES.pdf PDF
Technical_Exhibit_5.13-004_Deliverables_Schedule.pdf PDF
TE_5.2-021_-_Signal_Ground_Reference_Subsystem_Crecklist_For_Existing_Facilities.pdf PDF
TE_5.2-008-_USAIC_Suppl_1_to_AR_1-33.doc DOC document
TE_5.2-014_-_Ground_Fault_Protection_Subsystem_Checklist_For_New_Facilities.pdf PDF
TE_5.1-003-_Service_Order_(SO)_Priority_Classifications.pdf PDF
Sec_C-5.1__TECHNICAL_DESCRIPTION_OF_WORKb.pdf PDF
Show all 50

Sources Sought - Fort Benning, GA Base Operations has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract No:

Technical Exhibit 5.13-008

Chiller Annual Maintenance Checklist

1. Chillers

a. Manually clean all tubes.

b. Remove brushes in all automatic tube cleaners. (If operating)

c. Scrape, brush, sand, clean and prime and paint approximately 1000SF of external surfaces at each chiller location (condenser water piping, pumps, etc.)

d. Lubricate purge pump motor where applicable.

e.Change oil in purge and oil separator where applicable. f.Perform controls check.
g.Change refrigerant oil. (as needed by analysis)

h. Change distilled water in solid starters (three York chillers).

2. Towers

a. Clean basin.

b.Clean all screens (safety, overflow, drain, suction). c.Check/replace fuses in disconnects.
d.Change oil in all gearboxes/transmissions. e.Clean nozzles.
f.Winterize cooling towers from freeze damage (pipe, water meter, valves).

3. Pumps

a.Check bearings, seals, replace as required. b.Grease
4.Automatic Tube Cleaner (If operating)

a. Lubricate actuator pivot pins, shaft and gland area

b. Adjust packing gland so as to prevent water seepage.

File details come from the government source that posted it. Updated .