TE_5.4-001-_Required_Scheduled_Tasks.xls

XLS spreadsheet 332 KB Posted

Attached to
Sources Sought - Fort Benning, GA Base Operations Federal contract opportunity
Solicitation number
W911SF-16-R-0012
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Benning

About this file

TE 5.4-001

View the file

Other files for this federal contract opportunity

Other files attached to Sources Sought - Fort Benning, GA Base Operations, newest first.
File Type Posted
SOURCES_SOUGHT_15_Nov_17.pdf PDF
Amendment__0002_W911SF-16-R-0012_Benning_BASOPS_13_Oct_17.pdf PDF
Amendment__0001_W911SF-16-R-0012_Benning_BASOPS_8_Sep_17.pdf PDF
TE_1-006-_TNG_Density.xls XLS spreadsheet
Technical_Exhibit_5.13-008_Chiller_Annual_Maintenance_Checklist.docx DOCX document
TE_5.6-002_List_of_Memorials.xlsx XLSX spreadsheet
TE_5.7-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE5.12-006b_Columbarium_Numbering.docx DOCX document
TE_1-002-_Facility_and_Land_Summary-_Ft._Benning.xls XLS spreadsheet
TE_5.10-003-_Bidgs._Requireing__Heater_Inspections_).docx DOCX document
TE_5.2-018_-_Grounding_And_Bonding_Connection_Checklist_For_Existing_Facilities.doc DOC document
TE_5.2-017_-_Earth_Electrode_Subsystem_Checklist_For_Existing_Facilities.docx DOCX document
TE_5.2-004-_Assesment_of_NRE-Ft._Benning-Historic_Resources_.xls XLS spreadsheet
TE_5.7-002-_Street_Sweeping_Schedule.doc DOC document
TE_3-001-_Gov't_Furnished_Facilities.xls XLS spreadsheet
TE_5.5-002-_Chlorofluorocarbon_(CFC)_Control.doc DOC document
TE_5_5-006_Filter_Count.xlsx XLSX spreadsheet
TE_5.6-003-_Leaf_removal_Areas.doc DOC document
TE_5.2-007-_ICYET_Inspection_Deficiency_List.docx DOCX document
TE_5.6-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
Technical_Exhibit_5.13-002b_Refrigerant_Use_Data.docx DOCX document
TE_5_10-004_Water_Heater_Inspections_(8_Feb_13).docx DOCX document
TE-1-014_OM_CLS_SSP.doc DOC document
Attachment_8_-_Collective_Bargaining_Agreement_16-R-0012_DPW_Benning_BASOPS.pdf PDF
Sec_C-4_Contractor_Furnished_Property.docx DOCX document
Attachment_3_Teaming_Consent,16-R-0012_DPW_Benning_BASOPS.pdf PDF
Sec_C-5.7_SURFACED_AREA_MAINTENANCE.doc DOC document
Sec_C-5.11_RANGE_MAINTENANCE.doc DOC document
TE_5.10-006a-_Boiler_Building_List.pdf PDF
TE_5.1-001-_Installed_Serviceable_Equipment.pdf PDF
TE_5.8-004-_Recycle_Material_Collection_Stations-_Map.doc DOC document
TE_5.4-006_Petroleum_Products_Issued.pdf PDF
TE_5.2-011-_Welcome_Home_Ceremony_Sign_Route _Map_1.pdf PDF
TE_5.9-002_-_Transaction_Record.pdf PDF
TE_5.2-016_-_Signal_Ground_Reference_Subsystem_Checklist_For_New_Facilities.pdf PDF
Sec_C-5.5_HVAC_SYSTEMS_OPERATION_ _MAINTENANCEb.pdf PDF
TE_5.5-005-_Building_List_for_Heating_Plants_and_Systems.pdf PDF
TE_5.6-004-_List_of_Memorials.pdf PDF
Sec_C-5.8_MATERIAL_RECYCLING_FACILITY_b.pdf PDF
Sec_C-5.7_SURFACED_AREA_MAINTENANCEb.pdf PDF
TE_5.4-004a-_Propane_Storage_Tanks-_Camp_Merrill.pdf PDF
Technical_Exhibit_5.13-003_Building_100_Equipment.pdf PDF
TE_5.4-002a_Monthly_emergency_Hour-meter_Reading_Report.pdf PDF
Sec_C-5.11_RANGE_MAINTENANCEb.pdf PDF
Sec_C-5.6_GROUNDS_MAINTENANCEb.pdf PDF
TE_5.1-005-_Automated_Information_Systems.pdf PDF
TE_5.1-008-_Bldgs._Under_Barracks_Maint._Prgm..pdf PDF
TE_5.1-004-_Labor_Hours_for_IJO's_by_Craft.pdf PDF
TE_5.12-006b_Columbarium_Numbering.pdf PDF
TE_5.5-002-_Chlorofluorocarbon_(CFC)_Control.pdf PDF
Show all 50

Sources Sought - Fort Benning, GA Base Operations has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TE 5.4-001

DescriptionPWS Paragraph No.Unit DescriptionActual #Freq. Description# of Occur-ances /YearOther Require-mentsTime per Occ. (mhrs.)If Req., # PersonsTotal Hours/ Year (mhrs.)FY 1997 HoursGrade AnalysisSeries GradeComments
Electrical Systems
- Engine Generators5.4.3.2.1GeneratorsTE 5.4-003Monthly12
- Electric Meter Reading5.4.3.2.2MetersTE 5.1-001Monthly12
- Weather Sirens5.4.3.2.3System1Monthly12
- Traffic Lights5.4.2.1.3System25Monthly12
- Traffic Lights5.4.2.1.3System25Semi-Annually2
Fuel Distribution Systems
- UST Reports5.4.3.3.2Report1Annually1
Natural Gas Distribution Systems
- Gas Meter Readings5.4.3.4.2MetersTE 5.1-001Monthly12
Peak Shaving Propane Plant Maintenance5.4.3.5.10Plants2Semi-Annually2

&LContract Number:&C

&"Arial,Bold"&12TECHNICAL EXHIBIT 5.4-001

REQUIRED SCHEDULED TASKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"Technical Exhibits&CC-7.5.4-001-&P&R&"Arial,Italic"Fort Benning &LContract Number:&C

&"Arial,Bold"&12TECHNICAL EXHIBIT 5.4-001

REQUIRED SCHEDULED TASKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"Technical Exhibits&CC-7.5.4-001-&P&R&"Arial,Italic"Fort Benning &LContract Number:&C

&"Arial,Bold"&12TECHNICAL EXHIBIT 5.4-001

REQUIRED SCHEDULED TASKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"Technical Exhibits&CC-7.5.4-001-&P&R&"Arial,Italic"Fort Benning &C

&"Arial,Bold"&12TECHNICAL EXHIBIT 5.4-001

REQUIRED SCHEDULED TASKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"Technical Exhibits&CC-7.5.4-001-&P&R&"Arial,Italic"Fort Benning &C

&"Arial,Bold"&12TECHNICAL EXHIBIT 5.4-001

REQUIRED SCHEDULED TASKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"Technical Exhibits&CC-7.5.4-001-&P&R&"Arial,Italic"Fort Benning &L&"Arial,Italic"Contract No. DATB60-01-C-0005&C

&"Arial,Bold"&12TECHNICAL EXHIBIT 5.4-001

REQUIRED SCHEDULED TASKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"Technical Exhibits&CC-7.5.4-001-&P&R&"Arial,Italic"Fort Benning &L&"Arial,Italic"Contract No. xxxxxxxxxxx&C

&"Arial,Bold"&12TECHNICAL EXHIBIT 5.4-001

REQUIRED SCHEDULED TASKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"Technical Exhibits&CC-7.5.4-001-&P&R&"Arial,Italic"Fort Benning &L&"Arial,Italic"Revised by modification #P00003, DABT60-01-C-0005&C

&"Arial,Bold"&12TECHNICAL EXHIBIT 5.4-001

REQUIRED SCHEDULED TASKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"Technical Exhibits&CC-7.5.4-001-&P&R&"Arial,Italic"Fort Benning &L&"Arial,Italic"Contract No. DATB60-01-C-0005&C

&"Arial,Bold"&12TECHNICAL EXHIBIT 5.4-001

REQUIRED SCHEDULED TASKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"Technical Exhibits&CC-7.5.4-001-&P&R&"Arial,Italic"Fort Benning &L&"Arial,Italic"Contract No. DATB60-01-C-0005&C

&"Arial,Bold"&12TECHNICAL EXHIBIT 5.4-001

REQUIRED SCHEDULED TASKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"Technical Exhibits&CC-7.5.4-001-&P&R&"Arial,Italic"Fort Benning &C

&"Arial,Bold"&12TECHNICAL EXHIBIT 5.4-001

REQUIRED SCHEDULED TASKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"Technical Exhibits&CC-7.5.4-001-&P&R&"Arial,Italic"Fort Benning &LContract Number:&C

&"Arial,Bold"&12TECHNICAL EXHIBIT 5.4-001

REQUIRED SCHEDULED TASKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"Technical Exhibits&CC-7.5.4-001-&P&R&"Arial,Italic"Fort Benning

TE 5.4-002

Building No.PowerManufacturerType
430 KWKohlerGenerator Set
16100 KWKoto LightGenerator Set
7380 KWKohlerGenerator Set
7575 KWOnanGenerator Set
8375 KWOnanGenerator Set
21580 KWOnanGenerator Set
242Water PumpCummins EngPower Unit
244600 KWOnanGenerator Set
26220 KWKohlerGenerator Set
282250 KWKoto LightGenerator Set
301125 KWOnanGenerator Set
358350 KWKohlerGenerator Set
358350 KWKohlerGenerator Set
479200 KWGeneracGenerator Set
1146Water PumpDetroit Diesel EngPower Unit
209430 KWOnanGenerator Set
2435135 KWEuclidGenerator Set
2485150 KWOnanGenerator Set
2498200 KWDelcoGenerator Set
2678300 KWEuclidGenerator Set
2685500 KWEuclidGenerator Set
2687300 KWKohlerGenerator Set
283460 KWGenerator Set
2855260 KWEuclidGenerator Set
2855135 KWEuclidGenerator Set
2903100 KWMarin TypeGenerator Set
300080 KWGeneracGenerator Set
4211Water PumpDetroit Diesel EngPower Unit
4292500 KWEuclidGenerator Set
4373135 KWEuclidGenerator Set
448880 KWGeneracGenerator Set
6056150 KWOnanGenerator Set
885418 KWKohlerGenerator Set
885418 KWKohlerGenerator Set
885418 KWKohlerGenerator Set
9056Water PumpContinental EngPower Unit
907280 KWGeneracGenerator Set
9107125 KWOnanGenerator Set
920080 KWGeneracGenerator Set
9202600 KWKoto LightGenerator Set
9202600 KWKoto LightGenerator Set
922260 KWOnanGenerator Set
923040 KWKohlerGenerator Set
10309Water PumpPower Unit
10600150 KWOnanGenerator Set
730 Site20 kWOnanGenerator Set
McKenna MOUT10 KWWhisper WattGenerator Set
Site Bravo18 KWLister PetterGenerator Set
Site Bravo20 KWOnanGenerator Set
Camp Darby20 kWOnanGenerator Set
Camp Darby Class30 KWGenerator Set
New Fire Station60 KWGenerator Set
Camp Merrill Generators
BldgActivityKW
56Wtr Plant60
40Dining Fac30
27Clinic30
25Commisary15
Brawley MtnTransmitter Site20

&C

&"Arial,Bold"&12TECHNICAL EXHIBIT 5.4-002

LIST OF EMERGENCY GENERATORS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-002-&P&R&"Arial,Italic"&11Fort Benning

&L&"Arial,Italic"Contract No. DABT60-01-C-0005&C

&L&"Arial,Italic"Contract No. xxxxxxxxxxxxx&C

&L&"Arial,Italic"Revised by modification #P00003, DABT60-01-C-0005&C

&L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-002-&P&R&"Arial,Italic"&11Fort Benning

TE 5.4-003

FUEL OIL TANKS - STATUS AS OF 18 DEC 03
CENTRAL HEATING PLANTS/BOILER PLANTS
TANK NO.LOCATION BLDG NO.TANK CAPACITYGALLONS OF FUEL IN TANKUNDER GROUNDABOVE GROUNDREMARKS
82920220,079X
920220,079X
920220,079X
TOTALS:60,2370

&C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-003

LIST OF FUEL TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-003-&P&R&"Arial,Italic"&11Fort Benning &C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-003

LIST OF FUEL TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-003-&P&R&"Arial,Italic"&11Fort Benning &C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-003

LIST OF FUEL TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-003-&P&R&"Arial,Italic"&11Fort Benning &C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-003

LIST OF FUEL TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-003-&P&R&"Arial,Italic"&11Fort Benning &C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-003

LIST OF FUEL TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-003-&P&R&"Arial,Italic"&11Fort Benning &L&"Arial,Italic"Contract No. DATB60-010C-0005&C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-003

LIST OF FUEL TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-003-&P&R&"Arial,Italic"&11Fort Benning &L&"Arial,Italic"Contract No. xxxxxxxxxxxxx&C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-003

LIST OF FUEL TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-003-&P&R&"Arial,Italic"&11Fort Benning &L&"Arial,Italic"Revised by modification #P00008, DABT60-01-C-0005&C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-003

LIST OF FUEL TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-003-&P&R&"Arial,Italic"&11Fort Benning &L&"Arial,Italic"Contract No. DATB60-010C-0005 Revised By Modification P00101&C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-003

LIST OF FUEL TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-003-&P&R&"Arial,Italic"&11Fort Benning &L&"Arial,Italic"Contract No. DATB60-010C-0005&C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-003

LIST OF FUEL TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-003-&P&R&"Arial,Italic"&11Fort Benning &C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-003

LIST OF FUEL TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-003-&P&R&"Arial,Italic"&11Fort Benning &C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-003

LIST OF FUEL TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-003-&P&R&"Arial,Italic"&11Fort Benning

TE 5.4-004

FORT BENNING, GEORGIA
AUTOMATIC FILL REQUIREMENTS
PROPANE GAS
Date Updated: 6 February 2002Page 1 of 4
BuildingType of Facility To Be ServicedNo.TankTotal
NumberTanksCapacityCapacity
6 ALA-AUchee Creek Lodge Bldg1500500
6 ALA-BUchee Creek Lodge Bldg1500500
7 ALAUchee Creek Country Store (Generator)1120120
12 ALA-AUchee Creek Equip Rental/Maint Bldg11,0001,000
17 ALA-AUchee Creek Comfort Station/Laundry11,0001,000
17 ALA-BUchee Creek Comfort Station/Laundry1500500
CS2Uchee Creek Comfort Station #211,0001,000
CS3Uchee Creek Comfort Station #311,0001,000
RecCenterUchee Creek New Recreation Center21,000 & 5001500
BoyScoutBoy Scout Camp Uchee Creek1500500
Fryar FldFryar DZ Latrine11,0001,000
262DPW Metal Shop (located lower end B262)11,0001,000
1616Phillips Range11,0001,000
2679Cemetary Office/Latrine1250250
2680Cemetary Storage Area1500500
2803Leadership Course11,0001,000
2970Coursen Range11,0001,000
3308Recreational1120120
3720Administrative11,0001,000
3725DPW SandHill Maint Bldg11,0001,000
3744DOL Maintenance Building11,0001,000
3815Warehouse11,0001,000
3816Warehouse11,0001,000
3866Adminstrative11,0001,000
4151Maintenance Bldg11,0001,000
4155Administrative1500500
4303 ATank Training Facility11,0001,000
4303 BTank Training Facility11,0001,000
4303 CTank Training Facility11,0001,000
4303 DTank Training Facility11,0001,000
4303 ETank Training Facility11,0001,000
4303 FTank Training Facility11,0001,000
4345**AAFES Warehouse1500500
4628Administrative & Classroom11,0001,000
4695Administrative11,0001,000
4700Barracks21,0002,000
4701Barracks21,0002,000
4703Dining Facility11,0001,000
4704Barracks21,0002,000
4705Barracks21,0002,000
4706Barracks21,0002,000
4707Barracks21,0002,000
FORT BENNING, GEORGIA
AUTOMATIC FILL REQUIREMENTS
PROPANE GAS
Date Updated: 6 February 2002Page 2 of 4
BuildingType of Facility To Be ServicedNo.TankTotal
NumberTanksCapacityCapacity
4712Bn Hqs11,0001,000
4713Administrative & Storage31,0003,000
4714Administrative11,0001,000
4960Motor Pool21,0002,000
4964Maintenance Bldg (1-500gal & 1-1000 gal)1500500
4966Administrative & Storage11,0001,000
4969Converted Motorpool11,0001,000
5000Administrative & Classrooms11,0001,000
5018 AArea Tank Farm12,0002,000
5018 BArea Tank Farm12,0002,000
5018 CArea Tank Farm12,0002,000
5018 DArea Tank Farm12,0002,000
5018 EArea Tank Farm12,0002,000
5018 FArea Tank Farm11,0001,000
5018 GArea Tank Farm11,0001,000
5018 HArea Tank Farm11,0001,000
5018 IArea Tank Farm11,0001,000
5018 JArea Tank Farm11,0001,000
5024 AHeadquarters Building11,0001,000
5024 BHeadquarters Building11,0001,000
5024 CHQS Building (Not Used-No Regulator)11,0001,000
5034 ABarracks (Not Used-No Regulator)11,0001,000
5034 BBarracks11,0001,000
5034 CBarracks11,0001,000
5081 AMotor Pool11,0001,000
5081 BMotor Pool11,0001,000
5081 CMotor Pool (Not Used-No Regulator)11,0001,000
5081 DMotor Pool11,0001,000
5084Motor Pool21,0002,000
5500 ATraining Facility11,0001,000
5500 BTraining Facility11,0001,000
5500 CTraining Facility11,0001,000
5500 DTraining Facility11,0001,000
5500 ETraining Facility11,0001,000
5500 FTraining Facility11,0001,000
5500 GTraining Facility11,0001,000
5500 HTraining Facility11,0001,000
5500 ITraining Facility11,0001,000
5500 JTraining Facility11,0001,000
5500 KTraining Facility11,0001,000
5500 LTraining Facility11,0001,000
5500 MTraining Facility11,0001,000
5500 NTraining Facility11,0001,000
FORT BENNING, GEORGIA
AUTOMATIC FILL REQUIREMENTS
PROPANE GAS
Date Updated: 6 February 2002Page 3 of 4
BuildingType of Facility To Be ServicedNo.TankTotal
NumberTanksCapacityCapacity
5882Fish & Wildlife (Forestry)(DPW)11,0001,000
5883/5884Fish & Wildlife (Forestry)(DPW)21,0002,000
5888DPW Forestry Administrative11,0001,000
6000Ammo Supply Point11,0001,000
8000Roosevelt Range11,0001,000
8004Buckner Range11,0001,000
8006English Range11,0001,000
8010Brown Demo Range11,0001,000
8011Simpson Range11,0001,000
8015Wagner Range11,0001,000
8017Red Cloud Range11,0001,000
8021Burrows Range11,0001,000
8025South Galloway Range11,0001,000
8033Ruth Range11,0001,000
8041/8042Ware Range21,0002000
8534Moye Road POI Range11,0001,000
8538OSUT Classrooms1500500
8539OSUT Classrooms1500500
8540OSUT Classrooms1500500
8541OSUT Classrooms15006,500
8560Malone 17 Range11,0001,000
8563Malone 14 Range (M9874)11,0001,000
8567Malone 2 Range (M6853)11,0001,000
8570Malone 3 Range (M6849)11,0001,000
8573Malone 12 Range (M6850)11,0001,000
8576Malone 5 Range (M6851)11,0001,000
8579Malone 24 Range (M6462)11,0001,000
8583Duke Range11,0001,000
8589Buchanan Range11,0001,000
8586Booker Range11,0001,000
8591/8595Malone 25 Range21,0002,000
8598/8822Malone 22 Range11,0001,000
8601Malone 26 Range11,0001,000
8604AO Yellow11,0001,000
8605AO Yellow11,0001,000
8606AO Gold11,0001,000
8610Britton Range11,0001,000
8617AO Green11,0001,000
8620Malone MOUT Range(M6841)11,0001,000
8628McBrides Bridge (M6444)11,0001,000
8636Training Facility, MTA1500500
8642/8649Landmine Warfare21,000+5001,500
8645AO Eagle Range11,0001,000
8672Cole Range31,0003,000
8676Malone 811,0001,000
8680Malone 21 Range11,0001,000
8682Sand Hill Obstacle Course11,0001,000
8691Malone 9 Range11,0001,000
8694Malone 11 Range (M9868)11,0001,000
8698Malone 13 Range (M9873)11,0001,000
FORT BENNING, GEORGIA
AUTOMATIC FILL REQUIREMENTS
PROPANE GAS
Date Updated: 6 February 2002Page 4 of 4
BuildingType of Facility To Be ServicedNo.TankTotal
NumberTanksCapacityCapacity
8701Malone 15 Range (M9875)11,0001,000
8708Malone 7 Range (M9876)1500500
8711Malone 4 Range (M9923)11,0001,000
8714Malone 16 Range (M9878)11,0001,000
8724Young Range11,0001,000
8725Malone 1 Range11,0001,000
8730Lee Field (M6982)25001,000
8751/8752Yankee Road1500500
8766Camp Darby (A&B)25001,000
8765Porter Range1500500
8767Camp Darby Latrine11,0001,000
8872/8773Pierce Range1500500
8776/8639Coolidge Range11,0001,000
8780Camp Darby Quonset Building11,0001,000
8781Camp Darby Quonset Building11,0001,000
8787Camp Darby Clinic11,0001,000
8820Malone 18 Range (M6706)11,0001,000
8825Hasting Range (M6576)11,0001,000
9103Administrative Shop11,0001,000
9106Weapons Pool41,0004,000
**--->Buildings scheduled to be demolished - Exact dates unknown.
FILLED ON ORDER
1750PEAK SHAVING PLANT (PSP)730,000210,000
PSP TANKS ADDED IN FY 99930,000270,000
PSP TANKS ADDED IN FY 02930,000270,000
TOTAL NUMBER OF TANKS204925,240

&C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-004

LIST OF PROPANE TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-004-&P&R&"Arial,Italic"&11Fort Benning &C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-004

LIST OF PROPANE TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-004-&P&R&"Arial,Italic"&11Fort Benning &C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-004

LIST OF PROPANE TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-004-&P&R&"Arial,Italic"&11Fort Benning &C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-004

LIST OF PROPANE TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-004-&P&R&"Arial,Italic"&11Fort Benning &C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-004

LIST OF PROPANE TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-004-&P&R&"Arial,Italic"&11Fort Benning &L&"Arial,Italic"Contract No. DATB60-01-C-0005&C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-004

LIST OF PROPANE TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-004-&P&R&"Arial,Italic"&11Fort Benning &L&"Arial,Italic"Contract No. xxxxxxxxxxxxx&C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-004

LIST OF PROPANE TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-004-&P&R&"Arial,Italic"&11Fort Benning &L&"Arial,Italic"Revised by modification #P00008, DABT60-01-C-0005&C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-004

LIST OF PROPANE TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-004-&P&R&"Arial,Italic"&11Fort Benning &L&"Arial,Italic"Contract No. DATB60-01-C-0005&C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-004

LIST OF PROPANE TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-004-&P&R&"Arial,Italic"&11Fort Benning &L&"Arial,Italic"Contract No. DATB60-01-C-0005&C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-004

LIST OF PROPANE TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-004-&P&R&"Arial,Italic"&11Fort Benning &C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-004

LIST OF PROPANE TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-004-&P&R&"Arial,Italic"&11Fort Benning &C&"Arial,Bold"&12

TECHNICAL EXHIBIT 5.4-004

LIST OF PROPANE TANKS&R&"Arial,Italic"Utility Systems Operation and Maintenance &L&"Arial,Italic"&11Technical Exhibit&C&11 C-7.5.4-004-&P&R&"Arial,Italic"&11Fort Benning

TE 5.4-004a

Camp Merrill
Building No.Facility To Be ServicedNumber of TanksTank CapacityTotal Capacity
1VISITORS QUARTERS11,0001,000
4-5OFFICERS CLUB / LEARNING CENTER11,0001,000
6-7R & U SHOP11,0001,000
20AMOTOR POOL21,0002,000
20BDRIVER'S TRAILER1500500
11POST EXCHANGE21,0002,000
10BEQ1500500
12HEADQUARTERS11,0001,000
13CLASSROOM11,0001,000
3-70PATROLLING TOC / PATROLLING ANNEX11,0001,000
25COMMISSARY11,0001,000
29COMMO / FTX11,0001,000
27DISPENSARY21,0002,000
31SUPPLY21000 / 5001,500
33B / C COMPANY21,0002,000
34A CO / VISITING UNIT BILLETS21,0002,000
35LATRINE21000 / 5001,500
36LAUNDROMAT21000 / 5001,500
37STUDENT BARRACKS22,0004,000
38ARMS ROOM / SELF HELP BLDG1500500
40MESS HALL22,0004,000
49MOUNTAINEERING OFFICE11,0001,000
47NCO CLUB25001,000
42GYM22,0004,000
0SEWAGE PUMPING STATION11,0001,000
2-64LATRINE / WATER PLANT12,0002,000
61BARRACKS22,0004,000
2FIRE STATION21000 / 5001,500
16MAIL OFFICE1500500
2-74HQ ORDERLY ROOM / RSE11,0001,000
7-89TRAINING BLDG1500500
91STORAGE BLDG1500500
4649,000
Data current as of 8 FEB 02

&CPROPANE STORAGE TANKS

CAMP MERRILL

&C&P

&CPROPANE STORAGE TANKS

CAMP MERRILL

&C&P

&CPROPANE STORAGE TANKS

CAMP MERRILL

&C&P

&CPROPANE STORAGE TANKS

CAMP MERRILL

&C&P

&CPROPANE STORAGE TANKS

CAMP MERRILL

&C&P

&LCONTRACT DATB60-01-C-0005&CPROPANE STORAGE TANKS

CAMP MERRILL

&C&P &LRevised by modification #P00008, DABT60-01-C-0005&CPROPANE STORAGE TANKS

CAMP MERRILL

&C&P

&LCONTRACT DATB60-01-C-0005&CPROPANE STORAGE TANKS

CAMP MERRILL

&C&P

&LCONTRACT DATB60-01-C-0005&CPROPANE STORAGE TANKS

CAMP MERRILL

&C&P

&CPROPANE STORAGE TANKS

CAMP MERRILL

&C&P

&CPROPANE STORAGE TANKS

CAMP MERRILL

&C&P

Sheet1

File details come from the government source that posted it. Updated .