Technical_Exhibit_5.13-007_Governmnet_Furnished_Property.docx

DOCX document 16 KB Posted

Attached to
Sources Sought - Fort Benning, GA Base Operations
Solicitation number
W911SF-16-R-0012
Issued by

About this file

TE 5.13-007

View the file

Other files

File Type Posted
Special_Notice___Sources_Sought___Benning_BASOPS_20_Mar_18.docx DOCX document
SOURCES_SOUGHT_15_Nov_17.pdf PDF
Amendment__0002_W911SF-16-R-0012_Benning_BASOPS_13_Oct_17.pdf PDF
Amendment__0001_W911SF-16-R-0012_Benning_BASOPS_8_Sep_17.pdf PDF
TE_5.2-026_Mas_Fire_Alarm_Schedule_as_of_01April2013.xlsx XLSX spreadsheet
TE_5.2-027_Traffic_Light_Control_List.xlsx XLSX spreadsheet
TE_1-010-_Environmental_Reports.xls XLS spreadsheet
TE_5.2-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE_1-012-_Invoice_Register.docx DOCX document
TE_5.1-003-_Labor_Hours_for_IJO's_by_Craft.xls XLS spreadsheet
TE_5.10-007-_Chiller_Building_List.xls XLS spreadsheet
Technical_Exhibit_5.13-005_Operational_Inspection_Checklist.docx DOCX document
TE_5.2-024_SUPRESSION_LIST.xlsx XLSX spreadsheet
TE_5.2-021_-_Signal_Ground_Reference_Subsystem_Crecklist_For_Existing_Facilities.docx DOCX document
Technical_Exhibit_5.13-001_Chiller_Equipment.docx DOCX document
TE_5.2-020_-_Ground_Fault_Protection_Subsystem_Checklist_For_Existing_Facilities_-.docx DOCX document
TE_1-005-_Examples_of_Training_Courses.doc DOC document
TE_5.2-002-_List_of_Memorials.doc DOC document
TE_5.2-023_Fire_Sprinkler_system.xlsx XLSX spreadsheet
TE_5.3-002-_Dining_Facility_Equip.,_PMCS,_and_Repair_rev_by_amendment.doc DOC document
TE_5.5-004-_List_of_Buildings_Requiring_Monthly_Filter_Chang.xls XLS spreadsheet
TE_5.2-005-_Bldgs._Designated_for_Roof_Truss_Inspection.xls XLS spreadsheet
Technical_Exhibit_5.13-002a_Chiller_Data.docx DOCX document
TE_5.4-005-_Operating_Checklist_for_Peak_Shaving_Plant_(old).doc DOC document
TE_5_12-001-Workload_Data.xls XLS spreadsheet
TE_5.4-004a-_Propane_Storage_Tanks-_Camp_Merrill.xls XLS spreadsheet
TE_5.2-022_-_Shielding_Subsystem_Checklist_For_Existing_Facilities.docx DOCX document
TE_5.12-002_Cemeteries_Locations.xls XLS spreadsheet
TE_1-006-_TNG_Density.xls XLS spreadsheet
Technical_Exhibit_5.13-008_Chiller_Annual_Maintenance_Checklist.docx DOCX document
TE_5.6-002_List_of_Memorials.xlsx XLSX spreadsheet
TE_5.7-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE5.12-006b_Columbarium_Numbering.docx DOCX document
TE_1-002-_Facility_and_Land_Summary-_Ft._Benning.xls XLS spreadsheet
TE_5.10-003-_Bidgs._Requireing__Heater_Inspections_).docx DOCX document
TE_5.4-004-_List_of_Propane_Tanks-_Ft._Benning.xls XLS spreadsheet
TE_1-015-_DPW_Mail_Courier.doc DOC document
TE_5.11-002-_Maintenance_Allocation_Chart.doc DOC document
TE_5.5-005-_Building__Heating_Plants_and_Systems.xls XLS spreadsheet
TE_5.2-011-_Welcome_Home_Ceremony_Sign_Route,_Map_1.pdf PDF
TE_5.2-019_-_Lighting_Protection_Grounding_Subsystem_Checklist_For_Existing_Facilities.docx DOCX document
TE_5.2-012-_Welcome_Home_Ceremony_Sign_Route,_Map_2.pdf PDF
TE_5.4-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE_5.5-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE_3-002_GFE_Gov't_Furnish_Equipment.xlsx XLSX spreadsheet
TE_5.11-003_Range_Roads_Grading.xls XLS spreadsheet
TE_5.10-001-_Required_Scheduled_Tasks.xlsx XLSX spreadsheet
TE_5.5-003_Changeover_Heat_to_Air.xls XLS spreadsheet
TE_5.4-002a_Monthly_emergency_Hour-meter_Reading_Report.docx DOCX document
TE_1-011-_ASP_Identifications.xls XLS spreadsheet
Show 40 more

Latest 50 of 229 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract No:

Technical Exhibit 5.13-007

(GOVERNMENT FURNISHED PROPERTY)

Lockable enclosed space within building 398 to utilize for storing O&M manuals, records, drawings, etc., as well as office space. Utilities for this space will be provided at no cost to the contractor.

Copies of available O&M manuals, records, drawings of currently installed equipment. These are to be returned to the government at the end of the contract period.

Utilities for equipment operated (electricity and steam for chillers, water for towers, electricity for pump motors, electricity for lights in mechanical spaces, etc.).

Ten-drawer plans cabinet.

Spill Containment Pallets (sixteen).

Flammable storage cabinets (two).

Workbench with Vise (Bldg 398)

Desks (four)

File details come from the government source that posted it. Updated .