TE_1-010-_Environmental_Reports.xls

XLS spreadsheet 36 KB Posted

Attached to
Sources Sought - Fort Benning, GA Base Operations
Solicitation number
W911SF-16-R-0012
Issued by

About this file

TE 1-010

View the file

Other files

File Type Posted
Special_Notice___Sources_Sought___Benning_BASOPS_20_Mar_18.docx DOCX document
SOURCES_SOUGHT_15_Nov_17.pdf PDF
Amendment__0002_W911SF-16-R-0012_Benning_BASOPS_13_Oct_17.pdf PDF
Amendment__0001_W911SF-16-R-0012_Benning_BASOPS_8_Sep_17.pdf PDF
TE_5.2-026_Mas_Fire_Alarm_Schedule_as_of_01April2013.xlsx XLSX spreadsheet
TE_5.2-027_Traffic_Light_Control_List.xlsx XLSX spreadsheet
TE_5.2-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE_1-012-_Invoice_Register.docx DOCX document
TE_5.1-003-_Labor_Hours_for_IJO's_by_Craft.xls XLS spreadsheet
TE_5.10-007-_Chiller_Building_List.xls XLS spreadsheet
Technical_Exhibit_5.13-005_Operational_Inspection_Checklist.docx DOCX document
TE_5.2-024_SUPRESSION_LIST.xlsx XLSX spreadsheet
TE_5.2-021_-_Signal_Ground_Reference_Subsystem_Crecklist_For_Existing_Facilities.docx DOCX document
Technical_Exhibit_5.13-001_Chiller_Equipment.docx DOCX document
TE_5.2-020_-_Ground_Fault_Protection_Subsystem_Checklist_For_Existing_Facilities_-.docx DOCX document
TE_1-005-_Examples_of_Training_Courses.doc DOC document
TE_5.2-002-_List_of_Memorials.doc DOC document
TE_5.2-023_Fire_Sprinkler_system.xlsx XLSX spreadsheet
TE_5.3-002-_Dining_Facility_Equip.,_PMCS,_and_Repair_rev_by_amendment.doc DOC document
TE_5.5-004-_List_of_Buildings_Requiring_Monthly_Filter_Chang.xls XLS spreadsheet
TE_5.2-005-_Bldgs._Designated_for_Roof_Truss_Inspection.xls XLS spreadsheet
Technical_Exhibit_5.13-002a_Chiller_Data.docx DOCX document
Technical_Exhibit_5.13-007_Governmnet_Furnished_Property.docx DOCX document
TE_5.4-005-_Operating_Checklist_for_Peak_Shaving_Plant_(old).doc DOC document
TE_5_12-001-Workload_Data.xls XLS spreadsheet
TE_5.4-004a-_Propane_Storage_Tanks-_Camp_Merrill.xls XLS spreadsheet
TE_5.2-022_-_Shielding_Subsystem_Checklist_For_Existing_Facilities.docx DOCX document
TE_5.12-002_Cemeteries_Locations.xls XLS spreadsheet
TE_1-006-_TNG_Density.xls XLS spreadsheet
Technical_Exhibit_5.13-008_Chiller_Annual_Maintenance_Checklist.docx DOCX document
TE_5.6-002_List_of_Memorials.xlsx XLSX spreadsheet
TE_5.7-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE5.12-006b_Columbarium_Numbering.docx DOCX document
TE_1-002-_Facility_and_Land_Summary-_Ft._Benning.xls XLS spreadsheet
TE_5.10-003-_Bidgs._Requireing__Heater_Inspections_).docx DOCX document
TE_5.4-004-_List_of_Propane_Tanks-_Ft._Benning.xls XLS spreadsheet
TE_1-015-_DPW_Mail_Courier.doc DOC document
TE_5.11-002-_Maintenance_Allocation_Chart.doc DOC document
TE_5.5-005-_Building__Heating_Plants_and_Systems.xls XLS spreadsheet
TE_5.2-011-_Welcome_Home_Ceremony_Sign_Route,_Map_1.pdf PDF
TE_5.2-019_-_Lighting_Protection_Grounding_Subsystem_Checklist_For_Existing_Facilities.docx DOCX document
TE_5.2-012-_Welcome_Home_Ceremony_Sign_Route,_Map_2.pdf PDF
TE_5.4-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE_5.5-001-_Required_Scheduled_Tasks.xls XLS spreadsheet
TE_3-002_GFE_Gov't_Furnish_Equipment.xlsx XLSX spreadsheet
TE_5.11-003_Range_Roads_Grading.xls XLS spreadsheet
TE_5.10-001-_Required_Scheduled_Tasks.xlsx XLSX spreadsheet
TE_5.5-003_Changeover_Heat_to_Air.xls XLS spreadsheet
TE_5.4-002a_Monthly_emergency_Hour-meter_Reading_Report.docx DOCX document
TE_1-011-_ASP_Identifications.xls XLS spreadsheet
Show 40 more

Latest 50 of 229 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Records

Report Description and/or Data RequiredFrequencyA-76 Sec C-1 ReferencePermit Condition and/or Ft. Benning PlanEmission Units and/or specific site/activityRecords Y/NOther requirements
Replace filter once per calendar month if the system the filter serves was in operation during the monthmonthly1.4.5.5.4 bTV 3.5.3PC06/P006 @ Shop 3Y
Replace filter every 90 days if the system the filter serves was in operation during the 90 day period.quarterly1.4.5.5.4 bTV 3.5.3PC11/P101** @ DCAY
Replace filter every 60 days if the system the filter serves was inoperating during the 60 day periodevery 60 days1.4.5.5.4 bTV 3.5.3DC01/D005-D010 @ Weapons PoolY
Replace filter every 60 days if the system the filter serves was inoperating during the 60 day periodevery 60 days1.4.5.5.4 bTV 3.5.3DC02/D011-D014 @ Weapons PoolY
Replace filter every 60 days if the system the filter serves was inoperating during the 60 day periodevery 60 days1.4.5.5.4 bTV 3.5.3DC03/D016-D018 @ Weapons PoolY
Replace filter every 60 days if the system the filter serves was inoperating during the 60 day periodevery 60 days1.4.5.5.4 bTV 3.5.3DC04/D001-D004 @ Weapons PoolY
Record of cumulating hour meter on each engine driven pumpmonthly1.4.5.5.4 bTV 5.2.1aG001, E001-E009YCumulating hour meter
Record fuel oil consumption.daily1.4.5.5.4 bTV 5.2.1bH008, H010,H011Y
Record natural gas consumptiondaily1.4.5.5.4 bTV 5.2.1cH008,H010,H011,H018-H022Y
Record LPG consumptionmonthly1.4.5.5.4 bTV 5.2.1eN101 Peak Shaving PlantYLPG consumption meter
HW Inspections for SAP and CAPWeekly1.4.5.5.3 cHWMPAll SAPs and CAPsY
HW Inspections for SAP and CAPMonthly1.4.5.5.3 cHWMPAll SAPs and CAPsY
Visual Inspections and require daily inspections as per Ft. Benning SWP3Daily1.4.5.5.6SWP3All regulated NPDES FacilitiesYSWP3 Training
Require Weekly inspections as per Ft. Benning SWP3Weekly1.4.5.5.6SWP3All regulated NPDES FacilitiesYSWP3 Training
Require Quarterly inspections as per Ft. Benning SWP3Quarterly1.4.5.5.6SWP3All regulated NPDES FacilitiesYSWP3 Training
Ft. Benning SWP3 Evaluation/Inspection Report form (Table 5-1)Annual1.4.5.5.6SWP3All regulated NPDES FacilitiesYSWP3 Training
Require daily inspections as per Ft. Benning SPCC& ASPDaily1.4.5.5.5 & 1.4.5.7SPCCAll regulated SPCC FacilitiesYSPCC Training
Require weekly inspections as per Ft. Benning SPCC & ASPWeekly1.4.5.5.5 & 1.4.5.7SPCCAll regulated SPCC FacilitiesYSPCC Training
Require monthly inspections as per Ft. Benning SPCC & ASPMonthly1.4.5.5.5 & 1.4.5.7SPCCAll regulated SPCC FacilitiesYSPCC Training
Spill Report - POL/hazardous materials/waste,chemical/substances, etcAll Spills1.4.5.5.5ISCPY
Spill Log - Incidental ReleasesIncidental Spills1.4.5.5.5ISCPY
Require daily inspections as per Ft. Benning UST/AST GuidanceDaily1.4.5.6.7UST/ASTAll regulated UST or ASTY
Require monthly inspections as per Ft. Benning UST/AST GuidanceMonthly1.4.5.6.7UST/ASTAll regulated UST or ASTY
Drainage of Secondary ContainmentAfter Rain Event1.4.5.6.7ASTAll AST with secondary containmentY
Record of Environmental Consideration - FB 144 RAs required1.4.5.5.1NEPAAll project/activities as per AR 200-1Y
Environmental Compliance Book - Activity Specific Plan (ASP)Initial and/or as designated by EMD1.4.5.2Ft. Benning EMD Compliance ProgramCurrently at al industrial/regulated facilities. Future Ft. Benning format for all unit/activitiesY
Pesticide Application (Non-concentrated Round-up)As required for each application1.4.5.7.3 fPMAll areas as applicableYTraining prior to application.
Submission of SAPs/CAPs list to EPMBJune/CY1.4.5.5.3 cHWMPY
Note: ASP currently available at industrial/regulated facilities. See TE 1-011. ASP serves as a record keeping book for all program areas as they relate to an specific facilities under ISCP/SWP3/HW/HM/UST/AST/EPCRA/RMP/CAA/etc. requirements.

&LContract Number: &CTECHNICAL EXHIBIT 1-010 Required Environmental Records &C&P

File details come from the government source that posted it. Updated .