TE_5.2-015_-_Lighting_Protection_Grounding_Subsystem_Checklist_For_New_Facilities.docx

DOCX document 29 KB Posted

Attached to
Sources Sought - Fort Benning, GA Base Operations Federal contract opportunity
Solicitation number
W911SF-16-R-0012
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Benning

About this file

TE 5.2-015

View the file

Other files for this federal contract opportunity

Other files attached to Sources Sought - Fort Benning, GA Base Operations, newest first.
File Type Posted
TE_5.2-014_-_Ground_Fault_Protection_Subsystem_Checklist_For_New_Facilities.docx DOCX document
TE_1-008-_BCT_Impact_Statement.doc DOC document
TE_5.4-005a-__Operating_Checklist_for_Peak_Shaving_Plant_(ne.doc DOC document
TE_5.11-001-_List_of_Ranges.doc DOC document
TE_5.12-005_Headstone_Cleaning_and_Alignement_Maintenance_Tracking_Chart.doc DOC document
TE_1-003_Real_Property_Inventory.xlsx XLSX spreadsheet
TE_1-003a-_Definitions_of_Real_Property_Inventory.xls XLS spreadsheet
TE_5.2-009-_Building_and_Traffic_Sign_Areas.doc DOC document
TE_5.11-004_Obstacle_and_Confidence_Course.xlsx XLSX spreadsheet
TE_5_10-002-_Bldgs__Requiring_Fire_Sprinkler_Inspections_(JAN_2017).docx DOCX document
TE_5.1-002-_Service_Order_(SO)_Priority_Classifications.doc DOC document
TE_3-003-_GFE-_Camp_Merrill.xls XLS spreadsheet
TE_5.2-010-_Locations_of_Welcome_Home_Ceremony_Signs.doc DOC document
TE_5.9-001-_Recommended_Self-Help_Center_Stockage_List.xls XLS spreadsheet
TE_5.2-028_Emergency_Light_Building_List.xlsx XLSX spreadsheet
TE_5.10-007-_Chiller_Building_List.xls XLS spreadsheet
TE_5.2-020_-_Ground_Fault_Protection_Subsystem_Checklist_For_Existing_Facilities_-.docx DOCX document
TE_5.2-021_-_Signal_Ground_Reference_Subsystem_Crecklist_For_Existing_Facilities.docx DOCX document
Technical_Exhibit_5.13-001_Chiller_Equipment.docx DOCX document
TE_5.2-024_SUPRESSION_LIST.xlsx XLSX spreadsheet
Technical_Exhibit_5.13-007_Governmnet_Furnished_Property.docx DOCX document
Sec_C-5.9_SELF-HELP.docx DOCX document
Sec_C-5.13_Chiller_Maintenance_and_Repair_Index.pdf PDF
Attachment_6_-_Specific_Relevant_Contract_Reference_Sheet_12-R-0012_DPW_Benning_BASOPS.pdf PDF
Attachment_9_-_Wage_Determination_16-R-0012_DPW_Benning_BASOPS.pdf PDF
Solicitation_W911SF-16-R-0012_DPW_BASOPS_Solicitation.pdf PDF
Sec_C-5.5_HVAC_SYSTEMS_OPERATION_&_MAINTENANCE.rtf RTF text file
Sec_C-1__General_Information.docx DOCX document
TE_5.7-003-Road_Inspection_Areas.pdf PDF
TE_5.2-018_-_Grounding_And_Bonding_Connection_Checklist_For_Existing_Facilities.pdf PDF
TE_5.10-007-_Chiller_Building_List_rev_by_amendment.pdf PDF
Technical_Exhibit_5.13-002a_Chiller_Data.pdf PDF
TE_5.11-001-_List_of_Ranges.pdf PDF
TE_5.10-003-_Bldgs._Requiring_Heater_Inspections.pdf PDF
TE_5.3-002-_Dining_Facility_Equip. _PMCS _and_Repair_rev_by_amendment.pdf PDF
TE_5.2-001-_Required_Scheduled_Tasks.pdf PDF
TABLE_OF_CONTENTS_-_Draft_PWS_ _Technical_Exhibits.pdf PDF
TE_3-001-_Gov't_Furnished_Facilities.pdf PDF
TE_5.2-020_-_Ground_Fault_Protection_Subsystem_Checklist_For_Existing_Facilities_-.pdf PDF
Technical_Exhibit_5.13-002b_Refrigerant_Use_Data.pdf PDF
TE_5.2-004-_Assesment_of_NRE-Ft._Benning-Historic_Resources_.pdf PDF
TE_5.2-007-_ICYET_Inspection_Deficiency_List.pdf PDF
TE_5.4-005a-__Operating_Checklist_for_Peak_Shaving_Plant_(ne.pdf PDF
TE_5.2-019_-_Lighting_Protection_Grounding_Subsystem_Checklist_For_Existing_Facilities.pdf PDF
TE_5.2-013_-_Earth_Ground_Electrode_Subsystem_Check_list_For_New_Facilities.pdf PDF
TE_5.1-007-_SO_procedure_for_Bldgs._Under_Barracks_Maint._Pr.pdf PDF
Technical_Exhibit_5.13-005_Operational_Inspection_Checklist.pdf PDF
TE_3-004-_GSA_Vehicles_for_KTR_use.pdf PDF
TE_5.4-001-_Required_Scheduled_Tasks.pdf PDF
TE_5.4-002-_List_of_Emergency_Generators.pdf PDF
Show all 50

Sources Sought - Fort Benning, GA Base Operations has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract No: TECHNICAL EXHIBIT 5.2-015

LIGHTNING PROTECTION GROUNDING SUBSYSTEM CHECKLIST FOR NEW FACILITIES

For use of this form, see TM 5-690; the proponent agency is COE.

1. F ACILITY
2. DATE (YYYYMMDD)
3 . L O C A T I O N
4. INSPECTOR

5. SKETCH THE LAYOUT OF THE ACTUAL LIGHTNING PROTECTION SUBSYSTEM (Or attach an up-to-date engineering drawing)

6. ALL LIGHTNING PROTECTION EQUIPMENT UL LABELED YESNO
5. UL MASTER LABEL ISSUED AND PROPERLY ATT ACHED T O T HE BUILDING
YESNO

8. AIR TERMINALS

8 a . C L A S S
8b. HEIGHT
8 c . M A T E R I A L
8d.SIZE (Diameter)
8e. PROPER BASES/FITTINGS
8f. P HYS ICA L CON DIT IO N
8g. PROPERLY INSTALLED
8h. LOCATED AND SPACED AS SPECIFIED YESNO
YES
NO

YES

NO

8i. DOES THE HEIGHT OF AIR TERMINALS PROVIDE PROPER CONE OF PROTECTION YESNO
8j.DEFICIENCIES

9. ROOF CONDUCTORS

9 a . C L A S S
9 b . T Y P E
9c. SIZE
9d.MATERIAL
9e. BEND RADIOUS
9 f. SECURELY ANCHORED YESNO
9g. PROPER FITTINGS YESNO
9 h. LOCATED AND SPACED AS SPECIFIED YESNO

9i. PROPERLY BONDED TO AIR TERMINALS AND OTHER METAL OBJECTS ON ROOF YES NO

9j. PROPERLY INTERCONNECTED TO OTHER CROSS ROOF CONDUCTORS YESNO
9k.DEFICIENCIES

10. DOWN CONDUCTORS

1 0 a . C L A S S
1 0 b . T Y P E
10c. SIZE
10d.MATERIAL
10e. BEND RADIOUS
10f. SECURLY ANCHORED YESNO
10g. PROPER FITTINGS YESNO
10h. LOCATED AND SPACED AS SPECIFIED YESNO
10i. PROPERLY BONDED TO ROOF CONDUCTORS / AIR TERMINALS AND GROUNDING ELECTRODES
YESNO

10j. DEFICIENCIES

1 1 . G U A R D S

11a. TYPE
11b. PROPER FITTINGS
YESNO
11c. SOLIDLY ANCHORED
YESNO

12. GROUNDING ELECTRODES

12a. T YPE
12b. SIZE
12c. LENGTH (Each)
12d. FORM COUNTERPOISE LOOP
YESNO
12e. DISTANCE BELOW GRADE LEVEL
12f. DISTANCE F ROM OUT ER WALL
12g. PROPERLY INSTALLED YESNO
12h. PROPERLY CONNECTED TO OTHER GROUNDING SYSTEMS OF THE BUILDING
YESNO
12i. PROPERLY CONNECTED DOWN CONDUCTORS
YESNO
12j. GROUND RESISTANCE MEASUREMENT

DA FORM 7452-2-R, FEB 2002 USAPA V1.00

File details come from the government source that posted it. Updated .