TE 5.2-015
View the file
Other files for this federal contract opportunity
Show all 50
Sources Sought - Fort Benning, GA Base Operations has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract No: TECHNICAL EXHIBIT 5.2-015
LIGHTNING PROTECTION GROUNDING SUBSYSTEM CHECKLIST FOR NEW FACILITIES
For use of this form, see TM 5-690; the proponent agency is COE.
| 1. F ACILITY |
| 2. DATE (YYYYMMDD) |
| 3 . L O C A T I O N |
| 4. INSPECTOR |
5. SKETCH THE LAYOUT OF THE ACTUAL LIGHTNING PROTECTION SUBSYSTEM (Or attach an up-to-date engineering drawing)
| 6. ALL LIGHTNING PROTECTION EQUIPMENT UL LABELED YES | NO | |
| 5. UL MASTER LABEL ISSUED AND PROPERLY ATT ACHED T O T HE BUILDING | ||
| YES | NO |
8. AIR TERMINALS
| 8 a . C L A S S | |
| 8b. HEIGHT | |
| 8 c . M A T E R I A L | |
| 8d. | SIZE (Diameter) |
| 8e. PROPER BASES/FITTINGS | |
| 8f. P HYS ICA L CON DIT IO N | |
| 8g. PROPERLY INSTALLED | |
| 8h. LOCATED AND SPACED AS SPECIFIED YES | NO |
| YES |
| NO |
YES
NO
| 8i. DOES THE HEIGHT OF AIR TERMINALS PROVIDE PROPER CONE OF PROTECTION YES | NO |
| 8j. | DEFICIENCIES |
9. ROOF CONDUCTORS
| 9 a . C L A S S | |
| 9 b . T Y P E | |
| 9c. SIZE | |
| 9d. | MATERIAL |
| 9e. BEND RADIOUS | |
| 9 f. SECURELY ANCHORED YES | NO |
| 9g. PROPER FITTINGS YES | NO |
| 9 h. LOCATED AND SPACED AS SPECIFIED YES | NO |
9i. PROPERLY BONDED TO AIR TERMINALS AND OTHER METAL OBJECTS ON ROOF YES NO
| 9j. PROPERLY INTERCONNECTED TO OTHER CROSS ROOF CONDUCTORS YES | NO |
| 9k. | DEFICIENCIES |
10. DOWN CONDUCTORS
| 1 0 a . C L A S S | |
| 1 0 b . T Y P E | |
| 10c. SIZE | |
| 10d. | MATERIAL |
| 10e. BEND RADIOUS | |
| 10f. SECURLY ANCHORED YES | NO |
| 10g. PROPER FITTINGS YES | NO |
| 10h. LOCATED AND SPACED AS SPECIFIED YES | NO |
| 10i. PROPERLY BONDED TO ROOF CONDUCTORS / AIR TERMINALS AND GROUNDING ELECTRODES | |
| YES | NO |
10j. DEFICIENCIES
1 1 . G U A R D S
| 11a. TYPE | |
| 11b. PROPER FITTINGS | |
| YES | NO |
| 11c. SOLIDLY ANCHORED | |
| YES | NO |
12. GROUNDING ELECTRODES
| 12a. T YPE | |
| 12b. SIZE | |
| 12c. LENGTH (Each) | |
| 12d. FORM COUNTERPOISE LOOP | |
| YES | NO |
| 12e. DISTANCE BELOW GRADE LEVEL | |
| 12f. DISTANCE F ROM OUT ER WALL | |
| 12g. PROPERLY INSTALLED YES | NO |
| 12h. PROPERLY CONNECTED TO OTHER GROUNDING SYSTEMS OF THE BUILDING | |
| YES | NO |
| 12i. PROPERLY CONNECTED DOWN CONDUCTORS | |
| YES | NO |
| 12j. GROUND RESISTANCE MEASUREMENT |