CODE
(Hour)
PAGE(S)
until 11:00 AM local t ime 18 Sep 2017
X
A X B X C
D
EX
X G F 93 - 106
107 - 128 X H 129 - 137 katie.c.washington.civ@mail.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 137
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W911SF 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
6650 Meloy Dr. Bldg 6 Ste. 250 conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
KATIE WASHINGTON 706-545-2219
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2 3 - 53
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
54 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
55 - 57
58 - 64 X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 65 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 66 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
67 - 91
PART II - CO NTRACT CLAUSES
MISSION & INSTALLATION CONTRACTING CMD
MICC - FORT BENNING
6600 MELOY DRIVE
BUILDING 6, SUITE 250
FT BENNING GA 31905
706-545-5172
706-545-6529FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
16 Aug 2017
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W911SF-16-R-0012
Section A - Solicitation/Contract Form
SUMMARY OF REQUIREMENT
Solicitation #: W911SF-16-R-0012 A.1 Description of Requirement: The Mission and Installation Contracting Command (MICC) – Fort Benning has a requirement to contract Base Operations Support Services (BASOPS) for the Directorate of Public Works (DPW) who supports the mission of the U.S. Army Maneuver Center for Excellence (MCoE) located at Fort Benning, GA. The DPW area of responsibility includes the Fort Benning installation, which is primarily located in the State of Georgia, adjacent to the City of Columbus, Georgia, but also extends into the State of Alabama.
Additionally, the DPW area of responsibility includes Camp Merrill (near Dahlonega, GA). The Fort Benning DPW is responsible for the operation, repair, and maintenance of the installation’s real property facilities; minor construction limited to less than $150,000.00, range operations, and cemetery maintenance; additionally, management of energy, environmental, historical cultural, and natural resources programs. These services support more than 30,000 personnel on a permanent basis, a transient population of more than 25,000 students each year and more than 21,000 family members and 29,000 retirees, in the area for a total average daily population of 105,000. The combined Benning and Merrill real estate consists of approximately 185,000 acres, and 21,000,000 square feet of buildings and structures space.
A.2. NAICS Code: 561210, Facilities Support Services
A.3. Size Standard: $38.5 Million
A.4. Set-Aside: Small Business
A.5 Offers shall remain valid for a minimum of 180 calendar days from the date of receipt.
A.6 All questions concerning this RFP must be submitted by 25 August 2017 to the electronic address provided in the General Instructions.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each
PHASE-IN PERIOD
FFP
The phase-in period is part of the base year of the Contract and starts immediately on the contract start date. During the phase-in period, the Contractor shall prepare to assume full responsibility for all areas of operation in accordance with the terms and conditions of this Contract. The Contractor shall take all actions necessary for a smooth transition of the contracted operations. This period will be two (2) months in duration. The Government will make all facilities and equipment accessible to the Contractor for a maximum of two (2) months prior to the Contract start date. During this period the Contractor's management personnel will be permitted to observe any Facilities engineering operations at Fort Benning, as approved by the Contracting Officer (KO). During the phase-in period, the Contractor shall at a minimum:
•Establish the Project Management Office.
•Recruit and hire necessary personnel.
•Obtain all required certifications and clearances, including personnel security clearances.
•Participate in joint inventories and sign for Government-furnished Property (GFP) or real property.
•Develop and submit any required deliverables.
•Attend postaward meetings as required.
•Receive natural resources briefings.
•Accomplish any necessary training of its personnel to support the functions, (specifically including, but not limited to Section C-5).
FOB: Destination
NET AMT
0002 Each
FACILITIES ENGINEERING SUPPORT
CPFF
LABOR: Facilities Engineering and Administrative Support/Management.
Includes all costs for labor. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-1, C-3, C-4, C-5.1 thru C-5.1.3.2, C-5.9) specifications and Technical Exhibits (TEs).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
0003 Each
FACILITIES ENGINEERING SUPPORT
COST
MATERIALS: Facilities Engineering and Administrative Support/Management - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205-26 and shall be a Not-to-Exceed Amount of $4,000,000.00 inclusive of all indirect Burden Rates and Fees.
0004 Each
GROUNDS MAINTENANCE
CPFF
LABOR: Grounds Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.2 thru C-5.6.4.5, C-5.6.4.8 thru C-5.6.4.16, C-5.10.3.4, C-5.10.4.4, C-5.11.4.2), specifications and Technical Exhibits (TEs).
0005 Each
GROUNDS MAINTENANCE
COST
MATERIALS: Grounds Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be reimbursed in accordance with FAR 31.205-26 and shall be a Not-to-Exceed Amount of $3,000,000.00 inclusive of all indirect Burden Rates and Fees.
0006 Each
FACILITY MAINTENANCE -VERTICAL
CPFF
LABOR: Facility Maintenance- Vertical Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections, C-5.2, C-5.3, C-5.4, C-5.5.3.4 thru C- 5.5.4.7, C-5.10.3.1 thru C-5.10.3.3, C-5.10.4.1 thru C-5.10.4.3, C-5.11.3.2, C- 5.11.4.1, C-5.11.4.3), specifications and Technical Exhibits (TEs).
0007 Each
FACILITY MAINTENANCE -VERTICAL
COST
MATERIALS: Facility Maintenance- Vertical - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be reimbursed in accordance with FAR 31.205-26 and shall be a Not-to-Exceed Amount of $4,000,000.00 inclusive of all indirect Burden Rates and Fees.
0008 Each
FACILITY MAINTENANCE - HORIZONTAL
CPFF
LABOR: Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS),(specifically including, but not limited to, Sections C- 5.7, C-5.10.3.5, C-5.10.4.5, C-5.11.3.1), specifications and Technical Exhibits
0009 Each
FACILITY MAINTENANCE - HORIZONTAL
COST
MATERIALS: Facility Maintenance – Horizontal - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be reimbursed in accordance with FAR 31.205-26 and shall be a Not-to- Exceed Amount of $1,000,000.00 inclusive of all indirect Burden Rates and Fees.
0010 Each
HEATING AND COOLING SYSTEMS
CPFF
LABOR: Heating and Cooling Systems - Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.1.3.3, C-5.5.3.1 thru C-5.5.3.3, C-5.13), specifications and Technical Exhibits (TEs).
0011 Each
HEATING AND COOLING SYSTEMS
COST
MATERIALS: Heating and Cooling Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be reimbursed in accordance with FAR 31.205-26 and shall be a Not-to-Exceed Amount of $1,000,000.00 inclusive of all indirect Burden Rates and Fees.
0012 Each
WATER TREATMENT SERVICES
CPFF
LABOR: Water Treatment Services - Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS),(specifically including, but not limited to, Sections C-5.10.3.6.5) specifications and Technical Exhibits (TEs).
0013 Each
WATER TREATMENT SERVICES
COST
MATERIALS: Water Treatment Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be reimbursed in accordance with FAR 31.205-26 and shall be a Not-to-Exceed Amount of $130,000.00 inclusive of all indirect Burden Rates and Fees.
0014 Each
WASTE WATER SERVICES
CPFF
LABOR: Waste Water Services - Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.10.3.6.1 thru C- 5.10.3.6.4, C-5.10.4.6), specifications and Technical Exhibits (TEs).
0015 Each
WASTE WATER SERVICES
COST
MATERIALS: Waste Water Services - includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be reimbursed in accordance with FAR 31.205-26 and shall be a Not-to-Exceed Amount of $20,000.00 inclusive of all indirect Burden Rates and Fees.
0016 Each
ARMY CEMETERIES
CPFF
LABOR: Army Cemeteries Operation and Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C-5.12), specifications and Technical Exhibits (TEs).
0017 Each
ARMY CEMETERIES
COST
MATERIALS: Army Cemeteries Operation and Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be reimbursed in accordance with FAR 31.205-26 and shall be a Not-to- Exceed Amount of $50,000.00 inclusive of all indirect Burden Rates and Fees.
0018 Each
TRAVEL
COST
Contractor will be reimbursed for required/authorized travel in accordance with the Joint Travel Regulation (JTR).Travel will be approved by the Government prior to the expenditure. Approved Travel Costs Not-to-Exceed Amount:
$100,000.00.
0019 Each
LEASED EQUIPMENT AND VEHICLES
COST
LEASED EQUIPMENT AND VEHICLES: Includes all costs for the lease of vehicle and rental of equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C- 3.4.2.1). Cost Not-to-Exceed Amount: $2,900,000.00
0020 Each
LEASED EQUIPMENT AND VEHICLES
COST
DAMAGES: Charges for damages to vehicles and equipment. Cost Not-to- Exceed Amount: $100,000.00
0021 Each
LEASED EQUIPMENT AND VEHICLES
COST
FEES: Environmental, delivery and pickup fees for vehicles: Cost Not-to-Exceed Amount: $50,000.00
0022 Each
CONTRACTOR MANPOWER REPORTING
FFP
The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS (Section C-1.2.6.14). Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1 through September 30.
0023 Each Delivery of CAP – EQP, ST, & STE
FFP
CLIN for the delivery of Contractor Acquired Property (CAP) classified as Equipment (EQP), Special Tooling (ST),and Special Test Equipment (STE). Once delivered and accepted by the Government, the Government assumes title and the items become GFP. All items meeting the IUID criteria of DFARS 211.274-2 shall be marked and reported in the IUID registry upon delivery IAW DFARS 252.211- 7003.
0024 Each Delivery of CAP – Material
FFP
CLIN for the delivery of Contractor Acquired Property (CAP) classified as Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. All items meeting the IUID criteria of DFARS 211.274-2 shall be marked and reported in the IUID registry upon delivery IAW DFARS 252.211-7003.
1001 Each
OPTION FACILITIES ENGINEERING SUPPORT
CPFF
LABOR: Facilities Engineering and Administrative Support/Management.
Includes all costs for labor, supplies, equipment. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-1, C-3, C-4, C-5.1 thru C-5.1.3.2, C-5.9) specifications and Technical Exhibits (TEs).
1002 Each
OPTION FACILITIES ENGINEERING SUPPORT
COST
MATERIALS: Facilities Engineering and Administrative Support/Management. .
Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, (Sections C-5.6.3.1, C-5.6.4.6 thru C-5.6.4.7, C-5.8), specifications and Technical Exhibits (TEs). Approved Material Costs shall be reimbursed in accordance with FAR 31.205-26 and shall be a Not-to-Exceed Amount of $4,060,000.00 inclusive of all indirect Burden Rates and Fees. Approved Material Costs shall be reimbursed in accordance with FAR 31.205-26 and shall be a Not-to-Exceed Amount of $4,060,000.00 inclusive of all indirect Burden Rates and Fees.
1003 Each
OPTION GROUNDS MAINTENANCE
CPFF
LABOR: Grounds Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.2 thru C-5.6.4.5, C-5.6.4.8 thru C-5.6.4.16, 1004 Each
OPTION GROUNDS MAINTENANCE
COST
MATERIALS: Grounds Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be reimbursed in accordance with FAR 31.205-26 and shall be a Not-to-Exceed Amount of $3,045,000.00 inclusive of all indirect Burden Rates and Fees.
1005 Each
OPTION FACILITY MAINTENANCE -VERTICAL
CPFF
LABOR: Facility Maintenance- Vertical Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections, C-5.2, C-5.3, 5.4, C-5.5.3.4 thru C- 5.5.4.7, C-5.10.3.1 thru C-5.10.3.3, C-5.10.4.1 thru C-5.10.4.3, C-5.11.3.2, C-5.11.4.1, C- 5.11.4.3),specifications and Technical Exhibits (TEs).
1006 Each
OPTION FACILITY MAINTENANCE -VERTICAL
COST
MATERIALS: Facility Maintenance- Vertical - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be
Amount of $4,060,000.00 inclusive of all indirect Burden Rates and Fees.
1007 Each
OPTION FACILITY MAINTENANCE - HORIZONTAL
CPFF
LABOR: Facility Maintenance - Horizontal - Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), ( specifically including, but not limited to, Sections C-5.7, C-5.10.3.5, C-5.10.4.5, C-5.11.3.1), specifications and Technical Exhibits (TEs).
1008 Each
OPTION FACILITY MAINTENANCE - HORIZONTAL
COST
MATERIALS: Facility Maintenance – Horizontal - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be reimbursed in accordance with FAR 31.205-26 and shall be a Not-to- Exceed Amount of $1,015,000.00 inclusive of all indirect Burden Rates and Fees.
1009 Each
OPTION HEATING AND COOLING SYSTEMS
CPFF
LABOR: Heating and Cooling Systems - Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.1.3.3, C-5.5.3.1 thru C- 5.5.3.3, C-5.13), specifications and Technical Exhibits (TEs).
1010 Each
OPTION HEATING AND COOLING SYSTEMS
COST
MATERIALS: Heating and Cooling Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be
Amount of $1,015,000.00 inclusive of all indirect Burden Rates and Fees.
1011 Each
OPTION WATER TREATMENT SERVICES
CPFF
LABOR: Water Treatment Services - Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.10.3.6.5)
1012 Each
OPTION WATER TREATMENT SERVICES
COST
MATERIALS: Water Treatment Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be
Amount of $131,950.00 inclusive of all indirect Burden Rates and Fees.
1013 Each
OPTION WASTE WATER SERVICES
CPFF
LABOR: Waste Water Services - Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.10.3.6.1 thru C-
1014 Each
OPTION WASTE WATER SERVICES
COST
MATERIALS: Waste Water Services - includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be
Amount of $20,300.00 inclusive of all indirect Burden Rates and Fees.
1015 Each
OPTION ARMY CEMETERIES
CPFF
LABOR: Army Cemeteries Operation and Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C-5.12), specifications and
1016 Each
OPTION ARMY CEMETERIES
COST
MATERIALS: Army Cemeteries Operation and Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs
Exceed Amount of $50,750.00 inclusive of all indirect Burden Rates and Fees.
1017 Each
OPTION TRAVEL
COST
Contractor will be reimbursed for required/authorized travel in accordance with the Joint Travel Regulation (JTR).Travel will be approved by the Government prior to the expenditure. Approved Travel Costs Not-to-Exceed Amount:
$101,500.00.
1018 Each
OPTION LEASED EQUIPMENT AND VEHICLES
COST
LEASED EQUIPMENT AND VEHICLES: Includes all costs for the lease of vehicle and rental of equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C- 3.4.2.1). Cost Not-to-Exceed Amount: $2,943,500.00
1019 Each
OPTION LEASED EQUIPMENT AND VEHICLES
COST
DAMAGES: Charges for damages to vehicles and equipment. Cost Not-to- Exceed Amount: $101,500.00
1020 Each
OPTION LEASED EQUIPMENT AND VEHICLES
COST
FEES: Environmental, delivery and pickup fees for vehicles.Cost Not-to-Exceed Amount: $50,750.00
1021 Each
OPTION CONTRACTOR MANPOWER REPORTING
FFP
The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS (Section 1.2.6.14). Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1 through
1022 Each OPTION Delivery of CAP – EQP, ST, & STE
FFP
CLIN for the delivery of Contractor Acquired Property (CAP) classified as Equipment (EQP), Special Tooling (ST) and Special Test Equipment (STE). Once delivered and accepted by the Government, the Government assumes title and the items become GFP. All items meeting the IUID criteria of DFARS 211.274-2 shall be marked and reported in the IUID registry upon delivery IAW DFARS 252.211-
1023 Each OPTION Delivery of CAP – Material
FFP
CLIN for the delivery of Contractor Acquired Property (CAP) classified as Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. All items meeting the IUID criteria of DFARS 211.274-2 shall be marked and reported in the IUID registry upon
2001 Each
OPTION FACILITIES ENGINEERING SUPPORT
CPFF
LABOR: Facilities Engineering and Administrative Support/Management.
Includes all costs for labor. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-1, C-3, C-4, C-5.1 thru C-5.1.3.2, C-5.9) specifications and Technical Exhibits
2002 Each
OPTION FACILITIES ENGINEERING SUPPORT
COST
MATERIALS: Facilities Engineering and Administrative Support/Management - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205-26 and shall be a Not-to-Exceed Amount of $4,120,900.00 inclusive of all indirect Burden
2003 Each
OPTION GROUNDS MAINTENANCE
CPFF
LABOR: Grounds Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.2 thru C-5.6.4.5, C-5.6.4.8 thru C-5.6.4.16, 2004 Each
OPTION GROUNDS MAINTENANCE
COST
MATERIALS: Grounds Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be
Amount of $3,090,675.00 inclusive of all indirect Burden Rates and Fees.
2005 Each
OPTION FACILITY MAINTENANCE -VERTICAL
CPFF
LABOR: Facility Maintenance- Vertical Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections, C-5.2, C-5.3, C-5.4, C-5.5.3.4 thru C- 5.5.4.7, C-5.10.3.1 thru C-5.10.3.3, C-5.10.4.1 thru C-5.10.4.3, C-5.11.3.2, C- 5.11.4.1, C- 5.11.4.3),specifications and Technical Exhibits (TEs).
2006 Each
OPTION FACILITY MAINTENANCE -VERTICAL
COST
MATERIALS: Facility Maintenance- Vertical - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be
Amount of $4,120,900.00 inclusive of all indirect Burden Rates and Fees.
2007 Each
OPTION FACILITY MAINTENANCE - HORIZONTAL
CPFF
LABOR: Facility Maintenance - Horizontal - Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.7, C-5.10.3.5, C-5.10.4.5, C-5.11.3.1), specifications and Technical Exhibits (TEs
2008 Each
OPTION FACILITY MAINTENANCE - HORIZONTAL
COST
MATERIALS: Facility Maintenance – Horizontal - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs
Exceed Amount of $1,030,225.00 inclusive of all indirect Burden Rates and Fees.
2009 Each
OPTION HEATING AND COOLING SYSTEMS
CPFF
LABOR: Heating and Cooling Systems - Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.1.3.3, C-5.5.3.1
2010 Each
OPTION HEATING AND COOLING SYSTEMS
COST
MATERIALS: Heating and Cooling Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be
Amount of $1,030,225.00 inclusive of all indirect Burden Rates and Fees.
2011 Each
OPTION WATER TREATMENT SERVICES
CPFF
LABOR: Water Treatment Services - Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.10.3.6.5)
2012 Each
OPTION WATER TREATMENT SERVICES
COST
MATERIALS: Water Treatment Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be
Amount of $133,929.00 inclusive of all indirect Burden Rates and Fees.
2013 Each
OPTION WASTE WATER SERVICES
CPFF
LABOR: Waste Water Services - Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.10.3.6.1 thru C-5.10.3.6.4, C-5.10.4.6), specifications and Technical Exhibits (TEs).
2014 Each
OPTION WASTE WATER SERVICES
COST
MATERIALS: Waste Water Services - includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be
Amount of $20,604.00 inclusive of all indirect Burden Rates and Fees.
2015 Each
OPTION ARMY CEMETERIES
CPFF
LABOR: Army Cemeteries Operation and Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C-5.12), specifications and Technical Exhibits (TEs)
2016 Each
OPTION ARMY CEMETERIES
COST
MATERIALS: Army Cemeteries Operation and Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs
Exceed Amount of $51,511.00 inclusive of all indirect Burden Rates and Fees.
2017 Each
OPTION TRAVEL
COST
Contractor will be reimbursed for required/authorized travel in accordance with the Joint Travel Regulation (JTR).Travel will be approved by the Government prior to the expenditure. Approved Travel Costs Not-to-Exceed Amount:
$103,022.00
2018 Each
OPTION LEASED EQUIPMENT AND VEHICLES
COST
LEASED EQUIPMENT AND VEHICLES: Includes all costs for the lease of vehicle and rental of equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C- 3.4.2.1). Cost Not-to-Exceed Amount: $2,987,652.00
2019 Each
OPTION LEASED EQUIPMENT AND VEHICLES
COST
DAMAGES: Charges for damages to vehicles and equipment. Cost Not-to- Exceed Amount: $103,022.00.
2020 Each
OPTION LEASED EQUIPMENT AND VEHICLES
COST
FEES: Environmental, delivery and pickup fees for vehicles. Cost Not-to-Exceed Amount: $51,511.00
2021 Each
OPTION CONTRACTOR MANPOWER REPORTING
FFP
The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS (Section 1.2.6.14). Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1 through
2022 1 Each OPTION Delivery of CAP – EQP, ST, & STE
FFP
CLIN for the delivery of Contractor Acquired Property (CAP) classified as Equipment (EQP), Special Tooling (ST) and Special Test Equipment (STE). Once delivered and accepted by the Government, the Government assumes title and the items become GFP. All items meeting the IUID criteria of DFARS 211.274-2 shall be marked and reported in the IUID registry upon delivery IAW DFARS 252.211-
2023 1 Each OPTION Delivery of CAP – Material
FFP
CLIN for the delivery of Contractor Acquired Property (CAP) classified as Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. All items meeting the IUID criteria of DFARS 211.274-2 shall be marked and reported in the IUID registry upon
3001 Each
OPTION FACILITIES ENGINEERING SUPPORT
CPFF
LABOR: Facilities Engineering and Administrative Support/Management.
Includes all costs for labor. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-1, C-3, C-4, C-5.1 thru C-5.1.3.2, C-5.9) specifications and Technical Exhibits
3002 Each
OPTION FACILITIES ENGINEERING SUPPORT
COST
MATERIALS: Facilities Engineering and Administrative Support/Management - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205-26 and shall be a Not-to-Exceed Amount of $4,182,713.00 inclusive of all indirect Burden
3003 Each
OPTION GROUNDS MAINTENANCE
CPFF
LABOR: Grounds Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.2 thru C-5.6.4.5, C-5.6.4.8 thru C-5.6.4.16, 3004 Each
OPTION GROUNDS MAINTENANCE
COST
MATERIALS: Grounds Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be
Amount of $3,137,035.00 inclusive of all indirect Burden Rates and Fees.
3005 Each
OPTION FACILITY MAINTENANCE -VERTICAL
CPFF
LABOR: Facility Maintenance- Vertical Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections, C-5.2, C-5.3, C-5.4, C-5.5.3.4 thru C- 5.5.4.7,C-5.10.3.1 thru 5.10.3.3, C-5.10.4.1 thru 5.10.4.3, C-5.11.3.2, C-5.11.4.1, C-5.11.4.3) specifications and Technical Exhibits (TEs).
3006 Each
OPTION FACILITY MAINTENANCE -VERTICAL
COST
MATERIALS: Facility Maintenance- Vertical - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be
Amount of $4,182,713.00 inclusive of all indirect Burden Rates and Fees.
3007 Each
OPTION FACILITY MAINTENANCE - HORIZONTAL
CPFF
LABOR: Facility Maintenance - Horizontal - lncludes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), ( specifically including, but not limited to, Sections C-5.7, C-5.10.3.5, C-5.10.4.5, C-5.11.3.1), specifications and Technical Exhibits (TEs)
3008 Each
OPTION FACILITY MAINTENANCE - HORIZONTAL
COST
MATERIALS: Facility Maintenance – Horizontal - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs
Exceed Amount of $1,045,678.00 inclusive of all indirect Burden Rates and Fees.
3009 Each
OPTION HEATING AND COOLING SYSTEMS
CPFF
LABOR: Heating and Cooling Systems - Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.1.3.3, C-5.5.3.1
3010 Each
OPTION HEATING AND COOLING SYSTEMS
COST
MATERIALS: Heating and Cooling Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be
Amount of $1,045,678.00 inclusive of all indirect Burden Rates and Fees.
3011 Each
OPTION WATER TREATMENT SERVICES
CPFF
LABOR: Water Treatment Services - Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.10.3.6.5).
3012 Each
OPTION WATER TREATMENT SERVICES
COST
MATERIALS: Water Treatment Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be
Amount of $135,938.00 inclusive of all indirect Burden Rates and Fees.
3013 Each
OPTION WASTE WATER SERVICES
CPFF
LABOR: Waste Water Services - Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.10.3.6.1 thru C-5.10.3.6.4, C-5.10.4.6), specifications and Technical Exhibits (TEs).
3014 Each
OPTION WASTE WATER SERVICES
COST
MATERIALS: Waste Water Services - includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be
Amount of $20,913.00 inclusive of all indirect Burden Rates and Fees.
3015 Each
OPTION ARMY CEMETERIES
CPFF
LABOR: Army Cemeteries Operation and Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C-5.12), specifications and
3016 Each
OPTION ARMY CEMETERIES
COST
MATERIALS: Army Cemeteries Operation and Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs
Exceed Amount of $52,283.00 inclusive of all indirect Burden Rates and Fees.
3017 Each
OPTION TRAVEL
COST
Contractor will be reimbursed for required/authorized travel in accordance with the Joint Travel Regulation (JTR).Travel will be approved by the Government prior to the expenditure. Approved Travel Costs Not-to-Exceed Amount:
$104,567.00
3018 Each
OPTION LEASED EQUIPMENT AND VEHICLES
COST
LEASED EQUIPMENT AND VEHICLES: Includes all costs for the lease of vehicle and rental of equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C- 3.4.2.1). Cost Not-to-Exceed Amount: $3,032,467.00.
3019 Each
OPTION LEASED EQUIPMENT AND VEHICLES
COST
DAMAGES: Charges for damages to vehicles and equipment. Cost Not-to- Exceed Amount: $104,567.00.
3020 Each
OPTION LEASED EQUIPMENT AND VEHICLES
COST
FEES: Environmental, delivery and pickup fees for vehicles.Cost Not-to-Exceed Amount: $52,283.00
3021 Each
OPTION CONTRACTOR MANPOWER REPORTING
FFP
The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS (Section 1.2.6.14). Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1 through September 30
3022 1 Each OPTION Delivery of CAP – EQP, ST, & STE
FFP
CLIN for the delivery of Contractor Acquired Property (CAP) classified as Equipment (EQP), Special Tooling (ST) and Special Test Equipment (STE). Once delivered and accepted by the Government, the Government assumes title and the items become GFP. All items meeting the IUID criteria of DFARS 211.274-2 shall be marked and reported in the IUID registry upon delivery IAW DFARS 252.211-
3023 1 Each OPTION Delivery of CAP – Material
FFP
CLIN for the delivery of Contractor Acquired Property (CAP) classified as Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. All items meeting the IUID criteria of DFARS 211.274-2 shall be marked and reported in the IUID registry upon
4001 Each
OPTION FACILITIES ENGINEERING SUPPORT
CPFF
LABOR: Facilities Engineering and Administrative Support/Management.
Includes all costs for labor. All work shall be performed successfully in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-1, C-3, C-4, C-5.1 thru C-5.1.3.2, C-5.9) specifications and Technical Exhibits
4002 Each
OPTION FACILITIES ENGINEERING SUPPORT
COST
MATERIALS: Facilities Engineering and Administrative Support/Management - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement. Approved Material Costs shall be reimbursed in accordance with FAR 31.205-26 and shall be a Not-to-Exceed Amount of $4,245,453.00 inclusive of all indirect Burden
4003 Each
OPTION GROUNDS MAINTENANCE
CPFF
LABOR: Grounds Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.6.3.2 thru C-5.6.4.5, C-5.6.4.8 thru C-5.6.4.16, 4004 Each
OPTION GROUNDS MAINTENANCE
COST
MATERIALS: Grounds Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be
Amount of $3,184,090.00 inclusive of all indirect Burden Rates and Fees.
4005 Each
OPTION FACILITY MAINTENANCE -VERTICAL
CPFF
LABOR: Facility Maintenance- Vertical Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections, C-5.2, C-5.3, C-5.4, C-5.5.3.4 thru C- 5.5.4.7, C-5.10.3.1 thru C-5.10.3.3, C-5.10.4.1 thru C-5.10.4.3, C-5.11.3.2, C- 5.11.4.1, C- 5.11.4.3) specifications and Technical Exhibits (TEs).
4006 Each
OPTION FACILITY MAINTENANCE -VERTICAL
COST
MATERIALS: Facility Maintenance- Vertical - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS).Approved Material Costs shall be
Amount of $4,245,453.00 inclusive of all indirect Burden Rates and Fees.
4007 Each
OPTION FACILITY MAINTENANCE - HORIZONTAL
CPFF
LABOR: Facility Maintenance - Horizontal - Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), ( specifically including, but not limited to, Sections C-5.7, C-5.10.3.5, C-5.10.4.5, C-5.11.3.1), specifications and Technical Exhibits (TEs).
4008 Each
OPTION FACILITY MAINTENANCE - HORIZONTAL
COST
MATERIALS: Facility Maintenance – Horizontal - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs
Exceed Amount of $1,061,363.00 inclusive of all indirect Burden Rates and Fees.
4009 Each
OPTION HEATING AND COOLING SYSTEMS
CPFF
LABOR: Heating and Cooling Systems - Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.1.3.3, C-5.5.3.1
4010 Each
OPTION HEATING AND COOLING SYSTEMS
COST
MATERIALS: Heating and Cooling Systems - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be
Amount of $1,061,363.00 inclusive of all indirect Burden Rates and Fees.
4011 Each
OPTION WATER TREATMENT SERVICES
CPFF
LABOR: Water Treatment Services - Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.10.3.6.5).
4012 Each
OPTION WATER TREATMENT SERVICES
COST
MATERIALS: Water Treatment Services - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be
Amount of $137,977.00 inclusive of all indirect Burden Rates and Fees.
4013 Each
OPTION WASTE WATER TREATMENT SERVICES
CPFF
LABOR: Waste Water Treatment Services - Includes all costs for labor, supplies and equipment. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Sections C-5.10.3.6.1 thru C-
4014 Each
OPTION WASTE WATER TREATMENT SERVICES
COST
MATERIALS: Waste Water Treatment Services - includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs shall be
Amount of $21,226.00 inclusive of all indirect Burden Rates and Fees.
4015 Each
OPTION ARMY CEMETERIES
CPFF
LABOR: Army Cemeteries Operation and Maintenance- Includes all costs for labor. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C-5.12), specifications and
4016 Each
OPTION ARMY CEMETERIES
COST
MATERIALS: Army Cemeteries Operation and Maintenance - Includes all costs for materials, supplies and equipment necessary to perform required services as specified in the Performance Work Statement (PWS). Approved Material Costs
Exceed Amount of $53,067.00 inclusive of all indirect Burden Rates and Fees.
4017 Each
OPTION TRAVEL
COST
Contractor will be reimbursed for required/authorized travel in accordance with the Joint Travel Regulation (JTR).Travel will be approved by the Government prior to the expenditure. Approved Travel Costs Not-to-Exceed Amount:
$106,135.00.
4018 Each
OPTION LEASED EQUIPMENT AND VEHICLES
COST
LEASED EQUIPMENT AND VEHICLES: Includes all costs for labor, supplies for lease vehicle and equipment rentals. All work shall be successfully performed in accordance with the terms and conditions of the contract and the Performance Work Statement (PWS), (specifically including, but not limited to, Section C- 3.4..2.1). Cost Not-to-Exceed Amount: $3,077,954.00.
4019 Each
OPTION LEASED EQUIPMENT AND VEHICLES
COST
DAMAGES: Charges for damages to vehicles and equipment. Cost Not-to- Exceed Amount: $106,135.00.
4020 Each
OPTION LEASED EQUIPMENT AND VEHICLES
COST
FEES: Environmental, delivery and pickup fees for vehicles. Cost Not-to-Exceed Amount: $53,067.00.
4021 Each
OPTION CONTRACTOR MANPOWER REPORTING
FFP
The Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS (Section C-1.2.6.14). Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs October 1 through
4022 1 Each OPTION Delivery of CAP – EQP, ST, & STE
FFP
CLIN for the delivery of Contractor Acquired Property (CAP) classified as Equipment (EQP), Special Tooling (ST) and Special Test Equipment (STE). Once delivered and accepted by the Government, the Government assumes title and the items become GFP. All items meeting the IUID criteria of DFARS 211.274-2 shall be marked and reported in the IUID registry upon delivery IAW DFARS 252.211-
4023 1 Each OPTION Delivery of CAP – Material
FFP
CLIN for the delivery of Contractor Acquired Property (CAP) classified as Material. Once delivered and accepted by the Government, the Government assumes title and the items become GFP. All items meeting the IUID criteria of DFARS 211.274-2 shall be marked and reported in the IUID registry upon
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT:
See Performance Work Statement (PWS) Attachment List in Section: J.
PWS Sections C-1 - C-4 PWS Sections C-5.1 -C-5.13
See Technical Exhibits Attachment List in Section J.
TE 3-001 through TE 5.15-003
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government 0016 Destination Government Destination Government 0017 Destination Government Destination Government 0018 Destination Government Destination Government 0019 Destination Government Destination Government 0020 Destination Government Destination Government 0021 Destination Government Destination Government 0022 Destination Government Destination Government 0023 Destination Government Destination Government 0024 Destination Government Destination Government 1001 Destination Government Destination Government…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .