Q As _v2.xlsx
XLSX spreadsheet 10 KB Posted
- Solicitation number
- W911S814R0003
About this file
2nd set of questions and answers
View the file
Other files
Show 40 more
Latest 50 of 61 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| # | Reference | Question | Response |
| 37 | Section L, Para 8.1 | Are you wanting just that section in our proposal to have sanitized/redacted information? | Amendment 0003 removed this statement to eliminate any confusion. |
| 38 | Section L, Para 8.1 | Wanted to clarify that you do not want the entire volume to be redacted. | See response to Question #37 |
| 39 | Can you let me know if the 2 CD’s for Volume III are requiring one of them to have the sanitized/redacted information. | See response to Question #37 | |
| 40 | Seed Project, Women's Restroom Scope | Is it just the flex duct or are we to include the rigid duct connected to the vertical riser? | The only requirement of this contract is to provide the required CFM called out in the seed project SOW. Updated drawings are provided in Amendment 0003. Unfortunately the as-builts provided are the only drawings available. |
| 41 | Seed Project, Women's Restroom Scope | Does the owner want the 6x6 duct installed as shown in the Women’s Locker Room which is not there now? | The 6x6 ductwork is assumed to be installed. All ductwork is above the ceiling so it can't be determined to be absent from the site visit. Only requirement is to provide the CFM as required per the seed project SOW; whether the contractor deems extra replacement of ductwork is necessary or not. Updated drawings are provided in Amendment 0003. Unfortunately the as-builts provided are the only drawings available. |