SECTION 03 01 30 Page 1
JOINT BASE LEWIS-MCCHORD DESIGN STANDARDS
SECTION 03 01 30 - RESTORATION OF CONCRETE IN HISTORIC STRUCTURES
Design Requirements Any concrete mix used for repairs or modifications to structures within the Joint Base Lewis-McChord Historic District which is exposed to view shall be tinted so as to approximate the color of the existing adjacent concrete. This guidance also applies to concrete used for miscellaneous paving repair (section 32 13 13.03) and sidewalks (section 32 16 13).
SECTION 03 01 30
RESTORATION OF CONCRETE IN HISTORIC STRUCTURES
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ACI INTERNATIONAL (ACI)
ACI 201.1R (1992; R 1997) Guide for Making a Condition Survey of Concrete in Service
ACI 211.1 (1991; R 2002) Standard Practice for Selecting
Proportions for Normal, Heavyweight, and Mass Concrete
ACI 211.2 (1998; R 2004) Standard Practice for Selecting
Proportions for Structural Lightweight Concrete
ACI 224.1R (12007) Causes, Evaluation, and Repair of Cracks in
Concrete Structures
ACI 301 (2005) Specifications for Structural Concrete
ACI 304R (2000) Guide for Measuring, Mixing, Transporting, and
Placing Concrete
ACI 318/318M (2002) Building Code Requirements for Structural
Concrete
ACI 347 (2004) Guide to Formwork for Concrete
ACI 364.1R (2007) Guide for Evaluation of Concrete Structures
Prior to Rehabilitation
ACI 437R (2003) Strength Evaluation of Existing Concrete
Buildings
ACI C-10 (1990) Repair and Rehabilitation of Concrete
Structures
ACI C-20 (1992) Repair and Rehabilitation II
SECTION 03 01 30 Page 2
ACI SP-66 (2004) ACI Detailing Manual
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO)
AASHTO M 182 (2005) Standard Specification for Burlap Cloth Made from Jute or Kenaf and Cotton Mats
ASTM INTERNATIONAL (ASTM)
ASTM A 36/A 36M (2008) Standard Specification for Carbon Structural Steel
ASTM A 615/A 615M (2008) Standard Specification for Deformed and Plain
Carbon-Steel Bars for Concrete Reinforcement
ASTM A 706/A 706M (2006a) Standard Specification for Low-Alloy Steel
Deformed and Plain Bars for Concrete Reinforcement
ASTM C 1017/C 1017M (2007) Standard Specification for Chemical Admixtures for Use in Producing Flowing Concrete
ASTM C 1084 (2002) Standard Specification for Portland-Cement Content of Hardened Hydraulic-Cement Concrete
ASTM C 109/C 109M (2007) Standard Test Method for Compressive Strength of Hydraulic Cement Mortars (Using 2-in. or (50-mm) Cube Specimens)
ASTM C 1107/C 1107M (2007a) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)
ASTM C 114 (2007) Standard Test Methods for Chemical Analysis of
Hydraulic Cement
ASTM C 1218/C 1218M (1999; r 2008) Standard Specification for Water-
Soluble Chloride in Mortar and Concrete
ASTM C 136 (2006) Standard Test Method for Sieve Analysis of
Fine and Coarse Aggregates
ASTM C 143/C 143M (2008) Standard Test Method for Slump of Hydraulic-
Cement Concrete
ASTM C 150 (2007) Standard Specification for Portland Cement
ASTM C 171 (2007) Standard Specification for Sheet Materials for
Curing Concrete
ASTM C 192/C 192M (2007) Standard Practice for Making and Curing
Concrete Test Specimens in the Laboratory
ASTM C 231 (2008) Standard Test Method for Air Content of
Freshly Mixed Concrete by the Pressure Method
ASTM C 260 (2006) Standard Specification for Air-Entraining
Admixtures for Concrete
SECTION 03 01 30 Page 3
ASTM C 295 (2003) Petrographic Examination of Aggregates for
ASTM C 31/C 31M (2008) Standard Practice for Making and Curing
Concrete Test Specimens in the Field
ASTM C 33 (2007) Standard Specification for Concrete Aggregates
ASTM C 39/C 39M (2005e1) Standard Test Method for Compressive
Strength of Cylindrical Concrete Specimens
ASTM C 42/C 42M (2004) Standard Test Method for Obtaining and Testing
Drilled Cores and Sawed Beams of Concrete
ASTM C 457 (2008) Microscopical Determination of Parameters of the Air-Void System in Hardened Concrete
ASTM C 494/C 494M (2008) Standard Specification for Chemical Admixtures for Concrete
ASTM C 597 (2002) Pulse Velocity Through Concrete
ASTM C 618 (2008) Standard Specification for Coal Fly Ash and
Raw or Calcined Natural Pozzolan for Use in Concrete
ASTM C 642 (2006) Density, Absorption, and Voids in Hardened
Concrete
ASTM C 78 (2008) Standard Test Method for Flexural Strength of
Concrete (Using Simple Beam with Third-Point Loading)
ASTM C 803/C 803M (2003) Penetration Resistance of Hardened Concrete
ASTM C 805 (2002) Rebound Number of Hardened Concrete
ASTM C 823/C 823M (2007) Examination and Sampling of Hardened Concrete in Construction
ASTM C 856 (2004) Petrographic Examination of Hardened Concrete
ASTM C 881/C 881M (2002) Standard Specification for Epoxy-Resin-Base
Bonding Systems for Concrete
ASTM C 979 (2005) Pigments for Integrally Colored Concrete
ASTM C 989 (2006) Standard Specification for Ground Granulated
Blast-Furnace Slag for Use in Concrete and Mortars
ASTM D 75 (2003) Standard Practice for Sampling Aggregates
U.S. ARMY CORPS OF ENGINEERS (USACE)
COE CRD-C 300 (1990) Specifications for Membrane-Forming Compounds for Curing Concrete
SECTION 03 01 30 Page 4
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Specialized concrete; G
The contractor shall submit detail drawings conforming to ACI SP-66 and ACI 318/318M. Detail drawings shall show location of architectural concrete elements in the work, building elevations, formwork fabrication details, reinforcements, embedments, dimensions, concrete strength, interface with adjacent materials, and special placing instructions, in sufficient detail to cover fabrication, placement, stripping, and finishing.
SD-03 Product Data
Proportions of Mixture; G
The results of trial mixture along with a statement giving the maximum nominal coarse aggregate size, aggregate grading, and the proportions of all ingredients that will be used in the manufacture of each strength of concrete, at least 14 days prior to commencing concrete placing operations. Aggregate quantities (by mass) shall be based on the saturated surface-dry condition. The statement shall include a complete petrographic analysis of the aggregates proposed for use in the concrete. The statement shall be accompanied by test results from an independent commercial testing laboratory, attesting that the proportions selected will produce concrete of the qualities indicated. No substitutions shall be made in the materials used in the work without additional tests to show that the quality of the concrete is satisfactory.
Form-Release Agents
Submit manufacturer documentation demonstrating type and percentage of biobased content or written justification of non-use per paragraph 2.1.10.
SD-04 Samples
Materials; G
A minimum of 3 sample specimens for each proposed mixture at least 14 days prior to any placements, in order to demonstrate range of variation of each mixture. Samples of cured concrete and mortar patching specimens for each mixture shall be submitted for comparison with the cleaned structure. Samples of concrete and mortar shall be approximately 12 by 12 inches in plan dimension and1 to 1-1/2 inches thick. The samples shall clearly indicate the mixture represented by the specimen, and shall have been produced, placed, finished, textured, and cured in the same manner as proposed for use in the
SECTION 03 01 30 Page 5 work. The samples shall be checked for matches in color and shade, finish, texture, and surface defects. The samples shall be compared to that part of the structure on which the mixture is proposed to be used. The samples shall be compared to the thoroughly cleaned structure. The samples and structure surfaces shall be clean and completely dry during the comparison. Following the comparison to dry surfaces, the sample and structure shall be dampened with clean, potable water and the surfaces shall be compared for acceptability to the Contracting Officer.
SD-06 Test Reports
Sampling and Laboratory Testing of Materials
Certified copies of laboratory test reports on analysis of existing concrete composition and new concrete mixtures, including all test data, for aggregate, admixtures, and curing compound. These tests shall be made by an approved commercial laboratory or by a laboratory maintained by the manufacturers of the materials.
SD-07 Certificates
Materials
Certificates of compliance attesting that the materials meet specification requirements.
Qualifications; G
A statement certified by the contractor attesting that the experience and qualification of the workers (journeymen) comply with the specifications.
1.3 GENERAL REQUIREMENTS
The contractor shall be responsible for equipment, materials, testing, labor and other items and services required to accomplish the work. Equipment and techniques proposed for use in the work shall not be used until they have been demonstrated and approved. Materials and equipment which have not been approved for use in the work shall not be stored or brought on to Government property. The contractor shall provide equipment, materials, and labor to demonstrate materials, equipment, and techniques proposed for use in the work. The demonstrations shall be performed at the site, at a time and location as directed. The demonstration shall include surface cleaning, excavation, surface patching (including finishing, texturing, and curing materials and methods), curing, safety procedures, surface finish and appearance. The contractor's quality control shall conform to Section 01 45 01 USACE QUALITY CONTROL. All sampling and testing shall be the contractor's responsibility, and shall be performed by an approved independent commercial testing laboratory, except as otherwise specified.
1.3.1 Concrete Mixture
The concrete mixture shall match that of the existing concrete to be repaired unless otherwise directed and shall be designed in accordance with ACI 211.1 or ACI 211.2. The mixture proportions shall include consideration of the finishes required.
SECTION 03 01 30 Page 6
1.3.2 Formwork Design
Formwork design shall conform to ACI 301 and ACI 347.
1.4 QUALIFICATIONS
The contractor shall provide qualified workers trained and experienced in restoration of concrete in historic structures for at least 5 consecutive years. A list of similar jobs shall be provided identifying when, where, and for whom the work was done.
1.5 EQUIPMENT
Equipment that is dependable and adequate to accomplish the specified work shall be assembled at the work site in sufficient time before the start of the work to permit thorough inspection, calibration of weighing and measuring devices, adjustment of parts, and the making of any repairs that may be required. The equipment shall be maintained in acceptable working condition during the life of the project.
1.5.1 Cleaning
Equipment used in cleaning shall not cause staining, erosion, marring, or other damage or changes in the appearance of the surfaces to be cleaned.
1.5.1.1 Sandblasting
Sandblasting equipment shall not be used in cleaning concrete and other building surfaces; and shall be subject to approval for each other specific applications. Sandblasting equipment permitted for use in cleaning reinforcement and other embedded metal items shall include an air compressor, hose, and long-wearing venturi-type nozzle of proper size, shape and opening. The maximum nozzle opening shall not exceed 1/4 inch. The air compressor shall be portable and shall be capable of furnishing not less than 150 cubic feet per minute and maintaining a line pressure of not less than 90 psi at the nozzle while in use. The compressor shall be equipped with traps that will maintain the compressed air free of oil and water. The nozzle shall have an adjustable guide that will hold the nozzle aligned with the reinforcement and other items to be cleaned, and will maintain the nozzle approximately 1 inch above the surface. The height, angle of inclination and the size of the nozzle shall be adjusted as necessary to provide satisfactory results. The contractor shall provide protective covers and barriers as required to prevent over-spray onto adjacent surfaces.
1.5.1.2 Water Blasting
Water blasting equipment shall include a trailer-mounted water tank, pumps, high-pressure hose, wand with safety release cutoff control, nozzle, and auxiliary water re-supply equipment. The equipment shall not be operated at a pressure which will cause etching or other damage to the concrete surface, except for the surfaces of the interior of the excavation, where operation at higher pressures may be used, subject to specific approval. The equipment shall be operated at a discharge capacity of 55 psi maximum and 2.5 to 3 gpm for general surface cleaning operations of the structure, and between 500 and 1,000 psi and 2.5 to 3 gpm for cleaning of drill holes and surfaces of excavations. The water tank and auxiliary re-supply equipment shall be of
SECTION 03 01 30 Page 7 sufficient capacity to permit continuous operations. The contractor shall provide protective covers and barriers as required to prevent over-spray onto adjacent surfaces.
1.5.2 Excavation
The equipment used to excavate concrete shall be handheld manual or power type with a low-impact energy output and shall have gad points. The use of chisel points is prohibited. Surface grinders for use in preparing concrete and metal surfaces shall be small, hand-held equipment with a slow to moderate operating RPM, using stone grinding wheels. Saw cutting equipment shall use circular diamond blades. The blade shall be at least 1/8-inch thick, with blade diameter selected as appropriate for the application.
Excavation equipment shall be subject to approval.
1.5.3 Drilling
Equipment used to drill holes in concrete for patch anchors and other applications shall be standard handheld masonry drills, commonly used for drilling small holes in concrete and masonry. The drill shall be a small, powered, handheld type, using rotary drilling mode only. Impact and rotary impact type drills are prohibited.
1.5.4 Finishing and Texturing
Hand tools used for placing, finishing, and texturing concrete and mortar shall be commercially available and commonly used in concrete construction and repair. Equipment used for finishing and texturing concrete and mortar surfaces shall be a type commonly used in the concrete construction and repair industry for that application. Surface grinders, impact tools, and other equipment shall conform to the requirements specified herein, except as specifically required by the type of finish and texture, and subject to approval.
1.5.5 Compressed Air Supplies
Compressed air shall provide clean, oil and moisture free compressed air at the surface to be cleaned. The compressed air line shall have at least two in-line air filters to remove oil and moisture from the air supply. The compressed air supply shall be tested during each shift for the presence of oil and moisture.
1.5.6 Mixing, Transporting, and Placing
Equipment used for mixing, transporting, placing, and confining concrete and mortar placements shall be suitable for the intended purpose and be capable of satisfactorily mixing material, and supporting placement operations in an uninterrupted manner. Equipment shall be maintained in a clean, good operable condition at all times. Equipment used in the work shall be subject to approval. Defects, and deficiencies in operation or capacity shall be resolved prior to use in the work. Equipment used for batching, mixing, conveying, and placing of materials shall be clean, free of old materials and contaminants, and shall conform to the material manufacturer's recommendations.
1.5.7 Associated Equipment
SECTION 03 01 30 Page 8
Associated equipment such as mixer timing equipment, valves, pressure gauges, pressure hoses, other hardware, and tools shall be provided as required to ensure a continuous supply of material and operation control.
Mechanical or radio communication systems shall be used between elements of mortar production and placement operation which are more than 100 feet apart.
1.6 SAMPLING AND LABORATORY TESTING OF MATERIALS
Sampling and testing shall be performed by an approved independent commercial testing laboratory, or by the contractor subject to approval.
Should the contractor elect to establish testing facilities, no work requiring testing shall be permitted until the contractor's facilities have been inspected and approved. All sampling and testing shall be the contractor's responsibility.
1.6.1 Existing Concrete Testing
Representative samples of existing concrete shall be taken from areas of the structure to be repaired at indicated locations. The samples shall be taken in accordance with ASTM C 42/C 42M and ASTM C 823/C 823M and tested in accordance with ASTM C 39/C 39M, ASTM C 42/C 42M, ASTM C 295, ASTM C 457, ASTM C 856, ASTM C 1218/C 1218M, and ASTM C 642, ASTM C 114, and ASTM C 1084. Aggregates in the existing concrete shall be evaluated in accordance with ASTM C 136 and ASTM C 295. The air content of the existing concrete shall be determined in accordance with ASTM C 457 and ASTM C 642.
1.6.2 Acceptance of Cement
Cement for repair concrete and mortars shall be tested as prescribed in the referenced specification under which it is furnished. Cement may be accepted on the basis of mill tests and the manufacturer's certification of compliance with the specification. The mill test reports and certification of compliance shall clearly reference the applicable ASTM documents and present the test result data. Cement shall conform to the specified requirements, and where the cement consists of a blend of cement and pozzolan, the pozzolan shall conform to the specified requirements for pozzolan, and the blend of cement and pozzolan shall conform to ASTM C 1107/C 1107M and all other specified requirements.
1.6.3 Aggregate
Aggregate samples for repair concrete and mortars for laboratory testing shall be taken in conformance with ASTM D 75 and tested in accordance with ASTM C 33, ASTM C 136, and ASTM C 295.
1.6.4 Epoxy-Resin Grout
Epoxy-resin grout shall be tested for conformance with ASTM C 881/C 881M.
1.7 SAMPLE PANELS
Sample panels of each mixture proposed for use in the work shall be submitted for approval. No concrete of mortar shall be used in the work until the samples and the represented mixture has been approved. Materials proposed for use in producing concrete and mortar shall not be brought on to Government property until the samples and mixtures have been approved.
SECTION 03 01 30 Page 9
Samples for each side of the structure shall be evaluated both close up and at a distance under both wet and dry conditions. Each patch location and each side of the structure may require a separate or different mixture.
1.8 SPECIFIC REQUIREMENTS
1.8.1 Compressive Strength
Each class or mixture of concrete and mortar proposed for use in the work shall have a 28-day compressive strength matching the compressive strength of the adjacent existing concrete in the structure as determined by ASTM C 39/C 39M for concrete and ASTM C 109/C 109M for mortar. The compressive strength of the existing concrete shall be determined from testing of samples for each portion of the work in accordance with ASTM C 42/C 42M.
Test specimens of existing concrete shall be taken from a sound and intact representative portion of the structure, at locations indicated.
1.8.2 Air Entrainment
Each class or mixture of concrete and mortar proposed for use in the work shall have a total air content matching the total air content of the adjacent concrete. Air content of the proposed mixture shall be determined in accordance with ASTM C 231. When air-entrained concrete is required for resistance to freezing and thawing, the concrete shall contain an air-entraining admixture conforming to ASTM C 260 and having an air content as indicated in ACI 301, (Table 3.4.1).
1.8.3 Admixtures
Concrete may contain admixtures, such as pigments, water reducers, high-range water reducers, or set retarders to provide special properties to the concrete. Use of admixtures shall be subject to approval.
1.8.4 Cementitious Content
Each class or mixture of concrete and mortar proposed for use in the work shall have a cement content matching the cement content of the adjacent existing concrete in order to provide uniform strength, weathering characteristics, and appearance of repaired surfaces in relation to existing surfaces.
1.8.5 Slump
Slump shall be determined in accordance with ASTM C 143/C 143M, and shall be within the following limits:
Structural Element Slump in Inches* Minimum Maximum
Walls, columns, and beams 2 4
Foundation walls, substructure walls, 1 3 footings, pavement, and slabs
Any structural concrete approved None 6 for placement by pumping
SECTION 03 01 30 Page 10
*These slump requirements do not apply when admixtures conforming to ASTM C 1017/C 1017M are approved to produce flowing concrete.
1.8.6 Technical Service for Specialized Concrete
The service of a technical representative shall be obtained to oversee proportioning, batching, mixing, placing, consolidating, and finishing of concrete and mortar, until field controls indicate specialized concrete of specified quality is furnished.
1.9 PROPORTIONS OF MIXTURE
Trial batches shall contain materials proposed to be used in the project.
Trial mixtures having proportions, consistencies and air content suitable for the work shall be made based on methodology described in ACI 211.1, using at least three different water/cement (w/c) ratios. Trial mixtures shall be proportioned to produce concrete matching the qualities specified.
In the case where ground granulated iron blast-furnace slag conforming to ASTM C 989 is used, the mass of the slag will be substituted in the equations for the term P which is used to denote the mass of pozzolan. Trial mixtures shall be designed for maximum permitted slump and air content. The concrete and mortar patching mixtures shall be designed using the lowest practical w/c ratio. The temperature, slump, and air content of the concrete and mortar mixtures in each trial batch shall be reported. For each w/c ratio at least three test specimens for each test age shall be made and cured in accordance with ASTM C 192/C 192M and ASTM C 109/C 109M. They shall be tested at 7 and 28 days in accordance with ASTM C 39/C 39M for concrete and ASTM C 109/C 109M for mortar. From these test results a curve shall be plotted showing the relationship between w/c ratio and strength. For each strength of concrete, the maximum allowable w/c ratio shall be that shown by these curves to produce an average strength as specified in paragraph Average Strength. Materials, physical and chemical properties, and composition of concrete and mortar patch mixtures shall match the existing concrete to be repaired, except that patching mixtures shall have the lowest total chlorides content practical and shall conform to ACI recommendation for maximum permitted total chloride content.
1.9.1 Average Strength
In meeting the strength requirements specified, the selected mixture shall produce an average compressive strength exceeding the specified strength by the amount indicated below. Where a concrete production facility has test records, a standard deviation shall be established. Test records from which a standard deviation is calculated shall represent materials, quality control procedures, and conditions similar to those expected; shall represent concrete produced to meet a specified strength or strengths within500 psi of that specified for proposed work; and shall consist of at least 30 consecutive tests. A strength test shall be the average of the strengths of two specimens made from the same sample of concrete and tested at 28 days or at other test age designated for determination of the specified strength.
1.9.2 Test Records Exceeding 29
Required average compressive strength used as the basis for selection of concrete proportions shall be the larger of the specified strength plus the
SECTION 03 01 30 Page 11 standard deviation multiplied by 1.34 or the specified strength plus the standard deviation multiplied by 2.33 minus 500 psi.
1.9.3 Test Records Less Than 29
Where a concrete production facility does not have test records meeting the above requirements but does have a record based on 15 to 29 consecutive tests, a standard deviation may be established as the product of the calculated standard deviation and a modification factor from the following Table.
No. of tests (1) Modification factor for standard deviation less than 15 See Note 15 1.16 20 1.08 25 1.03 30 or more 1.00
(1) Interpolate for intermediate numbers of tests.
Note: When a concrete production facility does not have field strength test records for calculation of standard deviation or the number of tests is less than 15, the required average strength shall be specified strength plus500 psi.
1.10 STORAGE OF MATERIALS
Cement and pozzolan shall be stored in weather tight buildings, bins, or silos which will exclude moisture and contaminants. Cement shall be furnished in suitable bags used for packaging cements. Labeling of packages shall clearly define contents, manufacturer, batch identification, etc.
Aggregate stockpiles shall be arranged and used in a manner to avoid excessive segregation and to prevent contamination with other materials or with other sizes of aggregates. Reinforcing bars and accessories shall be stored in such a manner as to avoid contamination and deterioration.
Admixtures which have been in storage at the project site for longer than six months or which have been subjected to freezing shall not be used unless retested and proven to meet the specified requirements. Epoxy shall be stored in accordance with the manufacturer's recommendations.
1.11 WEATHER LIMITATIONS
Concrete, mortar, and epoxy adhesives shall not be placed when weather conditions detrimentally affect the quality of the finished product. No concrete or mortar shall be placed when the air temperature is below 40 degrees F in the shade. When air temperature is likely to exceed 90 degrees F, concrete and mortar shall have a temperature not exceeding 90 degrees F when deposited, and the surface of the placed concrete shall be kept damp with a water fog until the approved curing medium is applied.
Materials proposed for use in the work shall not be produced and placed during periods of rain or other precipitation. Material placements shall be stopped and all in-place material shall be protected from exposure during periods of rain or other precipitation.
SECTION 03 01 30 Page 12
PART 2 PRODUCTS
2.1 MATERIALS
Materials, physical and chemical properties, and composition of new concrete shall match that of existing concrete to be repaired, unless samples and testing determine that existing mixtures and materials are faulty or non-performing.
2.1.1 Admixtures
Air entraining admixtures shall conform to ASTM C 260, water-reducing or -retarding admixtures shall conform to ASTM C 494/C 494M, and pigments for integrally colored concrete shall conform to ASTM C 979 and ASTM C 1017/C 1017M. Admixtures shall not contain added chlorides.
2.1.2 Aggregates
Aggregates shall match existing aggregates as determined by samples and testing and shall otherwise conform to ASTM C 33.
2.1.3 Bonding Agents
Bonding agents for use in bonding concrete and mortar patching materials to concrete and steel are specifically prohibited for use in the work.
2.1.4 Cementitious Materials
Cementitious materials shall each be of one type and from one source when used in concrete which will have surfaces exposed in the finished structure.
Cementitious materials shall conform to one of the following:
2.1.4.1 Cement
Cement composition shall match that of cement used in existing concrete to be repaired as determined by samples and testing and shall conform to the basic requirements of ASTM C 150, Type I. Cement shall have non-shrink (shrinkage compensating) properties and shall conform to ASTM C 1107/C 1107M, Class B or C, expansive cement type.
2.1.4.2 Pozzolan
Pozzolan shall conform to ASTM C 618, Class F, including limit on available alkalis, "Table 2 - Supplementary Optional Chemical Requirements," and uniformity requirements, "Table 4 - Supplementary Optional Physical Requirements."
2.1.5 Epoxy Anchor Adhesives
An epoxy-resin grout shall be used to bond steel anchors to concrete, and shall be a 100 percent solids, moisture insensitive, low creep, structural adhesive. The epoxy shall conform to ASTM C 881/C 881M, type IV; grade and class selected to conform to the manufacturer's recommendations for the application. The epoxy adhesive shall be conditioned, proportioned, mixed, and applied in accordance with the manufacturer's recommendations, except as otherwise specified herein or indicated on the drawings.
SECTION 03 01 30 Page 13
2.1.6 Reinforcing Steel
Reinforcing steel shall conform to ASTM A 615/A 615M, or ASTM A 706/A 706M sizes as indicated, unless otherwise directed.
2.1.7 Tie Wire
Tie wire shall be soft Monel Metal or 18-8 stainless steel.
2.1.8 Metal attachments
Anchors for spall repairs shall be threaded stainless steel, size as indicated. Other plates, angles, anchors, and embedments shall conform to ASTM A 36/A 36M, and shall be prime painted with inorganic zinc primer.
2.1.9 Formwork
Formwork for special effects shall be as indicated or directed, and shall be subject to specific approval.
2.1.10 Form-Release Agents
Form-release agents shall be the manufacturer's standard, nonstaining, nonpetroleum based, compatible with surface finish and subsequent surface treatments. Form-release agents shall meet the minimum biobased content requirement established by the USDA's BioPreferred program (2002 Farm Bill) unless the designer, contractor, or Task or Delivery Order determines that no biobased product can be obtained within the cost, performance, or availability requirements of the contract. If such determination of non-use is made, the contractor or subcontractor shall complete and submit the Joint Base Lewis-McChord Construction Green Procurement Exception Form. Using this form, the contractor shall specify the reason for exception (unreasonable price, inadequate performance, non-availability) and provide all associated information (including copies of all supporting evidence). This form is available from the contracting official or the Joint Base Lewis-McChord Green Procurement Program Coordinator (Building 1210, (253) 966-6466, LEWISPWGreenProcurement@conus.army.mil). The contractor shall submit the completed form via e-mail (with copies of supporting documents included) to the Contracting Officer's Representative. The contractor shall include the following address in the carbon copy ("cc") line of the e-mail:
LEWISPWGreenProcurement@conus.army.mil. The contractor shall keep attached file sizes to a minimum to avoid transmission errors associated with Joint Base Lewis-McChord security. If use of e-mail is not possible, the contractor shall coordinate the submission of these documents with the Contracting Officer's Representative and ask that they forward copies to the Joint Base Lewis-McChord Green Procurement Coordinator (Bldg 1210, 966- 6466). More information can be found at http://www.biopreferred.gov/ProposedAndFinalRegulations.aspx.
2.1.11 Cleaning Solution
The cleaning solution shall consist of a 1:1 to 1:1.5 (water: liquid chlorine bleach) mixture of clean potable water and liquid chlorine bleach.
Rinse water shall be clean potable water.
2.1.12 Water
SECTION 03 01 30 Page 14
Water used in cleaning concrete surfaces, used in producing concrete and mortars, and used for curing concrete shall be potable.
2.1.13 Curing Materials
2.1.13.1 Burlap
AASHTO M 182.
2.1.13.2 Impervious Sheets
ASTM C 171, type optional, except that polyethylene film, if used, shall be white opaque.
2.1.13.3 Membrane-Forming Compounds
COE CRD-C 300, non-pigmented, containing a fugitive dye.
2.1.14 Joint Sealing
Joint sealing shall be as specified in Section 07 92 00 JOINT SEALANTS.
2.1.15 Epoxy-Resin Grout
Epoxy-resin grout shall be a two-component material, 100 percent solids by weight, formulated to meet the requirements of ASTM C 881/C 881M, Type I or II. Type I material shall be used when materials or atmospheric temperatures are 70 degrees F or above. Type II material shall be used when materials or atmospheric temperatures are below 70 degrees F. Epoxy-resin grout shall have the ability to structurally rebond cracks, delaminations, and hollow plane conditions in concrete; shall be insensitive to the presence of water;
and shall have the capability to penetrate cracks down to 5 mils in width.
Materials shall have been used in similar conditions for a period of at least five years.
2.1.16 Epoxy Injection Ports
Injection ports for epoxy-resin grout shall be designed for the intended use as detailed in this section and shall be made according to the recommendation of the epoxy manufacturer.
PART 3 EXECUTION
3.1 EVALUATION AND ANALYSIS
Evaluation and analysis shall conform to the requirements specified herein, and the requirements specified in Section 01 45 01 USACE QUALITY CONTROL.
Any concrete mix used for repairs or modifications to structures within the Joint Base Lewis-McChord Historic District which is exposed to view shall be tinted so as to approximate the color of the existing concrete adjacent.
This guidance also applies to concrete used for miscellaneous concrete paving and sidewalks.
3.1.1 Existing Concrete
SECTION 03 01 30 Page 15
Concrete renovation shall be undertaken only after a complete evaluation and analysis of the areas to be repaired is completed. This shall include sampling and testing of the existing concrete to determine its composition and qualities. A condition survey of the area to be repaired shall conform to ACI 201.1R and ACI 364.1R. Strength evaluation shall be per ACI 437R.
Cracks shall be evaluated per ACI 224.1R. Examination and sampling procedures shall conform to ASTM C 823/C 823M.
3.1.2 Evaluation and Acceptance of New Concrete
3.1.2.1 Frequency of Testing
Samples for strength, slump, air content, and shrinkage tests of each concrete mixture placed each day shall be taken not less than once a day, and at least once for each 10 cubic feet of concrete; nor less than once for each 500 square feet of surface area for slabs or walls. Samples for strength, slump, air content, and shrinkage tests of each mortar mixture placed each day shall be taken not less than once a day, and at least for each 9 cubic feet of mortar. If this sampling frequency results in less than 3 strength tests for a given class of concrete or individual mixture design, tests shall be made from at least 3 randomly selected trucks (or batches) or from each truck (or batch) if fewer than 3 truck loads (or batches) are used. Field cured specimens for determining form-removal time or when a structure may be put in service shall be made in numbers directed to check the adequacy of curing and protection of concrete in the structure. The specimens shall be removed from the molds at the age of 24 hours and shall be cured and protected, insofar as practicable, in the same manner as that given to the portion of the structure the samples represent.
3.1.2.2 Testing Procedures
Strength test specimens for acceptance tests shall be molded and cured in accordance with ASTM C 31/C 31M. Strength test specimens and testing for mortar shall conform to ASTM C 109/C 109M. Cylinders shall be tested in accordance with ASTM C 39/C 39M and beams shall be tested in accordance with ASTM C 78. A strength test shall be the average of the strengths of two specimens made from the same sample of concrete and tested at 28 days or at another specified test age. Tests for total air content and slump shall be made on fresh samples of the concrete and mortar. Tests shall be performed on site, on samples taken at the location of placement. Slump shall be determined in accordance with ASTM C 143/C 143M. Air content shall be determined in accordance with ASTM C 231. Testing for shrinkage shall be determined in accordance with ASTM C 1107/C 1107M.
3.1.2.3 Evaluation of Results
Concrete and mortar shall have a compressive strength at 28 days as determined by ASTM C 39/C 39M and ASTM C 109/C 109M respectively, which matches the present compressive strength of concrete in the structure within a tolerance of from -0 to +500 psi. Concrete and mortar strengths will be considered satisfactory if the averages of all sets of three consecutive strength test results equal or exceed the specified strength and no individual strength test result falls below the required strength. For flexural strength concrete, the strength level of the concrete will be considered satisfactory if the averages of all sets of five consecutive strength test results equal or exceed the required flexural strength, and not more than 20 percent of the strength test results fall below the
SECTION 03 01 30 Page 16 required strength by more than 50 psi. The required minimum strength shall be the strength determined from testing of samples taken from the structure.
3.1.2.4 Investigation of Low-Strength Test Results
When any strength test of standard-cured test specimen falls below the specified strength requirement by more than 500 psi, or if tests of field-cured specimens indicate deficiencies in protection and curing, steps shall be taken to ensure that load-carrying capacity of the structure is not jeopardized. Nondestructive testing in accordance with ASTM C 597, ASTM C 803/C 803M, or ASTM C 805 may be permitted by the Contracting Officer to determine the relative strengths at various locations in the structure as an aid in evaluating concrete strength in place or for selecting areas to be cored. Such tests, unless properly calibrated and correlated with other test data, shall not be used as a basis for acceptance or rejection. When strength of concrete in place is considered potentially deficient, cores shall be obtained and tested in accordance with ASTM C 42/C 42M. At least three representative cores shall be taken from each member or area of concrete in place that is considered potentially deficient. The location of cores shall be determined by the Contracting Officer to least impair the strength of the structure. If the concrete in the structure is dry under service conditions, the cores shall be air-dried (temperature 60 to 80 degrees F, relative humidity less than 60 percent) for seven days before testing and shall be tested dry. If the concrete in the structure is more than superficially wet under service conditions, the cores shall be tested after moisture conditioning in accordance with ASTM C 42/C 42M. Concrete in the area represented by the core testing will be considered adequate if the average strength of the cores is equal to or at least 85 percent of the specified strength requirement and if no single core is less than 75 percent of the specified strength requirement. If the core tests are inconclusive or impractical to obtain, or if structural analysis does not confirm the safety of the structure, load tests may be directed by the Contracting Officer in accordance with the requirements of ACI 318/318M. Concrete work evaluated by structural analysis or by results of a load test and found deficient shall be corrected in a manner satisfactory to the Contracting Officer. All investigations, testing, load tests, and correction of deficiencies shall be performed, and approved by the Contracting Officer, at the expense of the contractor.
3.2 PREPARATION OF CONCRETE SURFACES
3.2.1 Initial Surface Cleaning
The cleaning materials, equipment, and methods shall not result in staining, erosion, marring, or other damage to the surfaces of the structure. The materials, equipment, and methods proposed for use in cleaning shall be demonstrated in a 3 by 3 foot square test section. The location of the test section, and the completed test section shall be subject to approval. The cleaning process shall be adjusted as required and the test section rerun until an acceptable process is obtained. Following an initial inspection and evaluation of the structure and surfaces, the structure shall be given an initial surface cleaning. The initial surface cleaning shall be completed prior to start of excavation, and sampling and testing for mixtures. The initial cleaning shall provide for the complete cleaning of all exterior concrete surfaces of the structures. The initial cleaning shall thoroughly clean the concrete surface to remove all traces of moss, dirt, and other contaminants. The cleaning shall provide a clean concrete surface to allow
SECTION 03 01 30 Page 17 determination of the concrete's color and shades, finish and texture, and other properties. The "initial cleaning" shall consist of initial surface washing, followed by treatment with the cleaning solution, and then followed by a final water rinse. The initial surface washing shall consist of washing the surface with clean, low-pressure water (pressure of less than 55 psi and
2.5 to 3 gpm discharge) and manual surface scrubbing using handheld natural or plastic bristle brushes, followed by a clean water rinse. Following completion of the initial surface washing of the entire structure (or side of structure) the concrete shall be dried prior to application of the cleaning solution. The concrete surfaces of the structure shall be coated with the cleaning solution at an application rate of 1 gallon of solution per 10 to 30 square feet of treated surface using low-pressure spraying equipment. The application rate of the solution shall be adjusted as directed to ensure that the entire surface has been thoroughly wetted with the solution. A manual surface scrubbing with handheld natural or plastic bristle brushes shall be used on heavily soiled areas. Following treatment with the cleaning solution the treated surfaces shall be rinsed with clean, low-pressure water. Water and all liquid materials used in the work shall be contained at the building perimeter and collected and disposed of in an approved manner.
3.2.2 Areas to be Removed
Unsound, weak, or damaged concrete shall be removed. Loose particles, laitance, spalling, cracked, or debonded concrete and foreign materials shall be removed with hand tools unless otherwise noted. Surfaces of the structure, and surfaces adjacent to the excavation shall be protected from damage which may result from excavation, cleaning, and patching operations.
3.2.3 Exposed Reinforcement
Concrete shall be removed from around exposed or deteriorated reinforcing steel. Steel shall stand free of concrete at least 1 inch minimum to provide mechanical bond with patch material.
3.2.4 Excavation in Concrete
Deteriorated areas indicated to be repaired shall be excavated to sound concrete. The use of concrete and masonry saws for outlining the excavation shall not be used. The excavation shall be accomplished by use of manual methods and low-energy, handheld equipment. The sides of the excavation shall be approximately perpendicular to the exposed surface, dovetailed back 15 degrees from perpendicular to the exposed surface at the bottom in order to key in the patch. The bottom (or back) of the excavation shall be approximately parallel with the exposed surface of the patch. The surfaces of the excavation shall be finished to remove excessive variations and roughness and shall be shaped to provide a patch with uniform dimensions.
Feathering at edges shall not be permitted. The excavation shall be accomplished to minimize the appearance of bond lines between the patch and the adjacent concrete and other abutting surfaces. Surfaces of the structure and surfaces adjacent to the excavation shall be protected from damage which may result from excavation operations.
3.2.5 Cleaning of Excavations
SECTION 03 01 30 Page 18
The surfaces of the excavation shall be cleaned by water blasting and manual scrubbing methods. Sandblasting shall not be used to clean concrete surfaces. The surfaces of excavations shall be cleaned of dust, dirt, laitance, corrosion, or other contamination. Cracks and voids shall be flushed out with clean water and allowed to dry. Concrete surfaces to be in contact with the freshly placed concrete shall be maintained in a continuously damp condition for at least 24 hours prior to concrete placement. Immediately before placement, areas to be patched shall be cleaned and rinsed, followed by blowing dry with filtered, dry, compressed air to remove excess water, and to provide a surface in a saturated, surface-dry, damp condition. Surfaces of the structure and surfaces adjacent to the excavation shall be protected from damage which may result from cleaning operations.
3.2.6 Previously Repaired Cracks
Old caulking or grout shall be removed from previously repaired cracks where it is failing. Loose particles shall be removed from cracks. Cracks shall be cleaned, rinsed with water followed by blowing with filtered, dry, compressed air.
3.3 REINFORCING STEEL
3.3.1 Cleaning
Exposed reinforcing steel shall be mechanically cleaned to bare metal.
Exposed steel in areas to be patched shall be painted with two coats of zinc-rich primer paint.
3.3.2 Repairing
The Contracting Officer shall be notified of any steel members that have significant loss in cross-sectional area due to corrosion, cutting, or other damage. Damaged portions shall be mechanically cut away. Reinforcing steel to match existing shall be installed where existing reinforcing is badly corroded or damaged. Lap splices shall be as required by code. If necessary, bars shall be fastened with tie wires.
3.4 FORMWORK ERECTION
Formwork shall be erected in accordance with the detail drawings to ensure that the finished concrete members conform accurately to the indicated dimensions, lines, elevations, and finishes. Deflection shall not exceed 1/360th of each component span or distance between adjacent supports.
Deflections and tolerance shall not be cumulative. Form liners shall be installed as necessary to provide the required finish. Forms shall be coated with form release agents before reinforcement is placed.
3.5 CONCRETE REPAIR
3.5.1 General Requisites
Repairs shall be accomplished in accordance with ACI C-10, ACI C-20, ACI 301, and ACI 304R. Cracks shall be repaired, if required, per ACI 224.1R.
Detailing shall be per ACI SP-66. Repaired surfaces shall match adjacent existing surfaces in all respects. Formwork as necessary to reconstruct concrete to match adjacent surfaces shall be provided. Voids shall be filled
SECTION 03 01 30 Page 19 flush with adjacent surfaces. Products shall be used in accordance with the manufacturer's instructions.
3.5.2 Spalls
Spalls less than 1-inch deep, where indicated to be repaired, shall be dry packed with an approved patching mortar. Spalls greater than 1-inch deep shall be excavated and patched with concrete.
3.5.3 Patch Anchors
Surface areas to be patched which do not have reinforcement or other metal embedments which will be placed in the patching concrete and mortar shall be provided with patch anchors. Patch anchors shall be provided to ensure that the patch is tied to the existing concrete structure. Patch anchors shall be provided within the excavation at a frequency of at least one patch anchor per square foot of patch plan surface area; specific locations for patch anchors shall be as indicated. Small handheld, low-speed rotary masonry drills shall be used to produce holes in the existing concrete, within the limits of the excavations for the patch anchor installation.
3.5.3.1 Holes
Holes shall be drilled into the existing concrete substrate material of the excavation using rotary (non-hammer) drills. Holes shall have a diameter 1/8 inch larger than the anchor diameter. The holes shall be drilled to a depth of 4 inches, except as otherwise indicated or directed. Drill holes shall be produced to ensure that the holes do not penetrate completely through the concrete, and will provide at least 1 inch of cover around the drill hole.
Holes shall be cleaned by water blasting to remove drill dust and other debris and then blown dry with filtered, dry, compressed air. Drill holes shall be conditioned in accordance with the epoxy adhesive manufacturer's recommendations.
3.5.3.2 Anchor Installation
Anchors shall be cleaned to remove all contaminants which may hinder epoxy bond. Epoxy adhesive shall be pressure injected into the back of the drilled holes. The epoxy shall fill the holes so that when the anchors are inserted, the epoxy completely fills the holes and excess epoxy is not exuded from the holes. Anchors shall be inserted immediately into the holes. The anchors shall be set back from the exterior face at least 1 inch. Anchors shall be installed without breaking or chipping the exposed concrete surface.
3.5.3.3 Cleanup
Excess epoxy and spills shall be removed from the surface of the excavation.
The surface of the excavation shall be left in a clean and uncontaminated condition. Spills on adjacent surfaces shall also be removed and surfaces repaired as required.
3.5.4 Mixing Epoxy-Resin Grout Components
Epoxy-resin grout components shall be mixed in the proportions recommended by the manufacturer. The components shall be conditioned from 70 to 85 degrees F for 48 hours prior to mixing. The two epoxy components shall be
SECTION 03 01 30 Page 20 mixed with a power-driven, explosion-proof stirring device in a metal or polyethylene container having a hemispherical bottom. The polysulfide curing agent component shall be added gradually to the epoxy-resin component with constant stirring until a uniform mixture is obtained. The rate of stirring shall be such that the entrained air is at a minimum.
3.5.4.1…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .